CN103215965A - Laminate type high-rise platform pile tower crane foundation and construction method - Google Patents

Laminate type high-rise platform pile tower crane foundation and construction method Download PDF

Info

Publication number
CN103215965A
CN103215965A CN2013101218381A CN201310121838A CN103215965A CN 103215965 A CN103215965 A CN 103215965A CN 2013101218381 A CN2013101218381 A CN 2013101218381A CN 201310121838 A CN201310121838 A CN 201310121838A CN 103215965 A CN103215965 A CN 103215965A
Authority
CN
China
Prior art keywords
tower crane
cast
pile
place concrete
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101218381A
Other languages
Chinese (zh)
Inventor
裴鸿斌
张宏建
钟福新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN2013101218381A priority Critical patent/CN103215965A/en
Publication of CN103215965A publication Critical patent/CN103215965A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention provides a laminate type high-rise platform pile tower crane foundation and a construction method. The method comprises the following steps of before excavating foundation pit earthwork, constructing four concrete cast-in-place piles, penetrating the concrete cast-in-place piles through a foundation bottom plate, wherein a pile top mark is higher than the ground or the close place; casting a reinforced concrete bearing platform on the tops of the four concrete cast-in-place piles, and pre-burying a tower crane foundation section in the bearing platform, wherein the mounting of a tower crane is finished; and before excavating the foundation pit earthwork, downwards excavating along the surrounding of the tower crane bearing platform, casting a concrete laminate structure layer by layer on the concrete cast-in-place piles above the foundation bottom plate, and widely excavating the earthwork in the other area. The problem that the tower crane is poor in stability when the tower crane is used for vertical conveying in a pit construction process is better solved, the tower crane can be mounted to work before engineering piles are not constructed or the foundation pit earthwork is excavated, the time for excavating a foundation pit is effectively shortened, the working efficiency of foundation pit construction is improved, the period for foundation pit construction can be greatly shortened, and beneficial conditions for the smooth perforation of the subsequent procedures are provided.

