CN203145038U - lattice column type tower crane foundation - Google Patents

lattice column type tower crane foundation Download PDF

Info

Publication number
CN203145038U
CN203145038U CN 201320123715 CN201320123715U CN203145038U CN 203145038 U CN203145038 U CN 203145038U CN 201320123715 CN201320123715 CN 201320123715 CN 201320123715 U CN201320123715 U CN 201320123715U CN 203145038 U CN203145038 U CN 203145038U
Authority
CN
China
Prior art keywords
lattice column
tower crane
lattice
cushion cap
foundation pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320123715
Other languages
Chinese (zh)
Inventor
常章平
孙维振
马永红
颜庭韵
宋敏
蒋画
郑鹏亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
CSCEC Paul Y Construction Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
CSCEC Paul Y Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd, CSCEC Paul Y Construction Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN 201320123715 priority Critical patent/CN203145038U/en
Application granted granted Critical
Publication of CN203145038U publication Critical patent/CN203145038U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

A lattice column type tower crane foundation comprises a foundation pile and a bearing platform, wherein the foundation pile is composed of four cast-in-place bored piles, and the bearing platform is erected between the bottom surface of a basement bottom plate and the foundation pile. Four drilling bored concrete piles are connected with the tower crane by four lattice columns respectively, and every lattice column is formed by four angle steels of distribution in four corners and the batten plate welding of connection between two adjacent angle steels, and the anchoring of lattice column lower part is in drilling bored concrete pile, and lattice column middle part and cushion cap anchor just upwards pass the basement bottom plate, and the lattice column platform that is used for fixed tower crane foundation festival is connected at the lattice column top, still is connected with the bracing piece between four lattice column upper portions. The utility model discloses a lattice column type basis is quality safety not only guaranteed, has also reduced the construction degree of difficulty of tower crane basis, has ensured the engineering progress, but wide application in building deep basal pit tower crane construction.

Description

Lattice pillar tower crane
Technical field
The utility model relates to a kind of tower crane, particularly a kind of tower crane that is applicable to deep foundation ditch.
Background technology
Design has basement in the construction project place, and tower crane comes into operation as early as possible as tower crane when being positioned at the basement basis, constructs significant to basement and bracing of foundation pit.The tower crane structure need satisfy performance and the supporting capacity of tower crane itself, and should satisfy design requirement simple for structure, easy construction as far as possible.Have now and excavate the tower crane earthwork in advance, tower crane is dropped on the method at basement bottom board place again, the soil excavation degree of depth is big, complicated geology, and construction risk is big, long in time limit.Have now in the tower crane bottom and the punching concrete pile is set as the method for tower crane, high material consumption is difficult to guarantee concrete strength, and pile body will produce a large amount of building wastes after removing.
The utility model content
The utility model provides a kind of lattice pillar tower crane, solve the existing technical problem that the tower crane difficulty of construction is big, long in time limit, cost is high.
The technical scheme that its technical problem that solves the utility model adopts is:
This lattice pillar tower crane comprises foundation pile and cushion cap, and described foundation pile is made of four bored piles, and cushion cap props up to be located between basement bottom board bottom surface and the foundation pile;
Be connected by four lattice columns respectively between described four bored piles and the tower crane, every lattice column is welded by the batten plate that is distributed in four angle steel of four jiaos and be connected between adjacent two angle steel, the lattice column bottom is anchored in the bored pile, the lattice column middle part is with the cushion cap anchoring and be upward through basement bottom board, the lattice column top connects and is used for the fixedly lattice column platform of tower crane base section, also is connected with support bar between four lattice column tops.
The stake top of described four bored piles embeds cushion cap 100mm at least.
Described cushion cap is made of end face arrangement of reinforcement, bottom surface arrangement of reinforcement, tension rib and base concrete.
Described lattice column is passing basement bottom board place full weld steel plate water-stopping sheet all around.
Described lattice column platform is by the horizontal steel plate that is welded in the lattice column end face, and the triangular steel plate that is welded between horizontal steel plate and the lattice column constitutes.
Described support bar comprises and is connected horizontal brace and diagonal brace between the adjacent lattice column, and is connected the horizontal cross brace between relative two horizontal braces.
Described support bar adopts channel-section steel or angle steel.
The beneficial effects of the utility model are as follows:
The utility model adopt to adopt four bored piles as foundation pile, adopts lattice column to be connected between stake and the tower crane, and the lattice column lower end imbeds that a conduct is connected and fixed a little in the stake, and lattice column can be with the Load Transfer of tower crane to bored pile.Not only quality safety is guaranteed on lattice pillar of the present utility model basis, has also reduced the difficulty of construction of tower crane, has guaranteed programming.
Lattice column is connected with support bar between the top, has improved stability of structure.It is recyclable that lattice column uses up the back material, reduced construction cost.Full weld steel plate water-stopping sheet around the lattice column at sole plate place can guarantee that sole plate is water-tight,
Description of drawings
Below in conjunction with drawings and Examples the utility model is further specified.
Fig. 1 is detail of construction of the present utility model.
Fig. 2 is the structural representation of Figure 1A-A section.
Fig. 3 is the structural representation of Figure 1B-B section.
Fig. 4 is the structural representation at Fig. 1 node C place.
Reference numeral: 1-bored pile, 2-cushion cap, 2.1-end face arrangement of reinforcement, 2.2-bottom surface arrangement of reinforcement, 2.3-tension rib, 2.4-base concrete, 3-lattice column, 3.1-angle steel, 3.2-batten plate, 4-lattice column platform, the horizontal steel plate of 4.1-, 4.2-triangular steel plate, 5-tower crane joint, 6-basement bottom board, 7-ground, 8-horizontal brace, 9-diagonal brace, 10-horizontal cross brace.
The specific embodiment
Embodiment is referring to shown in Figure 1, this lattice pillar tower crane, comprise foundation pile and cushion cap, described foundation pile is made of four bored piles 1,2 of cushion caps are located between basement bottom board 6 bottom surfaces and the foundation pile, are made of end face arrangement of reinforcement 2.1, bottom surface arrangement of reinforcement 2.2, tension rib 2.3 and base concrete 2.4.The stake top of four bored piles 1 embeds 100mm in the cushion cap 2.
Be connected by four lattice columns 3 respectively between described four bored piles 1 and the tower crane, lattice column 3 bottoms are anchored in the bored pile 1, lattice column 3 middle parts and cushion cap 2 anchorings and be upward through basement bottom board 6, described lattice column 3 is passing full weld steel plate water-stopping sheet around basement bottom board 6 places.Lattice column 3 tops connect to be used for also being connected with the support bar that channel-section steel is made between 4, four lattice column 3 tops of lattice column platform of fixing tower crane base section 5.
Referring to Fig. 1, shown in Figure 2, described support bar comprises and is connected horizontal brace 8 and diagonal brace 9 between the adjacent lattice column 3, and is connected the horizontal cross brace 10 between relative two horizontal braces 8.
Referring to shown in Figure 3, every lattice column 3 is welded by the batten plate 3.2 that is distributed in four angle steel 3.1 of four jiaos and be connected between adjacent two angle steel.
Referring to shown in Figure 4, described lattice column platform 4 is by the horizontal steel plate 4.1 that is welded in lattice column 3 end faces, and the triangular steel plate 4.2 that is welded between horizontal steel plate 4.1 and the lattice column 3 constitutes.

Claims (7)

1. a lattice pillar tower crane comprises foundation pile and cushion cap, it is characterized in that: described foundation pile is made of four bored piles (1), and cushion cap (2) props up and is located between basement bottom board (6) bottom surface and the foundation pile;
Be connected by four lattice columns (3) respectively between described four bored piles (1) and the tower crane, every lattice column (3) is welded by the batten plate (3.2) that is distributed in four angle steel (3.1) of four jiaos and be connected between adjacent two angle steel, lattice column (3) bottom is anchored in the bored pile (1), lattice column (3) middle part is with cushion cap (2) anchoring and be upward through basement bottom board (6), lattice column (3) top connects and is used for the fixedly lattice column platform (4) of tower crane base section (5), and four lattice columns (3) also are connected with support bar between the top.
2. lattice pillar tower crane according to claim 1 is characterized in that: the stake top of described four bored piles (1) embeds cushion cap (2) 100mm at least.
3. lattice pillar tower crane according to claim 1 is characterized in that: described cushion cap (2) is made of end face arrangement of reinforcement (2.1), bottom surface arrangement of reinforcement (2.2), tension rib (2.3) and base concrete (2.4).
4. lattice pillar tower crane according to claim 1 is characterized in that: described lattice column (3) pass basement bottom board (6) locate around full weld steel plate water-stopping sheet.
5. lattice pillar tower crane according to claim 1, it is characterized in that: described lattice column platform (4) is by the horizontal steel plate (4.1) that is welded in lattice column (3) end face, and the triangular steel plate (4.2) that is welded between horizontal steel plate (4.1) and the lattice column (3) constitutes.
6. lattice pillar tower crane according to claim 1, it is characterized in that: described support bar comprises and is connected horizontal brace (8) and diagonal brace (9) between the adjacent lattice column (3), and is connected the horizontal cross brace (10) between relative two horizontal braces (8).
7. lattice pillar tower crane according to claim 6 is characterized in that: described support bar employing channel-section steel or angle steel.
CN 201320123715 2013-03-19 2013-03-19 lattice column type tower crane foundation Expired - Fee Related CN203145038U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320123715 CN203145038U (en) 2013-03-19 2013-03-19 lattice column type tower crane foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320123715 CN203145038U (en) 2013-03-19 2013-03-19 lattice column type tower crane foundation

Publications (1)

Publication Number Publication Date
CN203145038U true CN203145038U (en) 2013-08-21

Family

ID=48972579

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320123715 Expired - Fee Related CN203145038U (en) 2013-03-19 2013-03-19 lattice column type tower crane foundation

Country Status (1)

Country Link
CN (1) CN203145038U (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103485360A (en) * 2013-10-12 2014-01-01 中建八局第三建设有限公司 Steel platform tower crane foundation and construction method thereof
CN104818729A (en) * 2015-05-27 2015-08-05 浙江省一建建设集团有限公司 Common foundation for transformation of large and small tower cranes
CN105297759A (en) * 2015-10-28 2016-02-03 中国地质大学(武汉) Framework structure of pile and pillar bearing platform
CN105951869A (en) * 2016-05-31 2016-09-21 中国冶集团有限公司 Construction method of steel latticework column tower crane foundation for underground garage without reserving construction joints
CN106120843A (en) * 2016-08-09 2016-11-16 泰兴市第建筑安装工程有限公司 A kind of ultra-deep foundation pit tower crane system and installation and application thereof
CN107299643A (en) * 2017-07-10 2017-10-27 杭州江润科技有限公司 Steel lattice column combined type tower crane foundation structure in foundation pit and construction method
CN107840256A (en) * 2017-11-15 2018-03-27 江苏江都建设集团有限公司 A kind of steel platform of derrick crane
CN108277818A (en) * 2018-03-22 2018-07-13 中国电建市政建设集团有限公司 Basement top-down method Combined tower crane foundation structure and construction method
CN109750686A (en) * 2019-01-07 2019-05-14 上海建工一建集团有限公司 A kind of tower crane is connected the construction method and structure of shared stand column pile with support
CN110004969A (en) * 2019-04-22 2019-07-12 上海建工一建集团有限公司 A kind of tower-crane foundation structure
CN112411595A (en) * 2020-11-09 2021-02-26 重庆渝发建设有限公司 Combined tower crane foundation for deep foundation pit operation
CN113373915A (en) * 2021-06-30 2021-09-10 中国十九冶集团有限公司 Method for reinforcing steel upright pile structure
CN113373968A (en) * 2021-06-29 2021-09-10 连云港市建院工程勘察检测有限公司 Tower crane foundation and construction method thereof
CN114215096A (en) * 2021-12-13 2022-03-22 珠海华发人居生活研究院有限公司 Tower crane lattice column pile foundation bearing platform

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103485360B (en) * 2013-10-12 2015-12-02 中建八局第三建设有限公司 A kind of steel platform tower crane foundation and construction method thereof
CN103485360A (en) * 2013-10-12 2014-01-01 中建八局第三建设有限公司 Steel platform tower crane foundation and construction method thereof
CN104818729A (en) * 2015-05-27 2015-08-05 浙江省一建建设集团有限公司 Common foundation for transformation of large and small tower cranes
CN104818729B (en) * 2015-05-27 2016-05-18 浙江省一建建设集团有限公司 Can be for the mutual foundation of big or small tower crane conversion
CN105297759A (en) * 2015-10-28 2016-02-03 中国地质大学(武汉) Framework structure of pile and pillar bearing platform
CN105951869A (en) * 2016-05-31 2016-09-21 中国冶集团有限公司 Construction method of steel latticework column tower crane foundation for underground garage without reserving construction joints
CN106120843A (en) * 2016-08-09 2016-11-16 泰兴市第建筑安装工程有限公司 A kind of ultra-deep foundation pit tower crane system and installation and application thereof
CN107299643B (en) * 2017-07-10 2019-03-29 杭州江润科技有限公司 Steel lattice column combined type tower crane foundation structure in foundation pit and construction method
CN107299643A (en) * 2017-07-10 2017-10-27 杭州江润科技有限公司 Steel lattice column combined type tower crane foundation structure in foundation pit and construction method
CN107840256A (en) * 2017-11-15 2018-03-27 江苏江都建设集团有限公司 A kind of steel platform of derrick crane
CN108277818A (en) * 2018-03-22 2018-07-13 中国电建市政建设集团有限公司 Basement top-down method Combined tower crane foundation structure and construction method
CN109750686A (en) * 2019-01-07 2019-05-14 上海建工一建集团有限公司 A kind of tower crane is connected the construction method and structure of shared stand column pile with support
CN110004969A (en) * 2019-04-22 2019-07-12 上海建工一建集团有限公司 A kind of tower-crane foundation structure
CN112411595A (en) * 2020-11-09 2021-02-26 重庆渝发建设有限公司 Combined tower crane foundation for deep foundation pit operation
CN113373968A (en) * 2021-06-29 2021-09-10 连云港市建院工程勘察检测有限公司 Tower crane foundation and construction method thereof
CN113373915A (en) * 2021-06-30 2021-09-10 中国十九冶集团有限公司 Method for reinforcing steel upright pile structure
CN114215096A (en) * 2021-12-13 2022-03-22 珠海华发人居生活研究院有限公司 Tower crane lattice column pile foundation bearing platform

Similar Documents

Publication Publication Date Title
CN203145038U (en) lattice column type tower crane foundation
CN103437567B (en) Method for supporting existing building underground added storey through original pile foundations
CN101775807B (en) Structure for supporting deep foundation pit of soft soil foundation
CN205134327U (en) Concrete diclinic props row -pile support system
CN203034464U (en) Truss type foundation pit supporting structure
CN203795458U (en) Bearing-platform-free lattice-type tower crane foundation device capable of traversing basement
CN102864780A (en) Supporting structure and supporting method of foundation pit
CN201581409U (en) Combined tower crane foundation of cross beam supported by steel latticework columns in deep foundation pit
CN103114595A (en) Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch
CN205024712U (en) Combined tower crane foundation
CN104652475A (en) Truss type retaining wall
CN205975658U (en) Steel platform tower crane foundation
CN109577277B (en) Wall-mounted drainage anchor rod retaining wall structure and construction method thereof
CN101851923B (en) Support pillar construction and erection method
CN206829148U (en) A kind of combined type shaped steel, concrete square pile bearing diagonal foundation pit enclosure structure
CN204590059U (en) A kind of combined type tower-crane foundation structure
CN202144598U (en) Sunk type underground structure
CN201991013U (en) High-piled tower footing structure of tower crane concrete-filled steel tube
CN202830936U (en) Supporting structure of foundation pit
CN203768914U (en) Foundation pit bracing diagonal support pile structure
CN104195956A (en) Scaffolding type water area continuous beam cast-in-situ supporting frame and erection method thereof
CN206769047U (en) A kind of steel lattice column and bored concrete pile attachment structure
CN211006702U (en) Inclined strut underground structure is thrown in soft soil foundation double-deck
CN212052780U (en) Oblique supporting type deep foundation pit supporting structure
CN209923935U (en) Co-location combined pile wall supporting structure in upper-soft and lower-hard stratum

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130821

Termination date: 20150319

EXPY Termination of patent right or utility model