CN102182325B - Storey adding method for existing building basement with frame structure and independent foundation - Google Patents

Storey adding method for existing building basement with frame structure and independent foundation Download PDF

Info

Publication number
CN102182325B
CN102182325B CN2011100754927A CN201110075492A CN102182325B CN 102182325 B CN102182325 B CN 102182325B CN 2011100754927 A CN2011100754927 A CN 2011100754927A CN 201110075492 A CN201110075492 A CN 201110075492A CN 102182325 B CN102182325 B CN 102182325B
Authority
CN
China
Prior art keywords
single footing
basement
former
former single
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011100754927A
Other languages
Chinese (zh)
Other versions
CN102182325A (en
Inventor
刘松玉
章定文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN2011100754927A priority Critical patent/CN102182325B/en
Publication of CN102182325A publication Critical patent/CN102182325A/en
Application granted granted Critical
Publication of CN102182325B publication Critical patent/CN102182325B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The invention relates to a storey adding method for an existing building basement with a frame structure and an independent foundation, which comprises the steps of: supporting an original independent foundation and an upper part load thereof by pressing-in steel drum concrete piles of foundation soil from the top surface drilling part of the original independent foundation; prolonging original frame pillars to form an integral new foundation with basement bottom plates; bearing the upper part load together by the foundation soil and the steel drum concrete piles under the bottom plates of the basement; and cutting off the original independent foundation to form a space which is the newly built basement so as to complete the storey addition for the basement. The method disclosed by the invention has the advantages of convenience for construction and capability of strictly controlling the deformation in the process of foundation underpinning construction.

Description

A kind of frame construction single footing existing building basement increases layer method
Technical field
The existing building foundation underpinning basement that the present invention relates to a kind of frame construction single footing increases layer method, belongs to the technical field of construction work in the civil engineering.
Background technology
Along with the continuous quickening of China's urban construction and urbanization process, the rapid expansion of city size has produced a series of problems such as urban population supersaturation, traffic congestion and architectural space crowd.The expansion in city often receives the restriction of limited land resources, and development then can increase the weight of urban space density to the high-altitude, makes development of urban space progressively move towards vicious circle.Therefore, the development and use of urban underground space having been become the inevitable outlet that solves the urban development problem, is the important channel that sustainable development path is walked in the city.Developing urban underground space resource in order, rationally, comprehensively, efficiently, is to expand the infrastructure capacity, improves land utilization efficiency and one of effective way that economizes the land resource.
Particularly China city private car owning amount increases sharply; And the urban centre is the area that the stream of people and wagon flow converge; The construction of underground parking has become one of restraining factors that develop in a healthy way big and medium-sized cities, does not particularly have the defective of existing building on function of use of facilities such as basement and underground parking to display day by day.Therefore, the development requirement of the existing building underground space highlights day by day.
Beijing's music hall alteration work keeps agent structure on the existing building basis, adopt the basement of " two holder one posts " foundation underpinning scheme with the newly-increased one deck 6.5m of former single footing frame construction transformation.Obtained the national inventing patent (patent No.: 98123196.9) in technology; Its critical process is done apron piece for dig stake in the post both sides on the stake top, and the original structure post is wrapped in the beam; Make it to become one, let the superstructure load pass in pile foundation and mat foundation through apron piece with beam.Adopt in lower area but this technology is applicable to groundwater table.
Patent method for supporting and replacing bed plate foundation (the patent No.: ZL200610045257.4) utilize the part top board and the base plate conduct of planning to build basement to underpin member, play interim basis, bear upper load, with the vertical member of construction basement.At basic upper position (generally at the indoor terrace place) construction part top board, top board reliably is connected with post through beam.This top board double as underpins member, and upper load is delivered to the soil body under the top board.So just can excavate the soil body under the former basis.At the bottom of vertical Force transmission parts construction part base plate, remake to " temporarily " basis, bear upper load, with the excavation residue soil body, build the residue base plate.This technology does not adopt pile foundation, can lower to underpin cost, underpins earth pillar support upper load unsettled under the plate all around but only rely on, and is only applicable to the good operating mode of ground soil property.When relatively poor and groundwater table is higher when soil property, adopts the malformation that this method maybe be excessive, even cause structural instability.Therefore, develop the relatively poor and higher regional existing building basement of groundwater table of a kind of soil property and increase a layer technological significant and application prospect.
Summary of the invention
Technical problem: the deficiency to prior art exists the purpose of this invention is to provide a kind of frame construction single footing existing building basement and increases layer method.This method easy construction, and can the strict distortion of controlling the foundation underpinning work progress.
Technical scheme: frame construction of the present invention single footing existing building basement increases the layer method utilization steel drum concrete pile that the end face drill hole is pressed into foundation soil from former single footing and supports former single footing and upper load thereof; And then former frame column prolonged and to form a globality newly basic with basement bottom board, bear upper load jointly by foundation soil under the basement floor and steel drum concrete pile; Forming the space after the amputation of former single footing is to increase the basement of building, and concrete steps are:
1). the existing building that increases layer in plan carries out the construction of foundation ditch retaining structure on every side, and retaining structure adopts a placing of reinforcement concrete drilling bored concrete pile and row's rotary churning pile to form;
2). begin to excavate foundation soil from indoor terrace, until former single footing end face;
3). the end face vertical drilling in former single footing is pressed into prefabricated steel drum concrete pile in the ground to projected depth the little cushion cap of cast steel drum concrete pile on the end face of former single footing by vertical drilling place, former single footing;
4). set the well-points dewatering pipe in foundation ditch retaining structure inboard, carry out precipitation;
5). continue the earthwork below excavation side, former single footing and the bottom surface, the absolute altitude place, base plate bottom surface that excavation is most planned to build basement makes the single footing reveal; Former single footing is supported by the steel drum concrete pile;
6). the excavation substrate is floating with concrete, and end face tiltedly bores injected hole in former single footing, the frame column on the former single footing is prolonged be poured into the end, hole, form the frame column that prolongs, and bottom board forms new basis;
7). outer unnecessary former single footing of the frame column that amputation prolongs and the steel drum concrete pile on the new single footing;
8). the top layer reinforcement of former frame column;
9). the basement roof cast;
10). external wall construction around the newly-built basement.
Beneficial effect: after the construction of this worker method was accomplished, the superstructure load was delivered to basement bottom board through the frame column that prolongs, and is born jointly by foundation soil under the base plate and steel drum concrete pile.Basement increases layer secondary deformation that construction causes and can be effectively controlled, and has reduced the original building effect on structure, and construction period does not influence the normal use of two layers of original structures and above floor.
Description of drawings
Fig. 1 is frame construction existing building post net of the present invention and single footing arrangement diagram;
Fig. 2 is a foundation ditch retaining structure layout plan around the frame construction existing building;
Fig. 3 is the underground preceding I-I sectional drawing of layer that increase of frame construction existing building;
Fig. 4 is the I-I sectional drawing after foundation soil partly is excavated to former single footing end face;
Fig. 5 be former single footing vertical drilling steel drum concrete pile be pressed into and little bearing platform construction after the I-I sectional drawing;
Fig. 6 is that former single footing vertical drilling and steel drum concrete pile are pressed into back plane figure;
Fig. 7 is the I-I sectional drawing behind the following soil excavation in bottom surface, former single footing;
Fig. 8 is the I-I sectional drawing after former frame column prolongation and the basement bottom board cast;
Fig. 9 is outer unnecessary former single footing of amputation frame column and the I-I sectional drawing behind the steel drum concrete pile on the new single footing;
Figure 10 is the I-I sectional drawing after the top layer reinforcement of former frame column;
Have among the figure: frame column 9, the basement bottom board 10 of frame column 1, former single footing 2, collar tie beam 3, foundation soil 4, retaining structure 5, reinforced concrete bored pile 51, rotary churning pile 52, steel drum concrete pile 6, little cushion cap 7, injected hole 8, prolongation.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the present invention is further specified.
It is following that single footing of the present invention existing building basement increases the layer process concrete steps:
(1) around plan increases the existing building of layer, carry out foundation ditch retaining structure 5 construction, retaining structure 5 adopts placing of reinforcement concrete drilling bored concrete piles 51 and row's rotary churning pile 52 compositions;
(2) begin to excavate foundation soil 4 from indoor terrace, until former single footing 2 end faces;
(3) the 2 end face vertical drillings in former single footing are pressed into prefabricated steel drum concrete pile 6 in the ground to projected depth by 2 vertical drilling places, former single footing, the little cushion cap 7 of cast steel drum concrete pile 6 on 2 end faces of former single footing;
(4) set the well-points dewatering pipe in foundation ditch retaining structure 5 inboards, carry out precipitation;
(5) continue the following earthwork in excavation 2 sides, former single footing and bottom surface, the absolute altitude place, base plate 10 bottom surface that excavation is most planned to build basement makes the single footing reveal; Former single footing 2 is supported by steel drum concrete pile 6;
(6) the excavation substrate is floating with concrete, and 2 end faces tiltedly bore injected hole 8 in former single footing, the frame column 1 on the former single footing 2 is prolonged be poured into the end, hole, form the frame column 9 that prolongs, and bottom board 10 forms new basis;
(7) the frame column 9 outer unnecessary former single footings 2 of amputation prolongation and the steel drum concrete pile 6 on the new single footing;
(8) former frame column 1 top layer reinforcement;
(9) basement roof cast;
(10) external wall construction around the newly-built basement.
After the construction of this worker method was accomplished, the superstructure load was delivered to basement bottom board through the frame column that prolongs, and is born jointly by foundation soil under the base plate and steel drum concrete pile.Basement increases layer secondary deformation that construction causes and can be effectively controlled, and has reduced the original building effect on structure, and construction period does not influence the normal use of two layers of original structures and above floor.

Claims (1)

1. a frame construction single footing existing building basement increases layer method; It is characterized in that this technology utilization steel drum concrete pile that the end face drill hole is pressed into foundation soil from former single footing supports former single footing and upper load thereof; And then former frame column prolonged and to form a globality newly basic with basement bottom board, bear upper load jointly by foundation soil under the basement bottom board and steel drum concrete pile; Forming the space after the amputation of former single footing is to increase the basement of building, and concrete steps are:
1). the existing building that increases layer in plan carries out foundation ditch retaining structure (5) construction on every side, and retaining structure (5) adopts a placing of reinforcement concrete drilling bored concrete pile (51) and row's rotary churning pile (52) to form;
2). begin to excavate foundation soil (4) from indoor terrace, until former single footing (2) end face;
3). the end face vertical drilling in former single footing (2); It is interior to projected depth that prefabricated steel drum concrete pile (6) is pressed into ground by former single footing (2) vertical drilling place, the little cushion cap (7) of cast steel drum concrete pile (6) on the end face of former single footing (2);
4). set the well-points dewatering pipe in foundation ditch retaining structure (5) inboard, carry out precipitation;
5). continue the earthwork below excavation (2) side, former single footing and the bottom surface, the absolute altitude place, base plate (10) bottom surface that excavation is most planned to build basement makes the single footing reveal; Former single footing (2) is supported by steel drum concrete pile (6);
6). the excavation substrate is floating with concrete; End face tiltedly bores injected hole (8) in former single footing (2); Frame column (1) on former single footing (2) prolonged be poured into the end, hole, the frame column (9) that form to prolong, and bottom board (10) forms new basis;
7). outer unnecessary former single footing (2) of the frame column (9) that amputation prolongs and the steel drum concrete pile (6) on the new single footing;
8). former frame column (1) top layer reinforcement;
9). the basement roof cast;
10). external wall construction around the newly-built basement.
CN2011100754927A 2011-03-28 2011-03-28 Storey adding method for existing building basement with frame structure and independent foundation Expired - Fee Related CN102182325B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100754927A CN102182325B (en) 2011-03-28 2011-03-28 Storey adding method for existing building basement with frame structure and independent foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100754927A CN102182325B (en) 2011-03-28 2011-03-28 Storey adding method for existing building basement with frame structure and independent foundation

