CN206769047U - A kind of steel lattice column and bored concrete pile attachment structure - Google Patents

A kind of steel lattice column and bored concrete pile attachment structure Download PDF

Info

Publication number
CN206769047U
CN206769047U CN201720286024.7U CN201720286024U CN206769047U CN 206769047 U CN206769047 U CN 206769047U CN 201720286024 U CN201720286024 U CN 201720286024U CN 206769047 U CN206769047 U CN 206769047U
Authority
CN
China
Prior art keywords
steel
lattice column
concrete pile
steel plate
bored concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720286024.7U
Other languages
Chinese (zh)
Inventor
吴金兴
吴晓斌
吴晓峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN FUTIAN JIANAN CONSTRUCTION GROUP Co Ltd
Original Assignee
SHENZHEN FUTIAN JIANAN CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN FUTIAN JIANAN CONSTRUCTION GROUP Co Ltd filed Critical SHENZHEN FUTIAN JIANAN CONSTRUCTION GROUP Co Ltd
Priority to CN201720286024.7U priority Critical patent/CN206769047U/en
Application granted granted Critical
Publication of CN206769047U publication Critical patent/CN206769047U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

The utility model discloses a kind of steel lattice column and bored concrete pile attachment structure, positioning bar is connected including setting, it is that positioning bar is connected between steel latticework and steel reinforcement cage in described connection positioning bar, described steel lattice column is strengthening steel plate with weldering in steel reinforcement cage connecting portion, the described bored concrete pile stake top installation prefabricated fastening steel plate of separate type, doughnut-shaped steel plate is welded thereon, described oblique strut is welded on doughnut-shaped steel plate and steel lattice column, is reserved on steel lattice column angle steel and the prefabricated fastening steel plate of separate type and is poured spout hole.Due to having used attachment structure of the present utility model, the connection of steel lattice column and bored concrete pile is more firm, and bearing capacity is higher.Of the present utility model simple in construction, construction is convenient.

Description

A kind of steel lattice column and bored concrete pile attachment structure
Technical field
The connected mode of steel lattice column bottom bracing structure in Excavation Process is the utility model is related to, more particularly to deeply A kind of steel lattice column of Excavation Process and bored concrete pile attachment structure.
Background technology
With the quickening of urbanization process and the increasingly reduction of land resource, all kinds of buildings in city start to send out to the underground space Exhibition, the basic more and more deeper of building is embodied in, the increasing floor space particularly occurred in the last few years is big, flat The complex-shaped ultra-deep foundation pit engineering in face.Foundation pit support plan is essential one during Foundation Pit Construction, right In the foundation ditch that foundation ditch area is big, cutting depth is deep, earth excavation difficulty is big, its supporting scheme need to mainly solve following point:① Solve the generous amount earth excavation transportation problem of deep basal pit, working face and passage are provided for digging machine and earth moving vehicles;2. solve The problem of site operation narrow field, place is provided for placing of material and processing;3. solves deep big foundation pit support stiffness deficiency Problem, control and reduction foundation pit deformation, improve the safe operating mode of foundation ditch;4. simultaneously it is also contemplated that economy, convenient construction and environment The influence of the other factors such as influence.Deep foundation pit support generally use armored concrete is used as support to support or angle brace at present, and sets Armored concrete trestle is put, as the earthwork and transport of materials passage, and irrational design can not only increase financial cost, can also Influence be unearthed efficiency, delay construction speed.Therefore, it is necessary to propose optimal branch for multi-form huge ultradeep foundation pit engineering Trestle system is supportted, so as to ensure the unearthed efficiency of pattern foundation pit supporting structure safety, raising, reduction engineering cost, shorten the cycle of being unearthed.Foundation ditch fills With formula steel trestle and construction method, such a support bridge system has great applicability in pit earthwork digging process.
Utility model content
Goal of the invention of the present utility model is a kind of steel lattice column of design and bored concrete pile attachment structure, realizes steel latticework and filling Note stake is reliably connected, and improves steel lattice column bearing capacity and stability.
The utility model is for the technical scheme realized its technical purpose and used:A kind of steel lattice column connects with bored concrete pile Binding structure, including connection positioning bar, are that positioning bar is connected between steel latticework and steel reinforcement cage in described connection positioning bar, described Steel lattice column is strengthening steel plate, the described bored concrete pile stake top installation prefabricated fastening steel of separate type with weldering in steel reinforcement cage connecting portion Plate, welds doughnut-shaped steel plate thereon, and described oblique strut is welded on doughnut-shaped steel plate and steel lattice column.
Further, in a kind of above-mentioned steel lattice column and bored concrete pile attachment structure:Angle steel and the prefabricated fastening steel of separate type Plate is reserved to pour spout hole.
Further, in a kind of above-mentioned steel lattice column and bored concrete pile attachment structure:Bored concrete pile stake top local wide, passes through Connection positioning bar is connected with steel lattice column.
Further, in a kind of above-mentioned steel lattice column and bored concrete pile attachment structure:The prefabricated fastening steel plate of separate type, passes through Prestressing force screw rod fastens.
Further, in a kind of above-mentioned steel lattice column and bored concrete pile attachment structure:Oblique strut is welded on doughnut-shaped steel plate It is connected with steel lattice column.
Due to having used attachment structure of the present utility model, steel lattice column is connected more firm, stable carrying with bored concrete pile Li Genggao, of the present utility model simple in construction, construction is convenient.
The utility model is described in detail with accompanying drawing with reference to specific embodiment.
Brief description of the drawings
Fig. 1 is the cross-sectional view of steel lattice column and bored concrete pile attachment structure;
Fig. 2 is the skiagraph of steel lattice column and bored concrete pile attachment structure
In figure:1st, angle steel, 2, pour spout hole, 3, tie hoop, 4, connection positioning bar, 5, prestressing force screw rod, 6, strengthen Steel plate, 7, steel batten plate, 8, reinforcing bar, 9, steel lattice column, 10, doughnut-shaped steel plate, 11, skewed horizontal load bar, 12, the prefabricated fastening stake of separate type Top plate
Embodiment
Embodiment 1, as shown in Figure 1 and Figure 2, the present embodiment are that a kind of steel lattice column separates with the setting of bored concrete pile attachment structure The prefabricated fastening steel plate 12 of formula.As shown in Figure 1 and Figure 2, the prefabricated top of fastening steel plate 12 of stake top separate type sets circular steel plate 10, ring Skewed horizontal load bar 11 is welded on shape steel plate to be connected with steel lattice column, and spacer bar 4, steel are welded between steel lattice column 9 and bored concrete pile Lattice column 9 welds in connecting portion strengthens steel plate 6, and steel lattice column angle steel 1 and the prefabricated fastening steel plate 12 of stake top separate type are reserved and poured Spout hole 2 is noted, downcomer, pours into a mould concrete, maintenance.
Lattice column and bored concrete pile attachment structure, including the prefabricated fastening steel plate 12 of separate type, the prefabricated fastening steel plate 12 of separate type Top sets doughnut-shaped steel plate 10, and weld skewed horizontal load bar 11 on doughnut-shaped steel plate 10 is connected with steel lattice column 9, and steel lattice column 9 is with filling Positioning bar 4 is welded to connect between note stake, steel lattice column 9 welds in connecting portion strengthens steel plate 6.Angle steel 1 and separate type are prefabricated tight Gu steel plate 12 is reserved to pour spout hole 2.Bored concrete pile stake top local wide, it is connected by connecting positioning bar 4 with steel lattice column 9.Point From the prefabricated fastening steel plate 12 of formula, fastened by prestressing force screw rod 5.

Claims (4)

1. a kind of steel lattice column and bored concrete pile attachment structure, including the prefabricated fastening steel plate of separate type (12), the prefabricated fastening of separate type Steel plate (12) top sets doughnut-shaped steel plate (10), and skewed horizontal load bar (11) is welded on doughnut-shaped steel plate (10) and is connected with steel lattice column (9) Connect, steel lattice column (9) is welded to connect positioning bar (4) between bored concrete pile, and steel lattice column (9) welds in connecting portion strengthens steel plate (6)。
2. a kind of steel lattice column according to claim 1 and bored concrete pile attachment structure, it is characterised in that:Angle steel (1) and point It is reserved from the prefabricated fastening steel plate of formula (12) to pour spout hole (2).
3. a kind of steel lattice column according to claim 2 and bored concrete pile attachment structure, it is characterised in that:Bored concrete pile stake top office Portion expands, and is connected by connecting positioning bar (4) with steel lattice column (9).
4. a kind of steel lattice column according to claim 3 and bored concrete pile attachment structure, it is characterised in that:Separate type is prefabricated tight Gu steel plate (12) is fastened by prestressing force screw rod (5).
CN201720286024.7U 2017-03-22 2017-03-22 A kind of steel lattice column and bored concrete pile attachment structure Active CN206769047U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720286024.7U CN206769047U (en) 2017-03-22 2017-03-22 A kind of steel lattice column and bored concrete pile attachment structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720286024.7U CN206769047U (en) 2017-03-22 2017-03-22 A kind of steel lattice column and bored concrete pile attachment structure

Publications (1)

Publication Number Publication Date
CN206769047U true CN206769047U (en) 2017-12-19

Family

ID=60632613

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720286024.7U Active CN206769047U (en) 2017-03-22 2017-03-22 A kind of steel lattice column and bored concrete pile attachment structure

Country Status (1)

Country Link
CN (1) CN206769047U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108239975A (en) * 2018-03-15 2018-07-03 天津建城基业集团有限公司 A kind of combined type foundation pit supporting pile and a kind of combined type pattern foundation pit supporting structure mode
CN109183812A (en) * 2018-11-01 2019-01-11 深圳市工勘岩土集团有限公司 The construction method of combined type deep foundation pit supporting structure
CN114703862A (en) * 2022-03-30 2022-07-05 中交(南京)建设有限公司 Vertical and rapid positioning device for mounting latticed column and mounting and positioning method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108239975A (en) * 2018-03-15 2018-07-03 天津建城基业集团有限公司 A kind of combined type foundation pit supporting pile and a kind of combined type pattern foundation pit supporting structure mode
CN109183812A (en) * 2018-11-01 2019-01-11 深圳市工勘岩土集团有限公司 The construction method of combined type deep foundation pit supporting structure
CN114703862A (en) * 2022-03-30 2022-07-05 中交(南京)建设有限公司 Vertical and rapid positioning device for mounting latticed column and mounting and positioning method
CN114703862B (en) * 2022-03-30 2024-08-20 中交二航局(南京)建设有限公司 Vertical quick positioning device for lattice column installation and installation positioning method

Similar Documents

Publication Publication Date Title
CN107299643A (en) Steel lattice column combined type tower crane foundation structure in foundation pit and construction method
CN203145038U (en) lattice column type tower crane foundation
CN201581409U (en) Combined tower crane foundation of cross beam supported by steel latticework columns in deep foundation pit
CN104878776B (en) A kind of underground shallow layer automatic parking garage the library structure
CN206769047U (en) A kind of steel lattice column and bored concrete pile attachment structure
CN205024712U (en) Combined tower crane foundation
CN102864780A (en) Supporting structure and supporting method of foundation pit
CN204899204U (en) Mouthful structure concrete structure's of department a template system fetches earth among reverse construction method
CN208072415U (en) Deep foundation pit reinforced concrete support part changes structure
CN203684108U (en) Fully-precast assembly type reinforced concrete bridge assembling structure
CN206768570U (en) A kind of foundation ditch assembled steel trestle
CN104233961B (en) A kind of supporting shelf bracket of No. 0 block of cantilever bridge
CN206768833U (en) A kind of concrete support and steel lattice column attachment structure
CN105040810B (en) Suitable for the connecting node of frame supported shear wall structure reverse construction
CN204590059U (en) A kind of combined type tower-crane foundation structure
CN208472763U (en) A kind of rear parados of jacking construction
CN202830936U (en) Supporting structure of foundation pit
CN106193101B (en) Tower crane steel platform pile foundation and its construction method
CN210106749U (en) Counter-force structure of soft soil foundation super large section push pipe jacking operation
CN204703190U (en) A kind of underground shallow layer automatic parking garage storehouse body structure
CN204510215U (en) For the steel platform of foundation pit construction
CN203755171U (en) Bridge back-pulling bearing construction support
CN103437349B (en) The construction method of steel concrete perfusion shaped pile
CN113585336B (en) Quick construction method of sinking type concrete mixing station in soft foundation environment
CN206337566U (en) Foundation ditch vertical prestressing anchor pole supporting construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant