CN102605801A - Suspension semi-reverse-construction method for underground circular water tank - Google Patents

Suspension semi-reverse-construction method for underground circular water tank Download PDF

Info

Publication number
CN102605801A
CN102605801A CN2012100690898A CN201210069089A CN102605801A CN 102605801 A CN102605801 A CN 102605801A CN 2012100690898 A CN2012100690898 A CN 2012100690898A CN 201210069089 A CN201210069089 A CN 201210069089A CN 102605801 A CN102605801 A CN 102605801A
Authority
CN
China
Prior art keywords
construction
round pool
water tank
construction method
fender post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100690898A
Other languages
Chinese (zh)
Inventor
张凤勇
邓斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
CMTCC Shanghai Shisanye Construction Co Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
CMTCC Shanghai Shisanye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd, CMTCC Shanghai Shisanye Construction Co Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN2012100690898A priority Critical patent/CN102605801A/en
Publication of CN102605801A publication Critical patent/CN102605801A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention relates to a suspension semi-reverse-construction method for an underground circular water tank. The method comprises the steps of: arranging fender posts along the circumference of the water tank, excavating earthwork to manufacture an upper structure of the circular water tank, simultaneously arranging annular hanging beams at the upper part of the fender posts together with the water tank, finishing the construction of the upper structure of the circular water tank by adopting a normal method from the bottom to the top; refilling the earthwork of a pit to form a construction work face of the reverse method, and constructing a lower part structure of the circular water tank trough the reverse method from the top to the bottom in a layering manner by virtue of the support of the annular hanging beams; and sealing a bottom plate of the water tank to complete the construction of the side wall of the circular reinforced concrete water tank. According to the suspension semi-reverse-construction method, the construction progress is improved, and the construction cost of the fender post structure is lowered.

Description

A kind of underground round pool hangs half reversed construction method
Technical field
The present invention relates to the technical field of construction of large-scale underground round pool, particularly relate to a kind of underground round pool and hang half reversed construction method.
Background technology
The general base underground round pool of constructing in hard soil, contrary sequence method is gone along with sb. to guard him in many employings entirely.Contrary sequence method is earlier along building basement axis or construct on every side diaphragm wall or other supporting and protection structure; Intermediate support stake and post are built or laid to the closed position that has of interior of building simultaneously, before the base plate back cover, bears the support of superstructure deadweight and working load as construction period.Construct the then beam slab floor structure of ground one deck, as the very big support of diaphragm wall rigidity, subsequently successively downwards earth excavation with build each layer underground structure, until the base plate back cover, but the reverse construction duration longly be difficult to satisfy construction period.
Summary of the invention
Technical problem to be solved by this invention provides a kind of underground round pool and hangs half reversed construction method, can improve construction speed, and reduces the space enclosing structure construction cost.
The technical solution adopted for the present invention to solve the technical problems is: provide a kind of underground round pool to hang half reversed construction method, may further comprise the steps:
(1) circumference is provided with fender post along the pond, and soil excavation is made the round pool superstructure, together with the pond annular drop in beam is set on fender post top simultaneously, adopts the positive practice to accomplish the construction of round pool superstructure from the bottom to top;
(2) backfill pit earthwork forms the reverse construction work plane, through the supporting role of annular drop in beam, and layering adverse construction method round pool substructure from top to bottom;
(3) back cover pond baseboard is accomplished the construction of steel concrete circular pool sidewall.
Adopt big opening mode to carry out soil excavation in the said step (1).
Fender post is a cast-in-place concrete pile described in the said step (1).
The reinforcing bar of said annular drop in beam is anchored in the round pool superstructure.
Also comprise behind the soil excavation in the said step (1) and adopt expansion bolt that steel mesh reinforcement is fixed on the fender post side, then the step of spraying cement mortar cover.
Circumference is provided with fender post and behind soil excavation, carries out along the pond in the said step (1), and said fender post is a manually digging hole filling pile.
Beneficial effect
Owing to adopted above-mentioned technical scheme, the present invention compared with prior art has following advantage and good effect: the present invention relates to a kind of underground round pool method that has solved the base construction of hard soil with lower cost; This method can accelerating construction progress, can reduce construction cost, this construction technology simple structure simultaneously; Make easily; Easy for installation, with strong points, be convenient to promote.
Description of drawings
Fig. 1 is the positive practice figure in round pool top;
Fig. 2 is annular drop in beam sketch map;
Fig. 3 is a round pool bottom contrary sequence method sketch map;
Fig. 4 is a round pool structure back cover sketch map.
The specific embodiment
Below in conjunction with specific embodiment, further set forth the present invention.Should be understood that these embodiment only to be used to the present invention is described and be not used in the restriction scope of the present invention.Should be understood that in addition those skilled in the art can do various changes or modification to the present invention after the content of having read the present invention's instruction, these equivalent form of values fall within the application's appended claims institute restricted portion equally.
Embodiment of the present invention relates to and a kind ofly is used for that round pool hangs half reversed construction method under the base, hard soil; Earlier consider whether can adopt the earthwork of big opening excavation ground according to field condition before the construction at sink construction area circularly; Confirm constructure scheme according to hydrogeological situation; Formulate necessary underground dewatering measure,, may further comprise the steps like Fig. 1-shown in Figure 4:
(1) circumference is provided with fender post 1 along the pond; Soil excavation forms excavation slope 2; Confirm cutting depth according to actual conditions, dig, make round pool superstructure 5 to foundation ditch bottom 3; Simultaneously together with the pond annular drop in beam 4 is set, adopts the positive practice to accomplish round pool superstructure 5 construction (see figure 1)s from the bottom to top on fender post 1 top.If can use the excavation ground earthwork of big opening according to field condition then use big opening mode to carry out soil excavation.Wherein, circumference is provided with fender post and is cast-in-place concrete pile along the pond, according to the actual conditions of foundation soil, can leave a determining deviation through the stake of design fender post.As shown in Figure 2, annular drop in beam 4 is arranged on fender post 1 top, is used for transmitting the load of work progress round pool and working measure generation.The reinforcing bar of annular drop in beam 4 is anchored at that both are connected as a single entity in the round pool superstructure.
(2) the backfill pit earthwork 6, form the reverse construction work plane, and through the supporting role of annular drop in beam 4, from top to bottom layering adverse construction method round pool substructure 7 (see figure 3)s are utilized the double pool wall inner side template of doing of autostability native between fender post and the fender post.For preventing that soil block from falling into the pool wall template, utilize expansion bolt that steel mesh reinforcement is fixed on the fender post side behind the excavation, thereby the spraying cement mortar cover form inner side template then.
(3) soil excavation to substrate 8 (see figure 4)s are in time carried out base plate 9 constructions, and the pool wall steel concrete of base plate 9 and top reverse construction connects as one from the bottom to top, accomplishes the construction of round pool sidewall.
What deserves to be mentioned is that wherein circumference is provided with this step of fender post and can also behind soil excavation, carries out along the pond in the step (1), the fender post that adopt this moment is a manually digging hole filling pile.
Be not difficult to find, the present invention relates to a kind ofly solve the underground round pool method of hard soil base construction that this method can accelerating construction progress with lower cost; Simultaneously can reduce construction cost, this construction technology simple structure is made easily; Easy for installation, with strong points, be convenient to promote.

Claims (6)

1. a underground round pool hangs half reversed construction method, it is characterized in that, may further comprise the steps:
(1) circumference is provided with fender post along the pond, and soil excavation is made the round pool superstructure, together with the pond annular drop in beam is set on fender post top simultaneously, adopts the positive practice to accomplish the construction of round pool superstructure from the bottom to top;
(2) backfill pit earthwork forms the reverse construction work plane, through the supporting role of annular drop in beam, and layering adverse construction method round pool substructure from top to bottom;
(3) back cover pond baseboard is accomplished the construction of steel concrete circular pool sidewall.
2. underground round pool according to claim 1 hangs half reversed construction method, it is characterized in that, adopts big opening mode to carry out soil excavation in the said step (1).
3. underground round pool according to claim 1 hangs half reversed construction method, it is characterized in that, fender post is a cast-in-place concrete pile described in the said step (1).
4. underground round pool according to claim 1 hangs half reversed construction method, it is characterized in that, the reinforcing bar of said annular drop in beam is anchored in the round pool superstructure.
5. underground round pool according to claim 1 hangs half reversed construction method, it is characterized in that, also comprises behind the soil excavation in the said step (1) adopting expansion bolt that steel mesh reinforcement is fixed on the fender post side, then the step of spraying cement mortar cover.
6. underground round pool according to claim 1 hangs half reversed construction method, it is characterized in that, circumference is provided with fender post and behind soil excavation, carries out along the pond in the said step (1), and said fender post is a manually digging hole filling pile.
CN2012100690898A 2012-03-15 2012-03-15 Suspension semi-reverse-construction method for underground circular water tank Pending CN102605801A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100690898A CN102605801A (en) 2012-03-15 2012-03-15 Suspension semi-reverse-construction method for underground circular water tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100690898A CN102605801A (en) 2012-03-15 2012-03-15 Suspension semi-reverse-construction method for underground circular water tank

Publications (1)

Publication Number Publication Date
CN102605801A true CN102605801A (en) 2012-07-25

Family

ID=46523534

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100690898A Pending CN102605801A (en) 2012-03-15 2012-03-15 Suspension semi-reverse-construction method for underground circular water tank

Country Status (1)

Country Link
CN (1) CN102605801A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104314093A (en) * 2014-11-13 2015-01-28 中冶天工集团有限公司 Excessive sinking preventing method for construction of open caisson of tapered-bottom and spiral flow type pool
CN104975616A (en) * 2015-06-30 2015-10-14 中国二十冶集团有限公司 Double-water-stop structure of rotational flow pool outer cylinder constructed through reverse building method and construction method of double-water-stop structure
CN107012871A (en) * 2017-04-18 2017-08-04 武汉志和岩土工程有限公司 A kind of suspension type goes along with sb. to guard him the deep reversed construction method for greatly enhancing foundation ditch fabricated construction
CN107740445A (en) * 2017-10-19 2018-02-27 山东电力建设第工程公司 PP module assembly pond overflowing water experiment bracing means and reinforcement means

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0347322A (en) * 1989-07-14 1991-02-28 Takenaka Komuten Co Ltd Inverted placing method for underground floor structure
KR20060028889A (en) * 2004-09-30 2006-04-04 황기수 Structure for plastic slab deck system and downward construction method using the same
CN201225015Y (en) * 2008-06-06 2009-04-22 中冶天工上海十三冶建设有限公司 Metallurgy large-scale underground tank construction formwork
CN102296616A (en) * 2011-07-05 2011-12-28 中冶天工上海十三冶建设有限公司 Semi-underground retaining and protecting method for constructing cylindrical underground tank
CN102330436A (en) * 2011-07-05 2012-01-25 中冶天工上海十三冶建设有限公司 Composite retaining structure and composite retaining method for half geotechnical layer ultradeep round spiral flow tank

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0347322A (en) * 1989-07-14 1991-02-28 Takenaka Komuten Co Ltd Inverted placing method for underground floor structure
KR20060028889A (en) * 2004-09-30 2006-04-04 황기수 Structure for plastic slab deck system and downward construction method using the same
CN201225015Y (en) * 2008-06-06 2009-04-22 中冶天工上海十三冶建设有限公司 Metallurgy large-scale underground tank construction formwork
CN102296616A (en) * 2011-07-05 2011-12-28 中冶天工上海十三冶建设有限公司 Semi-underground retaining and protecting method for constructing cylindrical underground tank
CN102330436A (en) * 2011-07-05 2012-01-25 中冶天工上海十三冶建设有限公司 Composite retaining structure and composite retaining method for half geotechnical layer ultradeep round spiral flow tank

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
敖海根: "32.5m深旋流沉淀池施工技术", 《江西冶金》, vol. 30, no. 02, 30 April 2010 (2010-04-30) *
黎明中: "半逆作法施工技术在旋流沉淀池工程中的应用", 《土工基础》, vol. 17, no. 04, 31 December 2003 (2003-12-31) *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104314093A (en) * 2014-11-13 2015-01-28 中冶天工集团有限公司 Excessive sinking preventing method for construction of open caisson of tapered-bottom and spiral flow type pool
CN104314093B (en) * 2014-11-13 2016-02-03 中冶天工集团有限公司 The anti-excessively heavy method of a kind of conical bottom Whirlwind tank open caisson construction
CN104975616A (en) * 2015-06-30 2015-10-14 中国二十冶集团有限公司 Double-water-stop structure of rotational flow pool outer cylinder constructed through reverse building method and construction method of double-water-stop structure
CN107012871A (en) * 2017-04-18 2017-08-04 武汉志和岩土工程有限公司 A kind of suspension type goes along with sb. to guard him the deep reversed construction method for greatly enhancing foundation ditch fabricated construction
CN107740445A (en) * 2017-10-19 2018-02-27 山东电力建设第工程公司 PP module assembly pond overflowing water experiment bracing means and reinforcement means

Similar Documents

Publication Publication Date Title
CN102182325B (en) Storey adding method for existing building basement with frame structure and independent foundation
US9567720B2 (en) Offshore platform for a marine environment
CN101691751B (en) Construction method for making ultra-long artificial excavating pile penetrate cave and ultra-long pile penetrating cave
CN102434717B (en) Construction method of joist steel pipe-jacking work pit
CN104947682A (en) Foundation pit support construction method and device thereof
CN109630127A (en) A kind of construction method of rich water soft stratum ultra-deep shield vertical shaft
CN100510281C (en) Semi-reverse construction method for ultra-large-diameter and ultra-buried depth storage tank
CN102505704A (en) Large open caisson construction method in soft geological shaft
CN101736757A (en) Two-way synchronous construction method of tube structure of high-rise building
CN109024662A (en) Method of the anchor pile underpinning without basement building underground space increasing layer
CN103103988A (en) Foundation ditch construction method of horizontal bracing structure of central island floor slaps
CN102605801A (en) Suspension semi-reverse-construction method for underground circular water tank
CN201801843U (en) Overwater gravity type earth-retaining structure with anchoring structure
CN101824825B (en) Deep foundation pit open cutting construction method
CN103758132B (en) The construction technology of the cantilever soldier pile retaining structure on slope is put in a kind of combination
CN1279319A (en) Full-reverse construction technology for basement
CN107165173A (en) A kind of foundation pit supporting system and its construction method
CN203160254U (en) Pit support structure
AU2012313196B2 (en) Partially floating marine platform for offshore wind-power, bridges and marine buildings, and construction method
CN106400814A (en) Foundation pit supporting method
JPH06146305A (en) Underwater foundation and installation method thereof
CN110820756A (en) Shield well and vertical shaft deep foundation pit excavation safety construction method
CN213625605U (en) Dig deep basal pit structure of stake anchor and hanging net injection concrete soon
CN213358679U (en) Water buoyancy balance system of subway upper cover structure
CN211421139U (en) Shield constructs well crown beam bearing structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120725