CN109024662A - Method of the anchor pile underpinning without basement building underground space increasing layer - Google Patents

Method of the anchor pile underpinning without basement building underground space increasing layer Download PDF

Info

Publication number
CN109024662A
CN109024662A CN201810797739.8A CN201810797739A CN109024662A CN 109024662 A CN109024662 A CN 109024662A CN 201810797739 A CN201810797739 A CN 201810797739A CN 109024662 A CN109024662 A CN 109024662A
Authority
CN
China
Prior art keywords
pile
anchor
basement
underpinning
underground space
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810797739.8A
Other languages
Chinese (zh)
Inventor
林志豪
雷斌
李森
杨静
章文轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Gongkan Geotechnical Group Co Ltd
Original Assignee
Shenzhen Gongkan Geotechnical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Gongkan Geotechnical Group Co Ltd filed Critical Shenzhen Gongkan Geotechnical Group Co Ltd
Priority to CN201810797739.8A priority Critical patent/CN109024662A/en
Publication of CN109024662A publication Critical patent/CN109024662A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/48Foundations inserted underneath existing buildings or constructions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/14Sealing joints between adjacent sheet piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Foundations (AREA)

Abstract

A kind of method the invention discloses anchor pile underpinning without basement building underground space increasing layer, include the following steps: S1: support construction: carrying out supporting construction around ground, a kind of foundation pit enclosure structure for being mutually twisted arrangement is formed between stake and stake, that is, uses interlocking pile structural support;S2: foundation soil pile sinking and pile foundation underpinning: is excavated from indoor terrace, until former isolated footing end face, pile sinking is carried out by the way of anchor jacked pile, the vertical drilling in former isolated footing end face, by burying the fixed pile driving frame of anchor pole on a stand alone basis, using the self weight of existing building as pressure pile reaction.The present invention is realized using anchor pile underpinning builds underground space increasing layer without basement, while not influencing building structure stabilization, extend basement effective use space, increase effective usable floor area of building, reach three-dimensional, high efficiency utilizes urban land resource, and the construction period is short, project cost is low.

Description

Method of the anchor pile underpinning without basement building underground space increasing layer
Technical field
The present invention relates to technical field of building construction more particularly to a kind of anchor pile underpinning to build underground without basement The method of space increasing layer.
Background technique
Since decision-making brings parking difficulty problem to become increasingly conspicuous to big city now, urban land is nervous, price Valuableness, building the underground spaces such as underground parking becomes a kind of suitable selection.80~nineties of 20th century, all parts of the country are built It is largely built without basement, removing this batch of building, to rebuild then cost excessive, does not meet Resources for construction economizing type, environmental-friendly The general plan of type harmonious society.
To solve to develop the underground of this batch of building under conditions of such as why not influencing normal use and rationally utilizing space Space, we use Anchored Pile Foundation Underpinning technology, effectively realize the secondary use of the underground space.
Summary of the invention
A kind of method the purpose of the present invention is to provide anchor pile underpinning without basement building underground space increasing layer, Have and extend basement effective use space, increase effective usable floor area of building, reaches three-dimensional, high efficiency utilizes Urban land resource, and the construction period is short, the low advantage of project cost, solves existing building and builds without basement but remove weight Build that cost is excessive, do not meet Resources for construction economizing type, environmentally friendly harmonious society general plan the problem of.
A kind of method of the anchor pile underpinning according to an embodiment of the present invention without basement building underground space increasing layer, tool Steps are as follows for body:
S1: support construction: carrying out supporting construction around ground, is formed between stake and stake and is mutually twisted arrangement A kind of foundation pit enclosure structure uses interlocking pile structural support;
S2: pile sinking and pile foundation underpinning: excavating foundation soil from indoor terrace, until former isolated footing end face, uses The mode of anchor jacked pile carries out pile sinking, the vertical drilling in former isolated footing end face, by burying anchor pole on a stand alone basis Prefabricated small square pile is pressed by fixed pile driving frame using the self weight of existing building as pressure pile reaction with jack out of piling hole In soil, and synchronous grouting;After the completion of pile sinking, using envelope pile cover technology, static pressed pile and original basis is bound up, top is tied Structure load is transferred to pile foundation from former isolated footing, carries out the construction of ground beam, ground beam and frame column in surface of base and interlocking pile connects It connects;
S3: earth excavation and frame column are handled: being set well-points dewatering on the inside of foundation pit supporting construction, carried out light well point drop Water excavates former isolated footing side and the bottom surface earthwork below, until at the designed elevation of proposed basement bottom board;It is excavated to and sets After counting depth, basement bottom board construction is carried out at once, later, in former isolated footing end face inclined borehole, on former isolated footing Frame column, which extend, to be poured to hole bottom, and extended frame column is formed;
S4: bottom slab concreting: cut out former isolated footing extra in addition to extended frame column and it is new on the basis of anchor rod static pressure Stake, then pours basement bottom board, completes construction.
On the basis of above scheme, in the S1, the arrangement mode of stake is a not arrangement of reinforcement and mixed using extra retarded set element Solidifying soil stake and a reinforced concrete pile arranged for interval.
On the basis of above scheme, in the S2, the ground beam and frame column, interlocking pile are using the connection side welded Formula.
On the basis of above scheme, in the S2, aperture is the 80% of stake diameter.
On the basis of above scheme, in the S3, the deformation of stage detection building is excavated, original basis sedimentation is not more than 5cm, former isolated footing are supported by anchor jacked pile.
On the basis of above scheme, in the S3, using layering, piecemeal, symmetrical digging mode.
Compared with the prior art, the invention has the beneficial effects that: by interlocking pile structural support mode, utilize occlusion The advantages of stake stiffness by itself and good water insulation effect, building structure can be close to, speed of application is fast, shortens the construction period, to ambient enviroment Disturbance is smaller, and exterior wall permanent structure can be used as after basement is built up;Synchronous grouting is combined in pile sinking, can be improved anchor The bearing capacity of rod static pressure pile improves pile foundation surrounding soil mechanical property, controls the sedimentation of superstructure, and use layering, piecemeal, Symmetrical digging mode can control the uniform settlement of superstructure, by cutting out extra original in addition to extended frame column solely The plane space that anchor jacked pile on the basis of vertical basic and new can reduce frame column is occupied for the effective of basement space The influence utilized;The present invention is realized using anchor pile underpinning builds underground space increasing layer without basement, is not influencing to build While stable structure, basement effective use space is extended, effective usable floor area of building is increased, reaches three-dimensional Change, high efficiency utilize urban land resource, and the construction period is short, and project cost is low.
Detailed description of the invention
Attached drawing is used to provide further understanding of the present invention, and constitutes part of specification, with reality of the invention It applies example to be used to explain the present invention together, not be construed as limiting the invention.In the accompanying drawings:
Fig. 1 is a kind of stinging for method of the anchor pile underpinning proposed by the present invention without basement building underground space increasing layer Close pilework schematic diagram.
Fig. 2 is the anchor for the method that a kind of anchor pile underpinning proposed by the present invention builds underground space increasing layer without basement Architectural section after rod static pressure pile construction.
Fig. 3 is the ground for the method that a kind of anchor pile underpinning proposed by the present invention builds underground space increasing layer without basement Lower room absolute altitude structural schematic diagram.
Fig. 4 is the ground for the method that a kind of anchor pile underpinning proposed by the present invention builds underground space increasing layer without basement Lower room sectional view.
In figure: 1- ground beam, 2- interlocking pile, 3- anchor jacked pile, 4- basement bottom board, 5- frame column.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
A kind of method of the anchor pile underpinning without basement building underground space increasing layer is present embodiments provided, it is specific to walk It is rapid as follows:
S1: support construction: carrying out supporting construction around ground, is formed between stake and stake and is mutually twisted arrangement A kind of foundation pit enclosure structure uses 2 structural support of interlocking pile, 2 structural schematic diagram of interlocking pile is as shown in Figure 1, interlocking pile 2 itself The advantages of rigidity and good water insulation effect, can be close to building structure, and speed of application is fast, shorten the construction period, to ambient enviroment disturbance compared with It is small;
S2: pile sinking and pile foundation underpinning: excavating foundation soil from indoor terrace, until former isolated footing end face, uses The mode of anchor jacked pile 3 carries out pile sinking, the vertical drilling in former isolated footing end face, by burying anchor pole on a stand alone basis Prefabricated small square pile is pressed by fixed pile driving frame using the self weight of existing building as pressure pile reaction with jack out of piling hole In soil, and synchronous grouting, it can be improved the bearing capacity of anchor jacked pile 3, improve pile foundation surrounding soil mechanical property, control top The sedimentation of structure;After the completion of pile sinking, using envelope pile cover technology, static pressed pile and original basis are bound up, by superstructure lotus It carries from former isolated footing and is transferred to pile foundation, carry out the construction of ground beam 1, ground beam 1 and frame column 5 in surface of base and interlocking pile 2 connects It connects, the architectural section after anchor rod static pressure pile driving construction is as shown in Figure 2;
S3: earth excavation and frame column are handled: being set well-points dewatering on the inside of foundation pit supporting construction, carried out light well point drop Water excavates former isolated footing side and the bottom surface earthwork below, until at the designed elevation of proposed basement bottom board 4;It is excavated to After projected depth, basement bottom board 4 is carried out at once and is constructed, later, in former isolated footing end face inclined borehole, on former isolated footing Frame column 5 carry out extend pour to hole bottom, form extended frame column 5, basement absolute altitude structural schematic diagram is as shown in Figure 3;
S4: bottom slab concreting: cut out former isolated footing extra in addition to extended frame column 5 and it is new on the basis of anchor rod static pressure Stake 3, the plane space that can reduce frame column 5 occupies the influence of the effective use for basement space, then to basement Bottom plate 4 is poured, and construction is completed, and basement sectional view is as shown in Figure 4.
In S1, the arrangement mode of stake is not arrangement of reinforcement and use extra retarded set plain concrete pile and an armored concrete Stake arranged for interval, in S2, ground beam 1 and frame column 5, interlocking pile 2 are using the connection type of welding, and in S2, aperture is stake diameter 80%, in S3, excavate the deformation of stage detection building, original basis sedimentation is not more than 5cm, and former isolated footing is quiet by anchor pole Piling 3 supports, and is not in collapsing phenomenon so that support is firm, in S3, using layering, piecemeal, symmetrical digging mode, The uniform settlement of superstructure can be controlled.
Place is not described in detail by the present invention, is the well-known technique of those skilled in the art.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (6)

