CN107299643A - Steel lattice column combined type tower crane foundation structure in foundation pit and construction method - Google Patents

Steel lattice column combined type tower crane foundation structure in foundation pit and construction method Download PDF

Info

Publication number
CN107299643A
CN107299643A CN201710557839.9A CN201710557839A CN107299643A CN 107299643 A CN107299643 A CN 107299643A CN 201710557839 A CN201710557839 A CN 201710557839A CN 107299643 A CN107299643 A CN 107299643A
Authority
CN
China
Prior art keywords
steel
column
lattice column
tower crane
cushion cap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710557839.9A
Other languages
Chinese (zh)
Other versions
CN107299643B (en
Inventor
王新泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Road & Bridge Shengtong Building Engineering Co ltd
Original Assignee
Hangzhou Jiangrun Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Jiangrun Technology Co Ltd filed Critical Hangzhou Jiangrun Technology Co Ltd
Priority to CN201710557839.9A priority Critical patent/CN107299643B/en
Publication of CN107299643A publication Critical patent/CN107299643A/en
Application granted granted Critical
Publication of CN107299643B publication Critical patent/CN107299643B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/44Foundations for machines, engines or ordnance

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Abstract

The invention discloses a steel lattice column combined type tower crane foundation structure in a foundation pit, which comprises a foundation pit and a cast-in-place pile prefabricated at the bottom of the foundation pit, wherein the cast-in-place pile is sequentially connected with a steel lattice column, a steel column, a bearing platform and a tower crane embedded section foundation from bottom to top; the connecting section of the rear-mounted detachable hoop reinforcing pile and the steel lattice structure is adopted, so that the structural stability is improved; and a concrete core column is pre-assembled in the lattice column, so that the rigidity is increased.