Publications (2)

Publication Number Publication Date
CN102182325A CN102182325A (en) 2011-09-14
CN102182325B true CN102182325B (en) 2012-08-22

Family

ID=44568602

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100754927A Expired - Fee Related CN102182325B (en) 2011-03-28 2011-03-28 Storey adding method for existing building basement with frame structure and independent foundation

Country Status (1)

Country Link
CN (1) CN102182325B (en)

Families Citing this family (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102444142B (en) * 2011-09-20 2014-01-15 新世纪建设集团有限公司 Pile group column replacement expanded basement and construction method of same
CN102864946B (en) * 2012-10-23 2014-07-16 山东建筑大学 Process for supporting existing buildings through structural steel and horizontal rachel rod member and additionally adding multilayer basement
CN103104102B (en) * 2013-01-31 2015-07-01 中国建筑第八工程局有限公司 Construction method for underground storey-addition reconstruction
CN103321244B (en) * 2013-03-27 2015-09-09 江苏苏南建筑技术发展有限公司 Sand foundation existing building sets up the construction method of basement
CN103195085B (en) * 2013-04-02 2015-01-28 东南大学 Downward story-adding basement and construction method thereof
CN103437567B (en) * 2013-08-30 2015-06-10 山东建筑大学 Method for supporting existing building underground added storey through original pile foundations
CN104532957B (en) * 2014-12-08 2016-08-24 江苏中南建筑产业集团有限责任公司 Existing building sets up basement reversed construction method
CN105064718A (en) * 2015-07-24 2015-11-18 武大巨成结构股份有限公司 Steel slideway for building jacking storey addition
CN106013834B (en) * 2016-06-03 2018-07-24 河海大学 Device and method for basement increasing layer
CN105971028B (en) * 2016-06-03 2018-03-20 河海大学 Exchange pillar bond-slip experimental rig and method
CN106245927B (en) * 2016-07-19 2018-06-01 山东建筑大学 A kind of method and building suitable for frame structure building underground increasing layer
KR101743758B1 (en) * 2016-07-25 2017-06-05 이엑스티 주식회사 Downward construction method for vertical extension of building using base block
CN107035159B (en) * 2017-05-05 2018-12-21 山东建筑大学 A method of suitable for frame structure isolated footing building underground increasing layer
CN107034918A (en) * 2017-06-23 2017-08-11 北京城乡建设集团有限责任公司 A kind of integral structure and amputation method for improving amputation efficiency
CN107642252B (en) * 2017-09-21 2019-09-10 青岛静力工程股份有限公司 Old building free removal is double to increase rebuilding construction technique
CN108149922B (en) * 2017-12-29 2023-06-16 上海市机械施工集团有限公司 Non-row formwork construction method suitable for top plate of reverse construction method construction structure
CN108643255A (en) * 2018-05-24 2018-10-12 山东建筑大学 Frame structure building lifting inclination-correcting method
CN109024662A (en) * 2018-07-19 2018-12-18 深圳市工勘岩土集团有限公司 Method of the anchor pile underpinning without basement building underground space increasing layer
CN108867723B (en) * 2018-07-24 2020-12-11 山东建筑大学 Method for correcting inclination of frame structure building and adding underground layer
CN109610874A (en) * 2019-01-18 2019-04-12 央固工程科技(上海)有限公司 Increase the basement and its construction process built inside existing workshop
CN110067400A (en) * 2019-03-21 2019-07-30 武大巨成结构股份有限公司 It is a kind of for extending the construction method of the building underground space
CN110043061A (en) * 2019-04-24 2019-07-23 天津建岩岩土工程有限公司 It is existing build/structures on build the method for basement
CN110565978B (en) * 2019-09-11 2023-08-15 上海建工一建集团有限公司 Control method and structure of confined water in existing basement storey-adding construction
CN110886507B (en) * 2019-12-11 2024-02-13 北京中岩智泊科技有限公司 Method for increasing storey and expanding under existing building
CN112593566A (en) * 2020-11-24 2021-04-02 浙江二十冶建设有限公司 Dewatering method for existing building deep foundation pit
CN114635580A (en) * 2022-03-09 2022-06-17 上海勘察设计研究院(集团)有限公司 Underground storey-adding underpinning structure utilizing existing building foundation structure and construction method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4119259A1 (en) * 1991-06-11 1992-12-17 Kunz Alfred & Co Method for constructing basements under existing building - uses root piles to underpin existing load-bearing walls for construction of concrete ceiling, foundation blocks, support columns
CN1257149A (en) * 1998-12-11 2000-06-21 北京市第七城市建设工程公司 Integral foundation underpinning technology for building added floor
CN101886479A (en) * 2010-07-14 2010-11-17 山东建筑大学 Underground storey-adding process of frame structural building by one-by-one independent foundation underpinning method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4119259A1 (en) * 1991-06-11 1992-12-17 Kunz Alfred & Co Method for constructing basements under existing building - uses root piles to underpin existing load-bearing walls for construction of concrete ceiling, foundation blocks, support columns
CN1257149A (en) * 1998-12-11 2000-06-21 北京市第七城市建设工程公司 Integral foundation underpinning technology for building added floor
CN101886479A (en) * 2010-07-14 2010-11-17 山东建筑大学 Underground storey-adding process of frame structural building by one-by-one independent foundation underpinning method

