CN201891128U - Single-pile elevated bearing-platform tower-crane foundation structure - Google Patents

Single-pile elevated bearing-platform tower-crane foundation structure Download PDF

Info

Publication number
CN201891128U
CN201891128U CN2010205901707U CN201020590170U CN201891128U CN 201891128 U CN201891128 U CN 201891128U CN 2010205901707 U CN2010205901707 U CN 2010205901707U CN 201020590170 U CN201020590170 U CN 201020590170U CN 201891128 U CN201891128 U CN 201891128U
Authority
CN
China
Prior art keywords
tower
reinforced concrete
pile
platform
bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205901707U
Other languages
Chinese (zh)
Inventor
丁文轩
张琨
罗宏
杨利民
梁贵才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Original Assignee
Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Engineering Co Ltd of China Construction Third Engineering Division filed Critical Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Priority to CN2010205901707U priority Critical patent/CN201891128U/en
Application granted granted Critical
Publication of CN201891128U publication Critical patent/CN201891128U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a single-pile elevated bearing-platform tower-crane foundation structure, comprising a reinforced concrete cast-in-place pile, a reinforced concrete stand column, a reinforced concrete bearing platform, a tower-crane foundation section or embedded part. The single-pile elevated bearing-platform tower-crane foundation structure is characterized in that the reinforced concrete cast-in-place pile comprises an overground part and an underground part, the upper end of the reinforced concrete cast-in-place pile is fixedly connected with a reinforcement cage which is the reinforced concrete stand column on the same shaft, the upper end of the reinforced concrete stand column is fixedly connected with a reinforcement cage which is the reinforced concrete bearing platform on the same shaft, and the reinforced concrete bearing platform is internally embedded with the tower-crane foundation section or embedded part fixedly connected with a tower body and is fixedly connected with the tower body into a whole through the tower crane foundation section or embedded part. In the single-pile elevated bearing-platform tower-crane foundation structure provided by the utility model, the design of a single pile and the bearing platform is adopted, so that the construction cost is greatly reduced; due to the design of the bearing platform, the tower crane can be installed before earth excavation is carried out so as not to influence the backfill of earthwork in the range of the tower foundation, and thus, later-stage expense and potential safety hazards are avoided; and the single-pile elevated bearing-platform tower-crane foundation structure has the advantages of small construction plane and simple structure, occupies less field, and is suitable for constructions in narrow fields with different soil properties, and the technology is easy to master and implement.

Description

The high-order cushion cap tower crane of single pile structure
Technical field
The utility model belongs to the tower crane of constructional engineering machinery equipment, relates in particular to the high-order cushion cap tower crane of a kind of middle-size and small-size single pile structure.
Background technology
Tower crane is the visual plant in building trade lifting machine field, and the vertical transport of all kinds of constructional materialss all is mainly to rely on tower crane to finish.The high-order cushion cap of many steel columns basis that the tower crane form that is adopted in the construction work at present is mainly independent cushion cap basis, rood beam basis, pile cap basis and adopts in recent years.
1. independent cushion cap basis and rood beam basis generally place below the excavation of foundation pit face, the back construction of basic earthwork excavation, its shortcoming is that foundation ditch need be put sloping shoveling, bank protection, daily draining, security protection, secondary backfill soil, its basic cross section is big, earthwork construction is many, working face is big, and natural foundation bearing capacity is had requirement;
2. the pile cap basis is a kind of tower crane form that adopts under natural foundation bearing capacity or the not enough situation of the basic resisting moment of toppling for solving, the general 1-4 root castinplace pile that adopts, cushion cap places on the ground, its shortcoming is that foundation ditch need be put sloping shoveling, bank protection, daily draining, security protection, backfill, earthwork construction is many, working face is big, the cost height;
3. many high-order cushion cap of steel column bases are used for the construction work that tower crane is arranged in deep foundation ditch, passes through basement more, 4 castinplace piles of the general employing of this base form, being the four directions arranges, stake withstands on the hole at the end, monimostyly steel column or steel core concrete column in the stake, it is affixed that capital passes through steel platform or concrete bearing platform and body of the tower.This base form has been save the operation of soil excavation, bank protection, daily draining, security protection, backfill, but cost own is very high.
Though the tower crane form was applicable to the construction work of different characteristics in the past, all exists not to be that operation is exactly the high problem of cost more, and all site condition is had certain requirement.Construction plant, city condition is narrow and small day by day from now on, and each building enterprise of engineering cost efficiency payes attention to all the more, and current tower crane form is difficult to the requirement that condition of compatibility changes.
Summary of the invention
The purpose of this utility model provides the high-order cushion cap tower crane of a kind of single pile structure in order to overcome problem and the shortcoming that above-mentioned prior art exists, and the utility model adopts single pile, cap design of pile to greatly reduce construction costs; Realized that by cap design of pile but tower crane can install, not influence column foot scope earthwork backfill before soil excavation, avoided later stage expense and potential safety hazard; The utility model construction operation face is little, does not account for the place, is applicable to different soil properties, the construction of narrow and small site condition; It is simple in structure, and technology is easy to grasp and implement.
The technical solution of the utility model is:
The high-order cushion cap tower crane of single pile structure, comprise a deposited reinforced concrete pile, reinforced concrete upright column, the steel concrete cushion cap, tower crane joint or embedded part, it is characterized in that: deposited reinforced concrete pile is divided into above and below ground two parts, affixed reinforcing cage is the reinforced concrete upright column of same axle in the deposited reinforced concrete pile upper end, the affixed reinforcing cage in reinforced concrete upright column stake upper end is the steel concrete cushion cap of same axle, and the tower crane joint or the embedded part of pre-buried and body of the tower Joint in the steel concrete cushion cap are by tower crane joint or embedded part and body of the tower is affixed is integral.
With the body of the tower of exposed steel bar cast-in-place concrete pile and reinforced concrete upright column instead of part steel work, like this can the material saving; The steel concrete cushion cap is the connected node of body of the tower and minor diameter reinforced concrete upright column; The diameter of described deposited reinforced concrete pile or reinforced concrete upright column can be less than the body of the tower width.
The utility model adopts single pile, cap design of pile to greatly reduce construction costs; Realized that by cap design of pile tower crane can install, not influence the backfill of the column foot scope earthwork before soil excavation, avoided later maintenance expense and potential safety hazard; The utility model construction operation face is little, does not account for the place, is applicable to different soil properties, the construction of narrow and small site condition; It is simple in structure, and technology is easy to grasp and implement.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described in detail:
As shown in Figure 1, the utility model comprises a deposited reinforced concrete pile, reinforced concrete upright column 3, steel concrete cushion cap 4, tower crane joint 5, deposited reinforced concrete pile is divided into above and below ground two parts, and under ground portion is 1, overground part is 2,2 affixed reinforcing cages are the reinforced concrete upright column 3 of same axle in the deposited reinforced concrete pile upper end, the affixed reinforcing cage in reinforced concrete upright column post 3 upper ends is the steel concrete cushion cap 4 of same axle, and pre-buried tower crane with body of the tower 6 Joints saves 5 in the steel concrete cushion cap 4, by tower crane joint 5 and body of the tower 6 affixed being integral.
With the body of the tower of exposed steel bar cast-in-place concrete pile and reinforced concrete upright column instead of part steel work, like this can the material saving; The steel concrete cushion cap is the connected node of body of the tower and minor diameter reinforced concrete upright column; The diameter of described deposited reinforced concrete pile or reinforced concrete upright column can be less than the body of the tower width.
The construction sequence of the high-order cushion cap tower crane of single pile of the present utility model structure is as follows:
1, carries out layout and tower crane type selecting according to engineering characteristic tower crane position, collect related datas such as the geology relevant, tower crane load simultaneously with the tower crane design;
2, according to site specific initial option stake type and bearing course at pile end, column, cushion cap member pattern.Check basic safety according to preliminary design then.The basis safety is calculated and is mainly comprised pile foundation Force Calculation and column Force Calculation.
The pile foundation Force Calculation comprises that mainly pile body stress and displacement calculating and vertical bearing capacity calculate, after finishing single pile upper joint pin cushion cap tower crane member type selecting and safety Force Calculation, carry out deposited reinforced concrete pile (1,2) construction, the deposited reinforced concrete pile absolute altitude at the bottom of the steel concrete cushion cap of can before soil excavation, once constructing, also can connect reinforced concrete upright column 3 to 4 end of steel concrete cushion cap absolute altitude on again, specifically determine according to field condition at construction behind the soil excavation to domatic absolute altitude.Lower rebar concrete bearing platform 4 lower parts of at first constructing during the steel concrete bearing platform construction, and the tower crane embedded foundation is installed is saved or embedded part 5 keepers, after reaching 50% to concrete strength, the base section or the embedded part 5 of lifting tower crane, construction reinforced bar concrete bearing platform 4 tops after centering and the adjustment level, affixed body of the tower 6 on tower crane joint or the embedded part 5, total body construction finishes.

Claims (2)

1. the high-order cushion cap tower crane of single pile structure, comprise a deposited reinforced concrete pile, reinforced concrete upright column, the steel concrete cushion cap, tower crane joint or embedded part, it is characterized in that: deposited reinforced concrete pile is divided into above and below ground two parts, affixed reinforcing cage is the reinforced concrete upright column of same axle in the deposited reinforced concrete pile upper end, the affixed reinforcing cage in reinforced concrete upright column stake upper end is the steel concrete cushion cap of same axle, and the tower crane joint or the embedded part of pre-buried and body of the tower Joint in the steel concrete cushion cap are by tower crane joint or embedded part and body of the tower is affixed is integral.
2. the high-order cushion cap tower crane of single pile according to claim 1 structure, it is characterized in that: the diameter of described deposited reinforced concrete pile or reinforced concrete upright column is less than the body of the tower width.
CN2010205901707U 2010-11-03 2010-11-03 Single-pile elevated bearing-platform tower-crane foundation structure Expired - Fee Related CN201891128U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205901707U CN201891128U (en) 2010-11-03 2010-11-03 Single-pile elevated bearing-platform tower-crane foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205901707U CN201891128U (en) 2010-11-03 2010-11-03 Single-pile elevated bearing-platform tower-crane foundation structure

Publications (1)

Publication Number Publication Date
CN201891128U true CN201891128U (en) 2011-07-06

Family

ID=44220606

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205901707U Expired - Fee Related CN201891128U (en) 2010-11-03 2010-11-03 Single-pile elevated bearing-platform tower-crane foundation structure

Country Status (1)

Country Link
CN (1) CN201891128U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103215965A (en) * 2013-04-10 2013-07-24 中国建筑第八工程局有限公司 Laminate type high-rise platform pile tower crane foundation and construction method
CN103422493A (en) * 2013-08-15 2013-12-04 东通岩土科技(杭州)有限公司 Upright column pile for foundation pit
CN113417310A (en) * 2021-06-02 2021-09-21 中建二局第四建筑工程有限公司 Construction method for foundation of column cap type elevator
CN114703887A (en) * 2022-04-29 2022-07-05 中国十九冶集团有限公司 Construction method of high-pile bearing platform tower crane foundation
CN115961636A (en) * 2022-12-14 2023-04-14 保利长大工程有限公司 Construction process taking single pile foundation as tower crane foundation
CN117342407A (en) * 2023-09-20 2024-01-05 广州一建建设集团有限公司 Combined portal frame for inclined pulling hoisting of hillside and construction method

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103215965A (en) * 2013-04-10 2013-07-24 中国建筑第八工程局有限公司 Laminate type high-rise platform pile tower crane foundation and construction method
CN103422493A (en) * 2013-08-15 2013-12-04 东通岩土科技(杭州)有限公司 Upright column pile for foundation pit
CN103422493B (en) * 2013-08-15 2015-05-13 东通岩土科技(杭州)有限公司 Upright column pile for foundation pit
CN104790383A (en) * 2013-08-15 2015-07-22 东通岩土科技(杭州)有限公司 Stand column pile for foundation pit
CN104790383B (en) * 2013-08-15 2016-08-17 东通岩土科技(杭州)有限公司 A kind of upright column pile for foundation pit
CN113417310A (en) * 2021-06-02 2021-09-21 中建二局第四建筑工程有限公司 Construction method for foundation of column cap type elevator
CN114703887A (en) * 2022-04-29 2022-07-05 中国十九冶集团有限公司 Construction method of high-pile bearing platform tower crane foundation
CN115961636A (en) * 2022-12-14 2023-04-14 保利长大工程有限公司 Construction process taking single pile foundation as tower crane foundation
CN117342407A (en) * 2023-09-20 2024-01-05 广州一建建设集团有限公司 Combined portal frame for inclined pulling hoisting of hillside and construction method
CN117342407B (en) * 2023-09-20 2024-09-13 广州一建建设集团有限公司 Combined portal frame for inclined pulling hoisting of hillside and construction method

Similar Documents

Publication Publication Date Title
CN201891128U (en) Single-pile elevated bearing-platform tower-crane foundation structure
CN104453274B (en) Utilize supporting and protection structure and underpinning structure to support existing building underground and increase layer method
CN102434717B (en) Construction method of joist steel pipe-jacking work pit
CN104532868B (en) High abrupt change shape sloped region bridge anchor pull-type high cap pile group basis construction method
CN201132960Y (en) Composite batardeau of steel light structure
CN105863042A (en) All-steel structure building and construction method thereof
CN101240550A (en) Construction method for lattice type steel column tower crane pedestal
CN205024712U (en) Combined tower crane foundation
CN104652475A (en) Truss type retaining wall
CN101793098B (en) Coordinated interactive combined rectification method
CN201605594U (en) Self-balancing cross base of iron tower for power transmission line
CN104499501B (en) Narrow-foundation-tower single-pile pier-type self-stabilized foundation for power transmission line
CN201172830Y (en) Anchor rod static-pressing pile foundation in tower crane
CN103510526A (en) Foundation pit stepped supporting method with double-row piles combined with single-row piles
CN202273242U (en) Base of union type mini type pile rod tower
CN104878786A (en) Inclined-straight alternating group piles-soil-structure interaction experiment model
CN208415284U (en) A kind of transmission line of electricity assembled girder system cushion cap small precast pile foundation
CN105951863B (en) A kind of construction method of the construction equipment of active assembled open caisson
CN111485572A (en) Construction method of prefabricated root key type wing plate foundation
CN100535259C (en) Partial adhered prestressed pile against drawing and floating and its construction
KR20210053497A (en) Fileless-up wall demolition method
CN103046574B (en) A kind of soft damage blower fan four leaf plum type concrete bearing platform prestressed pipe foundation structure
CN202323968U (en) Multi-purpose anti-slide pile structural system for landslides
CN102134856B (en) Tower crane foundation
CN213390202U (en) Combined type polygonal tubular structure fan foundation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110706

Termination date: 20151103

EXPY Termination of patent right or utility model