Description

Steel lattice column combined type tower-crane foundation structure and construction method in a kind of foundation ditch
Technical field
Building engineering field of the present invention, and in particular to steel lattice column combined type tower-crane foundation structure and construction in a kind of foundation ditch Method.
Background technology
With developing rapidly for national economy, the communication technology and control technology, all kinds of high-rise, high-rise buildings and large-scale build The rise of engineering is built, the monitoring technology of derrick crane is also being improved constantly, and to lifting altitude, plays liter weight, carriage amplitude varying width Degree, wind speed and hoisting moment etc. require increasing, using more and more wider in modernization building building construction process.
At present, the basic majority of the domestic derrick crane (hereinafter referred to as tower crane) used is provided according to tower crane specification Equipment Foundations organizing construction, due to the demand difference and the difference of place geological state of job site, the tower crane of same model Using identical foundation for tower crane, great waste is often resulted in, has been unfavorable for environmental protection and energy saving, while also increasing cost.Meanwhile, Tower crane is as most important vertically and horizontally transporting equipment in construction process, in some skyscrapers due to basement foundation ditch Relatively deep, the construction period is again relatively tight, particularly the need for some liftings, it usually needs tower crane is arranged in basement foundation ditch, because This will use tower crane in excavation of foundation pit, and this just brings a series of technical problem to foundation for tower crane design and construction.
The content of the invention
, can it is an object of the invention to provide steel lattice column combined type tower-crane foundation structure and construction method in a kind of foundation ditch The problems such as improving the high cost caused by traditional tower crane uses identical basis for different tower cranes, construct difficult, utilizes The hollow hollow cushion cap of assembled is from heavy and light, with being solved the features such as material is few, constructing operation facilitates, tower crane difficulty of construction is big etc. to ask Topic, with preferable technical economic benefit.
For up to above-mentioned purpose, major technique solution of the invention there is provided steel lattice column combined type in a kind of foundation ditch Tower-crane foundation structure, including the bored concrete pile that foundation ditch and foundation ditch bottom are prefabricated with, bored concrete pile be sequentially connected with from down to up steel lattice column, Steel column, cushion cap and the pre-buried section of tower crane are basic, are provided with steel lattice column in concrete-core column, bored concrete pile provided with many of composition steel reinforcement cage Muscle is indulged in pile, steel lattice column is welded and fixed with the steel reinforcement cage in bored concrete pile, and the welding section of bored concrete pile and steel lattice column is fastened with Removable anchor ear, removable anchor ear is fixed by anchor ear bolt.
The steel lattice column is that corner is multiple provided with being fixedly connected between four angle steel and two angle steel of same side Sew the rectangle column construction of part.
The cushion cap is connected with four steel columns, and each steel column has been sequentially connected with a steel lattice column and bored concrete pile, steel latticework Support, more consolidated provided with oblique truss support and horizontal truss between post, the cushion cap holds for the steel truss type of hollow hollow Platform or armored concrete formula cushion cap.
Steel plate is fixed with the top of the steel lattice column, steel column bottom is fixed with the terminal pad being bolted with steel plate.
The steel column is nuzzled cushion cap in advance, and the pre-buried section of tower crane is embedded in cushion cap in advance.
Present invention also offers a kind of construction method of steel lattice column combined type tower-crane foundation structure in foundation ditch, its feature exists In comprising the following steps:
1) selection and positioning of tower crane model:It is determined that meeting the construction need of job site transport, lifting and operating radius The tower crane position location of construction demand is determined rationally and met in the tower crane model asked, foundation ditch at the construction field (site);
2) steel lattice column makes:Make four limbs angle steel lattice column, central hollow, using steel plate or angle steel as sewing part;
3) bored pile construction:Concrete direct pipe method pouring underwater concrete is used at the position that tower crane is positioned Make and indulge muscle composition steel reinforcement cage in bored concrete pile, bored concrete pile in pre-buried many piles;
4) steel lattice column is constructed:Steel lattice column is welded and fixed through foundation ditch bottom with steel reinforcement cage, in steel lattice column and perfusion The progress that the welding section of stake installs removable anchor ear is reinforced, and sealing piece is set on each angle steel of steel lattice column;
5) concrete-core column is constructed:Prefabricated concrete-core column and steel lattice column are bolted by fixing bolt;
6) the pre-buried section basis of tower crane and bearing platform construction:Steel column is fixed on cushion cap bottom, terminal pad is fixed under steel column Fixed steel disc at the top of portion, steel lattice column, steel disc is connected with terminal pad, and cushion cap is steel truss type cushion cap, tower crane and the pre-buried section of tower crane Basis bolt or bolt-weld joint;
7) tower crane installation is used:When the pre-buried section basis of tower crane reaches more than 80% design strength, in the pre-buried section base of tower crane Tower crane is installed on plinth;
8) the pre-buried section basis detection of tower crane:Settled in cushion cap top surface corner and displacement observation point, and do original record, tower Periodic observation and recorded after machine is installed and during earth excavation.
The step 6) in cushion cap be armored concrete formula cushion cap, the pre-buried section basis of tower crane, which is embedded in pour in cushion cap, applies Work.
The characteristics of present invention has following and beneficial effect:
(1) using the hollow hollow cushion cap of assembled from heavy and light, with solving tower crane the features such as material is few, constructing operation facilitates The problems such as difficulty of construction is big, with preferable technical economic benefit;
(2) removable anchor ear reinforcing pile and the linkage section of steel latticework are filled after using, structural stability is added;
(3) prewired concrete-core column is filled after lattice column is interior, increases rigidity.
Brief description of the drawings
Fig. 1 is the structural representation of one embodiment of the invention;
Fig. 2 is the plane section figure of the steel lattice column in Fig. 1 embodiments;
Fig. 3 is steel lattice column, bored concrete pile and the connection diagram of removable anchor ear part in Fig. 1 embodiments;
Fig. 4 is the sealing piece schematic diagram in Fig. 1 embodiments;
Fig. 5 is steel lattice column and concrete-core column connection diagram in Fig. 1 embodiments;
Fig. 6 is the concrete bearing platform schematic diagram in Fig. 1 embodiments;
Fig. 7 is the steel truss type cushion cap in Fig. 1 embodiments;
Fig. 8 is the Specific construction flow chart in Fig. 1 embodiments;
In figure:1. bored concrete pile, 2. removable anchor ears, 3. anchor ear bolts, 4. sealing pieces, 5. concrete-core columns, 6. steel latticeworks Post, 7. oblique truss supports, the support of 8. horizontal truss, 9. cushion caps, the pre-buried section basis of 10. tower cranes, 11. foundation ditch bottoms, 12. steel plates, 13. bolt, 14. terminal pads, 15. steel columns, 16. angle steel, 17. sew vertical muscle, 19. fixing bolts in part, 18..
Embodiment
Tower crane construction technical requirement, the present invention is not repeated, and emphasis illustrates structure of the present invention.
As Figure 1-5, the combined type tower-crane foundation structure of steel lattice column 6 in a kind of foundation ditch described in the present embodiment, including The bored concrete pile 1 that foundation ditch and foundation ditch bottom 11 are prefabricated with, bored concrete pile 1 has been sequentially connected with steel lattice column 6, steel column 15, cushion cap 9 from down to up With the pre-buried section basis 10 of tower crane, steel lattice column 6 is interior to be provided with concrete-core column 5, bored concrete pile 1 provided with many piles for constituting steel reinforcement cage Interior vertical muscle 18, steel lattice column 6 is welded and fixed with the steel reinforcement cage in bored concrete pile 1, and the welding section of bored concrete pile 1 and steel lattice column 6 is fastened There is removable anchor ear 2, removable anchor ear 2 is fixed by anchor ear bolt 3.
It is provided with as shown in Fig. 2 the steel lattice column 6 is corner between four angle steel 16 and two angle steel 16 of same side It is fixedly connected with multiple rectangle column constructions for sewing part 17.
As shown in Figure 6 and Figure 7, the cushion cap 9 is connected with four steel columns 15, and each steel column 15 has been sequentially connected with a steel lattice Provided with oblique truss support 7 and horizontal truss support 8 between structure post 6 and bored concrete pile 1, steel lattice column 6, more consolidate, it is described to hold Platform 9 is the steel truss type cushion cap 9 or armored concrete formula cushion cap 9 of hollow hollow.
The top of steel lattice column 6 is fixed with steel plate 12, and the bottom of steel column 15 is fixed with to be fixed with steel plate 12 by bolt 13 Terminal pad 14.
The pre- cushion cap 9 of nuzzling of the steel column 15, the pre-buried section of tower crane is embedded in cushion cap 9 in advance.
As shown in figure 8, present invention also offers a kind of construction party of the combined type tower-crane foundation structure of steel lattice column in foundation ditch 6 Method, it is characterised in that comprise the following steps:
1) selection and positioning of tower crane model:It is determined that meeting the construction need of job site transport, lifting and operating radius The tower crane position location of construction demand is determined rationally and met in the tower crane model asked, foundation ditch at the construction field (site);
2) steel lattice column 6 makes:Make the lattice column 6 of four limbs angle steel 16, central hollow, using steel plate 12 or the conduct of angle steel 16 Sew part 17;
3) cast-in-situ bored pile 1 is constructed:Coagulation under concrete direct pipe method priming petock is used at the position that tower crane is positioned Soil, which makes, indulges the composition steel reinforcement cage of muscle 18 in pre-buried many piles in bored concrete pile 1, bored concrete pile 1;
4) steel lattice column 6 is constructed:Steel lattice column 6 is welded and fixed through foundation ditch bottom 11 with steel reinforcement cage, steel lattice column 6 with The progress that the welding section of bored concrete pile 1 installs removable anchor ear 2 is reinforced, and sealing piece 4 is set on each angle steel 16 of steel lattice column 6;
5) concrete-core column 5 is constructed:Prefabricated concrete-core column 5 and steel lattice column 6 are bolted by fixing bolt 19;
6) the pre-buried section basis 10 of tower crane and cushion cap 9 are constructed:Steel column 15 is fixed on the bottom of cushion cap 9, terminal pad 14 is fixed In the bottom of steel column 15, the fixed steel disc in the top of steel lattice column 6, steel disc is connected with terminal pad 14, and cushion cap 9 is steel truss type cushion cap 9, tower Hang and the pre-buried bolt of section basis 10 of tower crane or bolt-weld joint;
7) tower crane installation is used:When the pre-buried section basis 10 of tower crane reaches more than 80% design strength, in the pre-buried section of tower crane Tower crane is installed on basis 10;
8) the pre-buried section basis 10 of tower crane is detected:Settled and displacement observation point in the top surface corner of cushion cap 9, and do original note Record, periodic observation and is recorded after tower crane installation and during earth excavation.
The step 6) in cushion cap 9 be armored concrete formula cushion cap 9, the pre-buried section basis of tower crane 10 is embedded in cushion cap 9 Pouring construction.
The present invention is using the hollow hollow cushion cap 9 of assembled from heavy and light, with solving tower crane the features such as material is few, constructing operation facilitates The problems such as foundation construction difficulty is big, with preferable technical economic benefit;The removable reinforcing pile of anchor ear 2 and steel latticework are filled after Linkage section, add structural stability;Prewired concrete-core column 5 is filled after in lattice column, increases rigidity.

Claims (6)

1. steel lattice column combined type tower-crane foundation structure in a kind of foundation ditch, including the bored concrete pile that foundation ditch and foundation ditch bottom (11) are prefabricated with (1), bored concrete pile (1) has been sequentially connected with steel lattice column (6), steel column (15), cushion cap (9) and the pre-buried section basis of tower crane from down to up (10), it is characterised in that be provided with steel lattice column (6) in concrete-core column (5), bored concrete pile (1) provided with many of composition steel reinforcement cage Muscle (18) is indulged in pile, steel lattice column (6) is welded and fixed with the steel reinforcement cage in bored concrete pile (1), bored concrete pile (1) and steel lattice column (6) welding section is fastened with removable anchor ear (2), and removable anchor ear (2) is fixed by anchor ear bolt (3).
2. steel lattice column combined type tower-crane foundation structure in foundation ditch according to claim 1, it is characterised in that the steel lattice Structure post (6), which is corner, multiple sews part provided with being fixedly connected between four angle steel (16) and two angle steel (16) of same side (17) rectangle column construction.
3. steel lattice column combined type tower-crane foundation structure in foundation ditch according to claim 1, it is characterised in that the cushion cap (9) four steel columns (15) are connected with, each steel column (15) has been sequentially connected with a steel lattice column (6) and bored concrete pile (1), steel latticework Provided with oblique truss support (7) and horizontal truss support (8) between post (6), the cushion cap (9) is the steel truss type of hollow hollow Cushion cap (9) or armored concrete formula cushion cap (9).
4. steel lattice column combined type tower-crane foundation structure in foundation ditch according to claim 1, it is characterised in that the steel lattice Steel plate (12) is fixed with the top of structure post (6), steel column (15) bottom is fixed with passes through the fixed connection of bolt (13) with steel plate (12) Disk (14).
5. the construction method of steel lattice column combined type tower-crane foundation structure in a kind of foundation ditch, it is characterised in that comprise the following steps:
1) selection and positioning of tower crane model:It is determined that meet the construction demand of job site transport, lifting and operating radius The tower crane position location of construction demand is determined rationally and met in tower crane model, foundation ditch at the construction field (site);
2) steel lattice column (6) makes:Make four limbs angle steel lattice column (6), central hollow, using steel plate or angle steel as sewing part (17);
3) cast-in-situ bored pile (1) is constructed:Concrete direct pipe method pouring underwater concrete is used at the position that tower crane is positioned Make and indulge muscle (18) composition steel reinforcement cage in bored concrete pile (1), bored concrete pile (1) in pre-buried many piles;
4) steel lattice column (6) is constructed:Steel lattice column (6) is welded and fixed through foundation ditch bottom (11) with steel reinforcement cage, in steel lattice column (6) progress for installing removable anchor ear (2) with the welding section of bored concrete pile (1) is reinforced, on each angle steel (16) of steel lattice column (6) Sealing piece (4) is set;
5) concrete-core column (5) is constructed:Prefabricated concrete-core column (5) and steel lattice column (6) are passed through into fixing bolt (19) bolt Connect;
6) the pre-buried section of tower crane basic (10) and cushion cap (9) construction:Steel column (15) is fixed on cushion cap (9) bottom, by terminal pad (14) fixed steel disc at the top of steel column (15) bottom, steel lattice column (6) is fixed on, steel disc is connected with terminal pad (14), and cushion cap (9) is Steel truss type cushion cap (9), tower crane and tower crane pre-buried section basic (10) bolt or bolt-weld joint;
7) tower crane installation is used:When the pre-buried section of tower crane basic (10) reaches more than 80% design strength, in the pre-buried section base of tower crane Plinth installs tower crane on (10);
8) tower crane pre-buried section basic (10) detection:Settled and displacement observation point in cushion cap (9) top surface corner, and do original note Record, periodic observation and is recorded after tower crane installation and during earth excavation.
6. the construction method of steel lattice column combined type tower-crane foundation structure in foundation ditch according to claim 5, its feature exists In the step 6) in cushion cap (9) be armored concrete formula cushion cap (9), the pre-buried section of tower crane basic (10) is embedded in cushion cap (9) Middle pouring construction.
CN201710557839.9A 2017-07-10 2017-07-10 Steel lattice column combined type tower crane foundation structure in foundation pit and construction method Expired - Fee Related CN107299643B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710557839.9A CN107299643B (en) 2017-07-10 2017-07-10 Steel lattice column combined type tower crane foundation structure in foundation pit and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710557839.9A CN107299643B (en) 2017-07-10 2017-07-10 Steel lattice column combined type tower crane foundation structure in foundation pit and construction method

Publications (2)

Publication Number Publication Date
CN107299643A true CN107299643A (en) 2017-10-27
CN107299643B CN107299643B (en) 2019-03-29

Family

ID=60133883

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710557839.9A Expired - Fee Related CN107299643B (en) 2017-07-10 2017-07-10 Steel lattice column combined type tower crane foundation structure in foundation pit and construction method

Country Status (1)

Country Link
CN (1) CN107299643B (en)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107780533A (en) * 2017-11-23 2018-03-09 华东建筑设计研究院有限公司 A kind of vertical support steel lattice column and prefabricated pile jointing
CN108239975A (en) * 2018-03-15 2018-07-03 天津建城基业集团有限公司 A kind of combined type foundation pit supporting pile and a kind of combined type pattern foundation pit supporting structure mode
CN108277818A (en) * 2018-03-22 2018-07-13 中国电建市政建设集团有限公司 Basement top-down method Combined tower crane foundation structure and construction method
CN109577360A (en) * 2018-12-04 2019-04-05 江苏兴厦建设工程集团有限公司 A kind of derrick crane is inverse to make steel lattice column foundation construction method
CN109775586A (en) * 2019-03-14 2019-05-21 安徽宏志建设工程有限责任公司 A kind of removable steel hoop pile derrick crane
CN110005193A (en) * 2019-03-27 2019-07-12 中建三局集团有限公司 A kind of shuttering supporting mechanism of high-precision concrete roof
CN110067248A (en) * 2019-05-21 2019-07-30 中铁建设集团有限公司 Elevator system and construction method suitable for deep basal pit load-carrying vehicle vertical transport
CN110387899A (en) * 2019-07-30 2019-10-29 宁波建工建乐工程有限公司 A kind of fixed device of the pre-buried section of soft soil foundation large scale tower crane
CN111058472A (en) * 2019-12-10 2020-04-24 南通庞源机械工程有限公司 Tower crane foundation and reinforcing construction installation method thereof
CN111809647A (en) * 2020-06-04 2020-10-23 陕西建工第六建设集团有限公司 Connection structure of lattice column and concrete cushion cap foundation
CN112343077A (en) * 2020-11-30 2021-02-09 中天建设集团有限公司 High-pile bearing platform tower footing reinforcing construction method for improving reliability and reinforcing structure thereof
CN113323010A (en) * 2021-05-17 2021-08-31 宇旺建工集团有限公司 Construction method of embedded tower crane foundation
CN113338551A (en) * 2020-09-30 2021-09-03 中国建筑第二工程局有限公司 Steel structure roof equipment supporting system and construction method
CN113605437A (en) * 2021-07-16 2021-11-05 江苏富源广建设发展有限公司 Steel lattice column for bearing platform type tower crane foundation
CN113605439A (en) * 2021-08-06 2021-11-05 江苏富源广建设发展有限公司 Lattice steel bearing platform type tower crane foundation
CN113718786A (en) * 2021-07-22 2021-11-30 东南大学 Deep foundation pit supporting structure applying space combination structure and construction method thereof
CN114703887A (en) * 2022-04-29 2022-07-05 中国十九冶集团有限公司 Construction method of high-pile bearing platform tower crane foundation
CN114960731A (en) * 2022-04-07 2022-08-30 浙江国丰集团有限公司 Embedded and nested combined tower crane section foundation and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103132537A (en) * 2013-02-04 2013-06-05 中天建设集团有限公司 Steel latticed column homocentric-square-shaped concrete bearing platform combination type tower crane base structure and construction method
CN203145038U (en) * 2013-03-19 2013-08-21 中建保华建筑有限责任公司 lattice column type tower crane foundation
CN103485360A (en) * 2013-10-12 2014-01-01 中建八局第三建设有限公司 Steel platform tower crane foundation and construction method thereof
CN103866784A (en) * 2014-03-28 2014-06-18 上海绿地建设(集团)有限公司 Adjustable tower crane steel platform foundation
CN207176719U (en) * 2017-07-10 2018-04-03 杭州江润科技有限公司 Steel lattice column combined type tower-crane foundation structure in a kind of foundation ditch

