CN107700519A CN201710934960.9A CN201710934960A CN107700519A CN 107700519 A CN107700519 A CN 107700519A CN 201710934960 A CN201710934960 A CN 201710934960A CN 107700519 A CN107700519 A CN 107700519A
Authority
CN
China
Prior art keywords
tower crane
lifting
installation method
foundation ditch
framework
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710934960.9A
Other languages
Chinese (zh)
Inventor
宋千军
徐建军
郑永友
洪雷
金学胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Original Assignee
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd filed Critical Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority to CN201710934960.9A priority Critical patent/CN107700519A/en
Publication of CN107700519A publication Critical patent/CN107700519A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses one kind to lift tower crane installation method, including following construction procedure:First one piece of bearing plate is made in tower crane bottom of foundation ditch to be installed, one lifting framework being made up of beam column is set according to the height at foundation ditch bottom to natural ground on bearing plate top again, lifting framework is preferably higher by nature ground, tower crane positioning pedestal is set in lifting frame upper surface, the standard knot of tower crane is finally directly installed on lifting framework according to positioning pedestal.Present invention lifting tower crane installation method can directly be seated the supporting course of bottom of foundation ditch, caving in for foundation ditch is easily caused without being seated in foundation ditch periphery, the tower body of the installation method is more than natural ground simultaneously, basement will not be backfilled and impacted, without doing earth-retaining enclosure wall again around tower crane, and tower crane section is also not in have ponding to invade bubble, thoroughly solving is having bottom of foundation ditch to have ponding to need situation about being drawn water with suction pump to tower crane.

Description

One kind lifting tower crane installation method
Technical field
The present invention relates to the realm of building construction, particularly belongs to a kind of lifting tower crane installation method.
Background technology
Tower crane is a kind of indispensable crane gear in Building Construction.In work progress, the peace of tower crane It is the area coverage in ground storehouse according to building to put, economy and carry out after lifting that weight of material etc. is many-sided and considering it is reasonable Arrangement, tower crane in the presence of many risks, has plenty of because tower crane is near basis when installation, to the excavation on basis Cause landslide to produce displacement, or uneven sedimentation etc. is produced due to ponding, it is such, it can all cause serious peace Full accident, while the tower crane having is seated bottom of foundation ditch, periphery needs to make a circle retaining wall, influences the basement earthwork and integrally return Fill out, continual when bottom of foundation ditch produces ponding tower crane can also be drawn water.A kind of therefore, lifting tower crane base of invention Plinth installation method is to solve problems.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of lifting tower crane installation method, by using the installation Method, can solve the problem that because tower crane is on foundation ditch side, excavation of foundation pit and cause foundation ditch the risk caved in occur, tower crane is located The backfill of the basement earthwork is not interfered with bottom of foundation ditch, while tower crane can be directly installed on more than nature ground, will not be gone out Existing pit water accumulation influences tower crane and drawn water with suction pump.
In order to solve the above technical problems, the technical solution adopted by the present invention is as follows:
One kind lifting tower crane installation method, includes following construction technology:Foundation ditch 1 is excavated first, hole bottom 2 is smooth After-pouring concrete cushion, the position of repositioning pre-installation tower crane, release the position line of tower crane bearing plate 3, then formwork, Plate is wire-tie, and the reinforcing bar for four frame columns 4 for lifting framework 11 is previously inserted in bearing plate 3, then casting concrete;Work as tower crane After basis reaches form removal condition, the lifting framework 11 on top is started from, lifting framework 11 is rectangular configuration, and by four frameworks 4, four Vierendeel girders 6 of post are formed, and determine that the absolute altitude on nature ground, then plate prick the reinforcing bar of four frame columns 4, and formwork supporting plate, then The reinforcing bar of four Vierendeel girders 6 is made, the upper surface of lifting framework 11 is embedded into after tower crane section posting 5 is positioned, then is poured mixed It is solidifying native, after form removal condition to be achieved, form removal;Tower crane of the standard knot 7 of last tower crane directly with lifting framework 11 upper surface Section posting 5 is connected with high-strength bolt, that is, completes tower crane installation.
Described bearing plate 3 is poured by armored concrete to be formed, and is directly poured in the supporting course of the bottom of foundation ditch 1.
Described lifting framework 11 is made up of reinforced concrete beam column, is poured on bearing plate 3.
The described lifting height of framework 11 is chosen according to the absolute altitude of bearing plate 3 to natural ground, and lifting framework 11 is higher than certainly Right ground.
After the completion of the underground component 8 at hole bottom 2 is constructed, it can directly carry out the earthwork 9 and backfill, then carry out upper component 10 Construction.
The positioning pedestal of described lifting framework 11 upper surface setting tower crane tower body, positioning pedestal are relative with tower crane tower body Should.
The invention enables tower crane can directly be seated in bottom of foundation ditch, then directly be lifted tower crane by lifting framework To more than natural ground, tower crane is avoided near basis, and foundation pit collapse caused by foundation excavation, tower crane is from foundation ditch bottom directly quilt The influence eliminated after the completion of basement construction to basement backfilling of earthwork is given rise to more than nature ground, will not also allow tower crane Underground water or the erosion of other ponding are received, eliminates the work drawn water with suction pump to its basis.The tower crane of the present invention Installation method, it is simple to operate, easily implement, tower crane can be directly cast in the supporting course of bottom of foundation ditch, avoided in base The operating procedure driven piles is needed in the case of hole periphery geology is bad, while has prevented the risk that tower crane causes foundation pit collapse, It can adapt to, in most Deep Foundation Pit situation, reduce the security risk in engineering construction, the method has larger Development prospect.
Brief description of the drawings
Fig. 1 is the foundation ditch schematic diagram of the present invention.
Fig. 2 is the tower crane and lifting block schematic illustration of the present invention.
Fig. 3 is invention tower crane scheme of installation.
Fig. 4 is tower crane schematic diagram after backfilling of earthwork of the present invention.
Fig. 5 is present invention lifting circuit theory schematic diagram.
Embodiment
Referring to accompanying drawing, one kind lifting tower crane installation method, include following construction technology:Foundation ditch 1 is carried out first Excavate, cheat the smooth after-pouring concrete cushion in bottom 2, the position of repositioning pre-installation tower crane, release determining for tower crane bearing plate 3 Bit line, then formwork, plate wire-tie, the reinforcing bar of four frame columns 4 for lifting framework 11 is previously inserted in bearing plate 3, then is poured Build concrete;After tower crane reaches form removal condition, the lifting framework 11 on top is started from, lifting framework 11 is rectangle knot Structure, and be made up of four frame columns, 4, four Vierendeel girders 6, determine that the absolute altitude on nature ground, then plate prick the steel of four frame columns 4 Muscle, and formwork supporting plate, the reinforcing bar of four Vierendeel girders 6 is then made, lifting framework 11 is embedded into after tower crane section posting 5 is positioned Upper surface, then casting concrete, after form removal condition to be achieved, form removal;The standard knot 7 of last tower crane is directly with lifting framework The tower crane section posting 5 of 11 upper surfaces is connected with high-strength bolt, that is, completes tower crane installation.
Bearing plate 3 is poured by armored concrete to be formed, and is directly poured in the supporting course of the bottom of foundation ditch 1;Lift framework 11 by Reinforced concrete beam column forms, and pours on bearing plate 3;Lift absolute altitude of the height of framework 11 according to bearing plate 3 to natural ground Choose, lifting framework 11 is higher than nature ground;After the completion of the underground component 8 at hole bottom 2 is constructed, it can directly carry out the earthwork 9 and return Fill out, then carry out upper component 10 and construct;Lift the positioning pedestal that the upper surface of framework 11 sets tower crane tower body, positioning pedestal and tower Tower crane body is corresponding.

Claims (6)

1. one kind lifting tower crane installation method, it is characterised in that include following construction technology:First to foundation ditch(1)Enter Row excavates, and cheats bottom(2)Smooth after-pouring concrete cushion, the position of repositioning pre-installation tower crane, releases tower crane bearing plate (3)Position line, then formwork, plate wire-tie, framework will be lifted(11)Four frame columns(4)Reinforcing bar be previously inserted pressure-bearing Plate(3)It is interior, then casting concrete;After tower crane reaches form removal condition, the lifting framework on top is started from(11), lifting Framework(11)For rectangular configuration, and by four frame columns(4), four pieces Vierendeel girders(6)Form, determine the absolute altitude on nature ground, then Plate pricks four frame columns(4)Reinforcing bar, and formwork supporting plate, then make four Vierendeel girders(6)Reinforcing bar, by tower crane section posting (5)Lifting framework is embedded into after positioning(11)Upper surface, then casting concrete, after form removal condition to be achieved, form removal;Most The standard knot of tower crane afterwards(7)Directly with lifting framework(11)The tower crane section posting of upper surface(5)Connected with high-strength bolt, i.e., it is complete Installed into tower crane.
2. lifting tower crane installation method according to claim 1, it is characterised in that described bearing plate(3)By steel Reinforced concrete, which pours, to be formed, and is directly poured in foundation ditch(1)The supporting course of bottom.
3. lifting tower crane installation method according to claim 1, it is characterised in that described lifting framework(11)By Reinforced concrete beam column forms, and pours in bearing plate(3)On.
4. lifting tower crane installation method according to claim 1, it is characterised in that described lifting framework(11)It is high Degree is according to bearing plate(3)Absolute altitude to natural ground is chosen, and lifts framework(11)Higher than nature ground.
5. lifting tower crane installation method according to claim 1, it is characterised in that positioned at hole bottom(2)Subterranean Part(8)After the completion of construction, the earthwork can be directly carried out(9)Backfill, then carries out upper component(10)Construction.
6. lifting tower crane installation method according to claim 1, it is characterised in that described lifting framework(11)On The positioning pedestal of surface setting tower crane tower body, positioning pedestal are corresponding with tower crane tower body.
CN201710934960.9A 2017-10-10 2017-10-10 One kind lifting tower crane installation method Pending CN107700519A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710934960.9A CN107700519A (en) 2017-10-10 2017-10-10 One kind lifting tower crane installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710934960.9A CN107700519A (en) 2017-10-10 2017-10-10 One kind lifting tower crane installation method