Description

Laminated board type highrise pile cap tower crane structure and job practices
Technical field
The present invention relates to a kind of tower crane, particularly relate to a kind of laminated board type highrise pile cap tower crane structure and job practices.
Background technology
At present, the comparatively common a kind of mode of large-scale construction method of deep foundation ditch is: before soil excavation, four concrete filled steel tube castinplace piles of elder generation's construction or cast-in-place concrete pile, stake top mark height is located at below the tower crane cushion cap, after treating that tower crane installs, carry out soil excavation again, the castinplace pile of support tower crane successively exposes with the intensification of the soil excavation degree of depth, form destabilizing factor, for addressing this problem, need between four steel tube concrete piles or concrete pile, to form bridging, increase the resistance to overturning of high stake part with the steel pipe welding.Though this method has increased the stability of tower crane, increase welding sequence, increased a large amount of other operations such as steel work welding engineering amount, make tower crane be subjected to certain limitation service time.
Summary of the invention
In view of the existing technical problem that exists, the invention provides a kind of Stability Analysis of Structures, firmly, the efficiency of construction in the safety, raising foundation ditch, and easy construction, laminated board type highrise pile cap tower crane structure with low cost.
Laminated board type highrise pile cap tower crane structure of the present invention, comprise four cast-in-place concrete piles that are arranged in the foundation ditch, described cast-in-place concrete pile runs through sole plate, the stake top of described cast-in-place concrete pile is installed with a steel concrete cushion cap, be installed with tower crane joint on the described steel concrete cushion cap, be on the cast-in-place concrete pile of described sole plate top and be formed with plural layer of concrete plated construction at interval, and described cast-in-place concrete pile is arranged in the described layer of concrete plated construction.
The length that described cast-in-place concrete pile is positioned at the following anchoring section of sole plate is not less than 2 with the length ratio that exposes to the revealed section of foundation ditch.
Described layer of concrete plated construction comprises the reinforced mesh of double-layer double-direction.
Laminated board type highrise pile cap tower crane job practices of the present invention may further comprise the steps:
Before pit earthwork excavation, four cast-in-place concrete piles of construction make it run through sole plate earlier, a stake top mark high position in ground surface or near;
Build the steel concrete cushion cap four cast-in-place concrete pile stake top casting, pre-buried tower crane joint is finished tower crane and is installed in cushion cap;
The excavation pit earthwork downwards around the tower crane cushion cap, and on the cast-in-place concrete pile of described sole plate top concreting veneer structure successively, large tracts of land is excavated other zones cubic metre of earth again.
The length that described cast-in-place concrete pile is positioned at the following anchoring section of sole plate is not less than 2 with the length ratio that exposes to the revealed section of foundation ditch.
Described layer of concrete plated construction comprises the reinforced mesh of double-layer double-direction.
The present invention makes its beneficial effect that has be owing to adopt above technical scheme:
Behind construction and mounted castinplace pile and concrete bearing platform, earth excavation is built then and is formed the plural layer veneer structure downwards, finishes the installation of tower crane.The present invention is by being arranged on each plated construction layer by layer on four castinplace piles, make tower crane Stability Analysis of Structures of the present invention, firmly, safe, compare other highrise pile cap easy constructions, with low cost, preferably resolving in the foundation pit construction process overall process uses tower crane to carry out vertical transport, the difficult problem of tower crane poor stability, engineering piles do not construct or pit earthwork excavation before just can install tower crane in advance and turn round, effectively shortened the excavation of foundation pit time, improved the operating efficiency of foundation pit construction, can shorten the foundation pit construction duration in a large number, carrying out smoothly for subsequent handling provides advantage.
Description of drawings
Fig. 1 is the schematic diagram of the cast-in-place concrete pile of tower crane structure of the present invention;
Fig. 2 is the schematic diagram after tower crane structure of the present invention has been built cushion cap and tower crane joint;
Fig. 3 has built the schematic diagram of first floor veneer structure for the present invention;
Fig. 4 has built the schematic diagram of second layer veneer structure for the present invention;
Fig. 5 is the plan view of tower crane structural laminate plate structure of the present invention.
The specific embodiment
For the benefit of, describe below in conjunction with drawings and Examples to the understanding of structure of the present invention.
In conjunction with Fig. 4 and shown in Figure 5, laminated board type highrise pile cap tower crane structure of the present invention, comprise four cast-in-place concrete piles 1 that are arranged in the foundation ditch, become the four directions to arrange, a stake top mark high position is near ground surface, castinplace pile 1 wears in the sole plate 2, the length that every castinplace pile 1 is positioned at sole plate 2 following anchoring sections 11 is not less than 2 with the length ratio that exposes to the revealed section 12 of foundation ditch, guaranteed the stability of castinplace pile 1, and a steel concrete cushion cap 3 has been built in the stake top casting, pre-buried tower crane joint 4 in the concrete bearing platform 3, can make body of the tower and foundation structure is affixed is integral by tower crane joint 4, be on the castinplace pile 1 of sole plate 2 tops and be formed with plural layer of concrete plated construction 5 at interval, castinplace pile 1 is arranged in the veneer structure 5, and adjacent layer plated construction 5 is between the upper and lower every being not more than 2m, the every limit of planar dimension exceeds castinplace pile 1 and is not less than 0.5m, thick 250mm, configuration reinforcement diameter are not less than 25mm150mm double-layer double-direction reinforced mesh, and the strength grade of concrete of veneer structure 5 is not less than C35.
Extremely shown in Figure 3 in conjunction with Fig. 1 again, before the pit earthwork excavation, four cast-in-place concrete piles 1 of elder generation's construction, make castinplace pile 1 through sole plate 2, steel concrete cushion cap 3 is built in stake top casting at four castinplace piles 1, earlier pre-buried tower crane joint 4 before concrete bearing platform 3 is built, build then, finish the installation of tower crane, then excavation 500mm is dark downwards earlier around concrete bearing platform, smooth substantially after, lay common composite board, assembling reinforcement net sheet, template around installing is then built and is formed first floor veneer structure 5, the excavation pit earthwork then, in digging process, whenever dig 2m downwards, according to the identical step plated construction 5 from level to level of constructing, thereby finished the construction of tower crane structure, increase the resistance to overturning of high stake part, by tower crane joint 4 body of the tower has been installed on the tower crane structure then, lifted hauling operation.
The present invention is by being arranged on each the layer concrete veneer structure 5 on four cast-in-place concrete piles 1, make tower crane Stability Analysis of Structures of the present invention, firmly, safe, compare other highrise pile cap easy constructions, with low cost, preferably resolving in the foundation pit construction process overall process uses tower crane to carry out vertical transport, the difficult problem of tower crane poor stability, engineering piles do not construct or pit earthwork excavation before just can install tower crane in advance and turn round, effectively shortened the excavation of foundation pit time, improved the operating efficiency of foundation pit construction, can shorten the foundation pit construction duration in a large number, carrying out smoothly for subsequent handling provides advantage.

Claims (6)

1. laminated board type highrise pile cap tower crane structure, comprise four cast-in-place concrete piles that are arranged in the foundation ditch, described cast-in-place concrete pile runs through sole plate, the stake top of described cast-in-place concrete pile is installed with a steel concrete cushion cap, be installed with tower crane joint on the described steel concrete cushion cap, it is characterized in that: be on the cast-in-place concrete pile of described sole plate top and be formed with plural layer of concrete plated construction at interval, and described cast-in-place concrete pile is arranged in the described layer of concrete plated construction.
2. tower crane structure according to claim 1 is characterized in that: the length that described cast-in-place concrete pile is positioned at the following anchoring section of sole plate is not less than 2 with the length ratio that exposes to the revealed section of foundation ditch.
3. tower crane structure according to claim 1 is characterized in that: described layer of concrete plated construction comprises the reinforced mesh of double-layer double-direction.
4. laminated board type highrise pile cap tower crane job practices is characterized in that may further comprise the steps:
Before pit earthwork excavation, four cast-in-place concrete piles of construction make it run through sole plate earlier, a stake top mark high position in ground surface or near;
Build the steel concrete cushion cap four cast-in-place concrete pile stake top casting, pre-buried tower crane joint is finished tower crane and is installed in cushion cap;
The excavation pit earthwork downwards around the tower crane cushion cap, and on the cast-in-place concrete pile of described sole plate top concreting veneer structure successively, finish construction.
5. job practices as claimed in claim 4 is characterized in that: the length that described cast-in-place concrete pile is positioned at the following anchoring section of sole plate is not less than 2 with the length ratio that exposes to the revealed section of foundation ditch.
6. job practices as claimed in claim 4 is characterized in that: described layer of concrete plated construction comprises the reinforced mesh of double-layer double-direction.
CN2013101218381A 2013-04-10 2013-04-10 Laminate type high-rise platform pile tower crane foundation and construction method Pending CN103215965A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101218381A CN103215965A (en) 2013-04-10 2013-04-10 Laminate type high-rise platform pile tower crane foundation and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101218381A CN103215965A (en) 2013-04-10 2013-04-10 Laminate type high-rise platform pile tower crane foundation and construction method

Publications (1)

Publication Number Publication Date
CN103215965A true CN103215965A (en) 2013-07-24

Family

ID=48814090

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101218381A Pending CN103215965A (en) 2013-04-10 2013-04-10 Laminate type high-rise platform pile tower crane foundation and construction method

Country Status (1)

Country Link
CN (1) CN103215965A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103882882A (en) * 2014-04-02 2014-06-25 中国建筑第八工程局有限公司 Integral jacking type tower crane foundation platform structure
CN104514219A (en) * 2014-12-12 2015-04-15 中铁十九局集团有限公司 In-water drilled pile foundation construction system capable of recovering steel protective barrels and construction method thereof
CN115182340A (en) * 2022-09-01 2022-10-14 中国建筑第五工程局有限公司 Construction method of novel precast pile comprehensive tower crane pile under complex geological condition

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007113374A (en) * 2005-10-19 2007-05-10 Gou Kouzou:Kk Method of constructing temporary gantry in steel construction
CN201891128U (en) * 2010-11-03 2011-07-06 中建三局第二建设工程有限责任公司 Single-pile elevated bearing-platform tower-crane foundation structure
CN102433889A (en) * 2011-10-20 2012-05-02 中天建设集团有限公司天津分公司 Method for constructing high-rise pile cap tower footing and high-rise pile cap tower footing structure
CN202298641U (en) * 2011-10-20 2012-07-04 中天建设集团有限公司天津分公司 Tower foundation structure of high pile cap
CN203213140U (en) * 2013-04-10 2013-09-25 中国建筑第八工程局有限公司 Laminate-type high pile cap tower crane foundation structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007113374A (en) * 2005-10-19 2007-05-10 Gou Kouzou:Kk Method of constructing temporary gantry in steel construction
CN201891128U (en) * 2010-11-03 2011-07-06 中建三局第二建设工程有限责任公司 Single-pile elevated bearing-platform tower-crane foundation structure
CN102433889A (en) * 2011-10-20 2012-05-02 中天建设集团有限公司天津分公司 Method for constructing high-rise pile cap tower footing and high-rise pile cap tower footing structure
CN202298641U (en) * 2011-10-20 2012-07-04 中天建设集团有限公司天津分公司 Tower foundation structure of high pile cap
CN203213140U (en) * 2013-04-10 2013-09-25 中国建筑第八工程局有限公司 Laminate-type high pile cap tower crane foundation structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103882882A (en) * 2014-04-02 2014-06-25 中国建筑第八工程局有限公司 Integral jacking type tower crane foundation platform structure
CN103882882B (en) * 2014-04-02 2017-04-05 中国建筑第八工程局有限公司 Integral jacking formula tower crane platform structure
CN104514219A (en) * 2014-12-12 2015-04-15 中铁十九局集团有限公司 In-water drilled pile foundation construction system capable of recovering steel protective barrels and construction method thereof
CN115182340A (en) * 2022-09-01 2022-10-14 中国建筑第五工程局有限公司 Construction method of novel precast pile comprehensive tower crane pile under complex geological condition

Similar Documents

Publication Publication Date Title
CN106968256B (en) Foundation pit assembled steel trestle construction method
CN104453274B (en) Utilize supporting and protection structure and underpinning structure to support existing building underground and increase layer method
CN102191777B (en) Steel sheet pile coefferdam structure and topdown construction method thereof
CN107299643A (en) Steel lattice column combined type tower crane foundation structure in foundation pit and construction method
CN102434717B (en) Construction method of joist steel pipe-jacking work pit
CN104131565B (en) A kind of against making the construction method that the earthwork is just made to excavate
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN103195076A (en) Method for constructing silt deep foundation pit tower crane foundation
CN110374111B (en) Slope releasing and steel pipe pile anchor cooperative supporting system
CN201801872U (en) Deep foundation pit excavated on corrode geology through combined support
CN102561384A (en) Steel hoop truss type elevated pile cap tower crane foundation construction method and structure
CN104264683B (en) Building concave shape ultra-deep foundation pit subregion supporting method is protected for three around literary composition
CN205024712U (en) Modular tower crane basis
CN108867723B (en) Method for correcting inclination of frame structure building and adding underground layer
CN101793023A (en) Foundation pit construction method
CN112854228A (en) Confined space foundation pit earth excavation construction method
CN102359112A (en) Method for bracing foundation pit by using steel box piles
CN106498957A (en) Steel sheet pile cofferdam construction platform and integral construction method
CN207003421U (en) A kind of steel plate pilework for being seated hard rock top surface
CN101824825B (en) Deep foundation pit open cutting construction method
CN101498133B (en) Method and supporting construction for enlarging basement top-down method earth excavation space
CN1279319A (en) Full-reverse construction technology for basement
CN204590059U (en) A kind of combined type tower-crane foundation structure
CN102220764B (en) Construction method of deep foundation pit bracing system
CN103215965A (en) Laminate type high-rise platform pile tower crane foundation and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20130724

RJ01 Rejection of invention patent application after publication