CN104727617B - Connected barrel warehouse top plate module-decreasing construction method - Google Patents

Connected barrel warehouse top plate module-decreasing construction method Download PDF

Info

Publication number
CN104727617B
CN104727617B CN201310694229.5A CN201310694229A CN104727617B CN 104727617 B CN104727617 B CN 104727617B CN 201310694229 A CN201310694229 A CN 201310694229A CN 104727617 B CN104727617 B CN 104727617B
Authority
CN
China
Prior art keywords
construction
steel
top plate
shoulder pole
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310694229.5A
Other languages
Chinese (zh)
Other versions
CN104727617A (en
Inventor
冯桢
谭志斌
张志敏
蒋建忠
张德磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201310694229.5A priority Critical patent/CN104727617B/en
Publication of CN104727617A publication Critical patent/CN104727617A/en
Application granted granted Critical
Publication of CN104727617B publication Critical patent/CN104727617B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to a connected barrel warehouse. A connected barrel warehouse top plate module-decreasing construction method includes the following steps that 1 a steel beam hole is reserved in the barrel wall, a rigid operation platform shall fall before construction, steel beam installation is conducted through a sliding module platform, and pole steel beams are constructed through groove steel; 2 internal and external support systems of the warehouse are built, top plate support adopts a steel pipe truss structure, and all support pipes fall on the pole steel beams; 3 top plate template support erection and concrete construction are conducted, after the support system is finished, top plate and cornice erection and steel bar and concrete construction are conducted, a common wood template is adopted in construction to pump concrete, and pouring construction is completed according to the method of layering pouring and constructing layer by layer; 4 disassembly of a steel pipe truss and the rigid sliding module platform. By means of the method, construction difficulty is greatly reduced, safety hidden hazards of high altitude operation are effectively reduced, and the method achieves good benefits in the aspects of construction period, cost, safety and the like.

Description

Interconnected silos storehouse top board fall method constructing and overhanging model method
Technical field
The present invention relates to Interconnected silos storehouse, the more particularly, to construction method of Interconnected silos storehouse top board.
Background technology
In industry, in agricultural construction, in a large number using silo structure, be wherein no lack of towering silo structure, its top board and Cornice outward mostly reinforced concrete structure, and practice of construction difficulty is big.Conventional construction method such as raft support method, pre-buried steel bracket props up The drawbacks of methods such as frame construction all have certain in duration, cost, safety.
Content of the invention
Present invention seek to address that the problem of existing construction method, provide a kind of Interconnected silos storehouse top board fall mould construction method. The method of the present invention can greatly reduce difficulty of construction, effectively overcomes the potential safety hazard of work high above the ground, in duration, cost, safety etc. Aspect remarkable benefit.
In order to solve above-mentioned technical problem, method constructing and overhanging model method drops in a kind of Interconnected silos of present invention storehouse top board, and it includes:
Step one, has reserved girder steel hole in barrel in advance, and before construction, rigid operating platform should land and complete, steel girder erection Slip form platform is relied on to carry out;Shoulder pole girder steel is constructed using channel-section steel, channel-section steel along barrel arc direction@1.5m arrange, simultaneously with Every Pin size of rigid operating platform is adapted;Girder steel and the use of hole hole are carved son and are jumped a queue, so that it is solid and reliable;
Step 2, in storehouse, outer support system is set up:After shoulder pole outrigger installation, you can carry out taking of top plate supporting system If;Top plate supporting adopts steel pipe truss structures, and support tube all falls within shoulder pole girder steel, and the pin hand of top board girder is set up in construction first Pipe, then as benchmark, is connected by fastener, sets up little brace, forms the double-deck truss support tubular construction supporting each other, Prop up overall architecture;
Step 3, roof plate template installs and concrete construction;After the completion of support system, carry out top board and prop up with the template corniced And if reinforcing bar, concrete construction work;Construction adopts common plank sheathing, pump concrete, according to placement layer by layer, advances layer by layer Method pouring construction completes;
Step 4, the dismounting work of steel pipe truss and rigid slip form platform;Remove rigid slip form platform, slip form platform first Dismounting according to oil circuit, oil pump, -- center drag-line -- operating platform railing safety net -- jack, the order opening cabinet frame are carried out;With After waiting top board to reach strength of mould stripping afterwards, it is supported the dismounting work of system;Support system piecemeal carries out overall pulling down work, point Carried out with shoulder pole girder steel for boundary during block;Remove work all according to from inside to outside, the order of channel-section steel is carried out after first pipe fitting for every section.
Described Interconnected silos storehouse top board fall method constructing and overhanging model method, in described step one, channel-section steel can not along silo center to wearing, But choose outside one end and be connected with upper end barrel reinforcement welding by reinforcing bar, extend through rigid slip form platform in one end.
The present invention simplifies working procedure, and the construction period is greatly reduced;Work efficiency is high, low cost;The construction of work high above the ground is more Safe and reliable.
Brief description
Below in conjunction with the accompanying drawings invention is further described:
Fig. 1 is schematic diagram of the present invention;
Fig. 2 is shoulder pole steel beam joint schematic diagram.
Specific embodiment
As depicted in figs. 1 and 2, in figure 1 is barrel, and 2 is cylinder top board, and 3 is shoulder pole girder steel, and 4 is to carve son, and 5 is steel pipe steel pipe Truss.
A kind of Interconnected silos of present invention storehouse top board fall method constructing and overhanging model method, it includes:
1st, shoulder pole girder steel is set up on barrel
This construction just should be planned before silo barrel 1 is constructed, and has reserved girder steel hole in barrel in advance, before construction just Property operating platform should land and complete, steel girder erection relies on slip form platform to carry out.
Shoulder pole girder steel 3 is using [12 are constructed, and channel-section steel is arranged along barrel arc direction@1.5m, operate flat with rigidity simultaneously Every Pin size of platform is adapted(1.5m it is wide).Girder steel and the use of hole hole are carved son and are jumped a queue, so that it is solid and reliable.In order to abundant Save girder steel, channel-section steel along silo center to wearing, but can not be chosen outside one end by D25 reinforcing bar with upper end barrel steel bar welding in succession Connect, in one end, extend through rigid slip form platform.
2nd, in storehouse, outer support system is set up
After shoulder pole outrigger installation, you can carry out setting up of top plate supporting system.Top plate supporting is tied using steel pipe truss 5 Structure, support tube all falls within shoulder pole girder steel.The scaffold tubes of top board girder are set up in construction first, then as benchmark, by button Part connects, and sets up little brace, forms the double-deck truss support tubular construction supporting each other, supports overall architecture.
3rd, roof plate template installs and concrete construction
After the completion of support system, you can carry out top board and the formwork erection cornicing and reinforcing bar, concrete construction work.Construction Using common plank sheathing, pump concrete, according to placement layer by layer, the method pouring construction that advances layer by layer completes.
4th, the dismounting work of steel pipe truss and rigid slip form platform
Because shoulder pole girder steel and steel pipe truss have formed unified, stable support system, rigidity therefore can be removed first Slip form platform, the dismounting of slip form platform is according to oil circuit, oil pump -- center drag-line -- operating platform railing safety net -- jack, opens The order of cabinet frame is carried out.
After subsequently waiting top board to reach strength of mould stripping, you can be supported the dismounting work of system.Support system piecemeal is carried out Overall pulling down works, and is carried out with shoulder pole girder steel for boundary during piecemeal.Every section remove work all according to from inside to outside, channel-section steel after first pipe fitting Order carry out.

Claims (2)

1. a kind of Interconnected silos storehouse top board fall method constructing and overhanging model method is it is characterised in that it includes:
Step one, has reserved shoulder pole girder steel hole in barrel in advance, and before construction, rigid operating platform should land and complete, shoulder pole girder steel Install and rely on slip form platform to carry out;Shoulder pole girder steel is constructed using channel-section steel, and channel-section steel is arranged along barrel arc direction@1.5m, with When be adapted with every Pin size of rigid operating platform;Shoulder pole girder steel and the use of hole hole are carved son and are jumped a queue, so that it firmly may be used Lean on;
Step 2, in storehouse, outer support system is set up:After the completion of shoulder pole steel girder erection, you can carry out setting up of top plate supporting system; Top plate supporting adopts steel pipe truss structures, and support tube all falls within shoulder pole girder steel, and the scaffold tubes of top board girder are set up in construction first, Then as benchmark, connected by fastener, set up little brace, form the double-deck truss support tubular construction supporting each other, support Play overall architecture;
Step 3, roof plate template installs and concrete construction;After the completion of support system, carry out top board and the formwork erection that cornices and Reinforcing bar, concrete construction work;Construction adopts common plank sheathing, pump concrete, according to placement layer by layer, the method that advances layer by layer Pouring construction completes;
Step 4, the dismounting work of steel pipe truss and rigid slip form platform;Remove rigid slip form platform first, the tearing open of slip form platform -- center drag-line rigidity operating platform railing safety net -- jack, the order opening cabinet frame are carried out except according to oil circuit, oil pump;With After waiting top board to reach strength of mould stripping afterwards, it is supported the dismounting work of system;Support system piecemeal carries out overall pulling down work, point Carried out with shoulder pole girder steel for boundary during block;Remove work all according to from inside to outside, the order of channel-section steel is carried out after first pipe fitting for every section.
2. according to claim 1 Interconnected silos storehouse top board fall method constructing and overhanging model method it is characterised in that in described step one, Channel-section steel not along silo center to wearing, choose outside one end and be connected with upper end barrel reinforcement welding by reinforcing bar, in one end, extend through rigidity Slip form platform.
CN201310694229.5A 2013-12-18 2013-12-18 Connected barrel warehouse top plate module-decreasing construction method Active CN104727617B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310694229.5A CN104727617B (en) 2013-12-18 2013-12-18 Connected barrel warehouse top plate module-decreasing construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310694229.5A CN104727617B (en) 2013-12-18 2013-12-18 Connected barrel warehouse top plate module-decreasing construction method

Publications (2)

Publication Number Publication Date
CN104727617A CN104727617A (en) 2015-06-24
CN104727617B true CN104727617B (en) 2017-02-15

Family

ID=53451970

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310694229.5A Active CN104727617B (en) 2013-12-18 2013-12-18 Connected barrel warehouse top plate module-decreasing construction method

Country Status (1)

Country Link
CN (1) CN104727617B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107630583B (en) * 2016-07-19 2019-12-03 五冶集团上海有限公司 It is a kind of to hang steel pipe truss construction method with Bailey bracket is counter

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4409090C1 (en) * 1994-03-17 1995-06-01 Buddenberg Joerg Dr Ing Silo for loose materials
FR2908118A1 (en) * 2006-11-07 2008-05-09 Daniel Paillot Reinforced concrete tank for artisanal enterprise of building, has shoulder formed under prestressed cover to support head of walls by stopping walls on cover, and bias created on shoulder and walls to spot imperfections of execution
CN201310183Y (en) * 2008-11-20 2009-09-16 中国第二冶金建设有限责任公司 Convenient support device for cornice on silo roof
CN101476410B (en) * 2009-01-13 2010-06-09 杭州萧宏建设集团有限公司 Mounting and demounting method for roof plate formwork support platform of concrete silo
CN103015782A (en) * 2012-12-14 2013-04-03 中煤建筑安装工程集团有限公司 Construction platform and construction method for integrating silo roof and silo wall slip form

Also Published As

Publication number Publication date
CN104727617A (en) 2015-06-24

Similar Documents

Publication Publication Date Title
CN204098463U (en) Builder's jack
CN201826525U (en) Climbing shuttering system device for buildings
CN104100122B (en) The construction method of the conical storehouse of large-scale silo roof construction
CN101397844B (en) Construction method of special section steel concrete composite structure inclined wall mould base engineering
CN202090591U (en) Lift type climbing formwork of building operations
CN106437130A (en) Inner roof external climbing type formwork construction platform for super high-rise building construction
CN103935911B (en) Tower crane attached wall supporting construction and construction method thereof
CN206692235U (en) A kind of steel structure dome lifts by crane erecting device
CN103352428A (en) Suspension bridge cable bent tower beam non-support construction method
CN105442839A (en) Erecting method of cantilever structure formwork bent
CN103485574B (en) A kind of granulation tower tower top structure of reinforced concrete method
CN105525753A (en) Method and structure for simultaneously constructing constructional column and main body structure
CN103122691A (en) Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method
CN207268073U (en) Novel flexible formwork bearing frame
CN206157913U (en) Assembled square steel tube concrete post and girder steel connected node
CN203834926U (en) Formwork erecting structure for bare concrete basement exterior wall
CN207879008U (en) Diameter Silo structure roof support system
CN202125061U (en) Scaffold of large-space concrete structure
CN112160247B (en) Construction method of asynchronous hydraulic creeping formwork for hollow high pier of limited space pier group
CN109457814A (en) Towering and major diameter building top cover construction method based on Bailey bracket structure
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN203452375U (en) Hydraulic self-jacking oblique creeping formwork
CN204715764U (en) The structure that a kind of constructional column and agent structure are constructed simultaneously
CN104453228A (en) Construction method of large-span super-large-section steel plate wall beam
CN104727617B (en) Connected barrel warehouse top plate module-decreasing construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant