CN102220769A - System and method for underpinning and jacking building and adding storeys downwards - Google Patents

System and method for underpinning and jacking building and adding storeys downwards Download PDF

Info

Publication number
CN102220769A
CN102220769A CN2011100957283A CN201110095728A CN102220769A CN 102220769 A CN102220769 A CN 102220769A CN 2011100957283 A CN2011100957283 A CN 2011100957283A CN 201110095728 A CN201110095728 A CN 201110095728A CN 102220769 A CN102220769 A CN 102220769A
Authority
CN
China
Prior art keywords
jacking
building
support
pile
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011100957283A
Other languages
Chinese (zh)
Inventor
林其荃
彭勇平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI EVOLUTION BUILDING SHIFT ENGINEERING Co Ltd
Original Assignee
SHANGHAI EVOLUTION BUILDING SHIFT ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI EVOLUTION BUILDING SHIFT ENGINEERING Co Ltd filed Critical SHANGHAI EVOLUTION BUILDING SHIFT ENGINEERING Co Ltd
Priority to CN2011100957283A priority Critical patent/CN102220769A/en
Publication of CN102220769A publication Critical patent/CN102220769A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a method for underpinning and jacking a building and adding storeys downwards. The method is characterized by firstly forming tray structures by arranging jacketed wall beams, secondly arranging pile pressing platforms to press piles, thirdly arranging corbels to bear the load of the original building with the pile pressing platforms and the tray structures and fourthly excavating the foundation soil and connecting pressed piles by anchor rods to form a lattice column structure, thus making the storey-adding structures such as basement or making the storey-adding structures after jacking. The invention also discloses a system for underpinning and jacking the building and adding storeys downwards. The system and the method have the following beneficial effects: under the condition that the original building is not dismantled and moved horizontally, the floor area of the original building can be increased downwards in the original plane position to increase the use ratios of the houses and land so as to improve the condition of cramped room in cities.

Description

Building underpins jacking and increases layer system and method downwards
Technical field
The present invention relates to build the reconstruction technology, more particularly, relate to a kind of building and underpin jacking and increase layer system and method downwards.
Background technology
Nowadays city develop rapidly, its size of population constantly expands, and house and land resources are more and more valuable.How not remove original building, also out-of-level mobile original building, accomplishing increases the utilization rate that its building area increases house and soil in the primary plane position, and the building area that can make increase can be used between room, garage, storing or the like, and crowded with the space of improving the city is that present urban construction and development institute are badly in need of studying and the problem of solution.
Summary of the invention
At the above-mentioned shortcoming that exists in the prior art, the purpose of this invention is to provide a kind of building and underpin jacking and increase layer system and method downwards, in order to the building area of downward increase existing building.
For achieving the above object, the present invention adopts following technical scheme:
On the one hand, a kind of building underpins jacking and increases layer method downwards and may further comprise the steps:
A. remove original building bottom floor and accessory structure thereof, ready for underpining;
B. the sandwich wall beam is newly done wrapping all bodies of wall in the both sides of all bodies of wall on the original building underlying basis, and the support holder structure that makes all constitute the plane framework system in length and breadth to the staggered contact of sandwich wall beam, in order to the load of support original building;
C. at sandwich wall Liang Jiaochadianchu the piling platform is set, and reserves the anchor jacked pile hole at each place, angle of this platform;
D. utilize the piling platform as the counter-force point, make anchor jacked pile pass reserving hole and carry out piling, after the degree of depth that is pressed onto designing requirement, the piling platform downside in stake is installed bracket, and the load of original building is passed on all anchor jacked piles by support holder structure, piling platform and bracket;
E. excavate the original building basis both sides earthwork, and cut the former basic structure of piling platform downside, expose the anchor jacked pile of support holder structure downside, the anchor jacked pile under each piling platform is connected into the lattice column structure;
F. if original building need not jacking and increases, then can directly do basement structure by design elevation and size, comprise base plate, shear wall and newly-built one deck floor, make basement bottom board and shear wall pass the lattice column structure, and newly-built one deck floor and support holder structure is connected to form overall structure; If need jacking to increase, then carry out step G and H:
G. the jacking support is set as jacking counter-force platform in the lattice column inside configuration, and Lifting Equipment is installed on the jacking support the absolute altitude of original building jacking to designing requirement;
H. do basement bottom board, shear wall and newly-built one deck floor by design elevation and size, make basement bottom board and shear wall pass the lattice column structure, and newly-built one deck floor and support holder structure is connected to form overall structure;
I. remove basement bottom board to the unnecessary lattice column structure between newly-built one deck floor, finish underpining of building and increase layer.
Sandwich wall beam in described step B is reinforced concrete beam or steel structure girder; Anchor jacked pile in described step D is steel structure pile or reinforced concrete pile.
On the other hand, a kind of building underpins jacking and increases layer system downwards and comprises:
Support holder structure comprises the both sides of being located at all bodies of wall on the original building underlying basis and wraps the sandwich wall beam of all bodies of wall, and all constitute the support holder structure of plane framework system in length and breadth to the staggered contact of sandwich wall beam, in order to the load of support original building;
The piling platform is arranged at sandwich wall Liang Jiaochadianchu, and each place, angle of platform is reserved with the anchor jacked pile hole;
Anchor jacked pile is that counter-force point and the hole that passes above-mentioned each piling platform respectively are in order to carry out piling with the piling platform;
Bracket, the piling platform downside on the skyhook static pressed pile is with the load of support holder structure, piling platform support original building;
The lattice column structure is connected to form by the anchor jacked pile after the piling;
Lifting body comprises jacking support and Lifting Equipment, and the jacking support is arranged at the lattice column inside configuration as jacking counter-force platform, and Lifting Equipment is installed on the jacking support, in order to the original building jacking to design elevation;
Increase a layer mechanism, comprise basement bottom board, shear wall and newly-built one deck floor, basement bottom board and shear wall will pass the lattice column structure, and newly-built one deck floor and support holder structure are connected to form overall structure.
Described sandwich wall beam is reinforced concrete beam or steel structure girder; Described anchor jacked pile is steel structure pile or reinforced concrete pile.
In technique scheme, building of the present invention underpins jacking and also increases layer system and method downwards earlier by sandwich wall beam formation support holder structure is set, by being set, the piling platform carries out piling again, then by the load of bracket with piling platform, support holder structure support original building is set, excavate basic earthwork again anchor jacked pile is connected into the lattice column structure, can do layer reinforced structures such as basement, or by doing layer reinforced structure after the jacking downwards.Adopt this system and method not removing original building, also under the situation of out-of-level mobile original building, accomplishing increases the utilization rate that its building area increases house and soil downwards in the primary plane position, to improve the space congested problem in city.
Description of drawings
Fig. 1 is the structure vertical view that sandwich wall beam and piling platform are set of the present invention;
Fig. 2 is lattice column structure after the piling of the present invention and the structural representation that increases layer mechanism;
Fig. 3 is the structural representation of lifting body of the present invention.
The specific embodiment
Further specify technical scheme of the present invention below in conjunction with drawings and Examples.
Please refer to Fig. 1~shown in Figure 3, building of the present invention underpins jacking and increases layer method downwards and carries out on original constructure base, mainly may further comprise the steps:
A. remove original building bottom floor and accessory structure thereof, ready for underpining;
B. sandwich wall beam 2 is newly done wrapping all bodies of wall 1 in the both sides of all bodies of wall 1 on the original building underlying basis, and the support holder structures 3 that make all constitute the plane framework systems in length and breadth to the 2 staggered contacts of sandwich wall beam, in order to the load of support original building;
C. at place, sandwich wall beam 2 crosspoints piling platform 4 is set, and reserves anchor jacked pile hole 5 at each place, angle of this platform, the platform among Fig. 1 is four jiaos;
D. utilize piling platform 4 as the counter-force point, make anchor jacked pile pass reserving hole 5 and carry out piling, after the degree of depth that is pressed onto designing requirement, piling platform 4 downsides in stake are installed bracket 7, and the load of original building is passed on all anchor jacked piles 6 by support holder structure 3, piling platform 4 and bracket 7;
E. excavate the original building basis both sides earthwork, and cut the former basic structure of piling platform downside, expose the anchor jacked pile 6 of support holder structure 3 downsides, the anchor jacked pile 6 under each piling platform 4 is connected into lattice column 8 structures;
F. if original building need not jacking and increases, then can directly press design elevation and size new work basement below support holder structure 3, be specially and newly do basement bottom board 9, shear wall 10 and newly-built one deck floor, make basement bottom board 9 and shear wall 10 pass lattice column 8 structures, construction is not affected, and newly-built one deck floor 11 and support holder structure 3 are connected to form overall structure; If original building needs jacking to increase, then carry out step G and H:
G. jacking support 12 is set as jacking counter-force platform in lattice column 8 inside configuration, and on jacking support 12, installs as Lifting Equipments such as jack 13 the original building jacking to design elevation;
H. do basement bottom board 9, shear wall 10 and newly-built one deck floor by design elevation and size, make basement bottom board 9 and shear wall 10 pass lattice column 8 structures, and newly-built one deck floor 11 and support holder structure 3 are connected to form overall structure;
I. remove basement bottom board 9 to unnecessary lattice column 8 structures between newly-built one deck floor 11, finish underpining of building and increase layer.
Sandwich wall beam 2 in described step B is reinforced concrete beam or steel structure girder; Anchor jacked pile 6 in described step D is steel structure pile or reinforced concrete pile.
And the building of the present invention that adopts underpins jacking and increases layer system downwards and mainly comprises:
Support holder structure 3 comprises the both sides of being located at all bodies of wall 1 on the original building underlying basis and wraps the sandwich wall beam 2 of all bodies of wall 1, and all constitute the support holder structures 3 of plane framework systems in length and breadth to the 2 staggered contacts of sandwich wall beam, in order to the load of support original building;
Piling platform 4 is arranged at place, sandwich wall beam 2 crosspoints, and each place, angle of platform is reserved with anchor jacked pile 6 holes 5;
Anchor jacked pile 6 is that counter-force point and the hole 5 that passes above-mentioned each piling platform 4 respectively are in order to carry out piling with piling platform 4;
Bracket 7, piling platform 4 downsides on the skyhook static pressed pile 6 are with the load of support holder structure 3, piling platform 4 support original buildings;
Lattice column 8 structures are connected to form by the anchor jacked pile after the piling 6;
Lifting body comprises jacking support 12 and Lifting Equipment 13, and jacking support 12 is arranged at lattice column 8 inside configuration as jacking counter-force platform, and Lifting Equipment 13 is installed on the jacking support 12, in order to the original building jacking to design elevation;
Increase a layer mechanism, comprise basement bottom board 9, shear wall 10 and newly-built one deck floor 11, basement bottom board 9 and shear wall 10 will pass lattice column 8 structures, and newly-built one deck floor 11 is connected to form overall structure with support holder structure 3.
Wherein, described sandwich wall beam 2 is reinforced concrete beam or steel structure girder; Described anchor jacked pile 6 is steel structure pile or reinforced concrete pile.
Thereby adopt building of the present invention to underpin jacking and also increase layer system and method can be implemented in to be increased basement structure or will build jacking increase partly-exposed basement or floor in the original place under the original building purpose downwards, thereby needn't remove original building, also needn't move horizontally original building, accomplish to increase the effect of its building area in the primary plane position, increased the utilization rate in house and soil greatly, the building area that increases can be used between room, garage, storing or the like, be the crowded effect of getting instant result that played in the space of improving the city, and the reconstruction cost reduces greatly.
Those of ordinary skill in the art will be appreciated that, above embodiment is used for illustrating the present invention, and be not to be used as limitation of the invention, as long as in connotation scope of the present invention, all will drop in claims scope of the present invention variation, the modification of the above embodiment.

Claims (4)

1. a building underpins jacking and increases layer method downwards, it is characterized in that, may further comprise the steps:
A. remove original building bottom floor and accessory structure thereof, ready for underpining;
B. the sandwich wall beam is newly done wrapping all bodies of wall in the both sides of all bodies of wall on the original building underlying basis, and the support holder structure that makes all constitute the plane framework system in length and breadth to the staggered contact of sandwich wall beam, in order to the load of support original building;
C. at sandwich wall Liang Jiaochadianchu the piling platform is set, and reserves the anchor jacked pile hole at each place, angle of this platform;
D. utilize the piling platform as the counter-force point, make anchor jacked pile pass reserving hole and carry out piling, after the degree of depth that is pressed onto designing requirement, the piling platform downside in stake is installed bracket, and the load of original building is passed on all anchor jacked piles by support holder structure, piling platform and bracket;
E. excavate the original building basis both sides earthwork, and cut the former basic structure of piling platform downside, expose the anchor jacked pile of support holder structure downside, the anchor jacked pile under each piling platform is connected into the lattice column structure;
F. if original building need not jacking and increases, then can directly do basement structure by design elevation and size, comprise base plate, shear wall and newly-built one deck floor, make basement bottom board and shear wall pass the lattice column structure, and newly-built one deck floor and support holder structure is connected to form overall structure; If need jacking to increase, then carry out step G and H:
G. the jacking support is set as jacking counter-force platform in the lattice column inside configuration, and Lifting Equipment is installed on the jacking support the absolute altitude of original building jacking to designing requirement;
H. do basement bottom board, shear wall and newly-built one deck floor by design elevation and size, make basement bottom board and shear wall pass the lattice column structure, and newly-built one deck floor and support holder structure is connected to form overall structure;
I. remove basement bottom board to the unnecessary lattice column structure between newly-built one deck floor, finish underpining of building and increase layer.
2. building as claimed in claim 1 underpins jacking and increases layer system and method downwards, it is characterized in that:
Sandwich wall beam in described step B is reinforced concrete beam or steel structure girder; Anchor jacked pile in described step D is steel structure pile or reinforced concrete pile.
3. a building underpins jacking and increases layer system downwards, it is characterized in that, comprising:
Support holder structure comprises the both sides of being located at all bodies of wall on the original building underlying basis and wraps the sandwich wall beam of all bodies of wall, and all constitute the support holder structure of plane framework system in length and breadth to the staggered contact of sandwich wall beam, in order to the load of support original building;
The piling platform is arranged at sandwich wall Liang Jiaochadianchu, and each place, angle of platform is reserved with the anchor jacked pile hole;
Anchor jacked pile is that counter-force point and the hole that passes above-mentioned each piling platform respectively are in order to carry out piling with the piling platform;
Bracket, the piling platform downside on the skyhook static pressed pile is with the load of support holder structure, piling platform support original building;
The lattice column structure is connected to form by the anchor jacked pile after the piling;
Lifting body comprises jacking support and Lifting Equipment, and the jacking support is arranged at the lattice column inside configuration as jacking counter-force platform, and Lifting Equipment is installed on the jacking support, in order to the original building jacking to design elevation;
Increase a layer mechanism, comprise basement bottom board, shear wall and newly-built one deck floor, basement bottom board and shear wall will pass the lattice column structure, and newly-built one deck floor and support holder structure are connected to form overall structure.
4. building as claimed in claim 3 underpins jacking and increases layer method downwards, it is characterized in that:
Described sandwich wall beam is reinforced concrete beam or steel structure girder; Described anchor jacked pile is steel structure pile or reinforced concrete pile.
CN2011100957283A 2011-04-15 2011-04-15 System and method for underpinning and jacking building and adding storeys downwards Pending CN102220769A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100957283A CN102220769A (en) 2011-04-15 2011-04-15 System and method for underpinning and jacking building and adding storeys downwards

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100957283A CN102220769A (en) 2011-04-15 2011-04-15 System and method for underpinning and jacking building and adding storeys downwards

Publications (1)

Publication Number Publication Date
CN102220769A true CN102220769A (en) 2011-10-19

Family

ID=44777460

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100957283A Pending CN102220769A (en) 2011-04-15 2011-04-15 System and method for underpinning and jacking building and adding storeys downwards

Country Status (1)

Country Link
CN (1) CN102220769A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102444147A (en) * 2011-11-08 2012-05-09 山西太行建设开发有限公司 Slant correction method for building
CN102864946A (en) * 2012-10-23 2013-01-09 山东建筑大学 Process for supporting existing buildings through structural steel and horizontal rachel rod member and additionally adding multilayer basement
CN102864796A (en) * 2012-10-19 2013-01-09 重庆大学 Construction spreading foundation adaptive to filled ground settlement and construction method
CN103321261A (en) * 2013-07-18 2013-09-25 张继红 Construction method for directional expansion-rise deviation rectification
CN104975714A (en) * 2015-07-08 2015-10-14 中国葛洲坝集团第六工程有限公司 Factory building concrete floor reserved hidden bracket template device and construction method
CN104989121A (en) * 2015-07-24 2015-10-21 武大巨成结构股份有限公司 Steel slide way jacking building layer increasing device
CN108265618A (en) * 2018-01-24 2018-07-10 上海建工四建集团有限公司 A kind of reverse increasing layer construction method in overpass pier base underground
CN108643600A (en) * 2018-04-27 2018-10-12 湖南城市学院 A method of being suitable for building with brick-concrete structure underground increasing layer
CN109024662A (en) * 2018-07-19 2018-12-18 深圳市工勘岩土集团有限公司 Method of the anchor pile underpinning without basement building underground space increasing layer
CN110080556A (en) * 2019-05-09 2019-08-02 上海天演建筑物移位工程股份有限公司 A kind of building moving is inverse to make formula constructing structure and construction method
CN110295765A (en) * 2019-07-05 2019-10-01 杭州市市政工程集团有限公司 A kind of Architecture site is moved out the construction method of protection
CN110306831A (en) * 2019-07-12 2019-10-08 上海建工七建集团有限公司 Existing wall support system and its construction method
CN111894036A (en) * 2020-06-12 2020-11-06 广东省建筑科学研究院集团股份有限公司 Construction method for additionally arranging basement in strip foundation building
CN114658259A (en) * 2022-02-28 2022-06-24 广东最安建筑工程有限公司 Pile foundation for building jacking and jacking method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1058069A (en) * 1991-06-26 1992-01-22 黄正轩 The method of correcting and then reinforcing inclined house
CN1257149A (en) * 1998-12-11 2000-06-21 北京市第七城市建设工程公司 Integral foundation underpinning technology for building added floor
JP2007170070A (en) * 2005-12-22 2007-07-05 Takenaka Komuten Co Ltd Method for rebuilding building
CN101092850A (en) * 2006-06-22 2007-12-26 张准胜 Method and installation for rising building or historical building / cluster of historical building integrally
CN101397852A (en) * 2007-09-26 2009-04-01 上海市第二建筑有限公司 Construction method for increasing to build multi-storey basement to original building
CN101725258A (en) * 2008-10-30 2010-06-09 上海天演建筑物移位工程有限公司 Integral jacking method of heritage buildings
CN201614746U (en) * 2009-12-30 2010-10-27 上海天演建筑物移位工程有限公司 Limit power transmission device for building jacking
CN202055270U (en) * 2011-04-15 2011-11-30 上海天演建筑物移位工程有限公司 System and method for underpinning, lifting and top-down storey addition of building

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1058069A (en) * 1991-06-26 1992-01-22 黄正轩 The method of correcting and then reinforcing inclined house
CN1257149A (en) * 1998-12-11 2000-06-21 北京市第七城市建设工程公司 Integral foundation underpinning technology for building added floor
JP2007170070A (en) * 2005-12-22 2007-07-05 Takenaka Komuten Co Ltd Method for rebuilding building
CN101092850A (en) * 2006-06-22 2007-12-26 张准胜 Method and installation for rising building or historical building / cluster of historical building integrally
CN101397852A (en) * 2007-09-26 2009-04-01 上海市第二建筑有限公司 Construction method for increasing to build multi-storey basement to original building
CN101725258A (en) * 2008-10-30 2010-06-09 上海天演建筑物移位工程有限公司 Integral jacking method of heritage buildings
CN201614746U (en) * 2009-12-30 2010-10-27 上海天演建筑物移位工程有限公司 Limit power transmission device for building jacking
CN202055270U (en) * 2011-04-15 2011-11-30 上海天演建筑物移位工程有限公司 System and method for underpinning, lifting and top-down storey addition of building