Also Published As

Publication number Publication date
CN102182325A (en) 2011-09-14

Similar Documents

Publication Publication Date Title
CN102182325B (en) Storey adding method for existing building basement with frame structure and independent foundation
CN108868778B (en) Non-excavation construction method for large underground structure
CN106703828B (en) The construction method of subway station is built using prefabricated assembled lining cutting combination PBA
CN101886479B (en) Underground storey-adding process of frame structural building by one-by-one independent foundation underpinning method
CN105064397A (en) Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
CN104878776B (en) A kind of underground shallow layer automatic parking garage the library structure
CN107842035A (en) A kind of ultra-high performance concrete precast assembly pipe gallery system and construction method
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN105089670B (en) Construction method for enlarging and excavating subway station on basis of parallel interval shield tunnel
CN109914472B (en) Soft soil area assembled comprehensive pipe gallery and construction method thereof
CN108005399A (en) Add the construction method for building multi-layer underground space under a kind of existing building group
WO2017084573A1 (en) Upheaval-resisting support structure
CN105735354A (en) Covered-excavation full-top-down construction method of municipal underground engineering
CN109024662A (en) Method of the anchor pile underpinning without basement building underground space increasing layer
CN108867723B (en) Method for correcting inclination of frame structure building and adding underground layer
CN104652444A (en) Construction method for overall reverse operation of ultra-large type deep foundation pit center island type alternative earth excavation
CN101498133B (en) Method and supporting construction for enlarging basement top-down method earth excavation space
CN105064711A (en) Method for constructing underground garage between residential buildings
CN204282399U (en) A kind of subway space enclosing structure
CN109898556A (en) A kind of underground pipe gallery structure and sunk type construction method
CN106088758B (en) A kind of bilayer assembled underground granary
CN109487793A (en) Inner support of pile foundation pit permanent support structure is perfused in a kind of solid matter under complex environment
CN105986830B (en) The tunneling method of construction of roadside strip underground garage
CN207597914U (en) Add the construction stress structure for building multi-layer underground space under a kind of existing building group
CN207484508U (en) A kind of ultra-high performance concrete precast assembly pipe gallery system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120822

Termination date: 20180328