CN204645605U - A kind of circular steel reinforced concrete chimney wall reverse mould construction platform - Google Patents

A kind of circular steel reinforced concrete chimney wall reverse mould construction platform Download PDF

Info

Publication number
CN204645605U
CN204645605U CN201520138865.4U CN201520138865U CN204645605U CN 204645605 U CN204645605 U CN 204645605U CN 201520138865 U CN201520138865 U CN 201520138865U CN 204645605 U CN204645605 U CN 204645605U
Authority
CN
China
Prior art keywords
platform
chimney wall
reverse mould
bar
reinforced concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520138865.4U
Other languages
Chinese (zh)
Inventor
张丰民
李明怀
王金海
尹业先
张冬梅
王晓雷
郭栋
吴敦文
李峰
王洪伟
高绪军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shangdong Electric Power Construction No3 Engineering Co
Original Assignee
Shangdong Electric Power Construction No3 Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shangdong Electric Power Construction No3 Engineering Co filed Critical Shangdong Electric Power Construction No3 Engineering Co
Priority to CN201520138865.4U priority Critical patent/CN204645605U/en
Application granted granted Critical
Publication of CN204645605U publication Critical patent/CN204645605U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

A kind of circular steel reinforced concrete chimney wall reverse mould construction platform, comprise elevator foundation pit, elevator well frame is provided with in elevator foundation pit, elevator well frame is through central drum circle, outer rim is arranged with outside central authorities' drum circle, truss is provided with between outer rim and central drum circle, climb bar one end through punching jack rear support on truss, in the below of bar both sides of climbing, truss, steel concrete shuttering is housed, fill the concrete material forming chimney wall in the cavity of steel concrete shuttering, the bar overcoat that climbs has the bar sheath steel pipe that climbs with certain taper.This operation platform adopts two joint template overturnings, reduces one deck template than routine; This hydraulic pressure reverse mould apparatus platform construction labour intensity is moderate, the lifting work of rail-free mould, and the hoisting depth of stack shell template changes 3m into by original 4.5m, reduces labour intensity, obvious accelerating construction progress of dynamically working continuously, and construction period reduction obviously.

Description

A kind of circular steel reinforced concrete chimney wall reverse mould construction platform
Technical field
The utility model relates to technical field of building construction, especially relates to a kind of circular steel reinforced concrete chimney wall reverse mould construction platform.
Background technology
The construction method of circular steel reinforced concrete chimney wall generally has reverse mould construction method and slip-form construction method, chimney wall wherein after slding form operation has smooth in appearance, without connecing stubble, can not do surface-treated advantage, but the high defect of its construction equipment cost is also quite obvious; By contrast, although the chimney after reverse mould construction exists comparatively significantly seam, the method has the low advantage of construction cost, therefore, in less at diameter, highly little chimney construction, giving one's full attention under seam construction prerequisite, adopt reverse mould construction method as far as possible.
In prior art, chimney reverse mould construction will be fixed in chimney wall by Concrete Filled due to the lifting arm bearing platform Main Load, thus add chimney cost.
Summary of the invention
The purpose of this utility model is to overcome the shortcoming existed in prior art, a kind of circular steel reinforced concrete chimney wall reverse mould construction platform is provided, this platform adopts elevated lifting arm, thus greatly save cost, and this platform adopts two joint template turnover panels to get final product normal construction, the technical scheme adopted is: a kind of circular steel reinforced concrete chimney wall reverse mould construction platform, comprise elevator foundation pit, it is characterized in that: in described elevator foundation pit, be provided with elevator well frame, described elevator well frame is through central drum circle, outer rim is arranged with outside described central drum circle, truss is provided with between described outer rim and central drum circle, climb bar one end through punching jack rear support on described truss, in described bar both sides of climbing, steel concrete shuttering is equipped with in the below of truss, the concrete material forming chimney wall is filled in the cavity of described steel concrete shuttering, the described bar overcoat that climbs has the bar sheath steel pipe that climbs with certain taper.
Technical characteristic of the present utility model also has: the both sides of described steel concrete shuttering are also provided with formwork platform, are form removal platform in the below of described formwork platform.
Technical characteristic of the present utility model also has: described formwork platform comprises interior formwork platform and outer formwork platform.
Technical characteristic of the present utility model also has: described form removal platform comprises interior form removal platform and outer form removal platform.
Technical characteristic of the present utility model also has: described truss comprises main couple and time radiation beam, and described main couple is 8 Pin main couples, and described radiation beam is 24 Pin radiation beams.
Technical characteristic of the present utility model also has: described steel concrete shuttering comprises standard large form, contracture template, link and radius adjusting device.
Technical characteristic of the present utility model also has: described standard large form comprises standard inner formword and standard exterior sheathing, is linked into an integrated entity between described standard inner formword and standard exterior sheathing by split bolt.
Technical characteristic of the present utility model also has: described contracture template comprises contracture inner formword and contracture exterior sheathing, is also linked into an integrated entity by split bolt between described contracture inner formword and contracture exterior sheathing; Described radius adjusting device comprises encloses purlin and regulates the positive and negative leading screw of radius.
The beneficial effects of the utility model are: 1) this operation platform solves lifting arm and recycles a difficult problem, by sheath steel pipe, lifting arm promotes convenient, decreases the disposable input cost in construction, the use amount of template is about 33.3% of common equipment, reduces overall investment; 2) the little dead man of the supreme reinforcing bar of this hydraulic pressure reverse mould device, without the eccentric load of fixed-direction, operation platform without drift phenomenon, when the chimney wall that construction height is larger, overcome little dead man and Platform center cage rocks larger problem along Flexible slideway in lifting process, platform is more stable; Safety improves, and hoisting velocity also improves, and accelerates speed of application; 3) this operation platform adopts two joint template overturnings, reduces one deck template than routine; This hydraulic pressure reverse mould apparatus platform construction labour intensity is moderate, the lifting work of rail-free mould, and the hoisting depth of stack shell template changes 3m into by original 4.5m, reduces labour intensity, obvious accelerating construction progress of dynamically working continuously, and construction period reduction obviously.
Accompanying drawing explanation
Accompanying drawing 1 is that the present invention constructs schematic diagram, accompanying drawing 2 is part-structure schematic diagrames in accompanying drawing 1, accompanying drawing 3 be accompanying drawing 1 overlook direction schematic diagram, wherein, 1 is elevator, 2 is elevator well frames, 3 is main couples, 4 is time radiation beams, 5 is central drum circles, 6 is outer suspension brackets, 7 is internal hangers, 8 is outer formwork platforms, 9 is interior formwork platforms, 10 is outer form removal platforms, 11 is interior form removal platforms, 12 is enclose purlin, 13 is safety nets, 14 is elevator melt pits, 15 is barrel split bolts, 16 is the bar sheath steel pipes that climb, 17 is the bars that climb, 18 is punching jack, 19 is concrete horizontal construction joints, 20 is suspension bracket platform hoop crossbeams, 21 is operation platform scaffold floors, 22 is radius adjusting devices, 23 is that main couple revolves connecting rod.
Detailed description of the invention
Below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is described.The utility model discloses a kind of circular steel reinforced concrete chimney wall reverse mould construction platform, comprise elevator foundation pit 14, elevator well frame 2 is provided with in elevator foundation pit 14, elevator well frame 2 is through central drum circle 5, outer rim (not shown) is arranged with outside central authorities' drum circle 5, truss is provided with between outer rim and central drum circle 5, climb bar 17 one end through punching jack 18 rear support on truss, in bar 17 both sides of climbing, steel concrete shuttering is equipped with in the below of truss, the concrete material forming chimney wall is filled in the cavity of steel concrete shuttering, bar 17 overcoat that climbs has the bar sheath steel pipe 16 that climbs with certain taper.The both sides of steel concrete shuttering are also provided with formwork platform, are form removal platform in the below of formwork platform.Formwork platform comprises interior formwork platform 9 and outer formwork platform 8, and form removal platform comprises interior form removal platform 11 and outer form removal platform 10.
In this detailed description of the invention, truss comprises main couple 3 and time radiation beam 4, and main couple 3 is 8 Pin main couples, and secondary radiation beam 4 is 24 Pin radiation beams.
Steel concrete shuttering comprises standard large form, contracture template, link and radius adjusting device.Standard large form comprises standard inner formword and standard exterior sheathing, is linked into an integrated entity between standard inner formword and standard exterior sheathing by split bolt.Contracture template comprises contracture inner formword and contracture exterior sheathing, is also linked into an integrated entity by split bolt between contracture inner formword and contracture exterior sheathing; Radius adjusting device comprises encloses purlin and regulates the positive and negative leading screw of radius.
The construction method applying this platform comprises the following steps:
1) in chimney raft end face stack shell drop shadow spread, bury built-in fitting underground according to design, conventional construction chimney wall first segment reinforcing bar, template, install and to climb bar 17, bar 17 overcoat that climbs climbs bar sheath steel pipe 16, and bar sheath steel pipe 16 outer wall that climbs is processed into back taper.
The bar 17 that wherein climbs comprises climb bar and time radiation beam of main couple and to climb bar, the main couple bar that climbs is positioned at below main couple 3, and the secondary radiation beam bar that climbs is positioned at below time radiation beam 4, and main couple 3 is eight Pin main couples, every Pin main couple is provided with two main couples and climbs bar, and secondary radiation beam 4 is 24 truss structures.
Be the tapering that the long bar 17 that climbs of 1.6m processes 2.5mm at the tapering of the outer bar sheath steel pipe 16 that climbs arranged of the bar 17 that climbs.
2) set up scaffold in chimney wall center, scaffold adopts common scaffold tubes to set up.
3) the steel ring raw material transport connecting main couple 3 and time radiation beam 4 is also carried out steel ring assembling on the ground to chimney is inner.
4) central drum circle 5 is installed.
5) punching jack 18 is installed climbing on bar 17, in the released state punching jack 18 is installed and punching jack 18 is adjusted to corresponding absolute altitude.
6) install on main couple 3, secondary radiation beam 4 and main couple and revolve connecting rod 23, to promote bottom assembled good steel ring to secondary radiation beam 4 and with clamping plate, secondary radiation beam 4 to be connected with the crosspoint of swing arm under main couple by stud.
7) laying construction platform legs palm 21, at this moment the basic installation of the agent structure of whole operation platform, hydraulic power unit is installed in platform near central drum circle 5 place, debugging pumping plant also tries lifting construction platform, debug qualified rear lifting construction platform and raise 1.5m, then stack shell of constructing successively respectively saves concrete blinding, and now operation platform hoisting depth meets the installation needs of internal hanger 7, outer suspension bracket 6 completely.
8) below hitch point internal hanger 7, outer suspension bracket 6 being arranged on the Two bors d's oeuveres channel-section steel of swing arm under time radiation beam 4 and truss, by two-layer suspension bracket platform hoop crossbeam 20, internal hanger 7 and outer suspension bracket 6 are connected into a hoop entirety, suspension bracket platform hoop crossbeam 20 is laid platform legs hand cradle to form formwork platform and form removal platform, hang safety net 13 outside suspension bracket 6 outside and reveal all the details, the now installation of operation platform structure all completes.
9) chimney shaft normal construction, the bar sheath steel pipe 16 that climbs during operation platform lifting promotes together, after bar sheath steel pipe 16 lifting of climbing puts in place, the gap mortar between steel pipe lower end and concrete cavity is tamped, extract out in concrete tube wall every the 3-3.5m bar 17 that highly will climb, cavity is filled closely knit with mortar after extraction, place climbing boots in situ again, installation is climbed bar sheath steel pipe 16, climb bar 17, punching jack 18 resets, continue stack shell construction, climb bar 17 extraction displacement never allow same absolute altitude to extract the bar 17 that climbs of more than 2 groups quantity out for main couple 3 simultaneously, 8 times should be divided equally in 3-3.5m height, each extraction one, alternately extract out successively, for secondary radiation beam 4, allow the symmetrical operation of extracting two bars 17 that climb out simultaneously of same absolute altitude, but also to divide equally and extract out successively, can not the same period, the bar 17 that climbs is extracted out with the large quantity in position.
In addition, be exactly that stack shell reinforcing bar, steel concrete shuttering, concrete construction and conventional electric hoist platform reverse mould construction method are similar, just this scheme adopts two joint template overturnings, and reduce one deck than the template of routine, construction method does not repeat them here with order.
When operation platform rises to certain altitude, and finish platform loading test employing straight line elevator material loading is carried out stack shell construction, the construction method of construction method and conventional high-rise building straight line elevator is similar, also repeats no more.
Certainly; above-mentioned explanation is not limitation of the utility model; the utility model is also not limited only to above-mentioned citing, the change that those skilled in the art make in essential scope of the present utility model, remodeling, interpolation or replacement, also belongs to protection domain of the present utility model.

Claims (8)

1. a circular steel reinforced concrete chimney wall reverse mould construction platform, comprise elevator foundation pit, it is characterized in that: in described elevator foundation pit, be provided with elevator well frame, described elevator well frame is through central drum circle, outer rim is arranged with outside described central drum circle, truss is provided with between described outer rim and central drum circle, climb bar one end through punching jack rear support on described truss, in described bar both sides of climbing, steel concrete shuttering is equipped with in the below of truss, the concrete material forming chimney wall is filled in the cavity of described steel concrete shuttering, the described bar overcoat that climbs has the bar sheath steel pipe that climbs with certain taper.
2., according to circular steel reinforced concrete chimney wall reverse mould construction platform according to claim 1, it is characterized in that: the both sides of described steel concrete shuttering are also provided with formwork platform, is form removal platform in the below of described formwork platform.
3., according to circular steel reinforced concrete chimney wall reverse mould construction platform according to claim 2, it is characterized in that: described formwork platform comprises interior formwork platform and outer formwork platform.
4., according to circular steel reinforced concrete chimney wall reverse mould construction platform according to claim 2, it is characterized in that: described form removal platform comprises interior form removal platform and outer form removal platform.
5. according to circular steel reinforced concrete chimney wall reverse mould construction platform according to claim 2, it is characterized in that: described truss comprises main couple and time radiation beam, and described main couple is 8 Pin main couples, and described radiation beam is 24 Pin radiation beams.
6., according to circular steel reinforced concrete chimney wall reverse mould construction platform according to claim 2, it is characterized in that: described steel concrete shuttering comprises standard large form, contracture template, link and radius adjusting device.
7. according to circular steel reinforced concrete chimney wall reverse mould construction platform according to claim 6, it is characterized in that: described standard large form comprises standard inner formword and standard exterior sheathing, linked into an integrated entity by split bolt between described standard inner formword and standard exterior sheathing.
8. according to circular steel reinforced concrete chimney wall reverse mould construction platform according to claim 6, it is characterized in that: described contracture template comprises contracture inner formword and contracture exterior sheathing, also linked into an integrated entity by split bolt between described contracture inner formword and contracture exterior sheathing; Described radius adjusting device comprises encloses purlin and regulates the positive and negative leading screw of radius.
CN201520138865.4U 2015-03-12 2015-03-12 A kind of circular steel reinforced concrete chimney wall reverse mould construction platform Expired - Fee Related CN204645605U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520138865.4U CN204645605U (en) 2015-03-12 2015-03-12 A kind of circular steel reinforced concrete chimney wall reverse mould construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520138865.4U CN204645605U (en) 2015-03-12 2015-03-12 A kind of circular steel reinforced concrete chimney wall reverse mould construction platform

Publications (1)

Publication Number Publication Date
CN204645605U true CN204645605U (en) 2015-09-16

Family

ID=54098363

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520138865.4U Expired - Fee Related CN204645605U (en) 2015-03-12 2015-03-12 A kind of circular steel reinforced concrete chimney wall reverse mould construction platform

Country Status (1)

Country Link
CN (1) CN204645605U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113356289A (en) * 2021-06-07 2021-09-07 福建省九龙建设集团有限公司 Deep foundation pit brick chimney reinforcing method and ring beam reinforcing structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113356289A (en) * 2021-06-07 2021-09-07 福建省九龙建设集团有限公司 Deep foundation pit brick chimney reinforcing method and ring beam reinforcing structure

Similar Documents

Publication Publication Date Title
CN104712143B (en) A kind of circular steel reinforced concrete chimney wall reverse mould construction method
CN201826525U (en) Climbing shuttering system device for buildings
CN102913248B (en) The overall upset hanging template of wholecircle and formwork erection, release method
CN202467191U (en) Hydraulic slip form device used for construction of circular reinforced concrete chimney wall
CN104975719A (en) Novel material distribution device and floor concrete casting construction method of novel material distribution device
CN201367728Y (en) Derrick-less hydraulic slip form device used for reinforced concrete water tower supporting tube construction
CN103422668A (en) Construction method of super-thick large-slope shear wall and hydraulic self-jacking inclined creeping framework thereof
CN101397844A (en) Construction method of special section steel concrete composite structure inclined wall mould base engineering
CN203961238U (en) Bolt anchor slab adjustable tool formula builder's jack
CN205000974U (en) A tire formula automatic rising equipment rack for tunnel excavation construction
CN103485574B (en) A kind of granulation tower tower top structure of reinforced concrete method
CN203834926U (en) Formwork erecting structure for bare concrete basement exterior wall
CN207879008U (en) Diameter Silo structure roof support system
CN205636516U (en) Convertible template system of hollow concrete leaning tower
CN109457814B (en) Construction method for top cover of high-rise and large-diameter building based on Bailey truss structure
CN203878979U (en) Bolt opposite-pulling type track sliding formwork
CN204645605U (en) A kind of circular steel reinforced concrete chimney wall reverse mould construction platform
CN210483094U (en) Inverted triangular pipe truss lifting device
CN203640248U (en) Fast construction device for external wall of light well
CN110029671A (en) A kind of steep slope pile foundation steel bar cage transfers construction technology using aperture bracket section by section
CN105370027A (en) Construction method for integrally lifted and supported steel platform structure in high-rise suspended structure
CN104594631B (en) The construction technology of sliding form apparatus traction operation platform construction granulation tower spraying layer
CN104727617B (en) Connected barrel warehouse top plate module-decreasing construction method
CN107965193A (en) Diameter Silo structure roof construction method
CN210858723U (en) Template integration support frame is pour to working well

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150916

CF01 Termination of patent right due to non-payment of annual fee