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102444147A (en) * 2011-11-08 2012-05-09 山西太行建设开发有限公司 Slant correction method for building
CN102864796A (en) * 2012-10-19 2013-01-09 重庆大学 Construction spreading foundation adaptive to filled ground settlement and construction method
CN102864796B (en) * 2012-10-19 2015-06-03 重庆大学 Construction spreading foundation adaptive to filled ground settlement and construction method
CN102864946A (en) * 2012-10-23 2013-01-09 山东建筑大学 Process for supporting existing buildings through structural steel and horizontal rachel rod member and additionally adding multilayer basement
CN103321261A (en) * 2013-07-18 2013-09-25 张继红 Construction method for directional expansion-rise deviation rectification
CN104975714A (en) * 2015-07-08 2015-10-14 中国葛洲坝集团第六工程有限公司 Factory building concrete floor reserved hidden bracket template device and construction method
CN104989121A (en) * 2015-07-24 2015-10-21 武大巨成结构股份有限公司 Steel slide way jacking building layer increasing device
CN108265618B (en) * 2018-01-24 2023-10-31 上海建工四建集团有限公司 Underground reverse storey-adding construction method for viaduct pier foundation
CN108265618A (en) * 2018-01-24 2018-07-10 上海建工四建集团有限公司 A kind of reverse increasing layer construction method in overpass pier base underground
CN108643600A (en) * 2018-04-27 2018-10-12 湖南城市学院 A method of being suitable for building with brick-concrete structure underground increasing layer
CN108643600B (en) * 2018-04-27 2020-07-10 湖南城市学院 Method suitable for underground storey addition of brick-concrete structure building
CN109024662A (en) * 2018-07-19 2018-12-18 深圳市工勘岩土集团有限公司 Method of the anchor pile underpinning without basement building underground space increasing layer
CN110080556A (en) * 2019-05-09 2019-08-02 上海天演建筑物移位工程股份有限公司 A kind of building moving is inverse to make formula constructing structure and construction method
CN110295765A (en) * 2019-07-05 2019-10-01 杭州市市政工程集团有限公司 A kind of Architecture site is moved out the construction method of protection
CN110306831A (en) * 2019-07-12 2019-10-08 上海建工七建集团有限公司 Existing wall support system and its construction method
CN111894036A (en) * 2020-06-12 2020-11-06 广东省建筑科学研究院集团股份有限公司 Construction method for additionally arranging basement in strip foundation building
CN114658259A (en) * 2022-02-28 2022-06-24 广东最安建筑工程有限公司 Pile foundation for building jacking and jacking method

Similar Documents

Publication Publication Date Title
CN102220769A (en) System and method for underpinning and jacking building and adding storeys downwards
CN202055270U (en) System and method for underpinning, lifting and top-down storey addition of building
CN100595395C (en) Static pressure pile process for construction of existing building basement
CN102127974B (en) Design and construction method of additional cellar under existing building
CN103437567B (en) Method for supporting existing building underground added storey through original pile foundations
CN106088650A (en) A kind of building with brick-concrete structure underground that is applicable to increases method and the building of layer
CN204590038U (en) A kind of permanent foundation pit supporting construction
CN103276739A (en) Foundation pit supporting structure with oblique support and pre-stress surrounding purlin
CN209855277U (en) Conversion layer structure for underground added layer of existing building
CN103122691A (en) Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method
CN110499928A (en) The construction method and basement of existing building basement raising chamber height
JP4914940B1 (en) Middle-rise base-isolated building
JP2014118756A (en) Base-isolated building and construction method for the same
CN102828616A (en) High-formwork support system for roof
CN217710837U (en) Anti-floating underground building
RU2010133362A (en) METHOD FOR ESTABLISHING PILED BRIDGE BASES IN THE AQUATORIA
CN202577316U (en) Structure of miniature piles in combination with composite soil nailing wall
CN104652476A (en) Deep-foundation pit reverse construction method by honeycomb core floor support
KR101310677B1 (en) Top down method using precast composite retaining wall and raker in slope
CN203320543U (en) Basic structure of construction elevator
CN210857277U (en) Assembled underground structure
CN111441400B (en) Seismic isolation and reinforcement method for existing building foundation
CN211081037U (en) Above-ground building and underground structure integrated assembly type building structure
CN103306304A (en) Basic structure of construction elevator
WO2011121439A2 (en) Seismic insulating structure for existing buildings

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20111019