CN102605801A - Suspension semi-reverse-construction method for underground circular water tank - Google Patents
Suspension semi-reverse-construction method for underground circular water tank Download PDFInfo
- Publication number
- CN102605801A CN102605801A CN2012100690898A CN201210069089A CN102605801A CN 102605801 A CN102605801 A CN 102605801A CN 2012100690898 A CN2012100690898 A CN 2012100690898A CN 201210069089 A CN201210069089 A CN 201210069089A CN 102605801 A CN102605801 A CN 102605801A
- Authority
- CN
- China
- Prior art keywords
- construction
- round pool
- water tank
- construction method
- fender post
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The invention relates to a suspension semi-reverse-construction method for an underground circular water tank. The method comprises the steps of: arranging fender posts along the circumference of the water tank, excavating earthwork to manufacture an upper structure of the circular water tank, simultaneously arranging annular hanging beams at the upper part of the fender posts together with the water tank, finishing the construction of the upper structure of the circular water tank by adopting a normal method from the bottom to the top; refilling the earthwork of a pit to form a construction work face of the reverse method, and constructing a lower part structure of the circular water tank trough the reverse method from the top to the bottom in a layering manner by virtue of the support of the annular hanging beams; and sealing a bottom plate of the water tank to complete the construction of the side wall of the circular reinforced concrete water tank. According to the suspension semi-reverse-construction method, the construction progress is improved, and the construction cost of the fender post structure is lowered.
Description
Technical field
The present invention relates to the technical field of construction of large-scale underground round pool, particularly relate to a kind of underground round pool and hang half reversed construction method.
Background technology
The general base underground round pool of constructing in hard soil, contrary sequence method is gone along with sb. to guard him in many employings entirely.Contrary sequence method is earlier along building basement axis or construct on every side diaphragm wall or other supporting and protection structure; Intermediate support stake and post are built or laid to the closed position that has of interior of building simultaneously, before the base plate back cover, bears the support of superstructure deadweight and working load as construction period.Construct the then beam slab floor structure of ground one deck, as the very big support of diaphragm wall rigidity, subsequently successively downwards earth excavation with build each layer underground structure, until the base plate back cover, but the reverse construction duration longly be difficult to satisfy construction period.
Summary of the invention
Technical problem to be solved by this invention provides a kind of underground round pool and hangs half reversed construction method, can improve construction speed, and reduces the space enclosing structure construction cost.
The technical solution adopted for the present invention to solve the technical problems is: provide a kind of underground round pool to hang half reversed construction method, may further comprise the steps:
(1) circumference is provided with fender post along the pond, and soil excavation is made the round pool superstructure, together with the pond annular drop in beam is set on fender post top simultaneously, adopts the positive practice to accomplish the construction of round pool superstructure from the bottom to top;
(2) backfill pit earthwork forms the reverse construction work plane, through the supporting role of annular drop in beam, and layering adverse construction method round pool substructure from top to bottom;
(3) back cover pond baseboard is accomplished the construction of steel concrete circular pool sidewall.
Adopt big opening mode to carry out soil excavation in the said step (1).
Fender post is a cast-in-place concrete pile described in the said step (1).
The reinforcing bar of said annular drop in beam is anchored in the round pool superstructure.
Also comprise behind the soil excavation in the said step (1) and adopt expansion bolt that steel mesh reinforcement is fixed on the fender post side, then the step of spraying cement mortar cover.
Circumference is provided with fender post and behind soil excavation, carries out along the pond in the said step (1), and said fender post is a manually digging hole filling pile.
Beneficial effect
Owing to adopted above-mentioned technical scheme, the present invention compared with prior art has following advantage and good effect: the present invention relates to a kind of underground round pool method that has solved the base construction of hard soil with lower cost; This method can accelerating construction progress, can reduce construction cost, this construction technology simple structure simultaneously; Make easily; Easy for installation, with strong points, be convenient to promote.
Description of drawings
Fig. 1 is the positive practice figure in round pool top;
Fig. 2 is annular drop in beam sketch map;
Fig. 3 is a round pool bottom contrary sequence method sketch map;
Fig. 4 is a round pool structure back cover sketch map.
The specific embodiment
Below in conjunction with specific embodiment, further set forth the present invention.Should be understood that these embodiment only to be used to the present invention is described and be not used in the restriction scope of the present invention.Should be understood that in addition those skilled in the art can do various changes or modification to the present invention after the content of having read the present invention's instruction, these equivalent form of values fall within the application's appended claims institute restricted portion equally.
Embodiment of the present invention relates to and a kind ofly is used for that round pool hangs half reversed construction method under the base, hard soil; Earlier consider whether can adopt the earthwork of big opening excavation ground according to field condition before the construction at sink construction area circularly; Confirm constructure scheme according to hydrogeological situation; Formulate necessary underground dewatering measure,, may further comprise the steps like Fig. 1-shown in Figure 4:
(1) circumference is provided with fender post 1 along the pond; Soil excavation forms excavation slope 2; Confirm cutting depth according to actual conditions, dig, make round pool superstructure 5 to foundation ditch bottom 3; Simultaneously together with the pond annular drop in beam 4 is set, adopts the positive practice to accomplish round pool superstructure 5 construction (see figure 1)s from the bottom to top on fender post 1 top.If can use the excavation ground earthwork of big opening according to field condition then use big opening mode to carry out soil excavation.Wherein, circumference is provided with fender post and is cast-in-place concrete pile along the pond, according to the actual conditions of foundation soil, can leave a determining deviation through the stake of design fender post.As shown in Figure 2, annular drop in beam 4 is arranged on fender post 1 top, is used for transmitting the load of work progress round pool and working measure generation.The reinforcing bar of annular drop in beam 4 is anchored at that both are connected as a single entity in the round pool superstructure.
(2) the backfill pit earthwork 6, form the reverse construction work plane, and through the supporting role of annular drop in beam 4, from top to bottom layering adverse construction method round pool substructure 7 (see figure 3)s are utilized the double pool wall inner side template of doing of autostability native between fender post and the fender post.For preventing that soil block from falling into the pool wall template, utilize expansion bolt that steel mesh reinforcement is fixed on the fender post side behind the excavation, thereby the spraying cement mortar cover form inner side template then.
(3) soil excavation to substrate 8 (see figure 4)s are in time carried out base plate 9 constructions, and the pool wall steel concrete of base plate 9 and top reverse construction connects as one from the bottom to top, accomplishes the construction of round pool sidewall.
What deserves to be mentioned is that wherein circumference is provided with this step of fender post and can also behind soil excavation, carries out along the pond in the step (1), the fender post that adopt this moment is a manually digging hole filling pile.
Be not difficult to find, the present invention relates to a kind ofly solve the underground round pool method of hard soil base construction that this method can accelerating construction progress with lower cost; Simultaneously can reduce construction cost, this construction technology simple structure is made easily; Easy for installation, with strong points, be convenient to promote.
Claims (6)
1. a underground round pool hangs half reversed construction method, it is characterized in that, may further comprise the steps:
(1) circumference is provided with fender post along the pond, and soil excavation is made the round pool superstructure, together with the pond annular drop in beam is set on fender post top simultaneously, adopts the positive practice to accomplish the construction of round pool superstructure from the bottom to top;
(2) backfill pit earthwork forms the reverse construction work plane, through the supporting role of annular drop in beam, and layering adverse construction method round pool substructure from top to bottom;
(3) back cover pond baseboard is accomplished the construction of steel concrete circular pool sidewall.
2. underground round pool according to claim 1 hangs half reversed construction method, it is characterized in that, adopts big opening mode to carry out soil excavation in the said step (1).
3. underground round pool according to claim 1 hangs half reversed construction method, it is characterized in that, fender post is a cast-in-place concrete pile described in the said step (1).
4. underground round pool according to claim 1 hangs half reversed construction method, it is characterized in that, the reinforcing bar of said annular drop in beam is anchored in the round pool superstructure.
5. underground round pool according to claim 1 hangs half reversed construction method, it is characterized in that, also comprises behind the soil excavation in the said step (1) adopting expansion bolt that steel mesh reinforcement is fixed on the fender post side, then the step of spraying cement mortar cover.
6. underground round pool according to claim 1 hangs half reversed construction method, it is characterized in that, circumference is provided with fender post and behind soil excavation, carries out along the pond in the said step (1), and said fender post is a manually digging hole filling pile.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100690898A CN102605801A (en) | 2012-03-15 | 2012-03-15 | Suspension semi-reverse-construction method for underground circular water tank |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100690898A CN102605801A (en) | 2012-03-15 | 2012-03-15 | Suspension semi-reverse-construction method for underground circular water tank |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102605801A true CN102605801A (en) | 2012-07-25 |
Family
ID=46523534
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012100690898A Pending CN102605801A (en) | 2012-03-15 | 2012-03-15 | Suspension semi-reverse-construction method for underground circular water tank |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102605801A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104314093A (en) * | 2014-11-13 | 2015-01-28 | 中冶天工集团有限公司 | Excessive sinking preventing method for construction of open caisson of tapered-bottom and spiral flow type pool |
CN104975616A (en) * | 2015-06-30 | 2015-10-14 | 中国二十冶集团有限公司 | Double-water-stop structure of rotational flow pool outer cylinder constructed through reverse building method and construction method of double-water-stop structure |
CN107012871A (en) * | 2017-04-18 | 2017-08-04 | 武汉志和岩土工程有限公司 | A kind of suspension type goes along with sb. to guard him the deep reversed construction method for greatly enhancing foundation ditch fabricated construction |
CN107740445A (en) * | 2017-10-19 | 2018-02-27 | 山东电力建设第工程公司 | PP module assembly pond overflowing water experiment bracing means and reinforcement means |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0347322A (en) * | 1989-07-14 | 1991-02-28 | Takenaka Komuten Co Ltd | Inverted placing method for underground floor structure |
KR20060028889A (en) * | 2004-09-30 | 2006-04-04 | 황기수 | Structure for plastic slab deck system and downward construction method using the same |
CN201225015Y (en) * | 2008-06-06 | 2009-04-22 | 中冶天工上海十三冶建设有限公司 | Metallurgy large-scale underground tank construction formwork |
CN102296616A (en) * | 2011-07-05 | 2011-12-28 | 中冶天工上海十三冶建设有限公司 | Semi-underground retaining and protecting method for constructing cylindrical underground tank |
CN102330436A (en) * | 2011-07-05 | 2012-01-25 | 中冶天工上海十三冶建设有限公司 | Composite retaining structure and composite retaining method for half geotechnical layer ultradeep round spiral flow tank |
-
2012
- 2012-03-15 CN CN2012100690898A patent/CN102605801A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0347322A (en) * | 1989-07-14 | 1991-02-28 | Takenaka Komuten Co Ltd | Inverted placing method for underground floor structure |
KR20060028889A (en) * | 2004-09-30 | 2006-04-04 | 황기수 | Structure for plastic slab deck system and downward construction method using the same |
CN201225015Y (en) * | 2008-06-06 | 2009-04-22 | 中冶天工上海十三冶建设有限公司 | Metallurgy large-scale underground tank construction formwork |
CN102296616A (en) * | 2011-07-05 | 2011-12-28 | 中冶天工上海十三冶建设有限公司 | Semi-underground retaining and protecting method for constructing cylindrical underground tank |
CN102330436A (en) * | 2011-07-05 | 2012-01-25 | 中冶天工上海十三冶建设有限公司 | Composite retaining structure and composite retaining method for half geotechnical layer ultradeep round spiral flow tank |
Non-Patent Citations (2)
Title |
---|
敖海根: "32.5m深旋流沉淀池施工技术", 《江西冶金》, vol. 30, no. 02, 30 April 2010 (2010-04-30) * |
黎明中: "半逆作法施工技术在旋流沉淀池工程中的应用", 《土工基础》, vol. 17, no. 04, 31 December 2003 (2003-12-31) * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104314093A (en) * | 2014-11-13 | 2015-01-28 | 中冶天工集团有限公司 | Excessive sinking preventing method for construction of open caisson of tapered-bottom and spiral flow type pool |
CN104314093B (en) * | 2014-11-13 | 2016-02-03 | 中冶天工集团有限公司 | The anti-excessively heavy method of a kind of conical bottom Whirlwind tank open caisson construction |
CN104975616A (en) * | 2015-06-30 | 2015-10-14 | 中国二十冶集团有限公司 | Double-water-stop structure of rotational flow pool outer cylinder constructed through reverse building method and construction method of double-water-stop structure |
CN107012871A (en) * | 2017-04-18 | 2017-08-04 | 武汉志和岩土工程有限公司 | A kind of suspension type goes along with sb. to guard him the deep reversed construction method for greatly enhancing foundation ditch fabricated construction |
CN107740445A (en) * | 2017-10-19 | 2018-02-27 | 山东电力建设第工程公司 | PP module assembly pond overflowing water experiment bracing means and reinforcement means |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102182325B (en) | Storey adding method for existing building basement with frame structure and independent foundation | |
US9567720B2 (en) | Offshore platform for a marine environment | |
CN101691751B (en) | Construction method for making ultra-long artificial excavating pile penetrate cave and ultra-long pile penetrating cave | |
CN102434717B (en) | Construction method of joist steel pipe-jacking work pit | |
CN104947682A (en) | Foundation pit support construction method and device thereof | |
CN109630127A (en) | A kind of construction method of rich water soft stratum ultra-deep shield vertical shaft | |
CN100510281C (en) | Semi-reverse construction method for ultra-large-diameter and ultra-buried depth storage tank | |
CN102505704A (en) | Large open caisson construction method in soft geological shaft | |
CN101736757A (en) | Two-way synchronous construction method of tube structure of high-rise building | |
CN109024662A (en) | Method of the anchor pile underpinning without basement building underground space increasing layer | |
CN103103988A (en) | Foundation ditch construction method of horizontal bracing structure of central island floor slaps | |
CN102605801A (en) | Suspension semi-reverse-construction method for underground circular water tank | |
CN201801843U (en) | Overwater gravity type earth-retaining structure with anchoring structure | |
CN101824825B (en) | Deep foundation pit open cutting construction method | |
CN103758132B (en) | The construction technology of the cantilever soldier pile retaining structure on slope is put in a kind of combination | |
CN1279319A (en) | Full-reverse construction technology for basement | |
CN107165173A (en) | A kind of foundation pit supporting system and its construction method | |
CN203160254U (en) | Pit support structure | |
AU2012313196B2 (en) | Partially floating marine platform for offshore wind-power, bridges and marine buildings, and construction method | |
CN106400814A (en) | Foundation pit supporting method | |
JPH06146305A (en) | Underwater foundation and installation method thereof | |
CN110820756A (en) | Shield well and vertical shaft deep foundation pit excavation safety construction method | |
CN213625605U (en) | Dig deep basal pit structure of stake anchor and hanging net injection concrete soon | |
CN213358679U (en) | Water buoyancy balance system of subway upper cover structure | |
CN211421139U (en) | Shield constructs well crown beam bearing structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20120725 |