CN101397844A CNA2008101511070A CN200810151107A CN101397844A CN 101397844 A CN101397844 A CN 101397844A CN A2008101511070 A CNA2008101511070 A CN A2008101511070A CN 200810151107 A CN200810151107 A CN 200810151107A CN 101397844 A CN101397844 A CN 101397844A
Authority
CN
China
Prior art keywords
steel
template
wall
scaffold
mould
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008101511070A
Other languages
Chinese (zh)
Other versions
CN101397844B (en
Inventor
时炜
周明
谢鹏
万磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SCEGC NO.3 CONSTRUCTION ENGINEERING GROUP Co.,Ltd.
Original Assignee
SHANXI THIRD ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANXI THIRD ENGINEERING Co Ltd filed Critical SHANXI THIRD ENGINEERING Co Ltd
Priority to CN2008101511070A priority Critical patent/CN101397844B/en
Publication of CN101397844A publication Critical patent/CN101397844A/en
Application granted granted Critical
Publication of CN101397844B publication Critical patent/CN101397844B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a construction method of a special-steel concrete combination structure oblique wall mould frame; the construction method of a frame body is that channel steel is welded on a steel reinforced concrete column to form a cantilevered frame body which can act as the security preservation of operations as well as a supporting system of a die plate; and mirror boards are assembled on the site to form a bigger die plate which is hoisted integrally and ascends with a working layer floor by floor. The construction method has high-efficiency construction, convenient operation, simple technique and high safety factor. The adopted separate unit cantilevered frame body has a firm and safe frame body, lighter dead weight and larger bearing capacity. Material is saved by erecting a globally-stressed space truss structure with ordinary steel pipes, and the turnover of the die plate is increased by assembling ordinary mirror boards to form a bigger die plate.

Description

Construction method of special section steel concrete composite structure inclined wall mould base engineering
Technical field
The present invention relates to field of civil engineering, relate to the construction technology of template and support body, particularly the concrete composite structure inclined wall mould base engineering construction method.
Background technology
Further investigation along with development of times and building structure field, occurred large quantities of building structure that are different from conventional theory in the architectural design, its medium dip high level/high-rise buildings moulding has obtained architect's favor with its grand construction scope and unique visual effects.Because this structure construction work condition abnormality complexity, Mechanical Builds is various, space conversion, intersection, broken line node are more, body of wall tilts, corner structure is more, bring many difficult problems for the stability and the safety of structural system in the construction, brought difficulty particularly for the installation of setting up with template of scaffold.
The present common console mode support body or the support body of encorbelmenting of building trade, the construction effect is lower, and material usage is bigger, and can't solve the construction difficult problem of special construction; Common template system or climb the system complexity, cost is high.
Summary of the invention
The object of the present invention is to provide a kind of job practices of reinforced concrete composite structure inclined wall mould base, this job practices has improved the construction effect effectively, reduces engineering cost.
Technical scheme of the present invention is achieved in that
The installation of template:
1) template processing
According to setting type determined template size, with countersunk head screw the mirror board of standard is fixed on to piece together on the wooden back cord and makes large form, vertical back cord adopts 60 * 100 lumps of wood, and decide the bamboo film at the lumps of wood back side, horizontal back cord employing 5# channel-section steel, spacing 500mm; The template edge joint position is closely knit with glass cement;
2) locate unwrapping wire, determine the position and the size of per pass body of wall; The body of wall position is checked in inspection;
3) formwork hoisting
The template that configures is gone into mould with the tower crane lifting along slideway, form joint is managed everywhere: the template end opening installs the employing mortar levelling first, secondary installing is covered mouth, highly be 50mm~100mm, paste two-sided tape, seam is pasted two-sided tape between template, adjacent rough ground connects with bolt, typified form is adopted in the bight, adjacent forms is done tongue and groove clasping joint close, steel encloses the purlin joint to be strengthened with two steel pipes, through-wall bolt overcoat PVC plastic pipe and leakproof plug, and the position, turning is welded on three section header type through-wall bolts on the reinforced concrete column;
4) formwork reinforcement
Reinforcing in time puts in place after going into mould; The Template Location muscle adopts welding φ 16T shape reinforcing bar control on reinforced concrete column, beam, carry mould before, in advance positioning bar is controlled to the position of formwork erection, 1~1.5 meter of welding positioning bar spacing according to control line;
5) form removable and climbing
Form removable: when a construction layer surface construction finishes, after the concreting 24 hours, wall form can become flexible through-wall bolt, after 3 days, when top possesses the formwork condition, hang up properly tackles in advance on top, and pretension hangs the mould rope, connect to live template with leading screw after, remove through-wall bolt and template successively, promote rear lower and prop up pad with bracing frame and flitch, top and reinforced concrete column are done interim drawknot, and in time inner formword and its are fixed with through-wall bolt;
Set up support body:
1) welding channel-section steel
The encorbelment specification of channel-section steel of selection, the general 16# that adopts, length is at 1.8~2.2 meters, wherein being not less than 0.5 meter stretches in the body of wall, the residue length of encorbelmenting, girder steel is welded on the steel corbel upper surface, and spacing is not more than 4.5m, the beam outer end of encorbelmenting is welded the steel bar end of two ф 25 respectively, and company's wall drawknot of scaffold and building adopts steel pipe to weld screw rod through walls by screw hole through walls and body of wall ways of connecting:
2) set up the frame of encorbelmenting
Scaffold selects for use ф 48 * 3.5 steel pipes to set up; The vertical rod longitudinal pitch is 1.5 meters, laterally is the triangular form shape, goes on foot highly 1.8 meters, and the first step is set up into inside and outside truss with steel tube fastener, and lower edge is set up leger one; The vertical rod of installing on girder steel is set up into monolithic truss-like main frame with steel tube fastener, and bridging is completely taken in the support body outside, and per step is provided with steel tubular handrailing;
Before setting up, reinforce and utilize the scaffold of bottom, longitudinally on the girder steel upper berth leger is set, upright earlier inboard followed by the plug-in mounting vertical rod, the big or small cross bar on top is installed in upright again outside vertical rod, upwards progressively sets up again;
The same step, about two legers, leger joints staggered mutually, after leger is put up, little cross bar were installed, and its two should be stretched out more than the 10cm of leger outside, and same step vertical equity difference of height must not surpass 2cm;
3) safety net, frame plate are laid
After scaffold is put up part, the bottom of support body and side-closed, lay frame plate more in the above with Dense mesh screen; When the enemy spreads, under every plate termination, little cross bar is arranged, little cross bar should have in the 10-15cm from the scaffold termination;
4) slideway is installed
After scaffold building was good, the triangle frame body side surface was installed slideway;
Mould bases is set up:
The support body that utilization is set up is reinforced the template installation in place, has enough to meet the need the use of climbing repeatedly.
Support body of the present invention adopts channel-section steel to be welded on and forms the support body of encorbelmenting on the reinforced concrete column, both as the support system of the security maintenance while of operating as template; Template adopts on-the-spot assembly of mirror board to make the large form integral hoisting, successively climbs with work layer.Adopt the present invention's effect height of constructing.Easy and simple to handle, technology is simple, safety factor is high.Adopt independently the unit support body of encorbelmenting, support body is firm, safety, and it is lighter to conduct oneself with dignity, and bearing capacity is bigger.Common steel tube is set up whole stressed space truss structure, saved material; Template is utilized common mirror board to piece together and is made large overall template, has increased the number of turnover of template.
The specific embodiment
Work progress of the present invention:
1, template
(1) template processing
According to setting type determined template size, with countersunk head screw the mirror board of standard is fixed on to piece together on the wooden back cord and makes large form.Vertical back cord adopts 60 * 100 lumps of wood, and decides the bamboo film at the lumps of wood back side, to increase the rigidity of wooden back cord; Laterally back cord adopts 5# channel-section steel, spacing 500; The template edge joint position is closely knit with glass cement.
(2) location unwrapping wire
Determine the particular location and the size of per pass body of wall according to Design Requirement Drawing.
(3) check
The body of wall position is checked in inspection and whether size is correct.
(4) formwork hoisting
The template that configures is gone into mould with the tower crane lifting along slideway.Form joint is managed everywhere: the template end opening installs the employing mortar levelling first, and secondary installing is covered mouthful and (highly to be the subsides two-sided tape of 50mm~100mm).Seam is pasted two-sided tape between template, and adjacent rough ground connects with bolt.Typified form is adopted in the bight, and adjacent forms is done tongue and groove clasping joint close.Steel encloses the purlin joint and strengthens with two steel pipes.Through-wall bolt overcoat PVC plastic pipe and leakproof plug.Turning privileged sites such as T shape wall are welded on through-wall bolt (three section header types) on the reinforced concrete column;
(5) formwork reinforcement
Reinforcing in time puts in place after going into mould; The Template Location muscle adopts welding φ 16T shape reinforcing bar control on reinforced concrete column, beam, carry mould before, in advance positioning bar is controlled to the position of formwork erection according to control line.About 1~1.5 meter of welding positioning bar spacing.
(6) form removable and climbing
Form removable: when a construction layer surface construction finishes, after the concreting 24 hours, wall form can become flexible through-wall bolt, but non-disconnectable removing must be after 3 days, when top possesses the formwork condition, hang up properly tackles in advance on top, and pretension hangs the mould rope, connect to live template with leading screw after, can distinguish and remove through-wall bolt and template successively.Promote rear lower and prop up pad with bracing frame and flitch, top and reinforced concrete column are done interim drawknot, and in time inner formword and its are fixed with through-wall bolt;
2, support body
(1) welding channel-section steel
The specification that channel-section steel is encorbelmented in selection generally adopts 16#, and length wherein must not stretch in the body of wall residue length of encorbelmenting less than 0.5 meter at 1.8-2.2 meters.Girder steel is welded on the steel corbel upper surface, and spacing is not more than 4.5m.The beam outer end of encorbelmenting is welded the steel bar end of two ф 25 respectively, the usefulness of taking root as vertical rod.The company wall drawknot of scaffold and building adopts steel pipe to weld screw rod through walls by screw hole through walls and body of wall ways of connecting:
(2) set up the frame of encorbelmenting
Scaffold selects for use ф 48 * 3.5 steel pipes to set up; The vertical rod longitudinal pitch is 1.5 meters, laterally is the triangular form shape, goes on foot highly 1.8 meters, and the first step is set up into inside and outside truss with steel tube fastener, and lower edge is set up leger one; The vertical rod of installing on girder steel is set up into monolithic truss-like main frame with steel tube fastener.Bridging is completely taken in the support body outside, and per step is provided with steel tubular handrailing.
Before setting up, reinforce and utilize the scaffold of bottom, longitudinally leger is set on girder steel (vertical rod bottom) upper berth, followed by the plug-in mounting vertical rod, upright earlier inboard, upright again outside vertical rod, support with interim attached wall bar, adjust each rod member size after, the big or small cross bar on top in time is installed.Setting up order is extended forward gradually by an end.After sequencing at the bottom of the frame, upwards progressively set up again.
The same step, about two legers, leger joints should stagger mutually, and should not be arranged in the same span.After leger is put up, little cross bar is installed, its two should be stretched out more than the 10cm of leger outside.Same step vertical equity difference of height must not surpass 2cm.
(3) safety net, frame plate are laid
After scaffold is put up part,, the bottom of support body and side-closed, lay frame plate more in the above with Dense mesh screen in order to prevent the aerial work material that falls; Scaffold floor requires steady shop, full shop, must not be paved into the nose plate, latch plate.Tying with little cross bar, with anti-skidding by wall one side and end.When the enemy spreads.Under every plate termination, little cross bar should be arranged.Little cross bar should have in the 10-15cm from the scaffold termination.
(4) slideway is installed
After scaffold building was good, the triangle frame body side surface was installed slideway.
3, mould bases
The support body that utilization is set up is reinforced the template installation in place, has enough to meet the need the use of climbing repeatedly.

