CN203640248U - Fast construction device for external wall of light well - Google Patents
Fast construction device for external wall of light well Download PDFInfo
- Publication number
- CN203640248U CN203640248U CN201320727254.4U CN201320727254U CN203640248U CN 203640248 U CN203640248 U CN 203640248U CN 201320727254 U CN201320727254 U CN 201320727254U CN 203640248 U CN203640248 U CN 203640248U
- Authority
- CN
- China
- Prior art keywords
- construction
- operation platform
- exterior wall
- light shaft
- framework
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model discloses a fast construction device for the external wall of a light well. A lifting device (2) is arranged on a bracket (1); a construction framework (3) is lifted by the lifting device (2), and comprises at least two layers of construction platforms (4); at least two support beams (12) are placed on each construction platform (4). The fast construction device has the advantages that the construction platforms are not required to be disassembled and assembled repeatedly any more, and the construction framework with the construction platforms can be moved fast, so as to greatly improve the construction efficiency, greatly reduce the labor intensity of workers, improve the safety factor, and avoid the condition that a plurality of holes are formed in the external wall of the light well; the conception is ingenious; the structure is simple; the implementation is easy; large-scale popularization and application in external wall construction of the light well can be realized easily.
Description
Technical field
The utility model belongs to architectural lighting well construction apparatus field, relates in particular to a kind of light shaft exterior wall rapid construction device.
Background technology
As everyone knows, building is paid before owner the constructions such as the exterior wall of light shaft all needs to plaster.In the past, general first punching on the light shaft exterior wall of a floor, the two-port inner support of steel pipe, in hole, is then built an operation platform on steel pipe, and construction worker just stands on operation platform and constructs, complete after the light shaft external wall construction of a floor, need first this operation platform to be removed, move the material of pulling down to building interior again, then transport to by construction elevator the floor that the next one will be constructed, finally again take again one and build operation platform, so that construction worker just stands on operation platform and constructs, operation and so forth, until complete the light shaft external wall construction of entire building, this method complicated operation, efficiency of construction is very low, can not realize the rapid construction of light shaft exterior wall, and labor strength is high, and then cause safety factor lower, easily there is security incident, also can on light shaft exterior wall, leave in addition many holes, can increase so again follow-up working procedure.Afterwards, also someone expects building at multiple floors the operation platform of light shaft exterior wall simultaneously, so also can only improve to a certain extent efficiency of construction, and the defect that labor strength is high, safety factor is lower, leave many holes on light shaft exterior wall still can not overcome, be badly in need of solving the problems of the technologies described above for this reason.
Utility model content
The light shaft exterior wall rapid construction device that provides a kind of efficiency of construction high is provided technical problem to be solved in the utility model.
The technical solution of the utility model is as follows: a kind of light shaft exterior wall rapid construction device, it is characterized in that: on bracket (1), be provided with lifting gear (2), at the upper lifting construction framework (3) of lifting gear (2), this construction framework has at least two-layer operation platform (4), and is placed with at least two brace summers (12) on operation platform (4).
Before construction, this device is placed between the two sides exterior wall of light shaft, and bracket (1) is fixed on the exterior wall of light shaft.When construction, several workmans stand on each layer of operation platform simultaneously and construct, complete after the light shaft external wall construction of several floors, first brace summer (12) is fixed between the two sides exterior wall of light shaft, secondly the framework (3) of constructing is supported on brace summer (12), then the height of several floors moves up bracket (1), finally drive construction framework (3) to move up by lifting gear (2), and allow several workmans stand on each layer of operation platform to construct simultaneously, operation and so forth from lower to upper, until complete the light shaft external wall construction of whole building, need not repeatedly tear open as before again, build operation platform, efficiency of construction improves greatly.Adopt above structure, the utility model need not need repeatedly to tear open, build operation platform more as before, and can allow and there is the construction framework fast moving of at least two-layer operation platform, thereby significantly improve efficiency of construction, greatly reduce workman's labour intensity, and improve thus safety factor, and can on the exterior wall of light shaft, not leave a lot of holes, and be skillfully constructed, simple in structure, easy to implement, be suitable for large-scale promotion in architectural lighting well external wall construction and use.
As optimization, described bracket (1) is crossbeam, and the lifting gear (2) on this bracket is electronic or bottle gouard moved by hands.
In the present embodiment, it is upper that described construction framework (3) is lifted on two lifting gears (2), and this lifting gear is located on corresponding bracket (1).
As preferably, the operation platform (4) of described construction framework (3) is made up of steel pipe (5), scaffold (6) and springboard (7), and wherein steel pipe (5) is latticed layout, and connects through scaffold (6), and described springboard (7) is laid on steel pipe (5); Between described adjacent two layers operation platform (4), be connected by the vertical joint steel pipe (8) arranging.
In steel pipe (5) two-port of operation platform every layer described (4), be all equipped with screw rod (9), on this screw rod, cover has locking nut (10), is vertically provided with gripper shoe (11) in the outer end of screw rod (9).When construction, rotary screw (9) is supported on the exterior wall of light shaft gripper shoe (11), and the locking nut (10) on screw rod (9) is against the outer end of steel pipe (5), so just can effectively prevent that operation platform (4) from producing rocks, and guarantees that constructor stands in the upper construction of operation platform (4) safely.
As optimization, described construction framework (3) has 4~6 layers of operation platform (4), in practice, can adjust accordingly as required, is not limited to 4~6 layers.
Beneficial effect: the utility model need not need repeatedly to tear open, build operation platform more as before, and can allow and there is the construction framework fast moving of at least two-layer operation platform, thereby significantly improve efficiency of construction, greatly reduce workman's labour intensity, and improve thus safety factor, and can on the exterior wall of light shaft, not leave a lot of holes, be skillfully constructed, simple in structure, easy to implement, be suitable for large-scale promotion in architectural lighting well external wall construction and use.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is that the A of Fig. 1 is to view;
Fig. 3 is the layout schematic diagram of screw rod 9 in Fig. 1,2.
The specific embodiment
Below in conjunction with drawings and Examples, the utility model is described in further detail:
As shown in Figures 1 to 3, the utility model is mainly made up of bracket 1, lifting gear 2, construction framework 3 and operation platform 4 etc., wherein bracket 1 is provided with lifting gear 2, in the present embodiment, lifting gear 2 is electronic or bottle gouard moved by hands, and bracket 1 is crossbeam, and is made up of i iron, and bracket 1 is fixed on the light shaft exterior wall (representing with two-dot chain line in figure) of building.Described construction framework 3 is lifted on lifting gear 2, and as optimization, described construction framework 3 is lifted on two lifting gears 2, and these two lifting gears 2 are located at respectively on two corresponding brackets 1, and two brackets 1 are arranged side by side in horizontal plane.Above-mentioned two lifting gears 2 of Synchronization Control, the framework 3 that can make to construct moves up and down.
Above-mentioned construction framework 3 is quadra structure, certainly also can make as required other structures.Described construction framework 3 has at least two-layer operation platform 4, is preferably 4~6 layers, but is not limited to 4~6 layers.The operation platform 4 of described construction framework 3 is made up of steel pipe 5, scaffold 6 and springboard 7, and wherein steel pipe 5 is latticed layout, and connects through scaffold 6.Described springboard 7 is laid on steel pipe 5, and when construction, workman stands in construction on springboard 7.Between described adjacent two layers operation platform 4, be connected by the joint steel pipe 8 vertically arranging.
In addition, on operation platform 4, be also placed with at least two brace summers 12, in the time of needs movable support bracket 1, brace summer 12 be supported between the two sides exterior wall of light shaft, and construction framework 3 is supported on this brace summer 12.In this described example, above-mentioned brace summer 12 is placed on the operation platform 4 of the bottom.
Also can find out from Fig. 1~3, rock in order to prevent that this device when construction from producing, in steel pipe 5 two-port of light shaft exterior wall, be all equipped with screw rod 9 at operation platform every layer described 4, on this screw rod 9, cover has locking nut 10, be provided with gripper shoe 11 in the outer end of screw rod 9, the plate face of this gripper shoe 11 is vertical with the axial line of screw rod 9.When use, the screw rod 9 of rotating steel tube 5 two-port, makes two gripper shoes 11 on screw rod 9 be supported on the exterior wall of light shaft (representing with two-dot chain line in figure) upper, and the locking nut 10 on two screw rods 9 is against the port of screw rod 9.
Claims (6)
1. a light shaft exterior wall rapid construction device, it is characterized in that: on bracket (1), be provided with lifting gear (2), at the upper lifting construction framework (3) of lifting gear (2), this construction framework has at least two-layer operation platform (4), and is placed with at least two brace summers (12) on operation platform (4).
2. light shaft exterior wall rapid construction device according to claim 1, is characterized in that: described bracket (1) is crossbeam, and the lifting gear (2) on this bracket is electronic or bottle gouard moved by hands.
3. light shaft exterior wall rapid construction device according to claim 1, is characterized in that: it is upper that described construction framework (3) is lifted on two lifting gears (2), and this lifting gear is located at respectively on corresponding bracket (1).
4. according to the light shaft exterior wall rapid construction device described in claim 1 or 2 or 3, it is characterized in that: the operation platform (4) of described construction framework (3) is made up of steel pipe (5), scaffold (6) and springboard (7), wherein steel pipe (5) is latticed layout, and connect through scaffold (6), described springboard (7) is laid on steel pipe (5); Between described adjacent two layers operation platform (4), be connected by the vertical joint steel pipe (8) arranging.
5. light shaft exterior wall rapid construction device according to claim 4, it is characterized in that: in steel pipe (5) two-port of operation platform every layer described (4), be all equipped with screw rod (9), on this screw rod, cover has locking nut (10), is vertically provided with gripper shoe (11) in the outer end of screw rod (9).
6. light shaft exterior wall rapid construction device according to claim 4, is characterized in that: described construction framework (3) has 4~6 layers of operation platform (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320727254.4U CN203640248U (en) | 2013-11-15 | 2013-11-15 | Fast construction device for external wall of light well |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320727254.4U CN203640248U (en) | 2013-11-15 | 2013-11-15 | Fast construction device for external wall of light well |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203640248U true CN203640248U (en) | 2014-06-11 |
Family
ID=50871504
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320727254.4U Expired - Fee Related CN203640248U (en) | 2013-11-15 | 2013-11-15 | Fast construction device for external wall of light well |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203640248U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104947925A (en) * | 2015-06-26 | 2015-09-30 | 南通理工学院 | Elevator shaft protecting operation platform |
CN106760466A (en) * | 2016-11-21 | 2017-05-31 | 成都建筑工程集团总公司 | Pylon multilayer lifting linkage construction method at light shaft |
CN111075183A (en) * | 2020-01-03 | 2020-04-28 | 青岛国信海天中心建设有限公司 | Construction platform for court decoration of super high-rise building and installation method |
-
2013
- 2013-11-15 CN CN201320727254.4U patent/CN203640248U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104947925A (en) * | 2015-06-26 | 2015-09-30 | 南通理工学院 | Elevator shaft protecting operation platform |
CN106760466A (en) * | 2016-11-21 | 2017-05-31 | 成都建筑工程集团总公司 | Pylon multilayer lifting linkage construction method at light shaft |
CN106760466B (en) * | 2016-11-21 | 2019-02-05 | 成都建工集团有限公司 | Pylon multilayer lifts linkage construction method at light shaft |
CN111075183A (en) * | 2020-01-03 | 2020-04-28 | 青岛国信海天中心建设有限公司 | Construction platform for court decoration of super high-rise building and installation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203765773U (en) | Automatic maintenance device of precast concrete plate | |
CN206188316U (en) | Multistage thick stick synchronous lifting gear | |
CN108033367B (en) | Synchronous lifting device and lifting method for steel column and cylinder frame alternately supported steel platform and tower crane | |
CN107915158A (en) | A kind of inner climbing type tower crane is from climbing adhering supporter and its construction method | |
CN107190964A (en) | A kind of construction method of prefabricated hoistway operation platform | |
CN203640248U (en) | Fast construction device for external wall of light well | |
TWM527023U (en) | Lifting and descending type steel frame construction platform of bridge pillar work usage | |
CN103485574B (en) | A kind of granulation tower tower top structure of reinforced concrete method | |
CN106567542A (en) | Super high-rise double tower building steel structure corridor assembling method | |
CN203834926U (en) | Formwork erecting structure for bare concrete basement exterior wall | |
CN102888894B (en) | Structure and construction method for steel frame building with inner cylinder, outer frame and shape like Chinese character 'hui' | |
CN206753085U (en) | A kind of sliding platform for being used to install high-altitude wire frame steel construction | |
CN202450775U (en) | Hydraulic jacking and self-climbing template device with intelligent independent unit structure | |
CN104060846A (en) | Construction device and construction method for steel beam connection platform | |
CN104060813A (en) | Construction device and method for large-span steel girder frame connection platform | |
CN105625732A (en) | Supporting-free construction method of ultrahigh overhung steel-structure truss | |
CN204754150U (en) | Dish -type node formula scaffold | |
CN203130100U (en) | Tunnel eave wall construction trolley | |
CN202787956U (en) | Multifunctional outer wall large panel | |
CN204645605U (en) | A kind of circular steel reinforced concrete chimney wall reverse mould construction platform | |
CN203924666U (en) | The construction equipment of large-span steel girder framework interconnection system platform | |
CN203430045U (en) | Assembly construction gate tower | |
CN104675093B (en) | Dish-type node type scaffold | |
CN216380480U (en) | Integral movable operation frame | |
CN205205860U (en) | Automatic all hoist device of module system that fall of reverse construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140611 Termination date: 20161115 |