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103132537A (en) * 2013-02-04 2013-06-05 中天建设集团有限公司 Steel latticed column homocentric-square-shaped concrete bearing platform combination type tower crane base structure and construction method
CN203145038U (en) * 2013-03-19 2013-08-21 中建保华建筑有限责任公司 lattice column type tower crane foundation
CN103485360A (en) * 2013-10-12 2014-01-01 中建八局第三建设有限公司 Steel platform tower crane foundation and construction method thereof
CN103866784A (en) * 2014-03-28 2014-06-18 上海绿地建设(集团)有限公司 Adjustable tower crane steel platform foundation
CN207176719U (en) * 2017-07-10 2018-04-03 杭州江润科技有限公司 Steel lattice column combined type tower-crane foundation structure in a kind of foundation ditch

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
孙吉等: "钢格构柱平台式塔吊基础在超深基坑中的设计与施工", 《建筑施工》 *

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107780533A (en) * 2017-11-23 2018-03-09 华东建筑设计研究院有限公司 A kind of vertical support steel lattice column and prefabricated pile jointing
CN108239975A (en) * 2018-03-15 2018-07-03 天津建城基业集团有限公司 A kind of combined type foundation pit supporting pile and a kind of combined type pattern foundation pit supporting structure mode
CN108277818A (en) * 2018-03-22 2018-07-13 中国电建市政建设集团有限公司 Basement top-down method Combined tower crane foundation structure and construction method
CN109577360A (en) * 2018-12-04 2019-04-05 江苏兴厦建设工程集团有限公司 A kind of derrick crane is inverse to make steel lattice column foundation construction method
CN109775586A (en) * 2019-03-14 2019-05-21 安徽宏志建设工程有限责任公司 A kind of removable steel hoop pile derrick crane
CN109775586B (en) * 2019-03-14 2023-11-03 安徽宏志建设集团有限公司 Detachable steel hoop pile column tower crane
CN110005193A (en) * 2019-03-27 2019-07-12 中建三局集团有限公司 A kind of shuttering supporting mechanism of high-precision concrete roof
CN110067248A (en) * 2019-05-21 2019-07-30 中铁建设集团有限公司 Elevator system and construction method suitable for deep basal pit load-carrying vehicle vertical transport
CN110067248B (en) * 2019-05-21 2024-01-30 中铁建设集团有限公司 Elevator system suitable for vertical transportation of deep foundation pit loading vehicle and construction method
CN110387899A (en) * 2019-07-30 2019-10-29 宁波建工建乐工程有限公司 A kind of fixed device of the pre-buried section of soft soil foundation large scale tower crane
CN110387899B (en) * 2019-07-30 2021-05-11 宁波建工建乐工程有限公司 Pre-buried festival fixing device of large-scale tower crane foundation of soft soil foundation
CN111058472A (en) * 2019-12-10 2020-04-24 南通庞源机械工程有限公司 Tower crane foundation and reinforcing construction installation method thereof
CN111809647A (en) * 2020-06-04 2020-10-23 陕西建工第六建设集团有限公司 Connection structure of lattice column and concrete cushion cap foundation
CN111809647B (en) * 2020-06-04 2022-08-12 陕西建工第六建设集团有限公司 Connection structure of lattice column and concrete cushion cap foundation
CN113338551A (en) * 2020-09-30 2021-09-03 中国建筑第二工程局有限公司 Steel structure roof equipment supporting system and construction method
CN112343077A (en) * 2020-11-30 2021-02-09 中天建设集团有限公司 High-pile bearing platform tower footing reinforcing construction method for improving reliability and reinforcing structure thereof
CN113323010A (en) * 2021-05-17 2021-08-31 宇旺建工集团有限公司 Construction method of embedded tower crane foundation
CN113605437B (en) * 2021-07-16 2022-07-15 江苏富源广建设发展有限公司 Steel lattice column for bearing platform type tower crane foundation
CN113605437A (en) * 2021-07-16 2021-11-05 江苏富源广建设发展有限公司 Steel lattice column for bearing platform type tower crane foundation
CN113718786A (en) * 2021-07-22 2021-11-30 东南大学 Deep foundation pit supporting structure applying space combination structure and construction method thereof
CN113605439A (en) * 2021-08-06 2021-11-05 江苏富源广建设发展有限公司 Lattice steel bearing platform type tower crane foundation
CN114960731A (en) * 2022-04-07 2022-08-30 浙江国丰集团有限公司 Embedded and nested combined tower crane section foundation and construction method
CN114703887A (en) * 2022-04-29 2022-07-05 中国十九冶集团有限公司 Construction method of high-pile bearing platform tower crane foundation

Also Published As

Publication number Publication date
CN107299643B (en) 2019-03-29

Similar Documents

Publication Publication Date Title
CN107299643B (en) Steel lattice column combined type tower crane foundation structure in foundation pit and construction method
CN107090925A (en) Reinforced precast reinforced concrete shear wall, structural system and its construction method
CN208996025U (en) A kind of double casing pile foundation construction structures of thick silt layer
CN106120839A (en) A kind of construction technology of off-lying sea blower foundation embedded rock pile
CN206467667U (en) Suspended net shotcrete building enclosure between a kind of stake of use expansion type fixation reinforced mesh
CN105863042A (en) All-steel structure building and construction method thereof
CN102644290A (en) Steel cofferdam construction method suitable for construction of deep silt layer bridge in shallow sea area
CN205024712U (en) Combined tower crane foundation
CN108360535A (en) Foundation pit supporting construction based on campshed and inner support and its construction method
CN206769047U (en) A kind of steel lattice column and bored concrete pile attachment structure
CN207176719U (en) Steel lattice column combined type tower-crane foundation structure in a kind of foundation ditch
CN106193101B (en) Tower crane steel platform pile foundation and its construction method
CN209603163U (en) A kind of tower crane bearing platform ruggedized construction
CN202969333U (en) Steel truss rock-socketed wharf structure
CN108221954B (en) Easy-to-detach prefabricated underground diaphragm wall, lifting appliance and construction method
CN203891060U (en) Permanent steel pipe column positioning system of major structure of cover and excavation top-down station
CN105951863A (en) Construction device of active assembling type open caisson and construction method using same
CN111962549B (en) Anti-overturning construction method for existing tower crane under working condition of adjacent foundation pile
CN206616602U (en) A kind of outdoor construction elevator strengthening of foundation device
CN202131602U (en) Steel sheet pile cofferdam structure
CN105926635B (en) A kind of vertical rectangular prefabricated components construction equipment, assembly and construction method
CN103215965A (en) Laminate type high-rise platform pile tower crane foundation and construction method
CN205296206U (en) Tower cane foundation
CN212052780U (en) Oblique supporting type deep foundation pit supporting structure
CN208219667U (en) Foundation pit supporting construction based on campshed and inner support

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220524

Address after: 615000 No. 1, floor 9, block a, Kanghong international, beibifu Road, Xichang City, Liangshan Yi Autonomous Prefecture, Sichuan Province

Patentee after: SICHUAN ROAD & BRIDGE SHENGTONG BUILDING ENGINEERING Co.,Ltd.

Address before: 310015 room 1901, unit 3, 3 Wanda Commercial Center, Gongshu District, Hangzhou, Zhejiang.

Patentee before: HANGZHOU JIANGRUN TECHNOLOGY Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190329