Claims (1)

1, construction method of special section steel concrete composite structure inclined wall mould base engineering is characterized in that,
The installation of template:
1) template processing
According to setting type determined template size, with countersunk head screw the mirror board of standard is fixed on to piece together on the wooden back cord and makes large form, vertical back cord adopts 60 * 100 lumps of wood, and decide the bamboo film at the lumps of wood back side, horizontal back cord employing 5# channel-section steel, spacing 500mm; The template edge joint position is closely knit with glass cement;
2) locate unwrapping wire, determine the position and the size of per pass body of wall; The body of wall position is checked in inspection;
3) formwork hoisting
The template that configures is gone into mould with the tower crane lifting along slideway, form joint is managed everywhere: the template end opening installs the employing mortar levelling first, secondary installing is covered mouth, highly be 50mm~100mm, paste two-sided tape, seam is pasted two-sided tape between template, adjacent rough ground connects with bolt, typified form is adopted in the bight, adjacent forms is done tongue and groove clasping joint close, steel encloses the purlin joint to be strengthened with two steel pipes, through-wall bolt overcoat PVC plastic pipe and leakproof plug, and the position, turning is welded on three section header type through-wall bolts on the reinforced concrete column;
4) formwork reinforcement
Reinforcing in time puts in place after going into mould; The Template Location muscle adopts welding φ 16T shape reinforcing bar control on reinforced concrete column, beam, carry mould before, in advance positioning bar is controlled to the position of formwork erection, 1~1.5 meter of welding positioning bar spacing according to control line;
5) form removable and climbing
Form removable: when a construction layer surface construction finishes, after the concreting 24 hours, wall form can become flexible through-wall bolt, after 3 days, when top possesses the formwork condition, hang up properly tackles in advance on top, and pretension hangs the mould rope, connect to live template with leading screw after, remove through-wall bolt and template successively, promote rear lower and prop up pad with bracing frame and flitch, top and reinforced concrete column are done interim drawknot, and in time inner formword and its are fixed with through-wall bolt;
Set up support body:
1) welding channel-section steel
The encorbelment specification of channel-section steel of selection, the general 16# that adopts, length is at 1.8~2.2 meters, wherein being not less than 0.5 meter stretches in the body of wall, the residue length of encorbelmenting, girder steel is welded on the steel corbel upper surface, and spacing is not more than 4.5m, the beam outer end of encorbelmenting is welded the steel bar end of two ф 25 respectively, and company's wall drawknot of scaffold and building adopts steel pipe to weld screw rod through walls by screw hole through walls and body of wall ways of connecting:
2) set up the frame of encorbelmenting
Scaffold selects for use ф 48 * 3.5 steel pipes to set up; The vertical rod longitudinal pitch is 1.5 meters, laterally is the triangular form shape, goes on foot highly 1.8 meters, and the first step is set up into inside and outside truss with steel tube fastener, and lower edge is set up leger one; The vertical rod of installing on girder steel is set up into monolithic truss-like main frame with steel tube fastener, and bridging is completely taken in the support body outside, and per step is provided with steel tubular handrailing;
Before setting up, reinforce and utilize the scaffold of bottom, longitudinally on the girder steel upper berth leger is set, upright earlier inboard followed by the plug-in mounting vertical rod, the big or small cross bar on top is installed in upright again outside vertical rod, upwards progressively sets up again;
The same step, about two legers, leger joints staggered mutually, after leger is put up, little cross bar were installed, and its two should be stretched out more than the 10cm of leger outside, and same step vertical equity difference of height must not surpass 2cm;
3) safety net, frame plate are laid
After scaffold is put up part, the bottom of support body and side-closed, lay frame plate more in the above with Dense mesh screen; When the enemy spreads, under every plate termination, little cross bar is arranged, little cross bar should have in the 10-15cm from the scaffold termination;
4) slideway is installed
After scaffold building was good, the triangle frame body side surface was installed slideway;
Mould bases is set up:
The support body that utilization is set up is reinforced the template installation in place, has enough to meet the need the use of climbing repeatedly.
CN2008101511070A 2008-09-25 2008-09-25 Construction method of special section steel concrete composite structure inclined wall mould base engineering Active CN101397844B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008101511070A CN101397844B (en) 2008-09-25 2008-09-25 Construction method of special section steel concrete composite structure inclined wall mould base engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008101511070A CN101397844B (en) 2008-09-25 2008-09-25 Construction method of special section steel concrete composite structure inclined wall mould base engineering

Publications (2)

Publication Number Publication Date
CN101397844A true CN101397844A (en) 2009-04-01
CN101397844B CN101397844B (en) 2011-01-26

Family

ID=40516665

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101511070A Active CN101397844B (en) 2008-09-25 2008-09-25 Construction method of special section steel concrete composite structure inclined wall mould base engineering

Country Status (1)

Country Link
CN (1) CN101397844B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101881082A (en) * 2010-02-10 2010-11-10 广州市住宅建设发展有限公司 Construction method for releasing strong restraint stress of steel connecting rods of oblique and stiffened concrete structures
CN101858150B (en) * 2010-01-25 2011-06-29 安徽鲁班建设投资集团有限公司 Installation method of combined joint with steel structure
CN102127930A (en) * 2010-07-19 2011-07-20 曾庆胜 Net die member for steel-concrete building and method for constructing enclosure by combining net die members and filling into a frame shear wall
CN102409852A (en) * 2011-09-30 2012-04-11 中国二十二冶集团有限公司 Construction method for wood formwork with bigger circular structure by taking reinforcing steel bar as lateral rear edge
CN102704684A (en) * 2012-06-21 2012-10-03 福建省泷澄建设集团有限公司 Construction method for high-strength shaping combined template of plank frame of shear wall
CN104727560A (en) * 2015-02-16 2015-06-24 中交一航局第一工程有限公司 Reinforced concrete structure reinforced steel framework forming method and reinforced steel jig frame
CN105544966A (en) * 2016-01-29 2016-05-04 中国建筑第八工程局有限公司 Formwork reinforcing system and construction method for large-angle veneer fair-faced inclined wall
CN107100358A (en) * 2017-05-23 2017-08-29 北京六建集团有限责任公司 Without the special bracket of encorbelmenting of off-load industrialization security protection, support body and its construction method
CN109183846A (en) * 2018-11-02 2019-01-11 广东省水利水电第三工程局有限公司 A kind of concrete prefabricated formwork structure and production method applied to basement cushion cap
CN115478685A (en) * 2022-09-27 2022-12-16 上海建工一建集团有限公司 Formwork hanging device for inclined wall construction and construction method thereof
CN116357075A (en) * 2023-05-31 2023-06-30 北京市第三建筑工程有限公司 Construction method of multi-curved-surface stair railing of clean water modeling stair based on wood template

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000045511A (en) * 1998-07-29 2000-02-15 Taisei Corp Maintenance gondola device for inclined external wall face and maintenance method
JP2002295002A (en) * 2001-03-28 2002-10-09 Maeda Corp Fitting device of outer wall exterior plate
CN2469108Y (en) * 2001-04-11 2002-01-02 廖云松 Friction and self-locking type falling-down proof safety device for electrically lifting/lowering scaffold

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101858150B (en) * 2010-01-25 2011-06-29 安徽鲁班建设投资集团有限公司 Installation method of combined joint with steel structure
CN101881082B (en) * 2010-02-10 2011-11-30 广州市住宅建设发展有限公司 Construction method for releasing strong restraint stress of steel connecting rods of oblique and stiffened concrete structures
CN101881082A (en) * 2010-02-10 2010-11-10 广州市住宅建设发展有限公司 Construction method for releasing strong restraint stress of steel connecting rods of oblique and stiffened concrete structures
CN102127930A (en) * 2010-07-19 2011-07-20 曾庆胜 Net die member for steel-concrete building and method for constructing enclosure by combining net die members and filling into a frame shear wall
CN102127930B (en) * 2010-07-19 2012-10-17 曾庆胜 Net die member for steel-concrete building and method for constructing enclosure by combining net die members and filling into a frame shear wall
CN102409852B (en) * 2011-09-30 2013-10-23 中国二十二冶集团有限公司 Construction method for wood formwork with bigger circular structure by taking reinforcing steel bar as lateral rear edge
CN102409852A (en) * 2011-09-30 2012-04-11 中国二十二冶集团有限公司 Construction method for wood formwork with bigger circular structure by taking reinforcing steel bar as lateral rear edge
CN102704684B (en) * 2012-06-21 2015-01-07 福建省泷澄建设集团有限公司 Construction method for high-strength shaping combined template of plank frame of shear wall
CN102704684A (en) * 2012-06-21 2012-10-03 福建省泷澄建设集团有限公司 Construction method for high-strength shaping combined template of plank frame of shear wall
CN104727560A (en) * 2015-02-16 2015-06-24 中交一航局第一工程有限公司 Reinforced concrete structure reinforced steel framework forming method and reinforced steel jig frame
CN105544966A (en) * 2016-01-29 2016-05-04 中国建筑第八工程局有限公司 Formwork reinforcing system and construction method for large-angle veneer fair-faced inclined wall
CN107100358A (en) * 2017-05-23 2017-08-29 北京六建集团有限责任公司 Without the special bracket of encorbelmenting of off-load industrialization security protection, support body and its construction method
CN107100358B (en) * 2017-05-23 2023-12-29 北京六建集团有限责任公司 Cantilever bracket and bracket body special for unloading-free industrialized safety protection and construction method of cantilever bracket and bracket body
CN109183846A (en) * 2018-11-02 2019-01-11 广东省水利水电第三工程局有限公司 A kind of concrete prefabricated formwork structure and production method applied to basement cushion cap
CN109183846B (en) * 2018-11-02 2023-12-22 广东省水利水电第三工程局有限公司 Concrete prefabricated formwork structure applied to basement bearing platform and manufacturing method
CN115478685A (en) * 2022-09-27 2022-12-16 上海建工一建集团有限公司 Formwork hanging device for inclined wall construction and construction method thereof
CN115478685B (en) * 2022-09-27 2024-02-23 上海建工一建集团有限公司 Hanging die device for inclined wall construction and construction method thereof
CN116357075A (en) * 2023-05-31 2023-06-30 北京市第三建筑工程有限公司 Construction method of multi-curved-surface stair railing of clean water modeling stair based on wood template
CN116357075B (en) * 2023-05-31 2023-09-19 北京市第三建筑工程有限公司 Construction method of multi-curved-surface stair railing of clean water modeling stair based on wood template

Also Published As

Publication number Publication date
CN101397844B (en) 2011-01-26

Similar Documents

Publication Publication Date Title
CN101397844B (en) Construction method of special section steel concrete composite structure inclined wall mould base engineering
CN101538896B (en) Construction method for jettied structure at high attitude of high-rise building
CN206053274U (en) The external scaffolding device of the perpendicular BAIYE outer visor of skyscraper and glass curtain wall dual-purpose
CN103410320B (en) The tower silo flexibility platform bitubular connects sliding construction method
CN103669845A (en) High-altitude long-span overhung cornice formwork supporting system and constructing method thereof
CN103352563A (en) Self plate-bearing type steel bar mesh support combined template and construction method thereof
CN206352391U (en) Socket joint type key slot type Quick Release support system
CN111255217A (en) Elevator shaft shaping operation platform and operation method thereof
CN113931313A (en) Super high-rise core tube horizontal structure construction method
CN104878867A (en) Ceiling joist and double-layer construction platform integrated structure and manufacturing method thereof
CN115030046A (en) Hydraulic creeping formwork for hollow thin-wall pier and construction method thereof
CN207879008U (en) Diameter Silo structure roof support system
CN104831928B (en) High-altitude long-span concrete conjoined structure shuttering supporting steel platform construction method
CN108412231A (en) Assembled is bolted reinforcing steel processing shed and its assemble method entirely
CN111576832A (en) Construction system and construction method of cantilever multi-bent
CN215717078U (en) Bailey frame overhanging type steel operating platform
CN207905389U (en) Assembled is bolted reinforcing steel processing shed entirely
CN211923466U (en) Elevator shaft regularization operation platform
CN105370027A (en) Construction method for integrally lifted and supported steel platform structure in high-rise suspended structure
CN114775979A (en) Assembly operation frame device for safety production training
CN104594631B (en) The construction technology of sliding form apparatus traction operation platform construction granulation tower spraying layer
CN114215333A (en) Rapid construction method for outer cornice of high-rise building
CN112854702A (en) Large-span silo roof construction platform and erection method
CN113550550A (en) Overhanging unit type scaffold convenient to assemble and disassemble
CN206873494U (en) A kind of operating platform for narrow space on the outside of barricade

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 710054 No. 68 Anton street, Shaanxi, Xi'an

Patentee after: SCEGC NO.3 CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

Address before: 710054 No. 68 Anton street, Shaanxi, Xi'an

Patentee before: SHAANXI CONSTRUCTION ENGINEERING GROUP NO.3 BUILDING ENGINEERING Co.,Ltd.

Address after: 710054 No. 68 Anton street, Shaanxi, Xi'an

Patentee after: SHAANXI CONSTRUCTION ENGINEERING GROUP NO.3 BUILDING ENGINEERING Co.,Ltd.

Address before: 710054 No. 68 Anton street, Shaanxi, Xi'an

Patentee before: SHAANXI CONSTRUCTION ENGINEERING GROUP THIRD ENGINEERING Co.,Ltd.