CN204590059U - A kind of combined type tower-crane foundation structure - Google Patents

A kind of combined type tower-crane foundation structure Download PDF

Info

Publication number
CN204590059U
CN204590059U CN201520045779.9U CN201520045779U CN204590059U CN 204590059 U CN204590059 U CN 204590059U CN 201520045779 U CN201520045779 U CN 201520045779U CN 204590059 U CN204590059 U CN 204590059U
Authority
CN
China
Prior art keywords
crane
combined type
welded
tower
foundation structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520045779.9U
Other languages
Chinese (zh)
Inventor
黄艳芬
王高荣
林恒
司宗雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Kai Hui Mechanical Engineering Co Ltd
Original Assignee
Fujian Kai Hui Mechanical Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Kai Hui Mechanical Engineering Co Ltd filed Critical Fujian Kai Hui Mechanical Engineering Co Ltd
Priority to CN201520045779.9U priority Critical patent/CN204590059U/en
Application granted granted Critical
Publication of CN204590059U publication Critical patent/CN204590059U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model relates to a kind of combined type tower-crane foundation structure, comprise the foundation ditch being excavated to basement roof from ground, described basement roof offers some preformed holes, described preformed hole internal fixtion has filling pile cage of reinforcement, described filling pile cage of reinforcement welds with lattice column bottom, described lattice column top is welded with cushion cap distributing bar net, and the described online portion of cushion cap distributing bar is welded with tower crane socle pre-embedded bolt and saves with tower crane through tower crane socle pre-embedded bolt and is connected.This combined type tower-crane foundation structure effectively reduces project earthwork excavated volume, make project in construction early application plant equipment, decrease cost of labor, and structure is simple, stable, accelerates the progress of project and improves the economic benefit of project.

Description

A kind of combined type tower-crane foundation structure
Technical field
The utility model relates to a kind of combined type tower-crane foundation structure.
Background technology
Along with the development of engineering construction; the basement degree of depth and scale increasing; when the horizontal supporting and protection structure of deep foundation ditch of constructing; often can run into the earthwork and also not dig the situation just requiring that tower crane is installed in advance; and tower crane must be installed on basement position, according to traditional pile foundation+concrete bearing platform formula tower crane, that can cause tower crane digs dark intensification; earthwork excavated volume increases, and is unfavorable for the control of project construction progress and cost.
Utility model content
The utility model makes improvement for above-mentioned prior art Problems existing, and namely technical problem to be solved in the utility model is to provide the combined type tower-crane foundation structure that a kind of structure is simple, stability is high.
In order to solve the problems of the technologies described above, the technical solution of the utility model is: a kind of combined type tower-crane foundation structure, comprise the foundation ditch being excavated to basement roof from ground, described basement roof offers some preformed holes, described preformed hole internal fixtion has filling pile cage of reinforcement, described filling pile cage of reinforcement welds with lattice column bottom, described lattice column top is welded with cushion cap distributing bar net, and the described online portion of cushion cap distributing bar is welded with tower crane socle pre-embedded bolt and saves with tower crane through tower crane socle pre-embedded bolt and is connected.
Further, described lattice column corner is all welded with angle steel, and two adjacent angular steel lateral surfaces are welded with batten plate.
Further, steel holder is fixed with bottom described lattice column and cushion cap intersection.
Further, cross bar, diagonal web member is welded with between two adjacent lattice columns.
Further, the surrounding side of described basement roof is provided with water blocking tape.
Compared with prior art, the utility model has following beneficial effect: this combined type tower-crane foundation structure effectively reduces project earthwork excavated volume, make project in construction early application plant equipment, decrease cost of labor, and structure is simple, stable, accelerate the progress of project and improve the economic benefit of project.
Below in conjunction with the drawings and specific embodiments, the utility model is described in more detail.
Accompanying drawing explanation
Fig. 1 is the unitary construction schematic diagram of the utility model embodiment.
Fig. 2 is the basement roof schematic diagram of the utility model embodiment.
Fig. 3 is the lattice column organigram of the utility model embodiment.
Fig. 4 is the cushion cap organigram of the utility model embodiment.
Fig. 5 is the lattice column unibody construction schematic diagram of the utility model embodiment.
In figure: 1-basement roof, 2-preformed hole, 3-castinplace pile, 4-lattice column, 41-angle steel, 42-batten plate, 5-cushion cap, 6-tower crane saves, the holder of 7-steel, 8-cross bar, 9-diagonal web member, 10-tower crane socle pre-embedded bolt, 11-water blocking tape.
Detailed description of the invention
As shown in Fig. 1 ~ 5, a kind of combined type tower-crane foundation structure, comprise the foundation ditch being excavated to basement roof from ground, described basement roof offers four preformed holes 2, described preformed hole 2 internal fixtion has castinplace pile 3 reinforcing cage, described castinplace pile 3 reinforcing cage welds with lattice column 4 bottom, and described lattice column 4 top is welded with cushion cap 5 distributing bar net, and the online portion of described cushion cap 5 distributing bar is welded with tower crane socle pre-embedded bolt 10 and saves 6 through tower crane socle pre-embedded bolt 10 and tower crane and is connected.
In the utility model, described lattice column 4 four jiaos is all welded with angle steel 41, and two adjacent angular steel 41 lateral surfaces are welded with batten plate 42.
In the utility model, bottom described lattice column 4 and cushion cap 5 intersection, be fixed with steel holder 7.
In the utility model, between two adjacent lattice columns 4, be welded with cross bar 8, diagonal web member 9.
In the utility model, the surrounding side of described basement roof is provided with water blocking tape 11.
Specific construction process of the present utility model is as follows:
(1) before excavation of foundation pit, tower crane foundation position of having good positioning, piling, fixing castinplace pile 3 reinforcing cage;
(2) process four lattice columns 4 to be inserted respectively in the reinforcing cage of four castinplace piles 3 and to weld, insertion depth is determined after requiring calculating according to actual loading, after lattice column 4 has welded with the reinforcing cage of castinplace pile 3, at the inner concreting of castinplace pile 3 template to form castinplace pile 3, described lattice column 4 and castinplace pile 3 stable connection;
(3) in Excavation Process, the progress that the diagonal web member 9 of lattice column 4 part of combined type tower crane must be cut the earth along with foundation ditch with digging with weldering, until excavation of foundation pit is to basement bottom board place, to ensure the stability of whole foundation structure;
(4) by the leveling of four lattice column 4 capital levelnesss, error is no more than 1/1000;
(5) at lattice column 4 top braiding concrete blinding, concrete bearing platform 5 is made according to the technical requirements of concrete foundation in pillar crane description, and on concrete bearing platform 5 pre-embedded anchoring bolts (fixed supporting leg), when cushion cap 5 concrete strength reaches more than 95%, equipment is marched into the arena installation, and initial setting height(from bottom) must not higher than 30m;
(6) pillar crane installs that rear detection is qualified can come into operation.
The foregoing is only preferred embodiment of the present utility model, all equalizations done according to the utility model claim change and modify, and all should belong to covering scope of the present utility model.

Claims (5)

1. a combined type tower-crane foundation structure, it is characterized in that: comprise the foundation ditch being excavated to basement roof from ground, described basement roof offers some preformed holes, described preformed hole internal fixtion has filling pile cage of reinforcement, described filling pile cage of reinforcement welds with lattice column bottom, described lattice column top is welded with cushion cap distributing bar net, and the described online portion of cushion cap distributing bar is welded with tower crane socle pre-embedded bolt and saves with tower crane through tower crane socle pre-embedded bolt and is connected.
2. a kind of combined type tower-crane foundation structure according to claim 1, is characterized in that: described lattice column corner is all welded with angle steel, two adjacent angular steel lateral surfaces are welded with batten plate.
3. a kind of combined type tower-crane foundation structure according to claim 1 and 2, is characterized in that: be fixed with steel holder bottom described lattice column and cushion cap intersection.
4. a kind of combined type tower-crane foundation structure according to claim 3, is characterized in that: be welded with cross bar, diagonal web member between two adjacent lattice columns.
5. a kind of combined type tower-crane foundation structure according to claim 1, is characterized in that: the surrounding side of described basement roof is provided with water blocking tape.
CN201520045779.9U 2015-01-23 2015-01-23 A kind of combined type tower-crane foundation structure Active CN204590059U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520045779.9U CN204590059U (en) 2015-01-23 2015-01-23 A kind of combined type tower-crane foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520045779.9U CN204590059U (en) 2015-01-23 2015-01-23 A kind of combined type tower-crane foundation structure

Publications (1)

Publication Number Publication Date
CN204590059U true CN204590059U (en) 2015-08-26

Family

ID=53926228

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520045779.9U Active CN204590059U (en) 2015-01-23 2015-01-23 A kind of combined type tower-crane foundation structure

Country Status (1)

Country Link
CN (1) CN204590059U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887918A (en) * 2015-12-31 2016-08-24 上海建工七建集团有限公司 Tower crane foundation and construction method thereof
CN106836264A (en) * 2017-01-09 2017-06-13 国网山东省电力公司烟台供电公司 A kind of pole and tower foundation construction method
CN114541464A (en) * 2022-03-24 2022-05-27 浙江省特种设备科学研究院 Novel tower crane basis lattice column is consolidated device
CN114960731A (en) * 2022-04-07 2022-08-30 浙江国丰集团有限公司 Embedded and nested combined tower crane section foundation and construction method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887918A (en) * 2015-12-31 2016-08-24 上海建工七建集团有限公司 Tower crane foundation and construction method thereof
CN105887918B (en) * 2015-12-31 2018-06-22 上海建工七建集团有限公司 A kind of tower crane and its construction method
CN106836264A (en) * 2017-01-09 2017-06-13 国网山东省电力公司烟台供电公司 A kind of pole and tower foundation construction method
CN114541464A (en) * 2022-03-24 2022-05-27 浙江省特种设备科学研究院 Novel tower crane basis lattice column is consolidated device
CN114541464B (en) * 2022-03-24 2023-12-01 浙江省特种设备科学研究院 Novel tower crane foundation lattice column reinforcing device
CN114960731A (en) * 2022-04-07 2022-08-30 浙江国丰集团有限公司 Embedded and nested combined tower crane section foundation and construction method

Similar Documents

Publication Publication Date Title
CN102094425B (en) Foundation pit construction method adopting shallow buried depth Larsen steel plate pile as protective cofferdam
CN203145038U (en) Latticed column type tower crane foundation
CN104453274B (en) Utilize supporting and protection structure and underpinning structure to support existing building underground and increase layer method
CN103074899B (en) Subdepot pier-type foundation pit support structure and construction method
CN204491626U (en) The foundation pit enclosure structure that Larsen steel sheet pile and prestressed anchor combine
CN204590059U (en) A kind of combined type tower-crane foundation structure
CN102864780A (en) Supporting structure and supporting method of foundation pit
CN101614019A (en) The multilayer underground structure next to existing building self-supporting construction method
CN103321246A (en) Underground diaphragm wall based foundation pit construction method
CN205975658U (en) Steel platform tower crane foundation
CN111851523B (en) Settlement deviation prevention method for foundation pit construction
CN103938634A (en) Deep foundation pit supporting structure and construction method
CN205024712U (en) Modular tower crane basis
CN105064401A (en) Method for excavating and constructing large-area basement
CN204940298U (en) A kind of Composite Enclosure Structure of base pit engineering
CN206769047U (en) A kind of steel lattice column and bored concrete pile attachment structure
CN106498957B (en) Steel sheet pile cofferdam construction platform and integral construction method
CN202830936U (en) Supporting structure of foundation pit
CN209941754U (en) High-voltage power pipe culvert in-situ protection structure
CN207062955U (en) The foundation pit supporting construction that a kind of thick long stake is combined with thin stub
CN203821399U (en) Deep foundation pit supporting structure
CN106149774A (en) A kind of rectifying of leaned building reinforcement means based on anchor jacked pile envelope stake technology
CN103215965A (en) Laminate type high-rise platform pile tower crane foundation and construction method
CN107700519A (en) One kind lifting tower crane installation method
CN205000340U (en) Regard as foundation ditch of vertical cantilever fulcrum to go along with sb. to guard him system with underground continuous wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant