CN108412231A - Assembled is bolted reinforcing steel processing shed and its assemble method entirely - Google Patents
Assembled is bolted reinforcing steel processing shed and its assemble method entirely Download PDFInfo
- Publication number
- CN108412231A CN108412231A CN201810043260.5A CN201810043260A CN108412231A CN 108412231 A CN108412231 A CN 108412231A CN 201810043260 A CN201810043260 A CN 201810043260A CN 108412231 A CN108412231 A CN 108412231A
- Authority
- CN
- China
- Prior art keywords
- column
- processing shed
- shaped steel
- purlin
- purlins
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 7
- 229910001294 Reinforcing steel Inorganic materials 0.000 title 1
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 95
- 239000010959 steel Substances 0.000 claims abstract description 95
- 238000010079 rubber tapping Methods 0.000 claims description 6
- 230000002787 reinforcement Effects 0.000 claims description 4
- 238000010586 diagram Methods 0.000 description 8
- 238000010276 construction Methods 0.000 description 7
- 239000000463 material Substances 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000009415 formwork Methods 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000003139 buffering effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 239000000047 product Substances 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 239000011265 semifinished product Substances 0.000 description 1
- 238000004078 waterproofing Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/12—Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
- E04H1/1205—Small buildings erected in the open air
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2418—Details of bolting
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2448—Connections between open section profiles
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Rod-Shaped Construction Members (AREA)
Abstract
本发明涉及一种装配式全螺栓连接钢筋加工棚及其组装方法,包括混凝土基础,至少两个拼装单元,所述的每个拼装单元包括有两根方钢管立柱和一根工字型钢梁,两根方钢管立柱之间设置有交叉支撑,方钢管立柱的外侧通过梁柱斜撑与工字型钢梁相连,立柱两端焊接有端板,立柱顶端的端板通过螺栓与工字型钢梁相连,立柱底端的端板通过螺栓与混凝土基础相连,所述拼装单元平行设置。本发明结构安全可靠、空间灵活、装拆方便快捷、可多次循环使用。
The invention relates to a prefabricated full-bolt connection steel bar processing shed and an assembly method thereof, comprising a concrete foundation and at least two assembly units, each of which includes two square steel pipe columns and an I-shaped steel beam , There is a cross brace between the two square steel pipe columns. The outer side of the square steel pipe column is connected with the I-shaped steel beam through the beam-column diagonal brace. The steel beams are connected, the end plate at the bottom of the column is connected with the concrete foundation through bolts, and the assembled units are arranged in parallel. The invention has the advantages of safe and reliable structure, flexible space, convenient assembly and disassembly, and can be used repeatedly.
Description
技术领域technical field
本发明涉及一种建筑施工现场的临时作业棚,尤其是涉及一种装配式全螺栓连接钢筋加工棚。The invention relates to a temporary work shed on a building construction site, in particular to an assembly type full-bolt connection steel bar processing shed.
背景技术Background technique
钢筋加工棚是建筑施工现场对钢材进行加工的场地,同时也是为工人提供安全保障的地方。目前大多数施工现场使用的钢筋加工棚是通过扣件、钢管搭设或者通过焊接而组成的钢结构框架,该形式不仅导致材料成品及半成品运输不便,而且建造与拆卸速度慢、重复使用率较低、安全性不高。因此,在建造此类临时作业棚时,不仅要考虑安全、效率,还要确保能够多次重复使用,安装快捷,节能环保。The steel bar processing shed is the place where steel is processed on the construction site, and it is also a place to provide safety for workers. At present, most of the steel bar processing sheds used in construction sites are steel structure frames composed of fasteners, steel pipe erection or welding. This form not only makes the transportation of finished and semi-finished materials inconvenient, but also slows down construction and dismantling, and has a low reuse rate. , The security is not high. Therefore, when building such a temporary work shed, not only safety and efficiency must be considered, but also to ensure that it can be reused many times, quick to install, energy-saving and environmentally friendly.
发明内容Contents of the invention
本发明的目的是提供一种装配式全螺栓连接钢筋加工棚,该种加工棚全部构件由工厂预制,结构安全、建造拆卸速度快、可重复使用,可以在施工现场进行装配。The purpose of the present invention is to provide a prefabricated full-bolt connection steel bar processing shed. All components of this kind of processing shed are prefabricated by the factory. The structure is safe, the construction and disassembly speed is fast, and it can be reused.
本发明的另一个目的是提供一种装配式全螺栓连接钢筋加工棚的组装方法。Another object of the present invention is to provide an assembly method for a prefabricated fully bolted reinforcement processing shed.
为了解决目前建筑施工现场钢筋加工棚存在的问题,本发明采用的技术方案如下:In order to solve the problems existing in the steel bar processing shed on the construction site at present, the technical scheme adopted in the present invention is as follows:
一种装配式全螺栓连接钢筋加工棚,包括混凝土基础,还包括至少两个拼装单元,所述的每个拼装单元包括有两根方钢管立柱和一根工字型钢梁,两根方钢管立柱之间设置有交叉支撑,方钢管立柱的外侧通过梁柱斜撑与工字型钢梁相连,立柱两端焊接有端板,立柱顶端的端板通过螺栓与工字型钢梁相连,立柱底端的端板通过螺栓与混凝土基础相连,所述拼装单元平行设置。A prefabricated full-bolt connection reinforcement processing shed, including a concrete foundation, and at least two assembled units, each of which includes two square steel pipe columns and an I-shaped steel beam, two square steel pipes There are cross supports between the columns. The outer side of the square steel tube column is connected to the I-shaped steel beam through the beam-column brace. The two ends of the column are welded with end plates. The end plate at the top of the column is connected to the I-shaped steel beam through bolts. The column The end plate at the bottom is connected to the concrete foundation through bolts, and the assembled units are arranged in parallel.
所述的方钢管立柱的侧壁上焊接有柱侧耳板,交叉支撑通过螺栓固定在柱侧耳板上。The side wall of the square steel pipe column is welded with a column side ear plate, and the cross support is fixed on the column side ear plate by bolts.
所述的梁柱斜撑通过螺栓固定在柱侧耳板上。The beam-column braces are fixed on the column-side lugs by bolts.
所述工字型钢梁下翼缘布置有下层檩条,下层檩条上方布置彩钢板。A lower purlin is arranged on the lower flange of the I-shaped steel beam, and a color steel plate is arranged above the lower purlin.
所述彩钢板通过自攻螺钉固定于下层檩条上。The color steel plate is fixed on the lower purlins by self-tapping screws.
所述工字型钢梁上方设置有竖向檩托,竖向檩托上方设置有上层檩条,上层檩条上方设置有脚手板。A vertical purlin support is arranged above the I-shaped steel beam, an upper purlin is arranged above the vertical purlin support, and a scaffolding board is arranged above the upper purlin.
所述竖向檩托焊接于工字型钢梁上方。The vertical purlin supports are welded above the I-shaped steel beams.
所述竖向檩托与上层檩条之间通过螺栓连接。The vertical purlin support and the upper purlin are connected by bolts.
所述位于最外侧的上、下层檩条上焊接有檩条耳板,所述位于最外侧的工字型钢梁下翼缘处设有孔洞。Purlin lugs are welded on the outermost upper and lower purlins, and holes are provided at the lower flange of the outermost I-shaped steel beam.
所述的一种装配式全螺栓连接钢筋加工棚的组装方法,包括以下步骤:A method for assembling a prefabricated full-bolt connection steel bar processing shed includes the following steps:
①安装两根方钢管立柱;① Install two square steel pipe columns;
②在两根方钢管立柱上方安装工字型钢梁;② Install I-shaped steel beams above the two square steel pipe columns;
③安装交叉支撑和梁柱斜撑,③Install cross bracing and beam-column diagonal bracing,
④在两个工字型钢梁下方的相应螺栓孔部位,设置一排平行的下层檩条,然后在下层檩条上方通过自攻螺钉固定彩钢板;④In the corresponding bolt holes under the two I-shaped steel beams, set a row of parallel lower purlins, and then fix the color steel plate with self-tapping screws above the lower purlins;
⑤通过螺栓将上层檩条固定在竖向檩托上,然后在上层檩条的上方满铺脚手板,通过铁丝或者缆绳固定。⑤Fix the upper purlins on the vertical purlin brackets with bolts, and then spread scaffolding boards above the upper purlins, and fix them with wires or cables.
本发明所具有的优点与有益效果是:The advantages and beneficial effects that the present invention has are:
本发明一种装配式全螺栓连接钢筋加工棚所需构件都在工厂提前预制,在现场全部通过螺栓连接,无需焊接,装拆速度快捷;而且立柱位于中部,方便材料的运输和加工,可大大提高工人的工作效率。本发明由于每个拼装单元中设置有一个工字型钢梁、二个方钢管立柱、两个梁柱支撑、两个柱间支撑,立柱放置于工字型钢梁中部,四周空间灵活,方便加工器具以及钢材成品、半成品的运输。本发明由于工字型钢梁下翼缘两侧开一排孔,一侧通过螺栓连接下层檩条,一侧为企业后期悬挂宣传标语提供连接部位。由于上层檩条上方设置防砸结构,可放置脚手板、木模板等。由于下层檩条上方通过螺栓连接彩钢板可以用于防水。由于上下层最外侧檩条连接有耳板,可以为企业后期悬挂宣传标语提供连接部位。All the required components of the prefabricated full-bolt connection steel bar processing shed of the present invention are prefabricated in advance in the factory, and all are connected by bolts on site, without welding, and the assembly and disassembly speed is fast; moreover, the column is located in the middle, which is convenient for the transportation and processing of materials, and can be greatly improved. Improve worker productivity. In the present invention, since each assembly unit is provided with an I-shaped steel beam, two square steel pipe columns, two beam-column supports, and two inter-column supports, the column is placed in the middle of the I-shaped steel beam, and the surrounding space is flexible and convenient. Transportation of processing tools, finished steel products and semi-finished products. In the present invention, a row of holes is opened on both sides of the lower flange of the I-shaped steel beam, one side is connected to the lower purlin by bolts, and the other side provides a connection part for the enterprise to hang propaganda slogans later. Since the anti-smashing structure is set above the upper purlins, scaffolding boards, wooden formwork, etc. can be placed. Because the color steel plate is connected by bolts above the purlins of the lower layer, it can be used for waterproofing. Since the outermost purlins of the upper and lower floors are connected with lug plates, it can provide a connecting part for the company to hang promotional slogans later.
本发明由于设置有双层屋面板,上层能够满足防砸要求、下层可以满足防雨要求。并充分利用了工字型钢自身结构的优越性,防雨设置在下翼缘处,防砸设置在上翼缘处,对于坠落物体具有良好缓冲作用。可以自由设置拼装单元数量以满足工程需要。本发明所用构件全部为钢材,可重复循环使用,符合我国倡导的绿色施工理念,也契合国家的可持续发展战略。本发明不仅可以应用于施工现场的钢筋加工棚,还可用于木工加工棚、安全通道等。Since the present invention is provided with double-layer roof panels, the upper layer can meet the anti-smashing requirements, and the lower layer can meet the rain-proof requirements. And make full use of the superiority of the I-shaped steel structure itself, the rainproof is set at the lower flange, and the anti-smashing is set at the upper flange, which has a good buffering effect on falling objects. The number of assembled units can be freely set to meet engineering needs. The components used in the present invention are all steel materials, which can be used repeatedly, conform to the green construction concept advocated by my country, and also conform to the sustainable development strategy of the country. The present invention can be applied not only to steel bar processing sheds on construction sites, but also to carpentry processing sheds, safety passages and the like.
附图说明Description of drawings
下面结合附图对本发明做进一步详细说明:Below in conjunction with accompanying drawing, the present invention is described in further detail:
图1是本发明一种装配式全螺栓连接钢筋加工棚的整体结构图;Fig. 1 is an overall structural diagram of a prefabricated full-bolt connection steel bar processing shed of the present invention;
图2是本发明一种装配式全螺栓连接钢筋加工棚的拼装单元图;Fig. 2 is an assembled unit diagram of a prefabricated full-bolt connection steel bar processing shed of the present invention;
图3是图2中A部位交叉支撑的结构图;Fig. 3 is a structural diagram of a cross brace at part A in Fig. 2;
图4是图2中B部位梁柱斜撑的结构图;Fig. 4 is a structural diagram of a beam-column brace at part B in Fig. 2;
图5是图2中C部位梁柱节点的结构图;Fig. 5 is a structural diagram of a beam-column joint at part C in Fig. 2;
图6是图2中D部位柱脚节点的结构图;Fig. 6 is a structural diagram of the column base node at part D in Fig. 2;
图7是图1中E部位下层檩条与工字型钢梁连接示意图;Fig. 7 is a schematic diagram of the connection between the lower purlin and the I-shaped steel beam at the E part in Fig. 1;
图8是图1中F部位上层檩条与竖向檩托连接示意图。Fig. 8 is a schematic diagram of the connection between the upper purlin and the vertical purlin support at the F position in Fig. 1 .
具体实施方式Detailed ways
下面结合具体实施例对本发明进行进一步详细说明,但本发明的保护范围不受具体的实施例所限制,以权利要求书为准。另外,以不违背本发明技术方案的前提下,对本发明所作的本领域普通技术人员容易实现的任何改动或改变都将落入本发明的权利要求范围之内。The present invention will be further described in detail below in conjunction with specific examples, but the protection scope of the present invention is not limited by the specific examples, and the claims shall prevail. In addition, on the premise of not violating the technical solution of the present invention, any modification or change made to the present invention that can be easily realized by those skilled in the art will fall within the scope of the claims of the present invention.
如图1-8所示,本发明一种装配式全螺栓连接钢筋加工棚,包括混凝土基础,至少两个拼装单元,所述拼装单元平行设置。每个拼装单元包括有两根方钢管立柱2和一根工字型钢梁3,两根方钢管立柱之间设置有交叉支撑4,方钢管立柱的外侧通过梁柱斜撑5与工字型钢梁3相连,立柱两端焊接有端板1,立柱顶端的端板通过螺栓13与工字型钢梁3相连,立柱底端的端板通过螺栓与混凝土基础14相连。As shown in Figures 1-8, the present invention is a prefabricated full-bolt connection steel bar processing shed, which includes a concrete foundation and at least two assembled units, and the assembled units are arranged in parallel. Each assembly unit includes two square steel pipe columns 2 and an I-shaped steel beam 3, and a cross brace 4 is arranged between the two square steel pipe columns, and the outer side of the square steel pipe column is connected with the I-shaped steel beam brace 5 through the beam column. The steel beams 3 are connected, the two ends of the column are welded with end plates 1, the end plate at the top of the column is connected with the I-shaped steel beam 3 through bolts 13, and the end plate at the bottom of the column is connected with the concrete foundation 14 through bolts.
所述工字型钢梁下翼缘布置有下层檩条6,下层檩条上方布置彩钢板11。所述彩钢板通过自攻螺钉固定于下层檩条上。所述工字型钢梁上方设置有竖向檩托7,竖向檩托上方设置有上层檩条8,上层檩条上方设置有脚手板12。所述竖向檩托焊接于工字型钢梁上方。所述竖向檩托与上层檩条8之间通过螺栓连接。所述位于最外侧的上、下层檩条上焊接有檩条耳板9,所述位于最外侧的工字型钢梁下翼缘处设有孔洞,可根据自身要求设置宣传标语,方便连接。A lower purlin 6 is arranged on the lower flange of the I-shaped steel beam, and a color steel plate 11 is arranged above the lower purlin. The color steel plate is fixed on the lower purlins by self-tapping screws. A vertical purlin support 7 is arranged above the I-shaped steel beam, an upper purlin 8 is arranged above the vertical purlin support, and a scaffold board 12 is arranged above the upper purlin. The vertical purlin supports are welded above the I-shaped steel beams. The vertical purlin support and the upper purlin 8 are connected by bolts. Purlin lugs 9 are welded on the outermost upper and lower purlins, and holes are provided at the lower flange of the outermost I-shaped steel beam, and slogans can be set according to their own requirements to facilitate connection.
所述的方钢管立柱的侧壁上焊接有柱侧耳板10,交叉支撑4通过螺栓固定在柱侧耳板上。所述的梁柱斜撑通过螺栓固定在柱侧耳板上。The side wall of the square steel pipe column is welded with a column side ear plate 10, and the cross support 4 is fixed on the column side ear plate by bolts. The beam-column braces are fixed on the column-side lugs by bolts.
本发明一种装配式全螺栓连接钢筋加工棚的组装方法,包括以下步骤:An assembly method of a prefabricated full-bolt connection steel bar processing shed of the present invention comprises the following steps:
①安装两根方钢管立柱2;① Install two square steel pipe columns 2;
②在两根方钢管立柱2上方安装工字型钢梁3;②Install the I-shaped steel beam 3 above the two square steel pipe columns 2;
③安装交叉支撑4和梁柱斜撑5,③Install the cross brace 4 and the beam-column brace 5,
④在两个工字型钢梁下方的相应螺栓孔部位,设置一排平行的下层檩条6,然后在下层檩条6上方通过自攻螺钉固定彩钢板11用于防雨,以满足防水要求;④In the corresponding bolt holes below the two I-shaped steel beams, set a row of parallel lower purlins 6, and then fix the color steel plate 11 with self-tapping screws above the lower purlins 6 for rain protection to meet the waterproof requirements;
⑤通过螺栓13将上层檩条8固定在竖向檩托上,然后在上层檩条8的上方满铺脚手板12或者木模板,通过铁丝或者缆绳固定,以满足防砸要求。⑤Fix the upper purlin 8 on the vertical purlin support with bolts 13, then pave scaffolding boards 12 or wooden formwork above the upper purlin 8, and fix it with iron wires or cables to meet the anti-smashing requirements.
以上所述仅是本发明的较佳实施例而已,并非对本发明做任何形式的限制,对于本领域的普通技术人员来说,在不脱离本发明技术方案的的范围内,当可利用上述揭示的技术内容做出些许修饰为等同变化的等效实施例,但凡是未脱离本发明技术方案的内容,依据本发明的技术实质对以上实施例所做的任何简单修改、等同变化与修饰也应视为本发明的保护范围。本实施例中未明确的各组成部分均可用现有技术加以实现。The above description is only a preferred embodiment of the present invention, and does not limit the present invention in any form. For those of ordinary skill in the art, within the scope of the technical solution of the present invention, the above disclosure can be used The technical content of the present invention is slightly modified as an equivalent embodiment of an equivalent change, but any simple modifications, equivalent changes and modifications made to the above embodiments according to the technical essence of the present invention should also be used without departing from the content of the technical solution of the present invention It is regarded as the protection scope of the present invention. All components that are not specified in this embodiment can be realized by existing technologies.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810043260.5A CN108412231A (en) | 2018-01-17 | 2018-01-17 | Assembled is bolted reinforcing steel processing shed and its assemble method entirely |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810043260.5A CN108412231A (en) | 2018-01-17 | 2018-01-17 | Assembled is bolted reinforcing steel processing shed and its assemble method entirely |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN108412231A true CN108412231A (en) | 2018-08-17 |
Family
ID=63125852
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201810043260.5A Pending CN108412231A (en) | 2018-01-17 | 2018-01-17 | Assembled is bolted reinforcing steel processing shed and its assemble method entirely |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN108412231A (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109537737A (en) * | 2019-01-14 | 2019-03-29 | 浙江新盛建设集团有限公司 | A kind of the totally detachable type machining shed and its assemble method of waterproof layer partition |
| CN110230414A (en) * | 2019-07-12 | 2019-09-13 | 中铁建设集团有限公司 | A kind of assembled platform canopy and its installation method |
| CN110485757A (en) * | 2019-06-17 | 2019-11-22 | 天祥建设集团股份有限公司 | A kind of steel bar meter field protection canopy |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201953070U (en) * | 2010-12-20 | 2011-08-31 | 中国建筑一局(集团)有限公司 | Reusable fabricated processing shed for construction site |
| WO2012110506A1 (en) * | 2011-02-14 | 2012-08-23 | Stefan Boettle | Roof, in particular gas station roof |
| CN103741970A (en) * | 2013-12-30 | 2014-04-23 | 广西建工集团第五建筑工程有限责任公司 | Assembled machining shed for building construction and manufacture and installation method thereof |
| CN203594237U (en) * | 2013-11-01 | 2014-05-14 | 中建三局建设工程股份有限公司 | Multi-layer tool type recyclable crash-preventing shed |
| CN204676940U (en) * | 2015-03-25 | 2015-09-30 | 马鞍山职业技术学院 | Single column is outstanding draws Double Tops pin-connected panel reinforcing bar protection canopy |
| CN205840337U (en) * | 2016-06-23 | 2016-12-28 | 合肥深安钢结构建筑系统工程有限公司 | A kind of complete bolted reinforcing steel processing shed |
| CN207905389U (en) * | 2018-01-17 | 2018-09-25 | 沈阳建筑大学 | Assembled is bolted reinforcing steel processing shed entirely |
-
2018
- 2018-01-17 CN CN201810043260.5A patent/CN108412231A/en active Pending
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201953070U (en) * | 2010-12-20 | 2011-08-31 | 中国建筑一局(集团)有限公司 | Reusable fabricated processing shed for construction site |
| WO2012110506A1 (en) * | 2011-02-14 | 2012-08-23 | Stefan Boettle | Roof, in particular gas station roof |
| CN203594237U (en) * | 2013-11-01 | 2014-05-14 | 中建三局建设工程股份有限公司 | Multi-layer tool type recyclable crash-preventing shed |
| CN103741970A (en) * | 2013-12-30 | 2014-04-23 | 广西建工集团第五建筑工程有限责任公司 | Assembled machining shed for building construction and manufacture and installation method thereof |
| CN204676940U (en) * | 2015-03-25 | 2015-09-30 | 马鞍山职业技术学院 | Single column is outstanding draws Double Tops pin-connected panel reinforcing bar protection canopy |
| CN205840337U (en) * | 2016-06-23 | 2016-12-28 | 合肥深安钢结构建筑系统工程有限公司 | A kind of complete bolted reinforcing steel processing shed |
| CN207905389U (en) * | 2018-01-17 | 2018-09-25 | 沈阳建筑大学 | Assembled is bolted reinforcing steel processing shed entirely |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109537737A (en) * | 2019-01-14 | 2019-03-29 | 浙江新盛建设集团有限公司 | A kind of the totally detachable type machining shed and its assemble method of waterproof layer partition |
| CN110485757A (en) * | 2019-06-17 | 2019-11-22 | 天祥建设集团股份有限公司 | A kind of steel bar meter field protection canopy |
| CN110230414A (en) * | 2019-07-12 | 2019-09-13 | 中铁建设集团有限公司 | A kind of assembled platform canopy and its installation method |
| CN110230414B (en) * | 2019-07-12 | 2023-10-03 | 中铁建设集团有限公司 | Prefabricated platform canopy and installation method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3218530U (en) | Central assembly steel structure | |
| CN105604187B (en) | A kind of assembling type steel structure beam column node connection device | |
| CN204826308U (en) | Structure assembly type structure is pieced together in advance to prefabricated shaped steel concrete shear force wall | |
| CN205421547U (en) | Module building system is assembled to low layer | |
| CN207749908U (en) | A kind of enclosure wall of full assembly lightweight steel construction | |
| CN103352564A (en) | Horizontally-structured framework system and construction method | |
| CN106638957B (en) | Cold formed steel structure external wall of house structural system | |
| CN108590242A (en) | Assembling type steel structure one-shot job canopy and its installation method | |
| CN108756196A (en) | A kind of assembled architecture main body protective device and its construction method | |
| CN201953070U (en) | Reusable fabricated processing shed for construction site | |
| CN108755955A (en) | Reinforcement structure between light gauge cold-formed steel shape house longitudinal cross wall | |
| CN108331164A (en) | A kind of attachment device and installation method of Steel Truss Beam and lattice type steel column node | |
| CN102418417B (en) | Long-slab-span cast-in-situ beam ribbed floor early-dismantling template formwork system | |
| CN205296893U (en) | Embedded steel construction assembly house | |
| CN208202657U (en) | Assembled is bolted carpenter's machining shed entirely | |
| CN207905389U (en) | Assembled is bolted reinforcing steel processing shed entirely | |
| CN108086535B (en) | An Assembled Square Steel Tube Steel Plate Concrete Composite Shear Wall | |
| CN205531410U (en) | A simply can dismantle construction canopy for steel construction job site | |
| CN204983173U (en) | Steel construction beam -column connection node | |
| CN108412230A (en) | Assembled is bolted carpenter's machining shed and its assemble method entirely | |
| CN204174953U (en) | Temporory structure integrated rain-proof is anti-pounds canopy | |
| CN212866793U (en) | A prefabricated construction elevator parking platform | |
| CN202865996U (en) | Room modular structure for nuclear power plant | |
| CN104674949A (en) | Portable shelter | |
| CN207794690U (en) | The assembled steel reinforced machining shed that can be had enough to meet the need |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180817 |
|
| RJ01 | Rejection of invention patent application after publication |