1. a kind of method of anchor pile underpinning without basement building underground space increasing layer, it is characterised in that: specific steps are such as Under:
S1: support construction: carrying out supporting construction around ground, and the one kind for being mutually twisted arrangement is formed between stake and stake Foundation pit enclosure structure uses interlocking pile (2) structural support;
S2: pile sinking and pile foundation underpinning: excavating foundation soil from indoor terrace, until former isolated footing end face, using anchor pole The mode of static pressed pile 3 carries out pile sinking, the vertical drilling in former isolated footing end face, is fixed by burying anchor pole on a stand alone basis Pile driving frame with jack is buried prefabricated small square pile from piling hole internal pressure using the self weight of existing building as pressure pile reaction, And synchronous grouting;After the completion of pile sinking, using envelope pile cover technology, static pressed pile and original basis are bound up, by superstructure lotus It carries and from former isolated footing is transferred to pile foundation, carry out the construction of ground beam (1) in surface of base, ground beam (1) and frame column (5) and be engaged Stake (2) connection;
S3: earth excavation and frame column are handled: well-points dewatering set on the inside of foundation pit supporting construction, carries out Application of light well point precipitation, Former isolated footing side and the bottom surface earthwork below are excavated, until at the designed elevation of proposed basement bottom board (4);It is excavated to and sets After counting depth, basement bottom board (4) construction is carried out at once, later, in former isolated footing end face inclined borehole, on former isolated footing Frame column (5) carry out extend pour to hole bottom, form extended frame column (5);
S4: bottom slab concreting: cut out former isolated footing extra in addition to extended frame column (5) and it is new on the basis of anchor jacked pile (3), then basement bottom board (4) is poured, completes construction.
2. a kind of method of the anchor pile underpinning according to claim 1 without basement building underground space increasing layer, Be characterized in that: in the S1, the arrangement mode of stake is not arrangement of reinforcement and use extra retarded set plain concrete pile and a reinforcing bar Concrete-pile arranged for interval.
3. a kind of method of the anchor pile underpinning according to claim 1 without basement building underground space increasing layer, Be characterized in that: in the S2, the ground beam (1) and frame column (5), interlocking pile (2) are using the connection type welded.
4. a kind of method of the anchor pile underpinning according to claim 1 without basement building underground space increasing layer, Be characterized in that: in the S2, aperture is the 80% of stake diameter.
5. a kind of method of the anchor pile underpinning according to claim 1 without basement building underground space increasing layer, Be characterized in that: in the S3, excavate the stage detection building deformation, original basis sedimentation be not more than 5cm, former isolated footing by Anchor jacked pile (3) support.
6. a kind of method of the anchor pile underpinning according to claim 1 without basement building underground space increasing layer, It is characterized in that: in the S3, using layering, piecemeal, symmetrical digging mode.
CN201810797739.8A 2018-07-19 2018-07-19 Method of the anchor pile underpinning without basement building underground space increasing layer Pending CN109024662A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810797739.8A CN109024662A (en) 2018-07-19 2018-07-19 Method of the anchor pile underpinning without basement building underground space increasing layer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810797739.8A CN109024662A (en) 2018-07-19 2018-07-19 Method of the anchor pile underpinning without basement building underground space increasing layer

Publications (1)

Publication Number Publication Date
CN109024662A true CN109024662A (en) 2018-12-18

Family

ID=64643597

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810797739.8A Pending CN109024662A (en) 2018-07-19 2018-07-19 Method of the anchor pile underpinning without basement building underground space increasing layer

Country Status (1)

Country Link
CN (1) CN109024662A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067400A (en) * 2019-03-21 2019-07-30 武大巨成结构股份有限公司 It is a kind of for extending the construction method of the building underground space
CN110206135A (en) * 2019-05-21 2019-09-06 福建工程学院 A kind of stone masonry house foundation ruggedized construction and method
CN112031809A (en) * 2020-09-17 2020-12-04 西南交通大学 Underground engineering structure meeting double-zero conditions and construction method
CN112176879A (en) * 2020-10-15 2021-01-05 深圳市罗湖建筑安装工程有限公司 Bridge pier foundation underpinning structure and construction method
CN112576056A (en) * 2020-12-07 2021-03-30 北京中岩大地科技股份有限公司 Underpinning support system for storey-adding reconstruction of existing building basement and construction method thereof
CN114319930A (en) * 2021-12-30 2022-04-12 上海建工二建集团有限公司 Enclosure structure below bearing wall and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2236677A2 (en) * 2009-03-31 2010-10-06 AS Amhold Method for creating a building under an architectural monument
CN102127974A (en) * 2011-04-18 2011-07-20 上海现代建筑设计(集团)有限公司 Design and construction method of additional cellar under existing building
CN102182325A (en) * 2011-03-28 2011-09-14 东南大学 Storey adding method for existing building basement with frame structure and independent foundation
CN102220769A (en) * 2011-04-15 2011-10-19 上海天演建筑物移位工程有限公司 System and method for underpinning and jacking building and adding storeys downwards
CN103321244A (en) * 2013-03-27 2013-09-25 江苏苏南建筑技术发展有限公司 Construction method for additionally arranged basement in existing building on sand foundation
CN103912134A (en) * 2014-03-21 2014-07-09 上海建工四建集团有限公司 Construction in-situ underground space structure and construction method
CN108005399A (en) * 2017-10-31 2018-05-08 上海市政工程设计研究总院(集团)有限公司 Add the construction method for building multi-layer underground space under a kind of existing building group

