CN106088758B - A kind of bilayer assembled underground granary - Google Patents

A kind of bilayer assembled underground granary Download PDF

Info

Publication number
CN106088758B
CN106088758B CN201610525750.XA CN201610525750A CN106088758B CN 106088758 B CN106088758 B CN 106088758B CN 201610525750 A CN201610525750 A CN 201610525750A CN 106088758 B CN106088758 B CN 106088758B
Authority
CN
China
Prior art keywords
prefabricated
plate
layer
wall
multiple function
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610525750.XA
Other languages
Chinese (zh)
Other versions
CN106088758A (en
Inventor
王振清
张昊
陈桂香
刘海燕
张虎
金立兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Ditian Grain Tank Factory Technology Co Ltd
Original Assignee
Henan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan University of Technology filed Critical Henan University of Technology
Priority to CN201610525750.XA priority Critical patent/CN106088758B/en
Publication of CN106088758A publication Critical patent/CN106088758A/en
Application granted granted Critical
Publication of CN106088758B publication Critical patent/CN106088758B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H7/00Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
    • E04H7/22Containers for fluent solids, e.g. silos, bunkers; Supports therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H7/00Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
    • E04H7/22Containers for fluent solids, e.g. silos, bunkers; Supports therefor
    • E04H7/24Constructions, with or without perforated walls, depending on the use of specified materials
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H7/00Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
    • E04H7/22Containers for fluent solids, e.g. silos, bunkers; Supports therefor
    • E04H2007/225Silos with retaining wall type wall elements, e.g. trench silos
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/51Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture specially adapted for storing agricultural or horticultural products

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

A kind of bilayer assembled underground granary, which includes orlop, outer bulkhead, inner barn wall, silo roof and multiple function;The inner barn wall and outer bulkhead are to be spliced by polylith prefabricated chunk, and there is attachment device on prefabricated chunk periphery, can be attached with contiguous prefabricated plate and multiple function by attachment device prefabricated chunk;The multiple function positions bulkhead, and the depth anchored into soil is more than storehouse bottom plate depth, is subject to soil pressure, pressure and the main bearing member for resisting buoyancy;It is characterized in that:It is integral with multiple function connection between outer bulkhead and inner barn wall, form three-dimensional space structure, shared soil pressure, grain lateral pressure and buoyancy;For ventilation and leakage inspection channel in the gap that outer bulkhead, inner barn wall and multiple function surround;Multiple function is divided into several sections from top to bottom, and first layer bulkhead plate is equipped on the inside of the first segment of top layer, second layer bulkhead plate is equipped on the inside of second segment, and the double-deck assembled underground granary is formed until bottom one layer of bulkhead plate with above-mentioned similar set-up mode.

Description

一种双层装配式地下粮仓A double-layer assembled underground granary

技术领域technical field

本发明涉及地下粮仓技术领域,具体涉及一种双层装配式地下粮仓。The invention relates to the technical field of underground granaries, in particular to a double-layer assembled underground granary.

背景技术Background technique

地下粮仓建造在浅层地表下,常年低温储粮,保持粮食品质、抑制虫害发生,避免使用毒性药剂熏蒸,抵抗自然破坏和战平两用等众多优点,许多专家和学者一致认为合理推广应用地下储粮仓新体系与新技术,能够实现低温环保、节能节地、保质减损、生态储粮。Underground granaries are built under the shallow surface, which can store grain at low temperature all year round, maintain grain quality, inhibit the occurrence of pests, avoid fumigation with toxic chemicals, resist natural damage, and be used for both war and peace. Many experts and scholars agree that it is reasonable to promote the application of underground granaries The new system and new technology of grain storage can realize low-temperature environmental protection, energy saving and land saving, quality assurance and loss reduction, and ecological grain storage.

我国现有地下粮仓一般在地下水位较低的一般黄土和适合粘上性地区,如窑洞仓、喇叭仓、双曲拱仓、半地下仓、洞状喇叭仓;同时已建的地下仓多为砖砌结构,仓容小,占地面积大、机械化程度低。The existing underground granaries in my country are generally located in general loess areas with low groundwater levels and suitable for sticky areas, such as cave warehouses, trumpet warehouses, double-curved arch warehouses, semi-underground warehouses, and cave-shaped trumpet warehouses; Brick structure, small storage capacity, large floor space and low degree of mechanization.

为了建造适用在地下水位较高、复杂地质条件区域可推广应用的新型地下粮仓,一些国家专利和文献也提出了圆形粮仓,圆筒、半圆筒围成的大空间地下矩形,桩围复合式地下仓等仓型,但是上述新仓型的推广应用,还存在一些亟待解决的问题,如:(1)地下储粮仓具有高标准防水、防潮要求。确保仓体在使用年限内不漏水,不渗水;采用的卷材材料易老化,施工工序复杂,难度大,容易出现施工质量问题。(2)深基坑的湿作业环境施工周期长。基坑开挖、降水后,仓底板现浇、仓壁滑模施工需长时间在湿作业环境条件进行,劳动强度大、施工周期长,施工成本高。(3)基坑支护费用高。针对该类深基坑,“钢桩+腰梁+封水钢板”基坑支护是较为经济的方式,但费用占土建建设成本的25-30%,建设成本较高。In order to build a new type of underground granary that can be popularized and applied in areas with high groundwater levels and complex geological conditions, some national patents and documents have also proposed a circular granary, a large underground rectangle surrounded by cylinders and semi-cylinders, and a pile-enclosed compound type. However, there are still some problems to be solved urgently in the popularization and application of the above-mentioned new warehouse types, such as: (1) Underground grain storage warehouses have high standards of waterproof and moisture-proof requirements. Ensure that the warehouse body does not leak or seep within the service life; the coiled material used is easy to age, the construction process is complex and difficult, and construction quality problems are prone to occur. (2) The wet work environment of deep foundation pit has a long construction period. After foundation pit excavation and precipitation, the cast-in-place construction of the warehouse floor and the sliding form construction of the warehouse wall need to be carried out in a wet working environment for a long time, resulting in high labor intensity, long construction period and high construction cost. (3) The cost of foundation pit support is high. For this kind of deep foundation pit, "steel pile + waist beam + water sealing steel plate" foundation pit support is a more economical way, but the cost accounts for 25-30% of the civil construction cost, and the construction cost is relatively high.

申请号为CN200910207155.1的发明公开了一种地下粮仓,包括仓顶、仓壁和仓底,该仓壁外包钢,钢板既能单独作为仓壁的防水、防潮层,也能仓壁与钢板用钢构件连接形成组合结构的仓壁来防水、防潮。地下粮仓仓壁的形状为直线形或曲线形,如圆筒形、方筒形、半圆形仓壁等。该发明通过外包钢板解决了仓底板的防水防潮问题。同时在仓底进行施工时,钢板作为模板,加快施工速度,降低施工成本,但是其施工为现场浇筑施工,而且该施工方法需要进行基坑开挖,这样存在整体建造成本高,施工周期长等不足。The invention whose application number is CN200910207155.1 discloses an underground granary, which includes a roof, a wall and a bottom. The steel plates are connected by steel members to form a combined structure of the warehouse wall to prevent water and moisture. The shape of the wall of the underground granary is straight or curved, such as cylindrical, square, semicircular, etc. The invention solves the waterproof and moisture-proof problem of the bottom plate of the warehouse through the outsourcing steel plate. At the same time, when the construction is carried out at the bottom of the warehouse, the steel plate is used as a formwork to speed up the construction and reduce the construction cost. However, the construction is pouring on site, and this construction method requires excavation of the foundation pit, so the overall construction cost is high and the construction period is long. insufficient.

申请号为CN200910207154.7的发明公开了一种地下粮仓,包括仓顶、仓壁和仓底,该仓壁分为内壁和外壁,内壁与外壁之间采用连接件连成整体,内壁与外壁之间形成空腔,所述空腔用于地下粮仓漏水的检测和修复,并用于地下粮仓通风和粮情检测。该发明粮仓也需要基坑开挖,存在施工麻烦、建造成本高、施工周期长等不足。The invention with application number CN200910207154.7 discloses an underground granary, including a roof, a wall and a bottom. The wall is divided into an inner wall and an outer wall. A cavity is formed between them, and the cavity is used for detection and repair of water leakage in the underground granary, and for ventilation of the underground granary and detection of grain conditions. The granary of the invention also needs foundation pit excavation, which has disadvantages such as troublesome construction, high construction cost, and long construction period.

预制装配式结构是实现建筑结构产业化和建筑节能节排的有效途径之一,长期以来,混凝土建筑主要采用现场施工的传统作业方式,工业化程度低,水耗、能耗、人工垃圾、污水排放量大,不符合国家节能和环保的可持续发展政策。采用装配式结构,可以工厂预制、现场装配,实现建筑结构产业化,同时可以有效提高材料在建筑节能和结构性能的效率、节约能源与资源,减少建筑垃圾和环境的不良影响、降低施工场地限制等。因此,为了提供一种“快、好、省“的地下储粮新仓型,研发预制装配式新型地下仓已成为必需。The prefabricated structure is one of the effective ways to realize the industrialization of building structures and building energy saving and emission reduction. For a long time, concrete buildings mainly adopt the traditional operation method of on-site construction, with a low degree of industrialization, water consumption, energy consumption, artificial waste, and sewage discharge. The amount is large, which does not conform to the national sustainable development policy of energy conservation and environmental protection. The prefabricated structure can be prefabricated in the factory and assembled on site to realize the industrialization of building structures. At the same time, it can effectively improve the efficiency of materials in building energy saving and structural performance, save energy and resources, reduce construction waste and adverse effects on the environment, and reduce construction site restrictions. Wait. Therefore, in order to provide a "quick, good and economical" new type of underground grain storage, it has become necessary to develop a prefabricated new type of underground storage.

发明内容Contents of the invention

本发明的目的在于提供一种双层装配式地下粮仓,该预制装配式地下粮仓的仓壁包有钢板,此钢板可代替防水卷材,具有较好的防水、防渗效果和综合效益;预制仓壁板可在预制构件工厂标准化生产,加工制造质量既能有效控制又节能环保,预制成品现场组装,机械化安装施工,可交叉施工,缩短施工工期。另外,预制仓体结构可作为基坑支护体系,节约基坑支护成本,降低建设投资。The object of the present invention is to provide a double-layer assembled underground granary. The wall of the prefabricated assembled underground granary is covered with a steel plate. Warehouse wall panels can be produced in a prefabricated component factory in a standardized manner. The processing and manufacturing quality can be effectively controlled and energy-saving and environmentally friendly. Prefabricated products are assembled on site, mechanized installation and construction, and cross-construction can be used to shorten the construction period. In addition, the prefabricated warehouse structure can be used as a foundation pit support system, saving foundation pit support costs and reducing construction investment.

本发明的解决方案是:一种双层装配式地下粮仓,该地下粮仓包括仓底、外仓壁、内仓壁、仓顶和多功能柱;所述的内仓壁和外仓壁为均由多块预制板块拼接而成,预制板块周边有连接装置,通过连接装置预制板块能与相邻预制板块以及多功能柱进行连接;所述多功能柱对仓壁进行定位,其锚入土中的深度大于仓底板深度,是承受土压力、粮食压力和抵抗浮力的主要受力构件;其特征在于:外仓壁与内仓壁之间用多功能柱连接成整体,形成立体的空间结构,共同承担土压力、粮食侧压力和浮力;在外仓壁、内仓壁和多功能柱围成的空隙内供通风和漏水检查通道;多功能柱从上至下分成数段,最上层的第一段内侧设有第一层仓壁板,第二段内侧设有第二层仓壁板,用上述的设置方式,直到最下面一层仓壁板,形成双层装配式地下粮仓。The solution of the present invention is: a double-layer assembled underground granary, which includes a bottom, an outer wall, an inner wall, a roof and a multifunctional column; the inner wall and the outer wall are uniform It is composed of multiple prefabricated panels, and there are connecting devices around the prefabricated panels, through which the prefabricated panels can be connected with adjacent prefabricated panels and multi-functional columns; The depth is greater than the depth of the warehouse floor, and it is the main force-bearing member that bears earth pressure, grain pressure and resists buoyancy; it is characterized in that: the outer warehouse wall and the inner warehouse wall are connected as a whole by multi-functional columns to form a three-dimensional space structure. Undertake earth pressure, grain side pressure and buoyancy; provide ventilation and water leakage inspection channels in the gap surrounded by the outer warehouse wall, inner warehouse wall and multi-functional column; the multi-functional column is divided into several sections from top to bottom, the first section on the uppermost layer The inner side is provided with the first layer of warehouse wall panels, and the second section of the inner side is provided with the second layer of warehouse wall panels. With the above-mentioned setting method, the bottom layer of warehouse wall panels is used to form a double-layer assembled underground granary.

本发明的特征在于所述多功能柱采用钢柱或设有钢埋件的混凝土柱,多功能柱设有定位钢构件。多功能柱采用钢柱或设有钢埋件能使得相邻仓壁板与多功能柱方便的进行焊接;多功能柱的定位钢构件可以在预制仓壁板安装时进行精确的定位,同时在预制仓壁板与多功能柱焊接前提供固定作用。The present invention is characterized in that the multifunctional column adopts a steel column or a concrete column provided with steel embedded parts, and the multifunctional column is provided with positioning steel components. The multi-function column adopts steel column or is equipped with steel embedded parts, which can make the adjacent warehouse wall plate and multi-function column conveniently welded; The prefabricated silo wall panels and the multifunctional columns provide fixation before welding.

本发明的特征还在于内仓壁或外仓壁为内侧钢板和外侧混凝土板结合成整体的结构,内侧钢板与混凝土采用锚钉连接。这样,预制仓壁板的钢板可代替防水卷材和仓壁内层钢筋,具有较好的防水、防渗效果和综合效益;钢板与混凝土采用锚钉连接形成钢板混凝土组合结构预制仓壁板,它不但减少了仓壁钢筋绑扎的繁重工作,节省了仓壁制作时间,降低了劳动力成本,而且降低了用于浇筑普通钢筋混凝土结构所用模板的数量和费用;另外,预制仓壁板可在预制构件工厂标准化生产,加工制造质量既能有效控制又节能环保,预制成品现场组装,机械化安装施工,可交叉施工,缩短施工工期;最后,组合结构预制仓壁板具有承载力高、抗裂性能好、耗能能力强、延性好等优点。The present invention is also characterized in that the inner wall or the outer wall is a structure in which the inner steel plate and the outer concrete plate are integrated, and the inner steel plate and the concrete are connected by anchors. In this way, the steel plate of the prefabricated warehouse wall can replace the waterproof coiled material and the inner steel bar of the warehouse wall, which has good waterproof, anti-seepage effect and comprehensive benefits; the steel plate and the concrete are connected by anchors to form a steel plate concrete composite structure prefabricated warehouse wall, It not only reduces the heavy work of tying steel bars on the warehouse wall, saves the time for making the warehouse wall, reduces labor costs, but also reduces the number and cost of formwork used for pouring ordinary reinforced concrete structures; in addition, the prefabricated warehouse panels can be prefabricated Standardized production in the component factory, the quality of processing and manufacturing can be effectively controlled and energy-saving and environmentally friendly. Prefabricated products are assembled on site, mechanized installation and construction, cross-construction can be used, and the construction period can be shortened; finally, the prefabricated warehouse wall with combined structure has high bearing capacity and good crack resistance. , strong energy dissipation capacity, good ductility and other advantages.

本发明的特征还在于拼接成外仓壁的所述预制板块的四边均有U型钢板包角。这样,所述预制板块的U型钢板包角能使预制板块与多功能柱方便地进行焊接。The present invention is also characterized in that the four sides of the prefabricated panels that are spliced into the outer warehouse wall are all wrapped with U-shaped steel plates. In this way, the U-shaped steel plate wrapping angle of the prefabricated plate can make the prefabricated plate and the multifunctional column conveniently welded.

本发明的特征还在于拼接成外仓壁的所述预制板块环向水平外侧平齐,其外侧直接与多功能柱焊接连接。The present invention is also characterized in that the prefabricated panels spliced into the outer warehouse wall are flush with the horizontal outer side, and the outer side is directly welded to the multi-functional column.

本发明的特征还在于拼接成外仓壁的所述预制板块上下竖向外侧对齐,相邻上下预制板块的外侧、内侧均用连接钢板焊接;在外侧、内侧连接钢板以及相邻预制板块围成的空腔内浇筑与预制仓壁板相同或高一强度等级的防水混凝土。地下仓外侧的土压力大于其内的粮食对仓壁的侧压力,所以在仓壁结构设计时,空仓时地下仓只受到土压力的受力工况是最不利的,而实际上沿仓壁从上至下土体对仓壁的压力逐渐增大,因此,每层预制仓壁板的厚度应该根据仓壁受力特点进行变截面设计才能更加合理,仓壁建造费用才能更经济。预制仓壁板竖向外侧平齐,既可以使每层预制仓壁板更容易与多功能柱焊接和定位,内侧也可以根据实际受力情况进行调整来满足合理的变截面设计要求。上下相邻预制仓壁板端部内、外两侧均用连接钢板焊接连接,且它们之间浇筑防水混凝土,这样一方面可满足上下相邻预制板连接节点的结构设计要求,同时内外钢板为仓壁搭接处的防水提供二道可靠的防水措施。The present invention is also characterized in that the prefabricated panels spliced into the outer warehouse wall are aligned vertically and outwardly, and the outer and inner sides of the adjacent upper and lower prefabricated panels are welded with connecting steel plates; the outer and inner connecting steel plates and adjacent prefabricated panels form a Waterproof concrete of the same or higher strength level as the prefabricated warehouse wall is poured in the cavity. The earth pressure on the outside of the underground silo is greater than the lateral pressure of the grain inside on the silo wall. Therefore, in the design of the silo wall structure, it is the most unfavorable condition that the underground silo is only subjected to earth pressure when the silo is empty. The pressure of the soil on the silo wall gradually increases from top to bottom. Therefore, the thickness of each prefabricated silo wall should be designed with variable cross-section according to the force characteristics of the silo wall to be more reasonable and the construction cost of the silo wall to be more economical. The vertical outer sides of the prefabricated warehouse panels are flush, which not only makes it easier for each layer of prefabricated warehouse panels to be welded and positioned with the multi-functional columns, but also the inner side can be adjusted according to the actual stress conditions to meet the reasonable variable cross-section design requirements. The inner and outer sides of the upper and lower adjacent prefabricated warehouse wall panels are welded and connected by connecting steel plates, and waterproof concrete is poured between them, so that the structural design requirements of the upper and lower adjacent prefabricated panels can be met. The waterproofing of the lap joints provides two reliable waterproofing measures.

本发明的特征还在于拼接成内仓壁的所述预制板块环向水平外侧平齐,其外侧直接与多功能柱焊接连接,左右相邻预制板块内侧用连接钢板焊接,在多功能柱、相邻预制板块以及连接钢板围成的空腔内浇筑与预制仓壁板相同或高一强度等级的防水混凝土。这样,在仓壁板内侧用连接钢板焊接连接,一方面有增加了节点处的第二道防水措施,而且使多功能柱与预制仓壁以及其之间的混凝土形成了整体结构,使受力更加合理,节点施工更加简单方便。The present invention is also characterized in that the prefabricated panels spliced into the inner warehouse wall are flush to the horizontal outer side, and the outer side is directly welded and connected with the multifunctional column, and the inner side of the left and right adjacent prefabricated panels is welded with connecting steel plates, and the multifunctional column, the corresponding Waterproof concrete with the same or higher strength grade as the prefabricated warehouse wall is poured in the cavity surrounded by the adjacent prefabricated slab and the connecting steel plate. In this way, the connecting steel plates are welded and connected on the inner side of the warehouse wall. On the one hand, there is a second waterproof measure at the node, and the multifunctional column, the prefabricated warehouse wall and the concrete between them form an integral structure, so that the force It is more reasonable, and the node construction is simpler and more convenient.

本发明的特征还在于拼接成内仓壁的所述预制板块上下竖向外侧对齐,相邻上下预制板块的外侧、内侧均用连接钢板焊接;在外侧、内侧连接钢板以及相邻预制板块围成的空腔内浇筑与预制仓壁板相同或高一强度等级的防水混凝土。在仓壁结构设计时,地下仓内仓壁受到粮食侧压力,且沿仓壁从上至下粮食对仓壁的压力逐渐增大,因此,每层预制仓壁板的厚度应该根据仓壁受力特点进行变截面设计才能更加合理,仓壁建造费用才能更经济。预制仓壁板竖向外侧平齐,既可以使每层预制仓壁板更容易与多功能柱焊接和定位,内侧也可以根据实际受力情况进行调整来满足合理的变截面设计要求。上下相邻预制仓壁板端部内、外两侧均用连接钢板焊接连接,且它们之间浇筑防水混凝土,这样一方面可满足上下相邻预制板连接节点的结构设计要求,同时内外钢板为仓壁搭接处的防水提供二道可靠的防水措施。The present invention is also characterized in that the prefabricated panels spliced into the inner warehouse wall are aligned vertically and outwardly, and the outer and inner sides of the adjacent upper and lower prefabricated panels are welded with connecting steel plates; the outer and inner connecting steel plates and adjacent prefabricated panels form a Waterproof concrete of the same or higher strength level as the prefabricated warehouse wall is poured in the cavity. In the design of the warehouse wall structure, the inner warehouse wall of the underground warehouse is subjected to the lateral pressure of the grain, and the pressure of the grain on the warehouse wall gradually increases along the warehouse wall from top to bottom. Therefore, the thickness of each layer of prefabricated warehouse wall boards should The variable cross-section design can be more reasonable according to the force characteristics, and the construction cost of the warehouse wall can be more economical. The vertical outer sides of the prefabricated warehouse panels are flush, which not only makes it easier for each layer of prefabricated warehouse panels to be welded and positioned with the multi-functional columns, but also the inner side can be adjusted according to the actual stress conditions to meet the reasonable variable cross-section design requirements. The inner and outer sides of the upper and lower adjacent prefabricated warehouse wall panels are welded and connected by connecting steel plates, and waterproof concrete is poured between them, so that the structural design requirements of the upper and lower adjacent prefabricated panels can be met. The waterproofing of the lap joints provides two reliable waterproofing measures.

本发明的特征还在于预制板块内设有单层双向钢筋或钢筋网片。The present invention is also characterized in that a single-layer two-way reinforcement or reinforcement mesh is arranged in the prefabricated plate.

本发明的特征还在于仓底采用双面钢板混凝土组合结构,底板上下钢板与其之间的混凝土采用锚钉连接。这种双面组合结构仓壁中钢板作为仓底板的模板并代替钢筋,节省仓壁的施工费用,降低仓壁的施工难度,加快整体施工速度;双层钢板混凝土组合结构提高了仓壁的刚度和强度,有效抵抗土压力和粮食压力,有利于地下仓向更深更大的方向发张,增大了该仓型的适用范围,且更有利于粮仓防水防潮问题。The present invention is also characterized in that the bottom of the warehouse adopts a double-sided steel plate concrete composite structure, and the upper and lower steel plates on the bottom plate and the concrete between them are connected by anchors. The steel plate in the warehouse wall of this double-sided composite structure is used as the formwork of the warehouse floor and replaces the steel bar, which saves the construction cost of the warehouse wall, reduces the construction difficulty of the warehouse wall, and speeds up the overall construction speed; the double-layer steel plate concrete composite structure improves the rigidity of the warehouse wall. and strength, effectively resisting soil pressure and grain pressure, which is conducive to the expansion of the underground warehouse to a deeper and larger direction, which increases the scope of application of the warehouse type, and is more conducive to the waterproof and moisture-proof problems of the granary.

本发明的特征还在于仓顶板采用混凝土-钢板组合结构。这样,上述结构充分发挥了混凝土的抗压和钢板的抗拉能力,使大跨度仓顶板结构受力更加合理,而且施工时可以用钢板作为模板,极大地降低了施工难度,同时也可加快施工速度。The present invention is also characterized in that the warehouse roof adopts a concrete-steel composite structure. In this way, the above-mentioned structure fully exerts the compressive resistance of concrete and the tensile capacity of steel plates, making the stress of the roof structure of large-span warehouses more reasonable, and steel plates can be used as formwork during construction, which greatly reduces the difficulty of construction and can also speed up construction. speed.

本发明的特征还在于多功能柱采用截面形式为直线或曲线的空心柱或实心柱。The present invention is also characterized in that the multifunctional column adopts a hollow column or a solid column whose section form is a straight line or a curve.

本发明的特征在于施工方法包括以下步骤:(1)根据设计要求在预定位置将多功能柱打入地下一定深度;(2)在多功能柱围成区域内挖除第一层土;(3)在挖除第一层土后,在多功能柱相应位置安装第一层预制外仓壁板,然后安装第一层预制内仓壁板,从而形成第一层双层预制仓壁板。(4)安装好第一层双层预制仓壁板后,继续往下挖除第二层土;(5)在多功能柱相应位置安装第二层预制外仓壁板,然后安装第二层预制内仓壁板,从而形成第二层双层预制仓壁板。(6)按照上述第(4)-(5)步的施工方法,依次向下安装预制双层仓壁板,直到仓底位置;(7)进行仓底施工;(8)最后进行仓顶板和梁的施工,即完成地下粮仓的整体结构。The present invention is characterized in that the construction method includes the following steps: (1) driving the multifunctional column into the ground at a predetermined position according to the design requirements to a certain depth; (2) excavating the first layer of soil in the area surrounded by the multifunctional column; (3) ) After excavating the first layer of soil, install the first layer of prefabricated outer warehouse wall panels at the corresponding positions of the multifunctional columns, and then install the first layer of prefabricated inner warehouse wall panels to form the first layer of double-layer prefabricated warehouse wall panels. (4) After installing the first layer of double-layer prefabricated warehouse wall panels, continue to dig down the second layer of soil; (5) Install the second layer of prefabricated outer warehouse wall panels at the corresponding position of the multi-functional column, and then install the second layer Prefabricated inner silo panels to form a second layer of double-layer prefabricated silo panels. (6) According to the construction method of the above steps (4)-(5), install the prefabricated double-layer warehouse wall panels in sequence until the bottom of the warehouse; (7) carry out the construction of the warehouse bottom; (8) finally carry out the warehouse roof and The construction of the beams is to complete the overall structure of the underground granary.

多功能柱打入地下深度根据地基承载力、浮力、仓壁土压力、粮食侧压力多种因素综合而定,当地基承载力不能满足工程要求时,此时多功能柱可以代替桩承受筒仓传来的竖向压力;另外,多功能柱也可以代替抗拔桩抵抗地下水对筒仓的浮力;多功能柱能对预制仓壁板沿竖向和环向进行定位,保证预制仓壁板每层竖向垂直,环向形成一个圆环,从而使受力更加合理;完成多功能柱施工后,沿高度从上到下分数层进行安装;在安装每层预制仓壁板时,首先挖除高度大于或等于预制仓壁板高度,直径大于或等于仓体外直径的空间,同时保证土体在开挖过程中不塌方,这样才能给预制仓壁板安装留有施工空间,保证仓壁板施工安全顺利进行;当开挖深度在地下水位以下时,要先进行降水,然后进行开挖;安装完每层预制仓壁板后,在仓壁周围土体与预制仓壁板之间注浆,保证在开挖下一层土体时,本层土体不塌方,从而保证下层土开挖时的安全。The depth of the multi-functional column driven into the ground is determined based on various factors such as the foundation bearing capacity, buoyancy, soil pressure on the warehouse wall, and grain side pressure. In addition, the multi-functional column can also replace the uplift pile to resist the buoyancy of the groundwater on the silo; the multi-functional column can position the prefabricated silo wall in the vertical and circumferential directions to ensure that each layer of the prefabricated silo wall It is vertical and vertical, and forms a ring in the circular direction, so that the force bearing is more reasonable; after the construction of the multifunctional column is completed, it is installed in layers from top to bottom along the height; when installing each layer of prefabricated warehouse wall panels, the height The space is greater than or equal to the height of the prefabricated warehouse wall and the diameter is greater than or equal to the outer diameter of the warehouse. At the same time, it is ensured that the soil does not collapse during the excavation process, so as to leave a construction space for the installation of the prefabricated warehouse wall and ensure the safety of the construction of the warehouse wall. It is carried out smoothly; when the excavation depth is below the groundwater level, it is necessary to carry out precipitation first, and then excavate; after installing each layer of prefabricated silo wall panels, grout is injected between the soil around the silo wall and the prefabricated silo wall panels to ensure When the next layer of soil is excavated, the soil of this layer will not collapse, thereby ensuring the safety of the excavation of the lower layer of soil.

每层预制仓壁板安装时,首先将外仓壁板与相邻多功能柱焊接连接,保证预制仓壁板与多功能柱可靠连接,然后将内仓壁板与相邻多功能柱焊接连接,用连接钢板焊接水平相邻内仓壁板,最后在多功能柱、相邻预制内仓壁板以及连接钢板围成的空腔内浇筑与预制内仓壁板相同或高一强度等级的防水混凝土。When installing each layer of prefabricated warehouse wall panels, first weld the outer warehouse wall panels to the adjacent multi-functional columns to ensure the reliable connection between the prefabricated warehouse wall panels and the multi-functional columns, and then weld the inner warehouse wall panels to the adjacent multi-functional columns , use the connecting steel plate to weld the horizontally adjacent inner warehouse wall plate, and finally pour the same or one higher strength level waterproofing as the prefabricated inner warehouse wall plate in the cavity surrounded by the multi-functional column, the adjacent prefabricated inner warehouse wall plate and the connecting steel plate. concrete.

左右相邻水平预制仓壁板安装完毕后进行上下相邻竖向预制外仓壁板的安装:先将内仓壁的预制板块上下竖向外侧对齐,然后用连接钢板在外侧、内侧焊接相邻上下预制板块,最后在外侧、内侧连接钢板以及相邻预制板块围成的空腔内浇筑与预制仓壁板相同或高一强度等级的防水混凝土。上下相邻竖向预制外仓壁板安装完毕后进行上下相邻竖向预制内仓壁板的安装:先将外仓壁的预制板块上下竖向外侧对齐,然后用连接钢板在外侧、内侧焊接相邻上下预制板块,最后在外侧、内侧连接钢板以及相邻预制板块围成的空腔内浇筑与预制仓壁板相同或高一强度等级的防水混凝土。按上述施工方法,从上至下依次开挖土体和安装预制仓壁板,每层仓壁板形成的圆筒仓体结构可作为基坑支护体系,这样,很好地将筒仓仓体结构与基坑支护体系合二为一,不仅节约了单独进行基坑支护所带来的成本,大大降低建设投资,而且大大缩短了整个工程的建设周期。After the left and right adjacent horizontal prefabricated wall panels are installed, install the vertically adjacent vertical prefabricated outer wall panels: first align the prefabricated panels of the inner wall vertically and outwardly, and then weld the adjacent steel panels on the outer and inner sides with connecting steel plates. The upper and lower prefabricated slabs are finally poured in the cavity surrounded by the outer and inner connecting steel plates and adjacent prefabricated slabs with the same or a higher strength level as the prefabricated warehouse wall. After the upper and lower adjacent vertical prefabricated outer warehouse wall panels are installed, install the upper and lower adjacent vertical prefabricated inner warehouse wall panels: first align the upper and lower vertical and outer sides of the prefabricated panels of the outer warehouse wall, and then weld them on the outer and inner sides with connecting steel plates Adjacent to the upper and lower prefabricated panels, finally pour waterproof concrete of the same or higher strength level as the prefabricated warehouse wall panels in the cavity surrounded by the outer and inner connecting steel plates and adjacent prefabricated panels. According to the above construction method, the soil body is excavated and the prefabricated silo wall panels are installed sequentially from top to bottom. The cylindrical silo body structure formed by each layer of silo wall panels can be used as the foundation pit support system. The combination of the body structure and the foundation pit support system not only saves the cost of foundation pit support alone, greatly reduces the construction investment, but also greatly shortens the construction period of the entire project.

附图说明Description of drawings

图1 地下仓平面布置图Figure 1 Floor plan of the underground warehouse

图2 地下仓剖面布置图Figure 2 Sectional layout of the underground warehouse

图3 单块预制仓壁板截面示意图Figure 3 Schematic diagram of the section of a single prefabricated warehouse wall panel

图4 第一段预制混凝土板平面布置示意图Figure 4 Schematic diagram of the layout of the first precast concrete slab

图5 第二段及以下各段预制混凝土板平面布置示意图Figure 5 Schematic diagram of the layout of precast concrete slabs in the second section and the following sections

图6 第一种仓壁节点示意图Figure 6 Schematic diagram of the first warehouse wall node

图7 第二种仓壁节点示意图Figure 7 Schematic diagram of the second warehouse wall node

附图中:1为多功能柱;2为外仓壁;3为内仓壁;4为仓顶;5为仓底;6为连接钢板;10为进出粮口;12为防水混凝土;13为内侧钢板;14为带凹槽环梁。In the accompanying drawings: 1 is a multifunctional column; 2 is an outer warehouse wall; 3 is an inner warehouse wall; 4 is a warehouse roof; 5 is a warehouse bottom; 6 is a connecting steel plate; Inner steel plate; 14 is a grooved ring beam.

具体实施方式Detailed ways

下面结合附图和实施例对本发明作进一步的说明。The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

实施例一Embodiment one

如图1、图2、图3、图4、图6所示:本实施例提供了一种双层装配式地下粮仓。包括仓底5、外仓壁2、内仓壁3、仓顶4和多功能柱1;所述的内仓壁3和外仓壁2为均由多块预制板块拼接而成,预制板块周边有连接装置,通过连接装置预制板块能与相邻预制板块以及多功能柱1进行连接;所述多功能柱1对仓壁进行定位。外仓壁2与内仓壁3之间用多功能柱1连接成整体,形成立体的空间结构,共同承担土压力、粮食侧压力和浮力;在外仓壁2、内仓壁3和多功能柱5围成的空隙内供通风和漏水检查通道;多功能柱1从上至下分成数段,最上层的第一段内侧设有第一层仓壁板3,第二段内侧设有第二层仓壁板3,用上述的设置方式,直到最下面一层仓壁板3,形成双层装配式地下粮仓。As shown in Fig. 1, Fig. 2, Fig. 3, Fig. 4 and Fig. 6: this embodiment provides a double-layer assembled underground granary. It includes a warehouse bottom 5, an outer warehouse wall 2, an inner warehouse wall 3, a warehouse roof 4 and a multifunctional column 1; the inner warehouse wall 3 and the outer warehouse wall 2 are all spliced by a plurality of prefabricated panels, and the surrounding areas of the prefabricated panels are There is a connecting device, through which the prefabricated panels can be connected with the adjacent prefabricated panels and the multifunctional column 1; the multifunctional column 1 positions the warehouse wall. The outer warehouse wall 2 and the inner warehouse wall 3 are connected as a whole with a multifunctional column 1 to form a three-dimensional space structure, which jointly bears the earth pressure, grain side pressure and buoyancy; the outer warehouse wall 2, the inner warehouse wall 3 and the multifunctional column 5 provides ventilation and water leakage inspection channels in the gap; the multi-functional column 1 is divided into several sections from top to bottom, and the inner side of the first section of the uppermost layer is provided with the first layer of warehouse wall panels 3, and the inner side of the second section is provided with the second Layer storehouse wallboard 3, with above-mentioned arrangement mode, until the bottom storehouse wallplate 3, forms double-deck prefabricated underground granary.

所述多功能柱1采用钢柱或设有钢埋件的混凝土柱。The multifunctional column 1 is a steel column or a concrete column provided with steel embedded parts.

所述内仓壁3或外仓壁2为内侧钢板13和外侧混凝土板结合成整体的结构,内侧钢板13与混凝土采用锚钉连接。The inner warehouse wall 3 or the outer warehouse wall 2 is a structure in which the inner steel plate 13 and the outer concrete plate are integrated, and the inner steel plate 13 and the concrete are connected by anchors.

拼接成外仓壁2的所述预制板块环向水平外侧平齐,其外侧直接与多功能柱1焊接连接。拼接成外仓壁2的所述预制板块上下竖向外侧对齐,相邻上下预制板块的外侧、内侧均用连接钢板6焊接;在外侧、内侧连接钢板6以及相邻预制板块围成的空腔内浇筑与预制仓壁板3相同或高一强度等级的防水混凝土12。The prefabricated panels spliced to form the outer warehouse wall 2 are flush to the horizontal outer side, and the outer side is directly welded to the multifunctional column 1 . The prefabricated panels spliced into the outer warehouse wall 2 are aligned vertically and outwardly, and the outer and inner sides of the adjacent upper and lower prefabricated panels are welded with connecting steel plates 6; the cavity surrounded by the connecting steel plates 6 and adjacent prefabricated panels Waterproof concrete 12 that is the same as or higher than the strength grade of the prefabricated warehouse wall panel 3 is poured in.

拼接成内仓壁3的所述预制板块环向水平外侧平齐,其外侧直接与多功能柱1焊接连接,左右相邻预制板块内侧用连接钢板6焊接,在多功能柱1、相邻预制板块以及连接钢板6围成的空腔内浇筑与预制仓壁板3相同或高一强度等级的防水混凝土12。拼接成内仓壁3的所述预制板块上下竖向外侧对齐,相邻上下预制板块的外侧、内侧均用连接钢板6焊接;在外侧、内侧连接钢板6以及相邻预制板块围成的空腔内浇筑与预制仓壁板3相同或高一强度等级的防水混凝土12。The prefabricated panels spliced into the inner warehouse wall 3 are flush to the horizontal outer side, and the outer side is directly welded to the multifunctional column 1, and the inner side of the left and right adjacent prefabricated panels is welded with the connecting steel plate 6, and the multifunctional column 1, the adjacent prefabricated Waterproof concrete 12 that is the same as or one strength level higher than the prefabricated warehouse wall panel 3 is poured in the cavity surrounded by the plate and the connecting steel plate 6 . The prefabricated panels spliced into the inner warehouse wall 3 are aligned vertically and outwardly, and the outer and inner sides of the adjacent upper and lower prefabricated panels are welded with connecting steel plates 6; the cavity surrounded by the connecting steel plates 6 and adjacent prefabricated panels Waterproof concrete 12 that is the same as or higher than the strength grade of the prefabricated warehouse wall panel 3 is poured in.

实施例二Embodiment two

如图1和图2所示:本实施例提供了一种双层装配式地下粮仓。包括仓底5、外仓壁2、内仓壁3、仓顶4和多功能柱1;所述的内仓壁3和外仓壁2为均由多块预制板块拼接而成,预制板块周边有连接装置,通过连接装置预制板块能与相邻预制板块以及多功能柱1进行连接;所述多功能柱1对仓壁进行定位。外仓壁2与内仓壁3之间用多功能柱1连接成整体,形成立体的空间结构,共同承担土压力、粮食侧压力和浮力;在外仓壁2、内仓壁3和多功能柱5围成的空隙内供通风和漏水检查通道;多功能柱1从上至下分成数段,最上层的第一段内侧设有第一层仓壁板3,第二段内侧设有第二层仓壁板3,用上述的设置方式,直到最下面一层仓壁板3,形成双层装配式地下粮仓。As shown in Figure 1 and Figure 2: this embodiment provides a double-layer assembled underground granary. It includes a warehouse bottom 5, an outer warehouse wall 2, an inner warehouse wall 3, a warehouse roof 4 and a multifunctional column 1; the inner warehouse wall 3 and the outer warehouse wall 2 are all spliced by a plurality of prefabricated panels, and the surrounding areas of the prefabricated panels are There is a connecting device, through which the prefabricated panels can be connected with the adjacent prefabricated panels and the multifunctional column 1; the multifunctional column 1 positions the warehouse wall. The outer warehouse wall 2 and the inner warehouse wall 3 are connected as a whole with a multifunctional column 1 to form a three-dimensional space structure, which jointly bears the earth pressure, grain side pressure and buoyancy; the outer warehouse wall 2, the inner warehouse wall 3 and the multifunctional column 5 provides ventilation and water leakage inspection channels in the gap; the multi-functional column 1 is divided into several sections from top to bottom, and the inner side of the first section of the uppermost layer is provided with the first layer of warehouse wall panels 3, and the inner side of the second section is provided with the second Layer storehouse wallboard 3, with above-mentioned arrangement mode, until the bottom storehouse wallplate 3, forms double-deck prefabricated underground granary.

所述仓底5为锥形结构,所述仓底5采用双面钢板混凝土组合结构。这种钢板混凝土组合结构中钢板作为仓底板的模板并代替钢筋,不需要在施工时铺设钢筋,节省仓壁的施工费用,降低仓底的施工难度,加快整体施工速度;双层钢板混凝土组合结构提高了仓壁的刚度和强度,有效抵抗土压力和粮食压力,有利于地下粮仓向更深更大的方向发展,增大了该仓型的适用范围,且更有利于粮仓防水防潮问题。The warehouse bottom 5 is a conical structure, and the warehouse bottom 5 adopts a double-sided steel plate concrete composite structure. In this steel plate concrete composite structure, the steel plate is used as the formwork of the warehouse floor and replaces the steel bars. It does not need to lay steel bars during construction, which saves the construction cost of the warehouse wall, reduces the construction difficulty of the warehouse bottom, and speeds up the overall construction speed; the double-layer steel plate concrete composite structure It improves the stiffness and strength of the silo wall, effectively resists earth pressure and grain pressure, and is conducive to the development of underground granaries in a deeper and larger direction, which increases the scope of application of this type of silo, and is more conducive to the waterproof and moisture-proof problems of the granary.

所述仓顶4采用双面钢板混凝土组合结构,所述仓顶4设置进出粮口10,所述仓顶4上方设置覆土11。双面钢板混凝土组合结构结构充分发挥了混凝土的抗压和钢板的抗拉能力,使大跨度仓顶板结构受力更加合理,而且施工时可以用钢板作为模板,极大地降低了施工难度,同时也可加快施工速度。进出粮口设置现代化进出粮设备,便于粮食的存放和提取。The warehouse roof 4 adopts a double-sided steel plate concrete composite structure, the warehouse roof 4 is provided with a grain inlet and outlet 10, and the warehouse roof 4 is provided with a covering soil 11. The double-sided steel plate concrete composite structure fully exerts the compressive resistance of concrete and the tensile capacity of steel plates, making the stress of the roof structure of large-span warehouses more reasonable, and the steel plates can be used as formwork during construction, which greatly reduces the difficulty of construction and at the same time It can speed up the construction speed. The entrance and exit of grain are equipped with modern grain entry and exit equipment to facilitate the storage and extraction of grain.

所述地下粮仓可以实现固态颗粒、粉末物料或液态物料的存储。该地下粮仓密封性和支撑性很好,也可以实现对粉末、液态物料的存储,配合不同的进料和出料设备,应用十分广泛。The underground granary can realize the storage of solid particles, powder materials or liquid materials. The underground granary has good airtightness and support, and can also realize the storage of powder and liquid materials. With different feeding and discharging equipment, it is widely used.

实施例三Embodiment three

本实施例还提供了一种双层装配式地下粮仓的施工方法,包括如下步骤:This embodiment also provides a construction method for a double-deck fabricated underground granary, comprising the following steps:

1)根据设计要求在预定位置将多功能柱1打入地下一定深度;1) Drive the multifunctional column 1 into the ground to a certain depth at a predetermined position according to the design requirements;

2)在多功能柱1围成区域内挖除第一层土;2) Excavating the first layer of soil in the area surrounded by the multifunctional column 1;

3)在挖除第一层土后,在多功能柱1相应位置安装第一层预制外仓壁板2,然后安装第一层预制内仓壁板3,从而形成第一层双层预制仓壁板。3) After excavating the first layer of soil, install the first layer of prefabricated outer warehouse wall panel 2 at the corresponding position of the multifunctional column 1, and then install the first layer of prefabricated inner warehouse wall panel 3, thereby forming the first layer of double-layer prefabricated warehouse Siding.

4)安装好第一层双层预制仓壁板后,继续往下挖除第二层土;4) After installing the first layer of double-layer prefabricated warehouse wall panels, continue to dig down the second layer of soil;

5)在多功能柱1相应位置安装第二层预制外仓壁板2,然后安装第二层预制内仓壁板3,从而形成第二层双层预制仓壁板。5) Install the second layer of prefabricated outer warehouse wall panels 2 at the corresponding positions of the multifunctional column 1, and then install the second layer of prefabricated inner warehouse wall panels 3, thereby forming a second layer of double-layer prefabricated warehouse wall panels.

6)按照上述第4)-5)步的施工方法,依次向下安装预制双层仓壁板,直到仓底位置;6) According to the construction method of steps 4)-5) above, install the prefabricated double-layer warehouse wall panels downward in sequence until the bottom of the warehouse;

7)进行仓底5施工;7) Carry out the construction of the warehouse bottom 5;

8)最后进行仓顶板4和梁的施工,即完成地下粮仓的整体结构。8) Finally, the construction of the warehouse roof 4 and the beams is carried out, that is, the overall structure of the underground granary is completed.

多功能柱打入地下深度根据地基承载力、浮力、仓壁土压力、粮食侧压力多种因素综合而定,当地基承载力不能满足工程要求时,此时多功能柱可以代替桩承受筒仓传来的竖向压力;另外,多功能柱也可以代替抗拔桩抵抗地下水对筒仓的浮力;多功能柱能对预制仓壁板沿竖向和环向进行定位,保证预制仓壁板每层竖向垂直,环向形成一个圆环,从而使受力更加合理;完成多功能柱施工后,沿高度从上到下分数层进行安装;在安装每层预制仓壁板时,首先挖除高度大于或等于预制仓壁板高度,直径大于或等于仓体外直径的空间,同时保证土体在开挖过程中不塌方,这样才能给预制仓壁板安装留有施工空间,保证仓壁板施工安全顺利进行;当开挖深度在地下水位以下时,要先进行降水,然后进行开挖;安装完每层预制仓壁板后,在仓壁周围土体与预制仓壁板之间注浆,保证在开挖下一层土体时,本层土体不塌方,从而保证下层土开挖时的安全。The depth of the multi-functional column driven into the ground is determined based on various factors such as the foundation bearing capacity, buoyancy, soil pressure on the warehouse wall, and grain side pressure. In addition, the multi-functional column can also replace the uplift pile to resist the buoyancy of the groundwater on the silo; the multi-functional column can position the prefabricated silo wall in the vertical and circumferential directions to ensure that each layer of the prefabricated silo wall It is vertical and vertical, and forms a ring in the circular direction, so that the force bearing is more reasonable; after the construction of the multifunctional column is completed, it is installed in layers from top to bottom along the height; when installing each layer of prefabricated warehouse wall panels, the height The space is greater than or equal to the height of the prefabricated warehouse wall and the diameter is greater than or equal to the outer diameter of the warehouse. At the same time, it is ensured that the soil does not collapse during the excavation process, so as to leave a construction space for the installation of the prefabricated warehouse wall and ensure the safety of the construction of the warehouse wall. It is carried out smoothly; when the excavation depth is below the groundwater level, it is necessary to carry out precipitation first, and then excavate; after installing each layer of prefabricated silo wall panels, grout is injected between the soil around the silo wall and the prefabricated silo wall panels to ensure When the next layer of soil is excavated, the soil of this layer will not collapse, thereby ensuring the safety of the excavation of the lower layer of soil.

每层预制仓壁板安装时,首先将外仓壁板与相邻多功能柱焊接连接,保证预制仓壁板与多功能柱可靠连接,然后将内仓壁板与相邻多功能柱焊接连接,用连接钢板焊接水平相邻内仓壁板,最后在多功能柱、相邻预制内仓壁板以及连接钢板围成的空腔内浇筑与预制内仓壁板相同或高一强度等级的防水混凝土。When installing each layer of prefabricated warehouse wall panels, first weld the outer warehouse wall panels to the adjacent multi-functional columns to ensure the reliable connection between the prefabricated warehouse wall panels and the multi-functional columns, and then weld the inner warehouse wall panels to the adjacent multi-functional columns , use the connecting steel plate to weld the horizontally adjacent inner warehouse wall plate, and finally pour the same or one higher strength level waterproofing as the prefabricated inner warehouse wall plate in the cavity surrounded by the multi-functional column, the adjacent prefabricated inner warehouse wall plate and the connecting steel plate. concrete.

左右相邻水平预制仓壁板安装完毕后进行上下相邻竖向预制外仓壁板的安装:先将内仓壁的预制板块上下竖向外侧对齐,然后用连接钢板在外侧、内侧焊接相邻上下预制板块,最后在外侧、内侧连接钢板以及相邻预制板块围成的空腔内浇筑与预制仓壁板相同或高一强度等级的防水混凝土。上下相邻竖向预制外仓壁板安装完毕后进行上下相邻竖向预制内仓壁板的安装:先将外仓壁的预制板块上下竖向外侧对齐,然后用连接钢板在外侧、内侧焊接相邻上下预制板块,最后在外侧、内侧连接钢板以及相邻预制板块围成的空腔内浇筑与预制仓壁板相同或高一强度等级的防水混凝土。按上述施工方法,从上至下依次开挖土体和安装预制仓壁板,每层仓壁板形成的圆筒仓体结构可作为基坑支护体系,这样,很好地将筒仓仓体结构与基坑支护体系合二为一,不仅节约了单独进行基坑支护所带来的成本,大大降低建设投资,而且大大缩短了整个工程的建设周期。After the left and right adjacent horizontal prefabricated wall panels are installed, install the vertically adjacent vertical prefabricated outer wall panels: first align the prefabricated panels of the inner wall vertically and outwardly, and then weld the adjacent steel panels on the outer and inner sides with connecting steel plates. The upper and lower prefabricated slabs are finally poured in the cavity surrounded by the outer and inner connecting steel plates and adjacent prefabricated slabs with the same or a higher strength level as the prefabricated warehouse wall. After the upper and lower adjacent vertical prefabricated outer warehouse wall panels are installed, install the upper and lower adjacent vertical prefabricated inner warehouse wall panels: first align the upper and lower vertical and outer sides of the prefabricated panels of the outer warehouse wall, and then weld them on the outer and inner sides with connecting steel plates Adjacent to the upper and lower prefabricated panels, finally pour waterproof concrete of the same or higher strength level as the prefabricated warehouse wall panels in the cavity surrounded by the outer and inner connecting steel plates and adjacent prefabricated panels. According to the above construction method, the soil body is excavated and the prefabricated silo wall panels are installed sequentially from top to bottom. The cylindrical silo body structure formed by each layer of silo wall panels can be used as the foundation pit support system. The combination of the body structure and the foundation pit support system not only saves the cost of foundation pit support alone, greatly reduces the construction investment, but also greatly shortens the construction period of the entire project.

实施例四Embodiment four

如图1和图2所示:本实施例提供了一种双层装配式地下粮仓。包括仓底5、外仓壁2、内仓壁3、仓顶4和多功能柱1;所述的内仓壁3和外仓壁2为均由多块预制板块拼接而成,预制板块周边有连接装置,通过连接装置预制板块能与相邻预制板块以及多功能柱1进行连接;所述多功能柱1对仓壁进行定位。外仓壁2与内仓壁3之间用多功能柱1连接成整体,形成立体的空间结构,共同承担土压力、粮食侧压力和浮力;在外仓壁2、内仓壁3和多功能柱5围成的空隙内供通风和漏水检查通道;多功能柱1从上至下分成数段,最上层的第一段内侧设有第一层仓壁板3,第二段内侧设有第二层仓壁板3,用上述的设置方式,直到最下面一层仓壁板3,形成双层装配式地下粮仓。As shown in Figure 1 and Figure 2: this embodiment provides a double-layer assembled underground granary. It includes a warehouse bottom 5, an outer warehouse wall 2, an inner warehouse wall 3, a warehouse roof 4 and a multifunctional column 1; the inner warehouse wall 3 and the outer warehouse wall 2 are all spliced by a plurality of prefabricated panels, and the surrounding areas of the prefabricated panels are There is a connecting device, through which the prefabricated panels can be connected with the adjacent prefabricated panels and the multifunctional column 1; the multifunctional column 1 positions the warehouse wall. The outer warehouse wall 2 and the inner warehouse wall 3 are connected as a whole with a multifunctional column 1 to form a three-dimensional space structure, which jointly bears the earth pressure, grain side pressure and buoyancy; the outer warehouse wall 2, the inner warehouse wall 3 and the multifunctional column 5 provides ventilation and water leakage inspection channels in the gap; the multi-functional column 1 is divided into several sections from top to bottom, and the inner side of the first section of the uppermost layer is provided with the first layer of warehouse wall panels 3, and the inner side of the second section is provided with the second Layer storehouse wallboard 3, with above-mentioned arrangement mode, until the bottom storehouse wallplate 3, forms double-deck prefabricated underground granary.

所述仓壁板3外表面喷涂护面涂料,所述护面涂料包括如下重量份的材料制成:石油沥青115份,玻璃纤维7份,膨润土8份,乳化剂6份,分散剂1.5份,稳定剂1.5份,有机氟改性苯丙乳液25份、抗冻剂2.5份。The outer surface of the warehouse wall 3 is sprayed with a protective coating, and the protective coating includes the following materials in parts by weight: 115 parts of petroleum asphalt, 7 parts of glass fiber, 8 parts of bentonite, 6 parts of emulsifier, and 1.5 parts of dispersant , 1.5 parts of stabilizer, 25 parts of organic fluorine modified styrene-acrylic emulsion, 2.5 parts of antifreeze.

所述乳化剂采用氢化牛脂胺,所述分散剂采用硬脂酸单甘油酯,所述稳定剂采用硫酸盐,所述抗冻剂采用乙二醇。The emulsifier adopts hydrogenated tallow amine, the dispersant adopts monoglyceride stearate, the stabilizer adopts sulfate, and the antifreeze agent adopts ethylene glycol.

实施例五Embodiment five

如图1和图2所示:本实施例提供了一种双层装配式地下粮仓。包括仓底5、外仓壁2、内仓壁3、仓顶4和多功能柱1;所述的内仓壁3和外仓壁2为均由多块预制板块拼接而成,预制板块周边有连接装置,通过连接装置预制板块能与相邻预制板块以及多功能柱1进行连接;所述多功能柱1对仓壁进行定位。外仓壁2与内仓壁3之间用多功能柱1连接成整体,形成立体的空间结构,共同承担土压力、粮食侧压力和浮力;在外仓壁2、内仓壁3和多功能柱5围成的空隙内供通风和漏水检查通道;多功能柱1从上至下分成数段,最上层的第一段内侧设有第一层仓壁板3,第二段内侧设有第二层仓壁板3,用上述的设置方式,直到最下面一层仓壁板3,形成双层装配式地下粮仓。As shown in Figure 1 and Figure 2: this embodiment provides a double-layer assembled underground granary. It includes a warehouse bottom 5, an outer warehouse wall 2, an inner warehouse wall 3, a warehouse roof 4 and a multifunctional column 1; the inner warehouse wall 3 and the outer warehouse wall 2 are all spliced by a plurality of prefabricated panels, and the surrounding areas of the prefabricated panels are There is a connecting device, through which the prefabricated panels can be connected with the adjacent prefabricated panels and the multifunctional column 1; the multifunctional column 1 positions the warehouse wall. The outer warehouse wall 2 and the inner warehouse wall 3 are connected as a whole with a multifunctional column 1 to form a three-dimensional space structure, which jointly bears the earth pressure, grain side pressure and buoyancy; the outer warehouse wall 2, the inner warehouse wall 3 and the multifunctional column 5 provides ventilation and water leakage inspection channels in the gap; the multi-functional column 1 is divided into several sections from top to bottom, and the inner side of the first section of the uppermost layer is provided with the first layer of warehouse wall panels 3, and the inner side of the second section is provided with the second Layer storehouse wallboard 3, with above-mentioned arrangement mode, until the bottom storehouse wallplate 3, forms double-deck prefabricated underground granary.

所述仓壁板5外表面喷涂护面涂料,所述护面涂料包括如下重量份的材料制成:石油沥青110份,玻璃纤维10份,膨润土9份,乳化剂7.5份,分散剂2份,稳定剂2份,有机氟改性苯丙乳液30份、抗冻剂3份。The outer surface of the warehouse wall 5 is sprayed with a protective coating, and the protective coating includes the following materials in parts by weight: 110 parts of petroleum asphalt, 10 parts of glass fiber, 9 parts of bentonite, 7.5 parts of emulsifier, and 2 parts of dispersant , 2 parts of stabilizer, 30 parts of organic fluorine modified styrene-acrylic emulsion, 3 parts of antifreeze.

所述乳化剂采用氢化牛脂胺,所述分散剂采用硬脂酸单甘油酯,所述稳定剂采用硫酸盐,所述抗冻剂采用乙二醇。The emulsifier adopts hydrogenated tallow amine, the dispersant adopts monoglyceride stearate, the stabilizer adopts sulfate, and the antifreeze agent adopts ethylene glycol.

实施例六Embodiment six

如图1和图2所示:本实施例提供了一种双层装配式地下粮仓。包括仓底5、外仓壁2、内仓壁3、仓顶4和多功能柱1;所述的内仓壁3和外仓壁2为均由多块预制板块拼接而成,预制板块周边有连接装置,通过连接装置预制板块能与相邻预制板块以及多功能柱1进行连接;所述多功能柱1对仓壁进行定位。外仓壁2与内仓壁3之间用多功能柱1连接成整体,形成立体的空间结构,共同承担土压力、粮食侧压力和浮力;在外仓壁2、内仓壁3和多功能柱5围成的空隙内供通风和漏水检查通道;多功能柱1从上至下分成数段,最上层的第一段内侧设有第一层仓壁板3,第二段内侧设有第二层仓壁板3,用上述的设置方式,直到最下面一层仓壁板3,形成双层装配式地下粮仓。As shown in Figure 1 and Figure 2: this embodiment provides a double-layer assembled underground granary. It includes a warehouse bottom 5, an outer warehouse wall 2, an inner warehouse wall 3, a warehouse roof 4 and a multifunctional column 1; the inner warehouse wall 3 and the outer warehouse wall 2 are all spliced by a plurality of prefabricated panels, and the surrounding areas of the prefabricated panels are There is a connecting device, through which the prefabricated panels can be connected with the adjacent prefabricated panels and the multifunctional column 1; the multifunctional column 1 positions the warehouse wall. The outer warehouse wall 2 and the inner warehouse wall 3 are connected as a whole with a multifunctional column 1 to form a three-dimensional space structure, which jointly bears the earth pressure, grain side pressure and buoyancy; the outer warehouse wall 2, the inner warehouse wall 3 and the multifunctional column 5 provides ventilation and water leakage inspection channels in the gap; the multi-functional column 1 is divided into several sections from top to bottom, and the inner side of the first section of the uppermost layer is provided with the first layer of warehouse wall panels 3, and the inner side of the second section is provided with the second Layer storehouse wallboard 3, with above-mentioned arrangement mode, until the bottom storehouse wallplate 3, forms double-deck prefabricated underground granary.

所述仓壁板5外表面喷涂护面涂料,所述护面涂料包括如下重量份的材料制成:石油沥青105份,玻璃纤维13份,膨润土10份,乳化剂9份,分散剂2.5份,稳定剂2.5份,有机氟改性苯丙乳液35份、抗冻剂3.5份。The outer surface of the warehouse wall 5 is sprayed with protective paint, and the protective paint includes the following materials in parts by weight: 105 parts of petroleum asphalt, 13 parts of glass fiber, 10 parts of bentonite, 9 parts of emulsifier, and 2.5 parts of dispersant , 2.5 parts of stabilizer, 35 parts of organic fluorine modified styrene-acrylic emulsion, 3.5 parts of antifreeze.

所述乳化剂采用氢化牛脂胺,所述分散剂采用硬脂酸单甘油酯,所述稳定剂采用硫酸盐,所述抗冻剂采用乙二醇。The emulsifier adopts hydrogenated tallow amine, the dispersant adopts monoglyceride stearate, the stabilizer adopts sulfate, and the antifreeze agent adopts ethylene glycol.

实施例四至六提供了仓壁板外表面专用护面涂料,对仓壁板起到保护、防腐的作用,对仓壁起到防渗、密封的作用,可以在仓壁板预制时喷涂或在现场组装仓壁时喷涂,从根本上解决了边角、缝隙、不规则结构的连接处渗漏等技术难题,增强了地下粮仓的防水性能。护面涂料中加入了玻璃纤维,大大增加了涂料的韧性以及抗拉强度,延缓了涂层开裂的时间,增加其使用寿命,且对于仓壁也具有一定的支撑作用。加入的防冻剂可以减小低温对护面涂料的损坏,保证了寒冷地区冬季地下粮仓的安全运行。Embodiments 4 to 6 provide special protective coatings for the outer surface of the warehouse wall, which can protect the warehouse wall from corrosion and prevent seepage and seal the warehouse wall. It can be sprayed when the warehouse wall is prefabricated or in the Spraying when assembling the warehouse wall on site fundamentally solves technical problems such as corners, gaps, and joints with irregular structures such as leakage, and enhances the waterproof performance of the underground granary. Glass fiber is added to the protective coating, which greatly increases the toughness and tensile strength of the coating, delays the cracking time of the coating, increases its service life, and also has a certain supporting effect on the warehouse wall. The added antifreeze can reduce the damage of low temperature to the protective coating and ensure the safe operation of the underground granary in winter in cold regions.

最后说明的是,以上实施例仅用以说明本发明的技术方案而非限制,本领域普通技术人员对本发明的技术方案所做的其他修改或者等同替换,只要不脱离本发明技术方案的精神和范围,均应涵盖在本发明的权利要求范围当中。Finally, it is noted that the above embodiments are only used to illustrate the technical solution of the present invention and not to limit it. Those of ordinary skill in the art may make other modifications or equivalent replacements to the technical solution of the present invention, as long as they do not depart from the spirit and spirit of the technical solution of the present invention. All should be included in the scope of the claims of the present invention.

Claims (9)

1. a kind of bilayer assembled underground granary, which includes orlop (5), outer bulkhead (2), inner barn wall (3), silo roof (4) and multiple function (1);The inner barn wall (3) and outer bulkhead (2) is to be spliced by polylith prefabricated chunk, prefabricated board There is attachment device on block periphery, can be attached with contiguous prefabricated plate and multiple function (1) by attachment device prefabricated chunk; The multiple function (1) positions bulkhead, and the depth anchored into soil is more than orlop (5) depth, is subject to soil pressure, grain It eats pressure and resists the main bearing member of buoyancy;It is characterized in that:Multiple function is used between outer bulkhead (2) and inner barn wall (3) (1) connection is integral, forms three-dimensional space structure, shared soil pressure, grain lateral pressure and buoyancy;Outer bulkhead (2), For ventilation and leakage inspection channel in the gap that inner barn wall (3) and multiple function (1) surround;Multiple function (1) divides from top to bottom At several sections, it is equipped with first layer inner barn wall (3) plate and outer bulkhead (2) plate on the inside of the first segment of top layer, the is equipped on the inside of second segment Two layers of inner barn wall (3) plate and outer bulkhead (2) plate, with above-mentioned set-up mode, until bottom one layer of inner barn wall (3) plate and outer storehouse Wall (2) plate forms the double-deck assembled underground granary.
2. underground granary as described in claim 1, it is characterised in that:The multiple function (1) is buried using steel column or equipped with steel The concrete column of part.
3. underground granary as described in claim 1, it is characterised in that:The inner barn wall (3) or outer bulkhead (2) are inside steel plate (13) and outside concrete slab combines integral structure, inside steel plate (13) to be connect using holdfast with concrete.
4. underground granary as described in claim 1, it is characterised in that:It is spliced into the described pre- of inner barn wall (3) and outer bulkhead (2) There is U-shaped steel plate cornerite on four sides of making sheet block.
5. underground granary as claimed in claim 4, it is characterised in that:The prefabricated chunk for being spliced into outer bulkhead (2) is circumferential Horizontal outer side is concordant, and outside is directly welded to connect with multiple function (1).
6. underground granary as claimed in claim 4, it is characterised in that:It is spliced into the prefabricated chunk of outer bulkhead (2) or more Vertical outboard alignment, the outside, inside of adjacent prefabricated chunk up and down use junction steel plate (6) to weld;On the outside, inside connects steel The anti-of identical as prefabricated outer bulkhead (2) plate or high strength grade is poured in the cavity that plate (6) and contiguous prefabricated plate surround Water coagulation soil (12).
7. underground granary as claimed in claim 4, it is characterised in that:The prefabricated chunk for being spliced into inner barn wall (3) is circumferential Horizontal outer side is concordant, and outside is directly welded to connect with multiple function (1), the contiguous prefabricated plate inside junction steel plate in left and right (6) it welds, is poured and prefabricated inner barn wall in the cavity that multiple function (1), contiguous prefabricated plate and junction steel plate (6) surround (3) plate is identical or the water-proof concrete (12) of a high strength grade.
8. underground granary as claimed in claim 4, it is characterised in that:It is spliced into the prefabricated chunk of inner barn wall (3) or more Vertical outboard alignment, the outside, inside of adjacent prefabricated chunk up and down use junction steel plate (6) to weld;On the outside, inside connects steel The anti-of identical as prefabricated inner barn wall (3) plate or high strength grade is poured in the cavity that plate (6) and contiguous prefabricated plate surround Water coagulation soil (12).
9. a kind of construction method for building the underground granary described in the claims 1-8 any one, it is characterised in that:It is described Construction method includes the following steps:
(1) multiple function (1) is driven underground by certain depth in precalculated position according to design requirement;
(2) it is surrounded in multiple function (1) and excavates first layer soil in region;
(3) after excavating first layer soil, prefabricated outer bulkhead (2) plate of first layer is installed in multiple function (1) corresponding position, is then pacified The prefabricated inner barn wall of first layer (3) plate is filled, to form the double-deck prefabricated bulkhead plate of first layer.
(4) after installing the double-deck prefabricated bulkhead plate of first layer, second layer soil is excavated in continuation down;
(5) prefabricated outer bulkhead (2) plate of the second layer is installed in multiple function (1) corresponding position, then the prefabricated interior storehouse of the second layer is installed Wall (3) plate, to form the double-deck prefabricated bulkhead plate of the second layer;
(6) according to the construction method of above-mentioned (4)-(5) step, the prefabricated double-deck bulkhead plate is installed downwards successively, until orlop position;
(7) orlop (5) is carried out to construct;
(8) construction for finally carrying out silo roof (4) and beam, that is, complete the overall structure of underground granary.
CN201610525750.XA 2016-06-29 2016-06-29 A kind of bilayer assembled underground granary Active CN106088758B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610525750.XA CN106088758B (en) 2016-06-29 2016-06-29 A kind of bilayer assembled underground granary

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610525750.XA CN106088758B (en) 2016-06-29 2016-06-29 A kind of bilayer assembled underground granary

Publications (2)

Publication Number Publication Date
CN106088758A CN106088758A (en) 2016-11-09
CN106088758B true CN106088758B (en) 2018-09-28

Family

ID=57212882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610525750.XA Active CN106088758B (en) 2016-06-29 2016-06-29 A kind of bilayer assembled underground granary

Country Status (1)

Country Link
CN (1) CN106088758B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107543647B (en) * 2017-09-05 2023-09-22 国家能源集团科学技术研究院有限公司 Device and method for measuring lateral pressure of solid particle material on silo wall
CN108266037B (en) * 2018-03-26 2023-05-09 郑州航空工业管理学院 Vibration-absorbing and shock-insulating silo
CN110424805B (en) * 2019-08-15 2024-08-16 深圳大学 Light UHPC-grid concrete sandwich composite impermeable easy-repair water storage tank

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1090618A (en) * 1993-02-02 1994-08-10 侯殿新 Soil-free assembling granary
CN2383913Y (en) * 1999-07-13 2000-06-21 孙志祥 Barn
CN2372399Y (en) * 1999-07-23 2000-04-05 吉林省德惠市德惠粮食经贸有限责任公司 Prefabricatd panels and blocks combined bulk storage bin
CN101709604A (en) * 2009-10-29 2010-05-19 郑州粮油食品工程建筑设计院 Rectangular underground granary
CN101709603A (en) * 2009-10-29 2010-05-19 河南工业大学 Underground barn with cavity barn wall
FR3011023B1 (en) * 2013-09-25 2016-03-18 Vermeulen Materiaux EQUIPMENT FOR CARRYING OUT A REMOVABLE COVER STORAGE BUILDING
CN206438511U (en) * 2016-06-29 2017-08-25 河南工业大学 A kind of double-deck assembled underground granary

Also Published As

Publication number Publication date
CN106088758A (en) 2016-11-09

Similar Documents

Publication Publication Date Title
CN106088758B (en) A kind of bilayer assembled underground granary
CN106088762B (en) A kind of prefabricated assembled round underground granary of insertion slot type encased steel plate
CN206189966U (en) Circular underground granary of slot -in type prefabricated assembled of inside and outside equal steel plated
CN106013911B (en) A kind of interior steel plated assembled circle underground granary with premoulded filler strip
CN206189968U (en) Prefabricated assembled underground granary of inside lining plastics echelonment
CN206035052U (en) Prefabricated caulking strips's in area circular underground granary of outer steel plated assembled
CN206035051U (en) Prefabricated caulking strips's in area circular underground granary of double -layer steel plate assembled
CN206438511U (en) A kind of double-deck assembled underground granary
CN106193744B (en) The round prefabricated assembled underground granary of equal steel plated inside and outside one kind
CN206035043U (en) Prefabricated assembled rectangle underground granary of outer steel plated echelonment
CN106088764B (en) A kind of stepped prefabricated assembled circular underground granary of encased steel plate
CN206189970U (en) Circular prefabricated assembled underground granary of inside and outside equal steel plated
CN206189967U (en) Circular underground granary of prefabricated assembled of inside and outside equal steel plated echelonment
CN206189414U (en) Circular underground granary of slot -in type prefabricated bulkhead of outer steel plated
CN106088759B (en) The equal stepped prefabricated assembled circular underground granary of steel plated inside and outside one kind
CN206189971U (en) Circular underground granary of prefabricated assembled of outer steel plated
CN106049948B (en) Bag Plastic preform bulkhead underground granary in a kind of insertion slot type
CN106013909B (en) A kind of outsourcing Plastic preform assembled underground granary
CN206035050U (en) Prefabricated bulkhead underground granary of slot -in type endocyst plastics
CN206035048U (en) Prefabricated assembled underground granary of interior plastic cover
CN106088760B (en) The equal prefabricated assembled round underground granary of steel plated inside and outside a kind of insertion slot type
CN206035046U (en) Inside and outside prefabricated assembled underground granary of plastics echelonment that all wraps
CN206035042U (en) Prefabricated caulking strips's in area circular underground granary of interior steel plated assembled
CN106193746B (en) A kind of prefabricated assembled round underground granary of encased steel plate
CN206035047U (en) Prefabricated assembled underground granary of plastic cover

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190722

Address after: 450000 Science Avenue 65, Zhengzhou Hi-tech Industrial Development Zone, Henan Province, No. 8405, 4 storeys

Patentee after: Zhengzhou Ditian Grain Tank Factory Technology Co., Ltd.

Address before: 450001 Zhengzhou high tech Industrial Development Zone, Henan Lotus Street, No. 100

Patentee before: Henan Industry University