Publications (1)

Publication Number Publication Date
CN107700519A true CN107700519A (en) 2018-02-16

Family

ID=61183931

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710934960.9A Pending CN107700519A (en) 2017-10-10 2017-10-10 One kind lifting tower crane installation method

Country Status (1)

Country Link
CN (1) CN107700519A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111608195A (en) * 2020-06-01 2020-09-01 中国二十冶集团有限公司 Construction method for foundation of frame-structured water pump house
CN111733863A (en) * 2020-06-24 2020-10-02 江苏省宁强建设有限公司 Tower crane foundation for foundation pit and construction method thereof
CN112227405A (en) * 2020-09-29 2021-01-15 上海建工七建集团有限公司 Tower crane foundation located on foundation pit slope and construction method thereof
CN112227408A (en) * 2020-10-14 2021-01-15 上海建工七建集团有限公司 Tower crane foundation located on foundation pit slope and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704504A (en) * 2012-06-26 2012-10-03 南通华新建工集团有限公司 Method for constructing tower crane foundation
CN102912810A (en) * 2012-11-22 2013-02-06 北京城乡建设集团有限责任公司 Tower crane base structure in range of base bottom plate and construction method thereof
CN104032767A (en) * 2014-06-20 2014-09-10 天津二十冶建设有限公司 Tower crane foundation in deep foundation pit and construction method of tower crane foundation
CN205975658U (en) * 2016-08-18 2017-02-22 中国建筑第八工程局有限公司 Steel platform tower crane foundation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704504A (en) * 2012-06-26 2012-10-03 南通华新建工集团有限公司 Method for constructing tower crane foundation
CN102912810A (en) * 2012-11-22 2013-02-06 北京城乡建设集团有限责任公司 Tower crane base structure in range of base bottom plate and construction method thereof
CN104032767A (en) * 2014-06-20 2014-09-10 天津二十冶建设有限公司 Tower crane foundation in deep foundation pit and construction method of tower crane foundation
CN205975658U (en) * 2016-08-18 2017-02-22 中国建筑第八工程局有限公司 Steel platform tower crane foundation

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111608195A (en) * 2020-06-01 2020-09-01 中国二十冶集团有限公司 Construction method for foundation of frame-structured water pump house
CN111733863A (en) * 2020-06-24 2020-10-02 江苏省宁强建设有限公司 Tower crane foundation for foundation pit and construction method thereof
CN112227405A (en) * 2020-09-29 2021-01-15 上海建工七建集团有限公司 Tower crane foundation located on foundation pit slope and construction method thereof
CN112227408A (en) * 2020-10-14 2021-01-15 上海建工七建集团有限公司 Tower crane foundation located on foundation pit slope and construction method thereof

Similar Documents

Publication Publication Date Title
CN104264688B (en) Manually digging hole non-uniform pile support construction process
CN102094425B (en) Foundation pit construction method adopting shallow buried depth Larsen steel plate pile as protective cofferdam
CN103031839B (en) Construction method of hand-dug piles
CN107700519A (en) One kind lifting tower crane installation method
CN207003499U (en) A kind of anti-floating lifting device of underground tunnel upper excavation of foundation pit
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN106638640A (en) Modular coffer construction method for concrete without subsealing in the geologic condition of stratum
CN105239578B (en) Water-rich sand layer deep foundation pit underwater construction method
CN110106919A (en) A kind of lid digs the building enclosure and its construction method at station
CN108532586A (en) A kind of construction method of garage parking diaphram wall
CN102864780A (en) Supporting structure and supporting method of foundation pit
CN205742216U (en) A kind of Unfavorable geology foundation ditch that is used for puts slope excavation combined bearing structure
CN113550322A (en) Enclosure system next to deep and shallow foundation pit and construction method
CN207003421U (en) A kind of steel plate pilework for being seated hard rock top surface
CN204590059U (en) A kind of combined type tower-crane foundation structure
CN102220764B (en) Construction method of deep foundation pit bracing system
CN109440779A (en) Active X-shaped foundation pit supporting method with double rows of piles
CN206448285U (en) Without bottom concrete combined type cofferdam under the conditions of formation geology
CN103215965A (en) Laminate type high-rise platform pile tower crane foundation and construction method
CN108755702A (en) A kind of higher soft soil foundation foundation ditch strengthening processing method of level of ground water
CN110700270B (en) Construction method for non-drainage earthwork excavation of ultra-deep foundation pit
CN108035360A (en) A kind of method for pattern foundation pit supporting structure
CN106013174A (en) Oblique supporting method for foundation pit shoring and oblique supporting structure
CN216515701U (en) Miniature stake raft board combination foundation structure
CN102605801A (en) Suspension semi-reverse-construction method for underground circular water tank

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180216

RJ01 Rejection of invention patent application after publication