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2236677A2 (en) * 2009-03-31 2010-10-06 AS Amhold Method for creating a building under an architectural monument
CN102182325A (en) * 2011-03-28 2011-09-14 东南大学 Storey adding method for existing building basement with frame structure and independent foundation
CN102220769A (en) * 2011-04-15 2011-10-19 上海天演建筑物移位工程有限公司 System and method for underpinning and jacking building and adding storeys downwards
CN102127974A (en) * 2011-04-18 2011-07-20 上海现代建筑设计(集团)有限公司 Design and construction method of additional cellar under existing building
CN103321244A (en) * 2013-03-27 2013-09-25 江苏苏南建筑技术发展有限公司 Construction method for additionally arranged basement in existing building on sand foundation
CN103912134A (en) * 2014-03-21 2014-07-09 上海建工四建集团有限公司 Construction in-situ underground space structure and construction method
CN108005399A (en) * 2017-10-31 2018-05-08 上海市政工程设计研究总院(集团)有限公司 Add the construction method for building multi-layer underground space under a kind of existing building group

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067400A (en) * 2019-03-21 2019-07-30 武大巨成结构股份有限公司 It is a kind of for extending the construction method of the building underground space
CN110206135A (en) * 2019-05-21 2019-09-06 福建工程学院 A kind of stone masonry house foundation ruggedized construction and method
CN110206135B (en) * 2019-05-21 2024-01-12 福建理工大学 Stone masonry house foundation reinforcing structure and method
CN112031809A (en) * 2020-09-17 2020-12-04 西南交通大学 Underground engineering structure meeting double-zero conditions and construction method
CN112031809B (en) * 2020-09-17 2022-02-08 西南交通大学 Underground engineering structure meeting double-zero conditions and construction method
CN112176879A (en) * 2020-10-15 2021-01-05 深圳市罗湖建筑安装工程有限公司 Bridge pier foundation underpinning structure and construction method
CN112576056A (en) * 2020-12-07 2021-03-30 北京中岩大地科技股份有限公司 Underpinning support system for storey-adding reconstruction of existing building basement and construction method thereof
CN114319930A (en) * 2021-12-30 2022-04-12 上海建工二建集团有限公司 Enclosure structure below bearing wall and construction method thereof
CN114319930B (en) * 2021-12-30 2023-09-05 上海建工二建集团有限公司 Building envelope below bearing wall and construction method thereof

Similar Documents

Publication Publication Date Title
CN109024662A (en) Method of the anchor pile underpinning without basement building underground space increasing layer
CN102182325B (en) Storey adding method for existing building basement with frame structure and independent foundation
CN106088650B (en) A kind of method and building suitable for building with brick-concrete structure underground increasing layer
CN103321231A (en) Construction method of foundation pit support
CN103526781B (en) A kind of ancient architecture foundation integrated pallet base isolation reinforcement structure and construction method thereof
CN110106919A (en) A kind of lid digs the building enclosure and its construction method at station
CN108867723B (en) Method for correcting inclination of frame structure building and adding underground layer
CN113550322A (en) Enclosure system next to deep and shallow foundation pit and construction method
CN102162258A (en) Concrete-filled steel tubular high-pile tower footing structure of tower crane and construction method thereof
CN111236241A (en) Weak water-rich stratum subway foundation pit reinforcing excavation method based on half-cover excavation method
CN101498133B (en) Method and supporting construction for enlarging basement top-down method earth excavation space
CN216041201U (en) Earlier prop and dig double-deck diagonal bracing foundation ditch enclosure system afterwards
CN201991013U (en) High-piled tower footing structure of tower crane concrete-filled steel tube
CN107326932B (en) Quasi-semi-reverse construction method for underground garage
CN110904992B (en) Elevator foundation member for integrally assembling elevator and construction method thereof
CN207728018U (en) The building structure of skyscraper is built suitable for tier building set
CN116289979A (en) Deep foundation pit supporting construction method for underground forward and reverse synchronous construction
CN102605801A (en) Suspension semi-reverse-construction method for underground circular water tank
CN217027018U (en) A downthehole dynamic compaction gravel pile foundation structure for large tracts of land weak soil is consolidated
CN109989346A (en) Bridge major diameter precast concrete tubular column basis and its construction method
CN209509556U (en) Underpin the constructing structure of no basement building underground space increasing layer
CN210459300U (en) Enclosure structure for covering and digging station
CN107916798A (en) The building structure of skyscraper is built suitable for tier building set
CN114215106A (en) Multi-pile support column structure adopting upper steel structure full-reverse construction method and construction method
KR200413303Y1 (en) Stone stacked wall structure using steel beam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181218

RJ01 Rejection of invention patent application after publication