- CN109024662A CN109024662A CN201810797739.8A CN201810797739A CN109024662A CN 109024662 A CN109024662 A CN 109024662A CN 201810797739 A CN201810797739 A CN 201810797739A CN 109024662 A CN109024662 A CN 109024662A
- Authority
- CN
- China
- Prior art keywords
- pile
- anchor
- basement
- underpinning
- underground space
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/48—Foundations inserted underneath existing buildings or constructions
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/02—Sheet piles or sheet pile bulkheads
- E02D5/14—Sealing joints between adjacent sheet piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
- E02D5/76—Anchorings for bulkheads or sections thereof in as much as specially adapted therefor
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Foundations (AREA)
Abstract
A kind of method the invention discloses anchor pile underpinning without basement building underground space increasing layer, include the following steps: S1: support construction: carrying out supporting construction around ground, a kind of foundation pit enclosure structure for being mutually twisted arrangement is formed between stake and stake, that is, uses interlocking pile structural support;S2: foundation soil pile sinking and pile foundation underpinning: is excavated from indoor terrace, until former isolated footing end face, pile sinking is carried out by the way of anchor jacked pile, the vertical drilling in former isolated footing end face, by burying the fixed pile driving frame of anchor pole on a stand alone basis, using the self weight of existing building as pressure pile reaction.The present invention is realized using anchor pile underpinning builds underground space increasing layer without basement, while not influencing building structure stabilization, extend basement effective use space, increase effective usable floor area of building, reach three-dimensional, high efficiency utilizes urban land resource, and the construction period is short, project cost is low.
Description
Technical field
The present invention relates to technical field of building construction more particularly to a kind of anchor pile underpinning to build underground without basement
The method of space increasing layer.
Background technique
Since decision-making brings parking difficulty problem to become increasingly conspicuous to big city now, urban land is nervous, price
Valuableness, building the underground spaces such as underground parking becomes a kind of suitable selection.80~nineties of 20th century, all parts of the country are built
It is largely built without basement, removing this batch of building, to rebuild then cost excessive, does not meet Resources for construction economizing type, environmental-friendly
The general plan of type harmonious society.
To solve to develop the underground of this batch of building under conditions of such as why not influencing normal use and rationally utilizing space
Space, we use Anchored Pile Foundation Underpinning technology, effectively realize the secondary use of the underground space.
Summary of the invention
A kind of method the purpose of the present invention is to provide anchor pile underpinning without basement building underground space increasing layer,
Have and extend basement effective use space, increase effective usable floor area of building, reaches three-dimensional, high efficiency utilizes
Urban land resource, and the construction period is short, the low advantage of project cost, solves existing building and builds without basement but remove weight
Build that cost is excessive, do not meet Resources for construction economizing type, environmentally friendly harmonious society general plan the problem of.
A kind of method of the anchor pile underpinning according to an embodiment of the present invention without basement building underground space increasing layer, tool
Steps are as follows for body:
S1: support construction: carrying out supporting construction around ground, is formed between stake and stake and is mutually twisted arrangement
A kind of foundation pit enclosure structure uses interlocking pile structural support;
S2: pile sinking and pile foundation underpinning: excavating foundation soil from indoor terrace, until former isolated footing end face, uses
The mode of anchor jacked pile carries out pile sinking, the vertical drilling in former isolated footing end face, by burying anchor pole on a stand alone basis
Prefabricated small square pile is pressed by fixed pile driving frame using the self weight of existing building as pressure pile reaction with jack out of piling hole
In soil, and synchronous grouting;After the completion of pile sinking, using envelope pile cover technology, static pressed pile and original basis is bound up, top is tied
Structure load is transferred to pile foundation from former isolated footing, carries out the construction of ground beam, ground beam and frame column in surface of base and interlocking pile connects
It connects;
S3: earth excavation and frame column are handled: being set well-points dewatering on the inside of foundation pit supporting construction, carried out light well point drop
Water excavates former isolated footing side and the bottom surface earthwork below, until at the designed elevation of proposed basement bottom board;It is excavated to and sets
After counting depth, basement bottom board construction is carried out at once, later, in former isolated footing end face inclined borehole, on former isolated footing
Frame column, which extend, to be poured to hole bottom, and extended frame column is formed;
S4: bottom slab concreting: cut out former isolated footing extra in addition to extended frame column and it is new on the basis of anchor rod static pressure
Stake, then pours basement bottom board, completes construction.
On the basis of above scheme, in the S1, the arrangement mode of stake is a not arrangement of reinforcement and mixed using extra retarded set element
Solidifying soil stake and a reinforced concrete pile arranged for interval.
On the basis of above scheme, in the S2, the ground beam and frame column, interlocking pile are using the connection side welded
Formula.
On the basis of above scheme, in the S2, aperture is the 80% of stake diameter.
On the basis of above scheme, in the S3, the deformation of stage detection building is excavated, original basis sedimentation is not more than
5cm, former isolated footing are supported by anchor jacked pile.
On the basis of above scheme, in the S3, using layering, piecemeal, symmetrical digging mode.
Compared with the prior art, the invention has the beneficial effects that: by interlocking pile structural support mode, utilize occlusion
The advantages of stake stiffness by itself and good water insulation effect, building structure can be close to, speed of application is fast, shortens the construction period, to ambient enviroment
Disturbance is smaller, and exterior wall permanent structure can be used as after basement is built up;Synchronous grouting is combined in pile sinking, can be improved anchor
The bearing capacity of rod static pressure pile improves pile foundation surrounding soil mechanical property, controls the sedimentation of superstructure, and use layering, piecemeal,
Symmetrical digging mode can control the uniform settlement of superstructure, by cutting out extra original in addition to extended frame column solely
The plane space that anchor jacked pile on the basis of vertical basic and new can reduce frame column is occupied for the effective of basement space
The influence utilized;The present invention is realized using anchor pile underpinning builds underground space increasing layer without basement, is not influencing to build
While stable structure, basement effective use space is extended, effective usable floor area of building is increased, reaches three-dimensional
Change, high efficiency utilize urban land resource, and the construction period is short, and project cost is low.
Detailed description of the invention
Attached drawing is used to provide further understanding of the present invention, and constitutes part of specification, with reality of the invention
It applies example to be used to explain the present invention together, not be construed as limiting the invention.In the accompanying drawings:
Fig. 1 is a kind of stinging for method of the anchor pile underpinning proposed by the present invention without basement building underground space increasing layer
Close pilework schematic diagram.
Fig. 2 is the anchor for the method that a kind of anchor pile underpinning proposed by the present invention builds underground space increasing layer without basement
Architectural section after rod static pressure pile construction.
Fig. 3 is the ground for the method that a kind of anchor pile underpinning proposed by the present invention builds underground space increasing layer without basement
Lower room absolute altitude structural schematic diagram.
Fig. 4 is the ground for the method that a kind of anchor pile underpinning proposed by the present invention builds underground space increasing layer without basement
Lower room sectional view.
In figure: 1- ground beam, 2- interlocking pile, 3- anchor jacked pile, 4- basement bottom board, 5- frame column.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
A kind of method of the anchor pile underpinning without basement building underground space increasing layer is present embodiments provided, it is specific to walk
It is rapid as follows:
S1: support construction: carrying out supporting construction around ground, is formed between stake and stake and is mutually twisted arrangement
A kind of foundation pit enclosure structure uses 2 structural support of interlocking pile, 2 structural schematic diagram of interlocking pile is as shown in Figure 1, interlocking pile 2 itself
The advantages of rigidity and good water insulation effect, can be close to building structure, and speed of application is fast, shorten the construction period, to ambient enviroment disturbance compared with
It is small;
S2: pile sinking and pile foundation underpinning: excavating foundation soil from indoor terrace, until former isolated footing end face, uses
The mode of anchor jacked pile 3 carries out pile sinking, the vertical drilling in former isolated footing end face, by burying anchor pole on a stand alone basis
Prefabricated small square pile is pressed by fixed pile driving frame using the self weight of existing building as pressure pile reaction with jack out of piling hole
In soil, and synchronous grouting, it can be improved the bearing capacity of anchor jacked pile 3, improve pile foundation surrounding soil mechanical property, control top
The sedimentation of structure;After the completion of pile sinking, using envelope pile cover technology, static pressed pile and original basis are bound up, by superstructure lotus
It carries from former isolated footing and is transferred to pile foundation, carry out the construction of ground beam 1, ground beam 1 and frame column 5 in surface of base and interlocking pile 2 connects
It connects, the architectural section after anchor rod static pressure pile driving construction is as shown in Figure 2;
S3: earth excavation and frame column are handled: being set well-points dewatering on the inside of foundation pit supporting construction, carried out light well point drop
Water excavates former isolated footing side and the bottom surface earthwork below, until at the designed elevation of proposed basement bottom board 4;It is excavated to
After projected depth, basement bottom board 4 is carried out at once and is constructed, later, in former isolated footing end face inclined borehole, on former isolated footing
Frame column 5 carry out extend pour to hole bottom, form extended frame column 5, basement absolute altitude structural schematic diagram is as shown in Figure 3;
S4: bottom slab concreting: cut out former isolated footing extra in addition to extended frame column 5 and it is new on the basis of anchor rod static pressure
Stake 3, the plane space that can reduce frame column 5 occupies the influence of the effective use for basement space, then to basement
Bottom plate 4 is poured, and construction is completed, and basement sectional view is as shown in Figure 4.
In S1, the arrangement mode of stake is not arrangement of reinforcement and use extra retarded set plain concrete pile and an armored concrete
Stake arranged for interval, in S2, ground beam 1 and frame column 5, interlocking pile 2 are using the connection type of welding, and in S2, aperture is stake diameter
80%, in S3, excavate the deformation of stage detection building, original basis sedimentation is not more than 5cm, and former isolated footing is quiet by anchor pole
Piling 3 supports, and is not in collapsing phenomenon so that support is firm, in S3, using layering, piecemeal, symmetrical digging mode,
The uniform settlement of superstructure can be controlled.
Place is not described in detail by the present invention, is the well-known technique of those skilled in the art.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (6)
1. a kind of method of anchor pile underpinning without basement building underground space increasing layer, it is characterised in that: specific steps are such as
Under:
S1: support construction: carrying out supporting construction around ground, and the one kind for being mutually twisted arrangement is formed between stake and stake
Foundation pit enclosure structure uses interlocking pile (2) structural support;
S2: pile sinking and pile foundation underpinning: excavating foundation soil from indoor terrace, until former isolated footing end face, using anchor pole
The mode of static pressed pile 3 carries out pile sinking, the vertical drilling in former isolated footing end face, is fixed by burying anchor pole on a stand alone basis
Pile driving frame with jack is buried prefabricated small square pile from piling hole internal pressure using the self weight of existing building as pressure pile reaction,
And synchronous grouting;After the completion of pile sinking, using envelope pile cover technology, static pressed pile and original basis are bound up, by superstructure lotus
It carries and from former isolated footing is transferred to pile foundation, carry out the construction of ground beam (1) in surface of base, ground beam (1) and frame column (5) and be engaged
Stake (2) connection;
S3: earth excavation and frame column are handled: well-points dewatering set on the inside of foundation pit supporting construction, carries out Application of light well point precipitation,
Former isolated footing side and the bottom surface earthwork below are excavated, until at the designed elevation of proposed basement bottom board (4);It is excavated to and sets
After counting depth, basement bottom board (4) construction is carried out at once, later, in former isolated footing end face inclined borehole, on former isolated footing
Frame column (5) carry out extend pour to hole bottom, form extended frame column (5);
S4: bottom slab concreting: cut out former isolated footing extra in addition to extended frame column (5) and it is new on the basis of anchor jacked pile
(3), then basement bottom board (4) is poured, completes construction.
2. a kind of method of the anchor pile underpinning according to claim 1 without basement building underground space increasing layer,
Be characterized in that: in the S1, the arrangement mode of stake is not arrangement of reinforcement and use extra retarded set plain concrete pile and a reinforcing bar
Concrete-pile arranged for interval.
3. a kind of method of the anchor pile underpinning according to claim 1 without basement building underground space increasing layer,
Be characterized in that: in the S2, the ground beam (1) and frame column (5), interlocking pile (2) are using the connection type welded.
4. a kind of method of the anchor pile underpinning according to claim 1 without basement building underground space increasing layer,
Be characterized in that: in the S2, aperture is the 80% of stake diameter.
5. a kind of method of the anchor pile underpinning according to claim 1 without basement building underground space increasing layer,
Be characterized in that: in the S3, excavate the stage detection building deformation, original basis sedimentation be not more than 5cm, former isolated footing by
Anchor jacked pile (3) support.
6. a kind of method of the anchor pile underpinning according to claim 1 without basement building underground space increasing layer,
It is characterized in that: in the S3, using layering, piecemeal, symmetrical digging mode.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810797739.8A CN109024662A (en) | 2018-07-19 | 2018-07-19 | Method of the anchor pile underpinning without basement building underground space increasing layer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810797739.8A CN109024662A (en) | 2018-07-19 | 2018-07-19 | Method of the anchor pile underpinning without basement building underground space increasing layer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109024662A true CN109024662A (en) | 2018-12-18 |
Family
ID=64643597
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810797739.8A Pending CN109024662A (en) | 2018-07-19 | 2018-07-19 | Method of the anchor pile underpinning without basement building underground space increasing layer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109024662A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110067400A (en) * | 2019-03-21 | 2019-07-30 | 武大巨成结构股份有限公司 | It is a kind of for extending the construction method of the building underground space |
CN110206135A (en) * | 2019-05-21 | 2019-09-06 | 福建工程学院 | A kind of stone masonry house foundation ruggedized construction and method |
CN112031809A (en) * | 2020-09-17 | 2020-12-04 | 西南交通大学 | Underground engineering structure meeting double-zero conditions and construction method |
CN112176879A (en) * | 2020-10-15 | 2021-01-05 | 深圳市罗湖建筑安装工程有限公司 | Bridge pier foundation underpinning structure and construction method |
CN112576056A (en) * | 2020-12-07 | 2021-03-30 | 北京中岩大地科技股份有限公司 | Underpinning support system for storey-adding reconstruction of existing building basement and construction method thereof |
CN114319930A (en) * | 2021-12-30 | 2022-04-12 | 上海建工二建集团有限公司 | Enclosure structure below bearing wall and construction method thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2236677A2 (en) * | 2009-03-31 | 2010-10-06 | AS Amhold | Method for creating a building under an architectural monument |
CN102127974A (en) * | 2011-04-18 | 2011-07-20 | 上海现代建筑设计(集团)有限公司 | Design and construction method of additional cellar under existing building |
CN102182325A (en) * | 2011-03-28 | 2011-09-14 | 东南大学 | Storey adding method for existing building basement with frame structure and independent foundation |
CN102220769A (en) * | 2011-04-15 | 2011-10-19 | 上海天演建筑物移位工程有限公司 | System and method for underpinning and jacking building and adding storeys downwards |
CN103321244A (en) * | 2013-03-27 | 2013-09-25 | 江苏苏南建筑技术发展有限公司 | Construction method for additionally arranged basement in existing building on sand foundation |
CN103912134A (en) * | 2014-03-21 | 2014-07-09 | 上海建工四建集团有限公司 | Construction in-situ underground space structure and construction method |
CN108005399A (en) * | 2017-10-31 | 2018-05-08 | 上海市政工程设计研究总院(集团)有限公司 | Add the construction method for building multi-layer underground space under a kind of existing building group |
-
2018
- 2018-07-19 CN CN201810797739.8A patent/CN109024662A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2236677A2 (en) * | 2009-03-31 | 2010-10-06 | AS Amhold | Method for creating a building under an architectural monument |
CN102182325A (en) * | 2011-03-28 | 2011-09-14 | 东南大学 | Storey adding method for existing building basement with frame structure and independent foundation |
CN102220769A (en) * | 2011-04-15 | 2011-10-19 | 上海天演建筑物移位工程有限公司 | System and method for underpinning and jacking building and adding storeys downwards |
CN102127974A (en) * | 2011-04-18 | 2011-07-20 | 上海现代建筑设计(集团)有限公司 | Design and construction method of additional cellar under existing building |
CN103321244A (en) * | 2013-03-27 | 2013-09-25 | 江苏苏南建筑技术发展有限公司 | Construction method for additionally arranged basement in existing building on sand foundation |
CN103912134A (en) * | 2014-03-21 | 2014-07-09 | 上海建工四建集团有限公司 | Construction in-situ underground space structure and construction method |
CN108005399A (en) * | 2017-10-31 | 2018-05-08 | 上海市政工程设计研究总院(集团)有限公司 | Add the construction method for building multi-layer underground space under a kind of existing building group |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110067400A (en) * | 2019-03-21 | 2019-07-30 | 武大巨成结构股份有限公司 | It is a kind of for extending the construction method of the building underground space |
CN110206135A (en) * | 2019-05-21 | 2019-09-06 | 福建工程学院 | A kind of stone masonry house foundation ruggedized construction and method |
CN110206135B (en) * | 2019-05-21 | 2024-01-12 | 福建理工大学 | Stone masonry house foundation reinforcing structure and method |
CN112031809A (en) * | 2020-09-17 | 2020-12-04 | 西南交通大学 | Underground engineering structure meeting double-zero conditions and construction method |
CN112031809B (en) * | 2020-09-17 | 2022-02-08 | 西南交通大学 | Underground engineering structure meeting double-zero conditions and construction method |
CN112176879A (en) * | 2020-10-15 | 2021-01-05 | 深圳市罗湖建筑安装工程有限公司 | Bridge pier foundation underpinning structure and construction method |
CN112576056A (en) * | 2020-12-07 | 2021-03-30 | 北京中岩大地科技股份有限公司 | Underpinning support system for storey-adding reconstruction of existing building basement and construction method thereof |
CN114319930A (en) * | 2021-12-30 | 2022-04-12 | 上海建工二建集团有限公司 | Enclosure structure below bearing wall and construction method thereof |
CN114319930B (en) * | 2021-12-30 | 2023-09-05 | 上海建工二建集团有限公司 | Building envelope below bearing wall and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109024662A (en) | Method of the anchor pile underpinning without basement building underground space increasing layer | |
CN102182325B (en) | Storey adding method for existing building basement with frame structure and independent foundation | |
CN106088650B (en) | A kind of method and building suitable for building with brick-concrete structure underground increasing layer | |
CN103321231A (en) | Construction method of foundation pit support | |
CN103526781B (en) | A kind of ancient architecture foundation integrated pallet base isolation reinforcement structure and construction method thereof | |
CN110106919A (en) | A kind of lid digs the building enclosure and its construction method at station | |
CN108867723B (en) | Method for correcting inclination of frame structure building and adding underground layer | |
CN113550322A (en) | Enclosure system next to deep and shallow foundation pit and construction method | |
CN102162258A (en) | Concrete-filled steel tubular high-pile tower footing structure of tower crane and construction method thereof | |
CN111236241A (en) | Weak water-rich stratum subway foundation pit reinforcing excavation method based on half-cover excavation method | |
CN101498133B (en) | Method and supporting construction for enlarging basement top-down method earth excavation space | |
CN216041201U (en) | Earlier prop and dig double-deck diagonal bracing foundation ditch enclosure system afterwards | |
CN201991013U (en) | High-piled tower footing structure of tower crane concrete-filled steel tube | |
CN107326932B (en) | Quasi-semi-reverse construction method for underground garage | |
CN110904992B (en) | Elevator foundation member for integrally assembling elevator and construction method thereof | |
CN207728018U (en) | The building structure of skyscraper is built suitable for tier building set | |
CN116289979A (en) | Deep foundation pit supporting construction method for underground forward and reverse synchronous construction | |
CN102605801A (en) | Suspension semi-reverse-construction method for underground circular water tank | |
CN217027018U (en) | A downthehole dynamic compaction gravel pile foundation structure for large tracts of land weak soil is consolidated | |
CN109989346A (en) | Bridge major diameter precast concrete tubular column basis and its construction method | |
CN209509556U (en) | Underpin the constructing structure of no basement building underground space increasing layer | |
CN210459300U (en) | Enclosure structure for covering and digging station | |
CN107916798A (en) | The building structure of skyscraper is built suitable for tier building set | |
CN114215106A (en) | Multi-pile support column structure adopting upper steel structure full-reverse construction method and construction method | |
KR200413303Y1 (en) | Stone stacked wall structure using steel beam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181218 |
|
RJ01 | Rejection of invention patent application after publication |