CN206189967U - Circular underground granary of prefabricated assembled of inside and outside equal steel plated echelonment - Google Patents

Circular underground granary of prefabricated assembled of inside and outside equal steel plated echelonment Download PDF

Info

Publication number
CN206189967U
CN206189967U CN201620675717.0U CN201620675717U CN206189967U CN 206189967 U CN206189967 U CN 206189967U CN 201620675717 U CN201620675717 U CN 201620675717U CN 206189967 U CN206189967 U CN 206189967U
Authority
CN
China
Prior art keywords
prefabricated
warehouse
plate
bulkhead plate
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620675717.0U
Other languages
Chinese (zh)
Inventor
王振清
张昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan University of Technology
Original Assignee
Henan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan University of Technology filed Critical Henan University of Technology
Priority to CN201620675717.0U priority Critical patent/CN206189967U/en
Application granted granted Critical
Publication of CN206189967U publication Critical patent/CN206189967U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

一种内外均包钢板阶梯状预制装配式圆形地下粮仓,包括仓底、多块预制仓壁板、仓顶梁板、多功能柱、多层加强柱,所述的仓壁板为弧形预制板块,其通过连接装置能与相邻仓壁板、多功能柱和多层加强柱进行连接;所述多功能柱对仓壁进行定位,其锚入土中的深度大于仓底板深度,多功能柱从上至下分成数段,最上层的第一段内侧设有第一层仓壁板,第二段内侧先设有加强柱,使得加强柱内侧面与第一层仓壁板内侧面平齐,再在加强柱内侧面设有第二层仓壁板,使得第一、二层仓壁板部分搭接;用上述类似的设置方式,使得第二、三层仓壁板部分搭接,一直搭接至最下面一层仓壁板;所述预制仓壁板内、外侧钢板与其之间的混凝土采用锚钉连接。

A ladder-shaped prefabricated circular underground granary with internal and external cladding of steel plates, including the bottom of the silo, multiple prefabricated silo wall panels, roof beams, multi-functional columns, and multi-layer reinforced columns. The silo wall panels are arc-shaped The prefabricated plate can be connected with the adjacent warehouse wall panels, multi-functional columns and multi-layer reinforced columns through the connecting device; The column is divided into several sections from top to bottom. The inner side of the first section of the uppermost layer is provided with the first layer of warehouse walls, and the inner side of the second section is first provided with reinforced columns, so that the inner surface of the reinforced column is on the same level as the inner surface of the first layer of warehouse walls. Qi, and then set the second storey wall plate on the inner side of the reinforcement column, so that the first and second storey wall plates are partially overlapped; use the above-mentioned similar setting method to make the second and third storey wall plates partially overlap, It has been lapped to the bottom layer of the warehouse wall; the inner and outer steel plates of the prefabricated warehouse wall and the concrete between them are connected by anchors.

Description

一种内外均包钢板阶梯状预制装配式圆形地下粮仓A ladder-shaped prefabricated circular underground granary both inside and outside covered with steel plates

技术领域technical field

本实用新型涉及地下粮仓技术领域,具体涉及一种内外均包钢板阶梯状预制装配式圆形地下粮仓。The utility model relates to the technical field of underground granaries, in particular to a ladder-like prefabricated and assembled circular underground granary both inside and outside covered with steel plates.

背景技术Background technique

地下粮仓建造在浅层地表下,常年低温储粮,保持粮食品质、抑制虫害发生,避免使用毒性药剂熏蒸,抵抗自然破坏和战平两用等众多优点,许多专家和学者一致认为合理推广应用地下储粮仓新体系与新技术,能够实现低温环保、节能节地、保质减损、生态储粮。Underground granaries are built under the shallow surface, which can store grain at low temperature all year round, maintain grain quality, inhibit the occurrence of pests, avoid fumigation with toxic chemicals, resist natural damage, and be used for both war and peace. Many experts and scholars agree that it is reasonable to promote the application of underground granaries The new system and new technology of grain storage can realize low-temperature environmental protection, energy saving and land saving, quality assurance and loss reduction, and ecological grain storage.

我国现有地下粮仓一般在地下水位较低的一般黄土和适合粘上性地区,如窑洞仓、喇叭仓、双曲拱仓、半地下仓、洞状喇叭仓;同时已建的地下仓多为砖砌结构,仓容小,占地面积大、机械化程度低。The existing underground granaries in my country are generally located in general loess areas with low groundwater levels and suitable for sticky areas, such as cave warehouses, trumpet warehouses, double-curved arch warehouses, semi-underground warehouses, and cave-shaped trumpet warehouses; Brick structure, small storage capacity, large floor space and low degree of mechanization.

为了建造适用在地下水位较高、复杂地质条件区域可推广应用的新型地下粮仓,一些国家专利和文献也提出了圆形粮仓,圆筒、半圆筒围成的大空间地下矩形,桩围复合式地下仓等仓型,但是上述新仓型的推广应用,还存在一些亟待解决的问题,如:(1)地下储粮仓具有高标准防水、防潮要求。确保仓体在使用年限内不漏水,不渗水;采用的卷材材料易老化,施工工序复杂,难度大,容易出现施工质量问题。(2)深基坑的湿作业环境施工周期长。基坑开挖、降水后,仓底板现浇、仓壁滑模施工需长时间在湿作业环境条件进行,劳动强度大、施工周期长,施工成本高。(3)基坑支护费用高。针对该类深基坑,“钢桩+腰梁+封水钢板”基坑支护是较为经济的方式,但费用占土建建设成本的25-30%,建设成本较高。In order to build a new type of underground granary that can be popularized and applied in areas with high groundwater levels and complex geological conditions, some national patents and documents have also proposed a circular granary, a large underground rectangle surrounded by cylinders and semi-cylinders, and a pile-enclosed compound type. However, there are still some problems to be solved urgently in the popularization and application of the above-mentioned new warehouse types, such as: (1) Underground grain storage warehouses have high standards of waterproof and moisture-proof requirements. Ensure that the warehouse body does not leak or seep within the service life; the coiled material used is easy to age, the construction process is complex and difficult, and construction quality problems are prone to occur. (2) The wet work environment of deep foundation pit has a long construction period. After foundation pit excavation and precipitation, the cast-in-place construction of the warehouse floor and the sliding form construction of the warehouse wall need to be carried out in a wet working environment for a long time, resulting in high labor intensity, long construction period and high construction cost. (3) The cost of foundation pit support is high. For this kind of deep foundation pit, "steel pile + waist beam + water sealing steel plate" foundation pit support is a more economical way, but the cost accounts for 25-30% of the civil construction cost, and the construction cost is relatively high.

申请号为CN200910207155.1的发明公开了一种地下粮仓,包括仓顶、仓壁和仓底,该仓壁外包钢,钢板既能单独作为仓壁的防水、防潮层,也能仓壁与钢板用钢构件连接形成组合结构的仓壁来防水、防潮。地下粮仓仓壁的形状为直线形或曲线形,如圆筒形、方筒形、半圆形仓壁等。该发明通过外包钢板解决了仓底板的防水防潮问题。同时在仓底进行施工时,钢板作为模板,加快施工速度,降低施工成本,但是其施工为现场浇筑施工,而且该施工方法需要进行基坑开挖,这样存在整体建造成本高,施工周期长等不足。The invention whose application number is CN200910207155.1 discloses an underground granary, which includes a roof, a wall and a bottom. The steel plates are connected by steel members to form a combined structure of the warehouse wall to prevent water and moisture. The shape of the wall of the underground granary is straight or curved, such as cylindrical, square, semicircular, etc. The invention solves the waterproof and moisture-proof problem of the bottom plate of the warehouse through the outsourcing steel plate. At the same time, when the construction is carried out at the bottom of the warehouse, the steel plate is used as a formwork to speed up the construction and reduce the construction cost. However, the construction is pouring on site, and this construction method requires excavation of the foundation pit, so the overall construction cost is high and the construction period is long. insufficient.

