CN203640248U - Fast construction device for external wall of light well - Google Patents

Fast construction device for external wall of light well Download PDF

Info

Publication number
CN203640248U
CN203640248U CN201320727254.4U CN201320727254U CN203640248U CN 203640248 U CN203640248 U CN 203640248U CN 201320727254 U CN201320727254 U CN 201320727254U CN 203640248 U CN203640248 U CN 203640248U
Authority
CN
China
Prior art keywords
construction
operation platform
exterior wall
light shaft
framework
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320727254.4U
Other languages
Chinese (zh)
Inventor
金熙伟
刘华
童俊平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING HUALING RUANHUI TECHNOLOGY Co Ltd
Original Assignee
CHONGQING HUALING RUANHUI TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING HUALING RUANHUI TECHNOLOGY Co Ltd filed Critical CHONGQING HUALING RUANHUI TECHNOLOGY Co Ltd
Priority to CN201320727254.4U priority Critical patent/CN203640248U/en
Application granted granted Critical
Publication of CN203640248U publication Critical patent/CN203640248U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a fast construction device for the external wall of a light well. A lifting device (2) is arranged on a bracket (1); a construction framework (3) is lifted by the lifting device (2), and comprises at least two layers of construction platforms (4); at least two support beams (12) are placed on each construction platform (4). The fast construction device has the advantages that the construction platforms are not required to be disassembled and assembled repeatedly any more, and the construction framework with the construction platforms can be moved fast, so as to greatly improve the construction efficiency, greatly reduce the labor intensity of workers, improve the safety factor, and avoid the condition that a plurality of holes are formed in the external wall of the light well; the conception is ingenious; the structure is simple; the implementation is easy; large-scale popularization and application in external wall construction of the light well can be realized easily.

Description

Light shaft exterior wall rapid construction device
Technical field
The utility model belongs to architectural lighting well construction apparatus field, relates in particular to a kind of light shaft exterior wall rapid construction device.
Background technology
As everyone knows, building is paid before owner the constructions such as the exterior wall of light shaft all needs to plaster.In the past, general first punching on the light shaft exterior wall of a floor, the two-port inner support of steel pipe, in hole, is then built an operation platform on steel pipe, and construction worker just stands on operation platform and constructs, complete after the light shaft external wall construction of a floor, need first this operation platform to be removed, move the material of pulling down to building interior again, then transport to by construction elevator the floor that the next one will be constructed, finally again take again one and build operation platform, so that construction worker just stands on operation platform and constructs, operation and so forth, until complete the light shaft external wall construction of entire building, this method complicated operation, efficiency of construction is very low, can not realize the rapid construction of light shaft exterior wall, and labor strength is high, and then cause safety factor lower, easily there is security incident, also can on light shaft exterior wall, leave in addition many holes, can increase so again follow-up working procedure.Afterwards, also someone expects building at multiple floors the operation platform of light shaft exterior wall simultaneously, so also can only improve to a certain extent efficiency of construction, and the defect that labor strength is high, safety factor is lower, leave many holes on light shaft exterior wall still can not overcome, be badly in need of solving the problems of the technologies described above for this reason.
Utility model content
The light shaft exterior wall rapid construction device that provides a kind of efficiency of construction high is provided technical problem to be solved in the utility model.
The technical solution of the utility model is as follows: a kind of light shaft exterior wall rapid construction device, it is characterized in that: on bracket (1), be provided with lifting gear (2), at the upper lifting construction framework (3) of lifting gear (2), this construction framework has at least two-layer operation platform (4), and is placed with at least two brace summers (12) on operation platform (4).
Before construction, this device is placed between the two sides exterior wall of light shaft, and bracket (1) is fixed on the exterior wall of light shaft.When construction, several workmans stand on each layer of operation platform simultaneously and construct, complete after the light shaft external wall construction of several floors, first brace summer (12) is fixed between the two sides exterior wall of light shaft, secondly the framework (3) of constructing is supported on brace summer (12), then the height of several floors moves up bracket (1), finally drive construction framework (3) to move up by lifting gear (2), and allow several workmans stand on each layer of operation platform to construct simultaneously, operation and so forth from lower to upper, until complete the light shaft external wall construction of whole building, need not repeatedly tear open as before again, build operation platform, efficiency of construction improves greatly.Adopt above structure, the utility model need not need repeatedly to tear open, build operation platform more as before, and can allow and there is the construction framework fast moving of at least two-layer operation platform, thereby significantly improve efficiency of construction, greatly reduce workman's labour intensity, and improve thus safety factor, and can on the exterior wall of light shaft, not leave a lot of holes, and be skillfully constructed, simple in structure, easy to implement, be suitable for large-scale promotion in architectural lighting well external wall construction and use.
As optimization, described bracket (1) is crossbeam, and the lifting gear (2) on this bracket is electronic or bottle gouard moved by hands.
In the present embodiment, it is upper that described construction framework (3) is lifted on two lifting gears (2), and this lifting gear is located on corresponding bracket (1).
As preferably, the operation platform (4) of described construction framework (3) is made up of steel pipe (5), scaffold (6) and springboard (7), and wherein steel pipe (5) is latticed layout, and connects through scaffold (6), and described springboard (7) is laid on steel pipe (5); Between described adjacent two layers operation platform (4), be connected by the vertical joint steel pipe (8) arranging.
In steel pipe (5) two-port of operation platform every layer described (4), be all equipped with screw rod (9), on this screw rod, cover has locking nut (10), is vertically provided with gripper shoe (11) in the outer end of screw rod (9).When construction, rotary screw (9) is supported on the exterior wall of light shaft gripper shoe (11), and the locking nut (10) on screw rod (9) is against the outer end of steel pipe (5), so just can effectively prevent that operation platform (4) from producing rocks, and guarantees that constructor stands in the upper construction of operation platform (4) safely.
As optimization, described construction framework (3) has 4~6 layers of operation platform (4), in practice, can adjust accordingly as required, is not limited to 4~6 layers.
Beneficial effect: the utility model need not need repeatedly to tear open, build operation platform more as before, and can allow and there is the construction framework fast moving of at least two-layer operation platform, thereby significantly improve efficiency of construction, greatly reduce workman's labour intensity, and improve thus safety factor, and can on the exterior wall of light shaft, not leave a lot of holes, be skillfully constructed, simple in structure, easy to implement, be suitable for large-scale promotion in architectural lighting well external wall construction and use.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is that the A of Fig. 1 is to view;
Fig. 3 is the layout schematic diagram of screw rod 9 in Fig. 1,2.
The specific embodiment
Below in conjunction with drawings and Examples, the utility model is described in further detail:
As shown in Figures 1 to 3, the utility model is mainly made up of bracket 1, lifting gear 2, construction framework 3 and operation platform 4 etc., wherein bracket 1 is provided with lifting gear 2, in the present embodiment, lifting gear 2 is electronic or bottle gouard moved by hands, and bracket 1 is crossbeam, and is made up of i iron, and bracket 1 is fixed on the light shaft exterior wall (representing with two-dot chain line in figure) of building.Described construction framework 3 is lifted on lifting gear 2, and as optimization, described construction framework 3 is lifted on two lifting gears 2, and these two lifting gears 2 are located at respectively on two corresponding brackets 1, and two brackets 1 are arranged side by side in horizontal plane.Above-mentioned two lifting gears 2 of Synchronization Control, the framework 3 that can make to construct moves up and down.
Above-mentioned construction framework 3 is quadra structure, certainly also can make as required other structures.Described construction framework 3 has at least two-layer operation platform 4, is preferably 4~6 layers, but is not limited to 4~6 layers.The operation platform 4 of described construction framework 3 is made up of steel pipe 5, scaffold 6 and springboard 7, and wherein steel pipe 5 is latticed layout, and connects through scaffold 6.Described springboard 7 is laid on steel pipe 5, and when construction, workman stands in construction on springboard 7.Between described adjacent two layers operation platform 4, be connected by the joint steel pipe 8 vertically arranging.
In addition, on operation platform 4, be also placed with at least two brace summers 12, in the time of needs movable support bracket 1, brace summer 12 be supported between the two sides exterior wall of light shaft, and construction framework 3 is supported on this brace summer 12.In this described example, above-mentioned brace summer 12 is placed on the operation platform 4 of the bottom.
Also can find out from Fig. 1~3, rock in order to prevent that this device when construction from producing, in steel pipe 5 two-port of light shaft exterior wall, be all equipped with screw rod 9 at operation platform every layer described 4, on this screw rod 9, cover has locking nut 10, be provided with gripper shoe 11 in the outer end of screw rod 9, the plate face of this gripper shoe 11 is vertical with the axial line of screw rod 9.When use, the screw rod 9 of rotating steel tube 5 two-port, makes two gripper shoes 11 on screw rod 9 be supported on the exterior wall of light shaft (representing with two-dot chain line in figure) upper, and the locking nut 10 on two screw rods 9 is against the port of screw rod 9.

Claims (6)

1. a light shaft exterior wall rapid construction device, it is characterized in that: on bracket (1), be provided with lifting gear (2), at the upper lifting construction framework (3) of lifting gear (2), this construction framework has at least two-layer operation platform (4), and is placed with at least two brace summers (12) on operation platform (4).
2. light shaft exterior wall rapid construction device according to claim 1, is characterized in that: described bracket (1) is crossbeam, and the lifting gear (2) on this bracket is electronic or bottle gouard moved by hands.
3. light shaft exterior wall rapid construction device according to claim 1, is characterized in that: it is upper that described construction framework (3) is lifted on two lifting gears (2), and this lifting gear is located at respectively on corresponding bracket (1).
4. according to the light shaft exterior wall rapid construction device described in claim 1 or 2 or 3, it is characterized in that: the operation platform (4) of described construction framework (3) is made up of steel pipe (5), scaffold (6) and springboard (7), wherein steel pipe (5) is latticed layout, and connect through scaffold (6), described springboard (7) is laid on steel pipe (5); Between described adjacent two layers operation platform (4), be connected by the vertical joint steel pipe (8) arranging.
5. light shaft exterior wall rapid construction device according to claim 4, it is characterized in that: in steel pipe (5) two-port of operation platform every layer described (4), be all equipped with screw rod (9), on this screw rod, cover has locking nut (10), is vertically provided with gripper shoe (11) in the outer end of screw rod (9).
6. light shaft exterior wall rapid construction device according to claim 4, is characterized in that: described construction framework (3) has 4~6 layers of operation platform (4).
CN201320727254.4U 2013-11-15 2013-11-15 Fast construction device for external wall of light well Expired - Fee Related CN203640248U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320727254.4U CN203640248U (en) 2013-11-15 2013-11-15 Fast construction device for external wall of light well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320727254.4U CN203640248U (en) 2013-11-15 2013-11-15 Fast construction device for external wall of light well

Publications (1)

Publication Number Publication Date
CN203640248U true CN203640248U (en) 2014-06-11

Family

ID=50871504

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320727254.4U Expired - Fee Related CN203640248U (en) 2013-11-15 2013-11-15 Fast construction device for external wall of light well

Country Status (1)

Country Link
CN (1) CN203640248U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104947925A (en) * 2015-06-26 2015-09-30 南通理工学院 Elevator shaft protecting operation platform
CN106760466A (en) * 2016-11-21 2017-05-31 成都建筑工程集团总公司 Pylon multilayer lifting linkage construction method at light shaft
CN111075183A (en) * 2020-01-03 2020-04-28 青岛国信海天中心建设有限公司 Construction platform for court decoration of super high-rise building and installation method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104947925A (en) * 2015-06-26 2015-09-30 南通理工学院 Elevator shaft protecting operation platform
CN106760466A (en) * 2016-11-21 2017-05-31 成都建筑工程集团总公司 Pylon multilayer lifting linkage construction method at light shaft
CN106760466B (en) * 2016-11-21 2019-02-05 成都建工集团有限公司 Pylon multilayer lifts linkage construction method at light shaft
CN111075183A (en) * 2020-01-03 2020-04-28 青岛国信海天中心建设有限公司 Construction platform for court decoration of super high-rise building and installation method

Similar Documents

Publication Publication Date Title
CN203765773U (en) Automatic maintenance device of precast concrete plate
CN206188316U (en) Multistage thick stick synchronous lifting gear
CN108033367B (en) Synchronous lifting device and lifting method for steel column and cylinder frame alternately supported steel platform and tower crane
CN107915158A (en) A kind of inner climbing type tower crane is from climbing adhering supporter and its construction method
CN107190964A (en) A kind of construction method of prefabricated hoistway operation platform
CN203640248U (en) Fast construction device for external wall of light well
TWM527023U (en) Lifting and descending type steel frame construction platform of bridge pillar work usage
CN103485574B (en) A kind of granulation tower tower top structure of reinforced concrete method
CN106567542A (en) Super high-rise double tower building steel structure corridor assembling method
CN203834926U (en) Formwork erecting structure for bare concrete basement exterior wall
CN102888894B (en) Structure and construction method for steel frame building with inner cylinder, outer frame and shape like Chinese character 'hui'
CN206753085U (en) A kind of sliding platform for being used to install high-altitude wire frame steel construction
CN202450775U (en) Hydraulic jacking and self-climbing template device with intelligent independent unit structure
CN104060846A (en) Construction device and construction method for steel beam connection platform
CN104060813A (en) Construction device and method for large-span steel girder frame connection platform
CN105625732A (en) Supporting-free construction method of ultrahigh overhung steel-structure truss
CN204754150U (en) Dish -type node formula scaffold
CN203130100U (en) Tunnel eave wall construction trolley
CN202787956U (en) Multifunctional outer wall large panel
CN204645605U (en) A kind of circular steel reinforced concrete chimney wall reverse mould construction platform
CN203924666U (en) The construction equipment of large-span steel girder framework interconnection system platform
CN203430045U (en) Assembly construction gate tower
CN104675093B (en) Dish-type node type scaffold
CN216380480U (en) Integral movable operation frame
CN205205860U (en) Automatic all hoist device of module system that fall of reverse construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140611

Termination date: 20161115