申请号为CN200910207154.7的发明公开了一种地下粮仓,包括仓顶、仓壁和仓底,该仓壁分为内壁和外壁,内壁与外壁之间采用连接件连成整体,内壁与外壁之间形成空腔,所述空腔用于地下粮仓漏水的检测和修复,并用于地下粮仓通风和粮情检测。该发明粮仓也需要基坑开挖,存在施工麻烦、建造成本高、施工周期长等不足。The invention with application number CN200910207154.7 discloses an underground granary, including a roof, a wall and a bottom. The wall is divided into an inner wall and an outer wall. A cavity is formed between them, and the cavity is used for detection and repair of water leakage in the underground granary, and for ventilation of the underground granary and detection of grain conditions. The granary of the invention also needs foundation pit excavation, which has disadvantages such as troublesome construction, high construction cost, and long construction period.

预制装配式结构是实现建筑结构产业化和建筑节能节排的有效途径之一,长期以来,混 凝土建筑主要采用现场施工的传统作业方式,工业化程度低,水耗、能耗、人工垃圾、污水排放量大,不符合国家节能和环保的可持续发展政策。采用装配式结构,可以工厂预制、现场装配,实现建筑结构产业化,同时可以有效提高材料在建筑节能和结构性能的效率、节约能源与资源,减少建筑垃圾和环境的不良影响、降低施工场地限制等。因此,为了提供一种“快、好、省“的地下储粮新仓型,研发预制装配式新型地下仓已成为必需。The prefabricated structure is one of the effective ways to realize the industrialization of building structures and building energy saving and emission reduction. For a long time, concrete buildings mainly adopt the traditional operation method of on-site construction, with a low degree of industrialization, water consumption, energy consumption, artificial waste, and sewage discharge. The amount is large, which does not conform to the national sustainable development policy of energy conservation and environmental protection. The prefabricated structure can be prefabricated in the factory and assembled on site to realize the industrialization of building structures. At the same time, it can effectively improve the efficiency of materials in building energy saving and structural performance, save energy and resources, reduce construction waste and adverse effects on the environment, and reduce construction site restrictions. Wait. Therefore, in order to provide a "quick, good and economical" new type of underground grain storage, it has become necessary to develop a prefabricated new type of underground storage.

实用新型内容Utility model content

本实用新型的目的在于提供一种内外均包钢板阶梯状预制装配式圆形地下粮仓,该预制装配式地下粮仓的内外包钢板可代替防水卷材,具有较好的防水、防渗效果和综合效益;预制仓壁板可在预制构件工厂标准化生产,加工制造质量既能有效控制又节能环保,预制成品现场组装,机械化安装施工,可交叉施工,缩短施工工期。另外,预制仓体结构可作为基坑支护体系,节约基坑支护成本,降低建设投资。The purpose of this utility model is to provide a ladder-shaped prefabricated assembled circular underground granary with both inner and outer steel plates. The inner and outer steel plates of the prefabricated underground granary can replace waterproof coiled materials, and have better waterproof, anti-seepage effects and comprehensive Benefits: Prefabricated warehouse wall panels can be produced in a standardized manner in prefabricated component factories. The quality of processing and manufacturing can be effectively controlled and energy-saving and environmentally friendly. On-site assembly of prefabricated products, mechanized installation and construction, and cross-construction can shorten the construction period. In addition, the prefabricated warehouse structure can be used as a foundation pit support system, saving foundation pit support costs and reducing construction investment.

本实用新型的解决方案是:一种预制装配式地下粮仓,该地下粮仓的平面形状为圆形,包括仓底(1)、多块预制仓壁板(2)、仓顶梁板(3)、多功能柱(4)、多层加强柱(5),所述的仓壁板(2)为弧形预制板块,周边有连接装置,通过连接装置仓壁板能与相邻仓壁板、多功能柱(5)和多层加强柱进行连接;所述多功能柱对仓壁进行定位,其锚入土中的深度大于仓底板深度,是承受土压力、粮食压力和抵抗浮力的主要受力构件;其特征在于:多功能柱从上至下分成数段,最上层的第一段内侧设有第一层仓壁板,第二段内侧先设有加强柱,使得加强柱内侧面与第一层仓壁板内侧面平齐,再在加强柱内侧面设有第二层仓壁板,使得第一、二层仓壁板部分搭接;用上述类似的设置方式,使得第二、三层仓壁板部分搭接,一直搭接至最下面一层仓壁板,形成阶梯状装配式圆形地下粮仓;所述预制仓壁板为内、外侧钢板和其之间的混凝土板结合成整体的结构,内、外侧钢板与其之间的混凝土采用锚钉连接。The solution of the utility model is: a prefabricated assembled underground granary, the plane shape of which is circular, including the bottom of the granary (1), a plurality of prefabricated granary wall panels (2), and the beam plate (3) on the roof of the granary. , a multifunctional column (4), a multi-layer reinforced column (5), the warehouse wall (2) is an arc-shaped prefabricated plate, and there is a connecting device on the periphery, and the warehouse wall can be connected with the adjacent warehouse wall, The multifunctional column (5) is connected with the multi-layer reinforced column; the multifunctional column positions the warehouse wall, and its anchoring depth in the soil is greater than the depth of the warehouse floor, and is the main force for bearing earth pressure, grain pressure and buoyancy resistance Component; it is characterized in that: the multifunctional column is divided into several sections from top to bottom, the inner side of the first section of the uppermost layer is provided with the first layer of warehouse wall panels, and the inner side of the second section is first provided with a reinforcement column, so that the inner surface of the reinforcement column is in line with the first section. The inner side of the first layer of the warehouse wall is even, and the second layer of the warehouse wall is arranged on the inner side of the reinforcement column, so that the first and second layer of the warehouse wall are partially overlapped; with the above-mentioned similar setting method, the second and third The wall panels of the layer warehouses are partially overlapped until they are overlapped to the bottom layer of the warehouse wall panels to form a stepped assembled circular underground granary; For the overall structure, the inner and outer steel plates and the concrete between them are connected by anchors.

本实用新型的特征在于预制仓壁板多功能柱和加强柱采用钢柱或设有钢埋件的混凝土柱,多功能柱与加强柱通过螺栓或焊接缝连接,多功能柱或加强柱上设有定位刚构件。多功能柱和加强柱要保证其与周围的连接构件形成一个整体共同受力,这样,用钢柱或设有钢埋件的混凝土柱能简单方便地与其连接构件焊接;多功能柱与加强柱通过螺栓或焊接缝连接成一个整体,而且随着深度的增加,二者形成的整体截面尺寸越来越大,这样,可以有效地抵抗自上而下随深度增加的土压力,而且结构设计更加经济合理。多功能柱的定位钢构件可以在预制仓壁板安装时进行精确的定位,同时在预制仓壁板与多功能柱焊接前提供固定作用。The utility model is characterized in that the multifunctional column of the prefabricated warehouse wall board and the reinforced column adopt steel columns or concrete columns with steel embedded parts, the multifunctional column and the reinforced column are connected by bolts or welding seams, and the multifunctional column or the reinforced column is equipped with There are positioning rigid members. The multifunctional column and the reinforced column should ensure that they form an integral force with the surrounding connecting members, so that the steel column or the concrete column with steel embedded parts can be easily and conveniently welded to the connecting member; the multifunctional column and the reinforced column It is connected as a whole by bolts or welding seams, and as the depth increases, the overall cross-sectional size formed by the two becomes larger and larger, so that it can effectively resist the earth pressure that increases with depth from top to bottom, and the structural design is more comprehensive. Economically sound. The positioning steel member of the multifunctional column can be accurately positioned when the prefabricated warehouse wall is installed, and at the same time, it can provide a fixing function before the prefabricated warehouse wall and the multifunctional column are welded.

本实用新型的特征还在于预制仓壁板上边、下边、左边、右边均包有钢板。这样可方便地使仓壁板与周围相邻预制仓壁板及多功能柱或加强柱进行焊接连接。The utility model is also characterized in that the upper, lower, left and right sides of the prefabricated warehouse wall panels are all covered with steel plates. In this way, the warehouse wall panel can be welded and connected with the surrounding adjacent prefabricated warehouse wall panels and multifunctional columns or reinforced columns.

本实用新型的特征还在于所述预制仓壁板上边、下边、左边、右边均包有钢板,且左端 设有凸式梯形或半椭圆形插头,右端设有梯形或半椭圆形凹槽。这样可以方便地使相邻预制仓壁板进行连接,从而加快施工速度,大大缩短施工周期The utility model is also characterized in that the upper, lower, left and right sides of the prefabricated warehouse wall panels are covered with steel plates, and the left end is provided with a convex trapezoidal or semi-elliptical plug, and the right end is provided with a trapezoidal or semi-elliptical groove. In this way, the adjacent prefabricated warehouse wall panels can be connected conveniently, thereby speeding up the construction speed and greatly shortening the construction period

本实用新型的特征在于预制仓壁板环向水平平齐,其外侧与多功能柱或加强柱焊接连接,相邻预制仓壁板内侧用连接钢板连接,连接钢板与预制仓壁板采用焊接连接;在多功能柱或加强柱与相邻预制仓壁板以及连接钢板围成的空腔内浇筑与预制仓壁板相同或高一强度等级的防水混凝土。这样,在预制仓壁板外侧与多功能柱或加强柱焊接后保证了内侧钢板与多功能柱或加强柱在环向保持一个整体,从而能对预制仓壁进行有效的防水;另外,在仓壁板内侧用连接钢板焊接连接,一方面有增加了节点处的第二道防水措施,而且使多功能柱或加强柱与预制仓壁以及其之间的混凝土形成了整体结构,使受力更加合理,节点施工更加简单方便。The utility model is characterized in that the wall plate of the prefabricated warehouse is horizontally horizontal, and its outer side is welded and connected with the multi-functional column or reinforced column, and the inner side of the adjacent prefabricated warehouse wall plate is connected with a connecting steel plate, and the connecting steel plate and the prefabricated warehouse wall plate are connected by welding. ;Pour waterproof concrete with the same or higher strength level as the prefabricated warehouse wall in the cavity surrounded by the multifunctional column or reinforced column, the adjacent prefabricated warehouse wall and the connecting steel plate. In this way, after the outer side of the prefabricated warehouse wall plate is welded with the multifunctional column or the reinforced column, it is ensured that the inner steel plate and the multifunctional column or the reinforced column are kept as a whole in the circumferential direction, so that the prefabricated warehouse wall can be effectively waterproofed; The inner side of the wall plate is welded and connected by connecting steel plates. On the one hand, the second waterproof measure at the node is added, and the multifunctional column or reinforced column and the prefabricated warehouse wall and the concrete between them form an integral structure, which makes the force more stable. Reasonable, node construction is more simple and convenient.

本实用新型的特征还在于预制仓壁板环向水平平齐,每块预制仓壁板的凸式梯形或半椭圆型插头插入相邻预制仓壁板凹式梯形或半椭圆型插槽内;每块预制仓壁板与多功能柱或加强柱焊接连接,相邻预制仓壁板内侧的竖缝直接采用对接焊连接和/或用连接钢板焊接连接。首先,将第一块预制仓壁板的左右端外侧与多功能柱或加强柱焊接,然后,将其右侧相邻预制仓壁板的左端凸式梯形或半椭圆型插头插入相邻仓壁板的凹式梯形或半椭圆型插槽内并焊接连接,右端凹式梯形或半椭圆型插槽与多功能柱或加强柱焊接,按照上述焊接方法依次进行安装,直到完成该层预制仓壁板的安装。这样不但可以使预制仓壁与多功能柱或加强柱形成整体结构共同受力,而且可以使预制仓壁通过焊接在环向形成一个封闭整体进行有效的进行防水、防潮、防渗;另外,相邻预制仓壁板插槽式的连接方式使节点形式和施工更加简单,从而加快了施工速度,大大缩短施工周期。The utility model is also characterized in that the circumferential level of the prefabricated warehouse wall panels is even, and the convex trapezoidal or semi-elliptical plugs of each prefabricated warehouse wall panel are inserted into the concave trapezoidal or semi-elliptical slots of the adjacent prefabricated warehouse wall panels; Each prefabricated warehouse wall plate is welded to the multifunctional column or reinforced column, and the vertical joints on the inner side of the adjacent prefabricated warehouse wall plates are directly connected by butt welding and/or welded by connecting steel plates. Firstly, weld the outer sides of the left and right ends of the first prefabricated warehouse wall panel to the multi-functional column or reinforced column, and then insert the convex trapezoidal or semi-elliptical plug at the left end of the adjacent prefabricated warehouse wall panel on the right side into the adjacent warehouse wall The concave trapezoidal or semi-elliptical slot of the board is welded and connected, and the concave trapezoidal or semi-elliptical slot at the right end is welded to the multi-functional column or reinforced column, and the installation is carried out in sequence according to the above welding method until the prefabricated warehouse wall of this layer is completed board installation. In this way, not only can the prefabricated warehouse wall and the multifunctional column or reinforced column form an integral structure to bear the force together, but also the prefabricated warehouse wall can be welded to form a closed whole in the ring direction to effectively waterproof, moisture-proof and seepage-proof; The slot-type connection of the adjacent prefabricated warehouse wall panels makes the joint form and construction simpler, thereby speeding up the construction speed and greatly shortening the construction period.

本实用新型的特征在于预制仓壁板上、下两层竖向错位搭接,上、下两层仓壁板的搭接部位用通长角焊缝焊接。预制仓壁板上、下两层竖向错位搭接方式使上下相邻仓壁板的连接处施工时非常方便,能够较好地保证施工质量;上、下两层仓壁板的搭接部位的通长角焊缝一方面使钢板上下无缝焊接后形成整体,从而很好地防止地下水流进或渗进地下仓内部,另一方面使上下仓壁板在结构上成为一个整体,与定位柱或加强柱共同抵抗土压力等外力。The utility model is characterized in that the prefabricated warehouse wall plate and the lower two layers are vertically dislocated and overlapped, and the overlapping parts of the upper and lower layers of the warehouse wall plate are welded with a full-length fillet weld. The prefabricated warehouse wall panel and the lower two-layer vertical dislocation overlapping method make the construction of the connection between the upper and lower adjacent warehouse wall panels very convenient, and can better ensure the construction quality; the overlapping parts of the upper and lower warehouse wall panels On the one hand, the full-length fillet welds make the upper and lower steel plates seamlessly welded to form a whole, so as to prevent groundwater from flowing into or seeping into the interior of the underground warehouse; Columns or reinforced columns jointly resist external forces such as earth pressure.

本实用新型的特征在于预制仓壁板的上、下两层错位搭接处设有斜向加强板,加强板与上下仓壁板焊接。当粮食出仓时,预制仓壁板的上、下两层错位搭接处会留有粮食,此处粮食清清扫比较困难;搭接处设有一定坡度的斜向加强板一方面使粮食靠自流进入仓内,另一方面可以为仓壁搭接处提供第二道防水保障,同时在结构设计方面可加强上下仓壁的连接。The utility model is characterized in that the upper and lower layers of the prefabricated warehouse wall boards are provided with oblique reinforcement plates at the dislocation laps of the upper and lower layers, and the reinforcement boards are welded to the upper and lower warehouse wall boards. When the grain is out of the warehouse, there will be grain at the upper and lower two-layer dislocation laps of the prefabricated warehouse wall panels, and it is difficult to clean the grain here; an inclined reinforcing plate with a certain slope is provided at the lap joints. Self-flowing into the warehouse, on the other hand, it can provide a second waterproof guarantee for the overlap of the warehouse wall, and at the same time, the connection between the upper and lower warehouse walls can be strengthened in terms of structural design.

本实用新型的特征在于预制仓壁板的上、下两层错位搭接处沿环向间隔设置有加劲肋;所述加劲肋由直角三角形钢板切掉直角而成,该加劲肋与相邻上下预制仓壁板均垂直焊接; 加劲肋为多块,沿上下仓壁板搭接部位环向均匀分布。预制仓壁板的上、下两层错位搭接处沿环向间隔设置的加劲肋为加强上下相邻仓壁板的连接,加劲肋板设有的切角式加劲肋的焊接与上、下两层仓壁板的搭接部位的通长角焊缝空间上不冲突;加劲肋与相邻上下预制仓壁板均垂直焊接使仓壁处连接处提高了其抵抗弯矩和剪力的能力。The utility model is characterized in that the upper and lower layers of the prefabricated warehouse wall plate are provided with stiffening ribs at intervals along the circumferential direction; The prefabricated silo walls are all welded vertically; the stiffeners are multi-piece, evenly distributed along the circumferential direction of the overlapping parts of the upper and lower silo walls. The stiffening ribs provided at the dislocation laps of the upper and lower layers of the prefabricated warehouse wall panels along the circumferential interval are to strengthen the connection between the upper and lower adjacent warehouse wall panels. The full-length fillet welds of the overlapping parts of the two-story warehouse wall panels do not conflict in space; the stiffeners are welded vertically to the adjacent upper and lower prefabricated warehouse wall panels, so that the joints of the warehouse walls improve their ability to resist bending moments and shear forces .

本实用新型的特征在于仓底采用双面钢板混凝土组合结构,底板上下钢板与其之间的混凝土采用锚钉连接。这种双面组合结构仓壁中钢板作为仓底板的模板并代替钢筋,节省仓壁的施工费用,降低仓壁的施工难度,加快整体施工速度;双层钢板混凝土组合结构提高了仓壁的刚度和强度,有效抵抗土压力和粮食压力,有利于地下仓向更深更大的方向发张,增大了该仓型的适用范围,且更有利于粮仓防水防潮问题。The utility model is characterized in that the bottom of the warehouse adopts a double-sided steel plate concrete composite structure, and the upper and lower steel plates on the bottom plate and the concrete between them are connected by anchors. The steel plate in the warehouse wall of this double-sided composite structure is used as the formwork of the warehouse floor and replaces the steel bar, which saves the construction cost of the warehouse wall, reduces the construction difficulty of the warehouse wall, and speeds up the overall construction speed; the double-layer steel plate concrete composite structure improves the rigidity of the warehouse wall. and strength, effectively resisting soil pressure and grain pressure, which is conducive to the expansion of the underground warehouse to a deeper and larger direction, which increases the scope of application of the warehouse type, and is more conducive to the waterproof and moisture-proof problems of the granary.

本实用新型的特征还在于所述的仓顶采用混凝土-钢板组合结构。这样,上述结构充分发挥了混凝土的抗压和钢板的抗拉能力,使大跨度仓顶板结构受力更加合理,而且施工时可以用钢板作为模板,极大地降低了施工难度,同时也可加快施工速度。The utility model is also characterized in that the roof of the warehouse adopts a concrete-steel composite structure. In this way, the above-mentioned structure fully exerts the compressive resistance of concrete and the tensile capacity of steel plates, making the stress of the roof structure of large-span warehouses more reasonable, and steel plates can be used as formwork during construction, which greatly reduces the difficulty of construction and can also speed up construction. speed.

本实用新型的特征在于多功能柱和加强柱采用截面形式为直线或曲线的空心柱或实心柱。The utility model is characterized in that the multifunctional column and the reinforcing column adopt hollow columns or solid columns whose section form is a straight line or a curve.

附图说明Description of drawings

图1第一种地下仓平面布置图Figure 1 Layout plan of the first type of underground warehouse

图2第二种地下仓平面布置图Figure 2 Layout plan of the second type of underground warehouse

图3第一、二种地下仓剖面布置图Figure 3 Sectional layout of the first and second types of underground warehouses

图4第一、二种单块预制仓壁板截面示意图Figure 4 Schematic diagram of the cross-section of the first and second types of single-block prefabricated warehouse wall panels

图5第一种第一段预制混凝土板平面布置示意图Figure 5 Schematic diagram of the layout of the first section of the precast concrete slab of the first type

图6第一种第二段及以下各段预制混凝土板平面布置示意图Fig. 6 Schematic diagram of plan layout of precast concrete slabs in the second section and the following sections of the first type

图7第一、二种仓壁节点示意图Figure 7 Schematic diagram of the first and second warehouse wall nodes

图8第二种第一段预制混凝土板平面布置示意图Figure 8 Schematic diagram of the plane layout of the first section of the second type of precast concrete slab

图9第二种第二段及以下各段预制混凝土板平面布置示意图Figure 9 Schematic diagram of the plane layout of the second section and the following sections of the second type of precast concrete slab

附图中:1为多功能柱;2为加强柱;3为预制仓壁;4为仓顶;5为仓底;6为连接钢板;7为加劲肋;8为斜向加强板;9为通长角焊缝;10为进出粮口;11为覆土;12为防水混凝土;13为内侧钢板。In the attached drawings: 1 is a multifunctional column; 2 is a reinforced column; 3 is a prefabricated warehouse wall; 4 is a warehouse roof; 5 is a warehouse bottom; 6 is a connecting steel plate; 7 is a stiffening rib; 10 is the grain inlet and outlet; 11 is the covering soil; 12 is waterproof concrete; 13 is the inner steel plate.

具体实施方式detailed description

下面结合附图和实施例对本实用新型作进一步的说明。Below in conjunction with accompanying drawing and embodiment the utility model is described further.

实施例一Embodiment one

如图1、图3、图4、图5、图7所示:本实施例提供了一种内外均包钢板阶梯状预制装配式圆形地下粮仓。包括仓底板5、多块预制仓壁板3、仓顶梁板4、多功能柱1、多层加强柱2,所述的仓壁板3为弧形预制板块,周边有连接装置,通过连接装置仓壁板能与相邻仓壁板、多功能柱1和多层加强柱2进行连接;所述多功能柱1对仓壁进行定位。多功能柱1从上至下分成数段,最上层的第一段内侧设有第一层仓壁板,第二段内侧先设有加强柱2,使得加强柱2内侧面与第一层仓壁板内侧面平齐,再在加强柱2内侧面设有第二层仓壁板,使得第一、二层仓壁板部分搭接;用上述类似的设置方式,使得第二、三层仓壁板部分搭接,一直搭接至最下面一层仓壁板,形成阶梯状装配式圆形地下粮仓;所述预制仓壁板3为内、外侧钢板13、14和其之间的混凝土板结合成整体的结构,内、外侧钢板13、14与其之间的混凝土采用锚钉连接。所述预制仓壁板3上边、下边、左边、右边均包有钢板。As shown in Fig. 1, Fig. 3, Fig. 4, Fig. 5 and Fig. 7: this embodiment provides a ladder-like prefabricated circular underground granary both inside and outside covered with steel plates. It includes a warehouse bottom plate 5, a plurality of prefabricated warehouse wall panels 3, a warehouse roof beam plate 4, a multifunctional column 1, and a multi-layer reinforced column 2. The warehouse wall panels 3 are arc-shaped prefabricated plates with connecting devices around them. The wall board of the device warehouse can be connected with the wall board of the adjacent warehouse, the multi-functional column 1 and the multi-layer reinforcement column 2; the multi-functional column 1 can position the warehouse wall. The multifunctional column 1 is divided into several sections from top to bottom. The inner side of the first section of the uppermost layer is provided with the first layer of warehouse wall panels, and the inner side of the second section is first provided with a reinforcing column 2, so that the inner surface of the reinforcing column 2 is in line with the first layer of the warehouse. The inner side of the wall board is flush, and the second layer of the warehouse wall is provided on the inner side of the reinforcing column 2, so that the first and second layer of the warehouse wall are partially overlapped; with the above-mentioned similar setting method, the second and third layer of the warehouse The wall panels are partially overlapped until they reach the bottom layer of the warehouse wall panels to form a stepped assembled circular underground granary; the prefabricated warehouse wall panels 3 are the inner and outer steel plates 13, 14 and the concrete panels between them Combined into an integral structure, the inner and outer steel plates 13, 14 and the concrete between them are connected by anchors. The upper, lower, left and right sides of the prefabricated warehouse wall panels 3 are all covered with steel plates.

预制仓壁板3环向水平平齐,其外侧与多功能柱1或加强柱2焊接连接,相邻预制仓壁板3内侧用连接钢板6连接,连接钢板6与预制仓壁板3采用焊接连接;在多功能柱1或加强柱2与相邻预制仓壁板3以及连接钢板6围成的空腔内浇筑与预制仓壁板相同或高一强度等级的防水混凝土12。The prefabricated warehouse wall panel 3 is horizontally aligned in the circumferential direction, and its outer side is welded and connected with the multifunctional column 1 or the reinforced column 2. The inner side of the adjacent prefabricated warehouse wall panel 3 is connected with the connecting steel plate 6, and the connecting steel plate 6 and the prefabricated warehouse wall panel 3 are welded. Connection; pouring waterproof concrete 12 of the same or higher strength level as the prefabricated warehouse wall panel in the cavity surrounded by the multifunctional column 1 or reinforced column 2 and the adjacent prefabricated warehouse wall panel 3 and connecting steel plate 6 .

所述预制仓壁板3上、下两层竖向错位搭接,上、下两层仓壁板的搭接部位用通长角焊缝9焊接。所述预制仓壁板3的上、下两层错位搭接处设有斜向加强板8,加强板与上下仓壁板焊接。所述预制仓壁板3的上、下两层错位搭接处沿环向间隔设置有加劲肋7;所述加劲肋7由直角三角形钢板切掉直角而成,该加劲肋7与相邻上下预制仓壁板3均垂直焊接;加劲肋7为多块,沿上下仓壁板3搭接部位环向均匀分布。The upper and lower layers of the prefabricated warehouse wall panels 3 are vertically dislocated and overlapped, and the overlapping parts of the upper and lower layers of warehouse wall panels are welded with a full-length fillet weld 9 . The upper and lower layers of the prefabricated warehouse wall panels 3 are provided with oblique reinforcement plates 8 at the dislocation laps of the upper and lower layers, and the reinforcement plates are welded to the upper and lower warehouse wall panels. The upper and lower layers of the prefabricated warehouse wall panel 3 are provided with stiffening ribs 7 at intervals along the ring; The prefabricated warehouse wall panels 3 are all vertically welded; the stiffeners 7 are multi-piece, and are evenly distributed along the circumferential direction of the overlapping parts of the upper and lower warehouse wall panels 3 .

实施例二Embodiment two

如图2、图3、图4、图7、图8所示:本实施例提供了一种内外均包钢板阶梯状预制装配式圆形地下粮仓。包括仓底板5、多块预制仓壁板3、仓顶梁板4、多功能柱1、多层加强柱2,所述的仓壁板3为弧形预制板块,周边有连接装置,通过连接装置仓壁板能与相邻仓壁板、多功能柱1和多层加强柱2进行连接;所述多功能柱1对仓壁进行定位。多功能柱1从上至下分成数段,最上层的第一段内侧设有第一层仓壁板,第二段内侧先设有加强柱2,使得加强柱2内侧面与第一层仓壁板内侧面平齐,再在加强柱2内侧面设有第二层仓壁板,使得第一、二层仓壁板部分搭接;用上述类似的设置方式,使得第二、三层仓壁板部分搭接,一直搭接至最下面一层仓壁板,形成阶梯状装配式圆形地下粮仓;所述预制仓壁板3为内、外侧钢板13、14和其之间的混凝土板结合成整体的结构,内、外侧钢板13、14与其之间的混凝土采用锚钉连接。所述预制仓壁板3上边、下边、左边、右边均包有钢板,且左端设有凸式梯形或半椭圆形插头,右端设有梯形或半椭圆形凹槽。As shown in Fig. 2, Fig. 3, Fig. 4, Fig. 7, and Fig. 8: this embodiment provides a ladder-like prefabricated circular underground granary both inside and outside covered with steel plates. It includes a warehouse bottom plate 5, a plurality of prefabricated warehouse wall panels 3, a warehouse roof beam plate 4, a multifunctional column 1, and a multi-layer reinforced column 2. The warehouse wall panels 3 are arc-shaped prefabricated plates with connecting devices around them. The wall board of the device warehouse can be connected with the wall board of the adjacent warehouse, the multi-functional column 1 and the multi-layer reinforcement column 2; the multi-functional column 1 can position the warehouse wall. The multifunctional column 1 is divided into several sections from top to bottom. The inner side of the first section of the uppermost layer is provided with the first layer of warehouse wall panels, and the inner side of the second section is first provided with a reinforcing column 2, so that the inner surface of the reinforcing column 2 is in line with the first layer of the warehouse. The inner side of the wall board is flush, and the second layer of the warehouse wall is provided on the inner side of the reinforcing column 2, so that the first and second layer of the warehouse wall are partially overlapped; with the above-mentioned similar setting method, the second and third layer of the warehouse The wall panels are partially overlapped until they reach the bottom layer of the warehouse wall panels to form a stepped assembled circular underground granary; the prefabricated warehouse wall panels 3 are the inner and outer steel plates 13, 14 and the concrete panels between them Combined into an integral structure, the inner and outer steel plates 13, 14 and the concrete between them are connected by anchors. The upper, lower, left and right sides of the prefabricated warehouse wall panels 3 are covered with steel plates, and the left end is provided with a convex trapezoidal or semi-elliptical plug, and the right end is provided with a trapezoidal or semi-elliptical groove.

所述预制仓壁板3环向水平平齐,每块预制仓壁板3的凸式梯形或半椭圆型插头插入相邻预制仓壁板3凹式梯形或半椭圆型插槽内;每块预制仓壁板3与多功能柱1或加强柱2焊接连接,相邻预制仓壁板3内侧的竖缝直接采用对接焊连接和/或用连接钢板焊接连接。The prefabricated warehouse wall panels 3 are horizontally aligned in the circumferential direction, and the convex trapezoidal or semi-elliptical plugs of each prefabricated warehouse wall panel 3 are inserted into the concave trapezoidal or semi-elliptical slots of the adjacent prefabricated warehouse wall panels 3; The prefabricated warehouse wall panel 3 is welded to the multifunctional column 1 or the reinforced column 2, and the vertical seam on the inner side of the adjacent prefabricated warehouse wall panel 3 is directly connected by butt welding and/or welded by connecting steel plates.

所述预制仓壁板3上、下两层竖向错位搭接,上、下两层仓壁板的搭接部位用通长角焊缝9焊接。所述预制仓壁板3的上、下两层错位搭接处设有斜向加强板8,加强板与上下仓壁板焊接。所述预制仓壁板3的上、下两层错位搭接处沿环向间隔设置有加劲肋7;所述加劲肋7由直角三角形钢板切掉直角而成,该加劲肋7与相邻上下预制仓壁板3均垂直焊接;加劲肋7为多块,沿上下仓壁板3搭接部位环向均匀分布。The upper and lower layers of the prefabricated warehouse wall panels 3 are vertically dislocated and overlapped, and the overlapping parts of the upper and lower layers of warehouse wall panels are welded with a full-length fillet weld 9 . The upper and lower layers of the prefabricated warehouse wall panels 3 are provided with oblique reinforcement plates 8 at the dislocation laps of the upper and lower layers, and the reinforcement plates are welded to the upper and lower warehouse wall panels. The upper and lower layers of the prefabricated warehouse wall panel 3 are provided with stiffening ribs 7 at intervals along the ring; The prefabricated warehouse wall panels 3 are all vertically welded; the stiffeners 7 are multi-piece, and are evenly distributed along the circumferential direction of the overlapping parts of the upper and lower warehouse wall panels 3 .

实施例三Embodiment three

如图1和图3所示:本实施例提供了一种内外均包钢板阶梯状预制装配式圆形地下粮仓。包括仓底板5、多块预制仓壁板3、仓顶梁板4、多功能柱1、多层加强柱2,所述的仓壁板3为弧形预制板块,周边有连接装置,通过连接装置仓壁板能与相邻仓壁板、多功能柱1和多层加强柱2进行连接;所述多功能柱1对仓壁进行定位。多功能柱1从上至下分成数段,最上层的第一段内侧设有第一层仓壁板,第二段内侧先设有加强柱2,使得加强柱2内侧面与第一层仓壁板内侧面平齐,再在加强柱2内侧面设有第二层仓壁板,使得第一、二层仓壁板部分搭接;用上述类似的设置方式,使得第二、三层仓壁板部分搭接,一直搭接至最下面一层仓壁板,形成阶梯状装配式圆形地下粮仓;所述预制仓壁板3为内、外侧钢板13、14和其之间的混凝土板结合成整体的结构,内、外侧钢板13、14与其之间的混凝土采用锚钉连接。As shown in Fig. 1 and Fig. 3: this embodiment provides a stepped prefabricated round underground granary both inside and outside covered with steel plates. It includes a warehouse bottom plate 5, a plurality of prefabricated warehouse wall panels 3, a warehouse roof beam plate 4, a multifunctional column 1, and a multi-layer reinforced column 2. The warehouse wall panels 3 are arc-shaped prefabricated plates with connecting devices around them. The wall board of the device warehouse can be connected with the wall board of the adjacent warehouse, the multi-functional column 1 and the multi-layer reinforcement column 2; the multi-functional column 1 can position the warehouse wall. The multifunctional column 1 is divided into several sections from top to bottom. The inner side of the first section of the uppermost layer is provided with the first layer of warehouse wall panels, and the inner side of the second section is first provided with a reinforcing column 2, so that the inner surface of the reinforcing column 2 is in line with the first layer of the warehouse. The inner side of the wall board is flush, and the second layer of the warehouse wall is provided on the inner side of the reinforcing column 2, so that the first and second layer of the warehouse wall are partially overlapped; with the above-mentioned similar setting method, the second and third layer of the warehouse The wall panels are partially overlapped until they reach the bottom layer of the warehouse wall panels to form a stepped assembled circular underground granary; the prefabricated warehouse wall panels 3 are the inner and outer steel plates 13, 14 and the concrete panels between them Combined into an integral structure, the inner and outer steel plates 13, 14 and the concrete between them are connected by anchors.

所述仓底5为锥形结构,所述仓底5采用双面钢板混凝土组合结构。这种钢板混凝土组合结构中钢板作为仓底板的模板并代替钢筋,不需要在施工时铺设钢筋,节省仓壁的施工费用,降低仓底的施工难度,加快整体施工速度;双层钢板混凝土组合结构提高了仓壁的刚度和强度,有效抵抗土压力和粮食压力,有利于地下粮仓向更深更大的方向发展,增大了该仓型的适用范围,且更有利于粮仓防水防潮问题。The warehouse bottom 5 is a conical structure, and the warehouse bottom 5 adopts a double-sided steel plate concrete composite structure. In this steel plate concrete composite structure, the steel plate is used as the formwork of the warehouse floor and replaces the steel bars. It does not need to lay steel bars during construction, which saves the construction cost of the warehouse wall, reduces the construction difficulty of the warehouse bottom, and speeds up the overall construction speed; the double-layer steel plate concrete composite structure It improves the stiffness and strength of the silo wall, effectively resists earth pressure and grain pressure, and is conducive to the development of underground granaries in a deeper and larger direction, which increases the scope of application of this type of silo, and is more conducive to the waterproof and moisture-proof problems of the granary.

所述仓顶4采用双面钢板混凝土组合结构,所述仓顶4设置进出粮口10,所述仓顶4上方设置覆土11。双面钢板混凝土组合结构结构充分发挥了混凝土的抗压和钢板的抗拉能力,使大跨度仓顶板结构受力更加合理,而且施工时可以用钢板作为模板,极大地降低了施工难度,同时也可加快施工速度。进出粮口设置现代化进出粮设备,便于粮食的存放和提取。The warehouse roof 4 adopts a double-sided steel plate concrete composite structure, the warehouse roof 4 is provided with a grain inlet and outlet 10, and the warehouse roof 4 is provided with a covering soil 11. The double-sided steel plate concrete composite structure fully exerts the compressive resistance of concrete and the tensile capacity of steel plates, making the stress of the roof structure of large-span warehouses more reasonable, and the steel plates can be used as formwork during construction, which greatly reduces the difficulty of construction and at the same time It can speed up the construction speed. The entrance and exit of grain are equipped with modern grain entry and exit equipment to facilitate the storage and extraction of grain.

所述地下粮仓可以实现固态颗粒、粉末物料或液态物料的存储。该地下粮仓密封性和支撑性很好,也可以实现对粉末、液态物料的存储,配合不同的进料和出料设备,应用十分广泛。The underground granary can realize the storage of solid particles, powder materials or liquid materials. The underground granary has good airtightness and support, and can also realize the storage of powder and liquid materials. With different feeding and discharging equipment, it is widely used.

实施例四Embodiment Four

如图1和图3所示:本实施例提供了一种内外均包钢板阶梯状预制装配式圆形地下粮仓。包括仓底板5、多块预制仓壁板3、仓顶梁板4、多功能柱1、多层加强柱2,所述的仓壁板3为弧形预制板块,周边有连接装置,通过连接装置仓壁板能与相邻仓壁板、多功能柱1和多层加强柱2进行连接;所述多功能柱1对仓壁进行定位。多功能柱1从上至下分成数段,最上层的第一段内侧设有第一层仓壁板,第二段内侧先设有加强柱2,使得加强柱2内侧面与第一层仓壁板内侧面平齐,再在加强柱2内侧面设有第二层仓壁板,使得第一、二层仓壁板部分搭接;用上述类似的设置方式,使得第二、三层仓壁板部分搭接,一直搭接至最下面一层仓壁板,形成阶梯状装配式圆形地下粮仓;所述预制仓壁板3为内、外侧钢板13、14和其之间的混凝土板结合成整体的结构,内、外侧钢板13、14与其之间的混凝土采用锚钉连接。As shown in Fig. 1 and Fig. 3: this embodiment provides a stepped prefabricated round underground granary both inside and outside covered with steel plates. It includes a warehouse bottom plate 5, a plurality of prefabricated warehouse wall panels 3, a warehouse roof beam plate 4, a multifunctional column 1, and a multi-layer reinforced column 2. The warehouse wall panels 3 are arc-shaped prefabricated plates with connecting devices around them. The wall board of the device warehouse can be connected with the wall board of the adjacent warehouse, the multi-functional column 1 and the multi-layer reinforcement column 2; the multi-functional column 1 can position the warehouse wall. The multifunctional column 1 is divided into several sections from top to bottom. The inner side of the first section of the uppermost layer is provided with the first layer of warehouse wall panels, and the inner side of the second section is first provided with a reinforcing column 2, so that the inner surface of the reinforcing column 2 is in line with the first layer of the warehouse. The inner side of the wall board is flush, and the second layer of the warehouse wall is provided on the inner side of the reinforcing column 2, so that the first and second layer of the warehouse wall are partially overlapped; with the above-mentioned similar setting method, the second and third layer of the warehouse The wall panels are partially overlapped until they reach the bottom layer of the warehouse wall panels to form a stepped assembled circular underground granary; the prefabricated warehouse wall panels 3 are the inner and outer steel plates 13, 14 and the concrete panels between them Combined into an integral structure, the inner and outer steel plates 13, 14 and the concrete between them are connected by anchors.

所述仓壁板3外表面喷涂护面涂料,所述护面涂料包括如下重量份的材料制成:石油沥青115份,玻璃纤维7份,膨润土8份,乳化剂6份,分散剂1.5份,稳定剂1.5份,有机氟改性苯丙乳液25份、抗冻剂2.5份。The outer surface of the warehouse wall 3 is sprayed with a protective coating, and the protective coating includes the following materials in parts by weight: 115 parts of petroleum asphalt, 7 parts of glass fiber, 8 parts of bentonite, 6 parts of emulsifier, and 1.5 parts of dispersant , 1.5 parts of stabilizer, 25 parts of organic fluorine modified styrene-acrylic emulsion, 2.5 parts of antifreeze.

所述乳化剂采用氢化牛脂胺,所述分散剂采用硬脂酸单甘油酯,所述稳定剂采用硫酸盐,所述抗冻剂采用乙二醇。The emulsifier adopts hydrogenated tallow amine, the dispersant adopts monoglyceride stearate, the stabilizer adopts sulfate, and the antifreeze agent adopts ethylene glycol.

实施例五Embodiment five

如图1和图3所示:本实施例提供了一种内外均包钢板阶梯状预制装配式圆形地下粮仓。包括仓底板5、多块预制仓壁板3、仓顶梁板4、多功能柱1、多层加强柱2,所述的仓壁板3为弧形预制板块,周边有连接装置,通过连接装置仓壁板能与相邻仓壁板、多功能柱1和多层加强柱2进行连接;所述多功能柱1对仓壁进行定位。多功能柱1从上至下分成数段,最上层的第一段内侧设有第一层仓壁板,第二段内侧先设有加强柱2,使得加强柱2内侧面与第一层仓壁板内侧面平齐,再在加强柱2内侧面设有第二层仓壁板,使得第一、二层仓壁板部分搭接;用上述类似的设置方式,使得第二、三层仓壁板部分搭接,一直搭接至最下面一层仓壁板,形成阶梯状装配式圆形地下粮仓;所述预制仓壁板3为内、外侧钢板13、14和其之间的混凝土板结合成整体的结构,内、外侧钢板13、14与其之间的混凝土采用锚钉连接。As shown in Fig. 1 and Fig. 3: this embodiment provides a stepped prefabricated round underground granary both inside and outside covered with steel plates. It includes a warehouse bottom plate 5, a plurality of prefabricated warehouse wall panels 3, a warehouse roof beam plate 4, a multifunctional column 1, and a multi-layer reinforced column 2. The warehouse wall panels 3 are arc-shaped prefabricated plates with connecting devices around them. The wall board of the device warehouse can be connected with the wall board of the adjacent warehouse, the multi-functional column 1 and the multi-layer reinforcement column 2; the multi-functional column 1 can position the warehouse wall. The multifunctional column 1 is divided into several sections from top to bottom. The inner side of the first section of the uppermost layer is provided with the first layer of warehouse wall panels, and the inner side of the second section is first provided with a reinforcing column 2, so that the inner surface of the reinforcing column 2 is in line with the first layer of the warehouse. The inner side of the wall board is flush, and the second layer of the warehouse wall is provided on the inner side of the reinforcing column 2, so that the first and second layer of the warehouse wall are partially overlapped; with the above-mentioned similar setting method, the second and third layer of the warehouse The wall panels are partially overlapped until they reach the bottom layer of the warehouse wall panels to form a stepped assembled circular underground granary; the prefabricated warehouse wall panels 3 are the inner and outer steel plates 13, 14 and the concrete panels between them Combined into an integral structure, the inner and outer steel plates 13, 14 and the concrete between them are connected by anchors.

所述仓壁板5外表面喷涂护面涂料,所述护面涂料包括如下重量份的材料制成:石油沥青110份,玻璃纤维10份,膨润土9份,乳化剂7.5份,分散剂2份,稳定剂2份,有机氟改性苯丙乳液30份、抗冻剂3份。The outer surface of the warehouse wall 5 is sprayed with a protective coating, and the protective coating includes the following materials in parts by weight: 110 parts of petroleum asphalt, 10 parts of glass fiber, 9 parts of bentonite, 7.5 parts of emulsifier, and 2 parts of dispersant , 2 parts of stabilizer, 30 parts of organic fluorine modified styrene-acrylic emulsion, 3 parts of antifreeze.

所述乳化剂采用氢化牛脂胺,所述分散剂采用硬脂酸单甘油酯,所述稳定剂采用硫酸盐,所述抗冻剂采用乙二醇。The emulsifier adopts hydrogenated tallow amine, the dispersant adopts monoglyceride stearate, the stabilizer adopts sulfate, and the antifreeze agent adopts ethylene glycol.

实施例六Embodiment six

如图1和图3所示:本实施例提供了一种内外均包钢板阶梯状预制装配式圆形地下粮仓。 包括仓底板5、多块预制仓壁板3、仓顶梁板4、多功能柱1、多层加强柱2,所述的仓壁板3为弧形预制板块,周边有连接装置,通过连接装置仓壁板能与相邻仓壁板、多功能柱1和多层加强柱2进行连接;所述多功能柱1对仓壁进行定位。多功能柱1从上至下分成数段,最上层的第一段内侧设有第一层仓壁板,第二段内侧先设有加强柱2,使得加强柱2内侧面与第一层仓壁板内侧面平齐,再在加强柱2内侧面设有第二层仓壁板,使得第一、二层仓壁板部分搭接;用上述类似的设置方式,使得第二、三层仓壁板部分搭接,一直搭接至最下面一层仓壁板,形成阶梯状装配式圆形地下粮仓;所述预制仓壁板3为内、外侧钢板13、14和其之间的混凝土板结合成整体的结构,内、外侧钢板13、14与其之间的混凝土采用锚钉连接。As shown in Fig. 1 and Fig. 3: this embodiment provides a stepped prefabricated round underground granary both inside and outside covered with steel plates. It includes a warehouse bottom plate 5, a plurality of prefabricated warehouse wall panels 3, a warehouse roof beam plate 4, a multifunctional column 1, and a multi-layer reinforced column 2. The warehouse wall panels 3 are arc-shaped prefabricated plates with connecting devices around them. The wall board of the device warehouse can be connected with the wall board of the adjacent warehouse, the multi-functional column 1 and the multi-layer reinforcement column 2; the multi-functional column 1 can position the warehouse wall. The multifunctional column 1 is divided into several sections from top to bottom. The inner side of the first section of the uppermost layer is provided with the first layer of warehouse wall panels, and the inner side of the second section is first provided with a reinforcing column 2, so that the inner surface of the reinforcing column 2 is in line with the first layer of the warehouse. The inner side of the wall board is flush, and the second layer of the warehouse wall is provided on the inner side of the reinforcing column 2, so that the first and second layer of the warehouse wall are partially overlapped; with the above-mentioned similar setting method, the second and third layer of the warehouse The wall panels are partially overlapped until they reach the bottom layer of the warehouse wall panels to form a stepped assembled circular underground granary; the prefabricated warehouse wall panels 3 are the inner and outer steel plates 13, 14 and the concrete panels between them Combined into an integral structure, the inner and outer steel plates 13, 14 and the concrete between them are connected by anchors.

所述仓壁板5外表面喷涂护面涂料,所述护面涂料包括如下重量份的材料制成:石油沥青105份,玻璃纤维13份,膨润土10份,乳化剂9份,分散剂2.5份,稳定剂2.5份,有机氟改性苯丙乳液35份、抗冻剂3.5份。The outer surface of the warehouse wall 5 is sprayed with protective paint, and the protective paint includes the following materials in parts by weight: 105 parts of petroleum asphalt, 13 parts of glass fiber, 10 parts of bentonite, 9 parts of emulsifier, and 2.5 parts of dispersant , 2.5 parts of stabilizer, 35 parts of organic fluorine modified styrene-acrylic emulsion, 3.5 parts of antifreeze.

所述乳化剂采用氢化牛脂胺,所述分散剂采用硬脂酸单甘油酯,所述稳定剂采用硫酸盐,所述抗冻剂采用乙二醇。The emulsifier adopts hydrogenated tallow amine, the dispersant adopts monoglyceride stearate, the stabilizer adopts sulfate, and the antifreeze agent adopts ethylene glycol.

实施例四至六提供了仓壁板外表面专用护面涂料,对仓壁板起到保护、防腐的作用,对仓壁起到防渗、密封的作用,可以在仓壁板预制时喷涂或在现场组装仓壁时喷涂,从根本上解决了边角、缝隙、不规则结构的连接处渗漏等技术难题,增强了地下粮仓的防水性能。护面涂料中加入了玻璃纤维,大大增加了涂料的韧性以及抗拉强度,延缓了涂层开裂的时间,增加其使用寿命,且对于仓壁也具有一定的支撑作用。加入的防冻剂可以减小低温对护面涂料的损坏,保证了寒冷地区冬季地下粮仓的安全运行。Embodiments 4 to 6 provide special protective coatings for the outer surface of the warehouse wall, which can protect the warehouse wall from corrosion and prevent seepage and seal the warehouse wall. It can be sprayed when the warehouse wall is prefabricated or in the Spraying when assembling the warehouse wall on site fundamentally solves technical problems such as corners, gaps, and joints with irregular structures such as leakage, and enhances the waterproof performance of the underground granary. Glass fiber is added to the protective coating, which greatly increases the toughness and tensile strength of the coating, delays the cracking time of the coating, increases its service life, and also has a certain supporting effect on the warehouse wall. The added antifreeze can reduce the damage of low temperature to the protective coating and ensure the safe operation of the underground granary in winter in cold regions.

最后说明的是,以上实施例仅用以说明本实用新型的技术方案而非限制,本领域普通技术人员对本实用新型的技术方案所做的其他修改或者等同替换,只要不脱离本实用新型技术方案的精神和范围,均应涵盖在本实用新型的权利要求范围当中。Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model without limitation, other modifications or equivalent replacements made by those of ordinary skill in the art to the technical solution of the utility model, as long as they do not depart from the technical solution of the utility model The spirit and scope should be included in the claims of the present utility model.

Claims (9)

1. a kind of prefabricated assembled underground granary, the flat shape of the underground granary is pre- for circle, including orlop plate (5), polylith Bulkhead plate (3) processed, silo roof beam slab (4), multiple function (1), multilayer reinforcing prop (2), described bulkhead plate (3) is arc prefabricated board There are attachment means on block, periphery, can be with adjacent bulkhead plate, multiple function (1) and multilayer reinforcing prop (2) by attachment means bulkhead plate It is attached;The multiple function (1) positions to bulkhead, and its depth anchored into soil is more than orlop plate (5) depth, is to hold By the main bearing member of soil pressure, pressure and resistance buoyancy;It is characterized in that:Multiple function (1) is divided into from top to bottom Several sections, the first paragraph inner side of the superiors is provided with ground floor bulkhead plate, and second segment inner side is first provided with reinforcing prop (2) so that reinforcing prop (2) medial surface is concordant with ground floor bulkhead plate medial surface, then is provided with second layer bulkhead plate in reinforcing prop (2) medial surface so that the First, two layers of bulkhead plate part overlap joint;With above-mentioned similar set-up mode so that second and third layer of bulkhead plate part overlap joint, take always Bottom one layer of bulkhead plate is connected to, stepped assembled circle underground granary is formed;The prefabricated bulkhead plate (3) is medial and lateral Steel plate (13,14) and the concrete slab between it combine integral structure, medial and lateral steel plate (13,14) and mixing between it Solidifying soil is using holdfast connection.
2. underground granary as claimed in claim 1, it is characterised in that:Described prefabricated bulkhead plate multiple function (1) and reinforcement Post (2) is using steel column or is provided with the concrete of steel embedded part, and multiple function (1) is connected with reinforcing prop (2) by bolt or soldered.
3. underground granary as claimed in claim 1, it is characterised in that:Prefabricated bulkhead plate (3) top, the following, left side, the right side Side is surrounded by steel plate.
4. underground granary as claimed in claim 1, it is characterised in that:Prefabricated bulkhead plate (3) top, the following, left side, the right side Side is surrounded by steel plate, and left end is provided with that male is trapezoidal or half elliptic plug, and right-hand member is provided with trapezoidal or half elliptic groove.
5. underground granary as claimed in claim 3, it is characterised in that:Prefabricated bulkhead plate (3) ring level is concordant, its outside with Multiple function (1) or reinforcing prop (2) are welded to connect, and contiguous prefabricated bulkhead plate (3) inner side is connected with junction steel plate (6), connects steel Plate (6) is used with prefabricated bulkhead plate (3) and is welded to connect;In multiple function (1) or reinforcing prop (2) and contiguous prefabricated bulkhead plate (3) And the water-proof concrete of a strength grade identical with prefabricated bulkhead plate or high is poured in the cavity that surrounds of junction steel plate (6) (12)。
6. underground granary as claimed in claim 4, it is characterised in that:Prefabricated bulkhead plate (3) the ring level is concordant, every piece The male of prefabricated bulkhead plate (3) is trapezoidal or semiellipse type plug inserts that contiguous prefabricated bulkhead plate (3) female is trapezoidal or semiellipse type In slot;Every piece of prefabricated bulkhead plate (3) is welded to connect with multiple function (1) or reinforcing prop (2), in contiguous prefabricated bulkhead plate (3) The perps of side is directly connected using butt welding and/or is welded to connect with junction steel plate.
7. underground granary as claimed in claim 1, it is characterised in that:The upper and lower two-layer of the prefabricated bulkhead plate (3) vertically misplaces Overlap joint, the overlapping part of upper and lower two-layer bulkhead plate is welded with elongated angle welding (9).
8. underground granary as claimed in claim 1, it is characterised in that:The upper and lower two-layer dislocation of the prefabricated bulkhead plate (3) is taken The place of connecing is provided with oblique stiffening plate (8), reinforcing plate and upper and lower bulkhead plate weld.
9. underground granary as claimed in claim 1, it is characterised in that:The upper and lower two-layer dislocation of the prefabricated bulkhead plate (3) is taken The place of connecing is circumferentially spaced to be provided with ribbed stiffener (7);The ribbed stiffener (7) is cut away right angle and is formed by right angled triangle steel plate, should be added Strength rib (7) and adjacent prefabricated bulkhead plate (3) up and down vertical welding;Ribbed stiffener (7) is polylith, vertically bulkhead plate (3) overlap joint Position ring is uniformly distributed.
CN201620675717.0U 2016-06-29 2016-06-29 Circular underground granary of prefabricated assembled of inside and outside equal steel plated echelonment Withdrawn - After Issue CN206189967U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620675717.0U CN206189967U (en) 2016-06-29 2016-06-29 Circular underground granary of prefabricated assembled of inside and outside equal steel plated echelonment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620675717.0U CN206189967U (en) 2016-06-29 2016-06-29 Circular underground granary of prefabricated assembled of inside and outside equal steel plated echelonment

Publications (1)

Publication Number Publication Date
CN206189967U true CN206189967U (en) 2017-05-24

Family

ID=58736139

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620675717.0U Withdrawn - After Issue CN206189967U (en) 2016-06-29 2016-06-29 Circular underground granary of prefabricated assembled of inside and outside equal steel plated echelonment

Country Status (1)

Country Link
CN (1) CN206189967U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106088759A (en) * 2016-06-29 2016-11-09 河南工业大学 The stepped prefabricated assembled circular underground granary of a kind of inside and outside all steel plateds

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106088759A (en) * 2016-06-29 2016-11-09 河南工业大学 The stepped prefabricated assembled circular underground granary of a kind of inside and outside all steel plateds
CN106088759B (en) * 2016-06-29 2018-05-08 河南工业大学 The equal stepped prefabricated assembled circular underground granary of steel plated inside and outside one kind

Similar Documents

Publication Publication Date Title
CN106088758B (en) A kind of bilayer assembled underground granary
CN106088762B (en) A kind of prefabricated assembled round underground granary of insertion slot type encased steel plate
CN206189966U (en) Circular underground granary of slot -in type prefabricated assembled of inside and outside equal steel plated
CN206189968U (en) Prefabricated assembled underground granary of inside lining plastics echelonment
CN206189967U (en) Circular underground granary of prefabricated assembled of inside and outside equal steel plated echelonment
CN106013911B (en) A kind of interior steel plated assembled circle underground granary with premoulded filler strip
CN206035051U (en) Prefabricated caulking strips's in area circular underground granary of double -layer steel plate assembled
CN206035052U (en) Prefabricated caulking strips's in area circular underground granary of outer steel plated assembled
CN106049948B (en) Bag Plastic preform bulkhead underground granary in a kind of insertion slot type
CN106088759B (en) The equal stepped prefabricated assembled circular underground granary of steel plated inside and outside one kind
CN106088764B (en) A kind of stepped prefabricated assembled circular underground granary of encased steel plate
CN206035043U (en) Prefabricated assembled rectangle underground granary of outer steel plated echelonment
CN206189414U (en) Circular underground granary of slot -in type prefabricated bulkhead of outer steel plated
CN106193744B (en) The round prefabricated assembled underground granary of equal steel plated inside and outside one kind
CN206189970U (en) Circular prefabricated assembled underground granary of inside and outside equal steel plated
CN206438511U (en) A kind of double-deck assembled underground granary
CN206189971U (en) Circular underground granary of prefabricated assembled of outer steel plated
CN206035050U (en) Prefabricated bulkhead underground granary of slot -in type endocyst plastics
CN206035046U (en) Inside and outside prefabricated assembled underground granary of plastics echelonment that all wraps
CN206035042U (en) Prefabricated caulking strips's in area circular underground granary of interior steel plated assembled
CN206035048U (en) Prefabricated assembled underground granary of interior plastic cover
CN106088760B (en) The equal prefabricated assembled round underground granary of steel plated inside and outside a kind of insertion slot type
CN106013909B (en) A kind of outsourcing Plastic preform assembled underground granary
CN106193745B (en) A kind of stepped prefabricated assembled rectangular underground granary of interior encased steel plate
CN106013910B (en) A kind of stepped prefabricated assembled rectangular underground granary of encased steel plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20170524

Effective date of abandoning: 20180508

AV01 Patent right actively abandoned

Granted publication date: 20170524

Effective date of abandoning: 20180508

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned