The method of correcting and then reinforcing inclined house Download PDFInfo
- Publication number
- CN1058069A CN1058069A CN 91104382 CN91104382A CN1058069A CN 1058069 A CN1058069 A CN 1058069A CN 91104382 CN91104382 CN 91104382 CN 91104382 A CN91104382 A CN 91104382A CN 1058069 A CN1058069 A CN 1058069A
- Authority
- CN
- China
- Prior art keywords
- house
- hole
- stake
- holding
- reinforcing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
The present invention relates to the method for a kind of inclined building straightening and reinforcing, it is characterized in that (1) drain hole in the close basis of the little lateral edges of the depression of tilting building brill some; (2) draw water by turns with submersible pump, hole in former hole site with special drill bit, the circulation several times obtain holding up whole until the house; (3) holding up whole house to play the underpinning stake of some, for example bracket stake all around.This method construction equipment is simple, easy to operate, the duration short, and resident family need not move during construction, and expense is low, is applicable to the correction and the reinforcing of coastal area median low structure thing.
Description
The present invention relates to the method for a kind of inclined building straightening and reinforcing.
In recent years, the house generally to the high level development, because the coastal area bearing capacity of foundation soil is poor, causes a lot of high-story house run-off the straights, becomes dilapidated house, and this phenomenon rural area is particularly serious.For the correction of tilting building, adopt " open caisson deep layer bath casting method " usually.Open caisson deep layer bath casting method is in the few side of tilting building settling amount, and several open caissons are set, treat that open caisson reaches certain depth after, punching by the one side on basis in the open caisson degree of depth, mix water-supply-pipe, high-pressure hydraulic pump, towards mud, the slime water in the open caisson is discharged to core pool with submersible pump.There are defectives such as cost is big, construction period length, workman's inconvenient operation, no reinforcement measure in this method.
The object of the present invention is to provide a kind of new multistoried building method for correcting error,, especially increase solid measure to overcome the existing defective of premises method for correcting error, make the tilting building correction after, can keep relative stability the phase.
Technical solution of the present invention is: in the little side of tilting building sedimentation, bore the suction eye of the some and the degree of depth, take out the water of extruding in the hole with submersible pump repeatedly, make the weak soil of substrate fixed by densification, reach the sedimentation unanimity, stamp all around in the house then and reinforce stake, make it that sedimentation no longer take place.Facts have proved that through construction this method has the following advantages: construction equipment is simple, and is easy to operate, the duration is short, generally can finish correction and reinforcing task with 8-16 days, and resident family need not move during construction, and expense is low.
Below in conjunction with embodiment and accompanying drawing thereof content of the present invention is described further.
Fig. 1 is an embodiment drain hole schematic diagram.Among the figure: 1 is the basis, and 2 is drain hole.
Fig. 2 is stake of embodiment bracket and drain hole arrangement diagram, and wherein, Fig. 2 a is the position of bracket stake under the basis, and among the figure, 3 is the bracket stake, and Fig. 2 b is the position of bracket stake and drain hole.
The construction sequence of embodiment correcting and then reinforcing inclined house method is as follows:
(1), bore the drain hole 2 of some near the basis, aperture and hole depth are determined by Practical Calculation, are generally the 300-500 millimeter, hole depth 8-10 rice at the little lateral edges of tilting building depression.
(2), drawn water by turns to two square holes by interstitial hole respectively, because the mud in basic deep is crowded in the hole, the aperture dwindles gradually with several submersible pumps, put to enter until submersible pump, hole in former hole site with special drill bit, the circulation several times obtain holding up whole until the house again.
(3), holding up whole house to play the underpinning stake of some all around.The present invention adopts bracket stake 3 as shown in Figure 2, job practices is as follows: (be 500 millimeters away from wall face more than) bores the hole (aperture 300-400 millimeter) of some around the house of holding up after whole, hole depth is determined by calculating, at about one meter dark concrete of Kong Zhongxian cast, dispose the reinforcing bar (bar reinforcement) of ┐ type then, pour into a mould and pile again.This new shape pilework can be constructed in very narrow alley, can be in 1 meter-2 meters depths construction of underground.
This job practices is applicable to the correction and the reinforcing of coastal area median low structure thing, is particularly useful for the correcting and then reinforcing of small towns, rural area tilting building.
Claims (2)
1, a kind of method of correcting and then reinforcing inclined house is characterized in that:
(1) bore the drain hole of some at the little lateral edges of tilting building depression near the basis,
(2) draw water by turns to two square holes by interstitial hole respectively with several submersible pumps, put to enter, hole in former hole site with special drill bit again until submersible pump, the circulation several times, obtain holding up until the house whole,
(3) holding up whole house to play the underpinning stake of some all around.
2, the method for correcting and then reinforcing inclined house according to claim 1, it is characterized in that 1(3) in the underpinning stake of indication be the bracket stake, job practices is as follows: the hole of boring some around the house of holding up after putting in order, pour into a mould concrete dark about half at Kong Zhongxian, dispose ┐ shaped steel muscle then, pour into a mould and pile again.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 91104382 CN1021982C (en) | 1991-06-26 | 1991-06-26 | Method for correcting and then reinforcing inclined house |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 91104382 CN1021982C (en) | 1991-06-26 | 1991-06-26 | Method for correcting and then reinforcing inclined house |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1058069A true CN1058069A (en) | 1992-01-22 |
CN1021982C CN1021982C (en) | 1993-09-01 |
Family
ID=4906577
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 91104382 Expired - Fee Related CN1021982C (en) | 1991-06-26 | 1991-06-26 | Method for correcting and then reinforcing inclined house |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1021982C (en) |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1078651C (en) * | 1996-12-31 | 2002-01-30 | 林礼 | Straightening method for inclined house on soft ground foundation |
CN100359100C (en) * | 2005-12-29 | 2008-01-02 | 徐士龙 | Method for treating soft foundition by fast 'high vacuum impacting dense, pile base' compound method |
CN102220769A (en) * | 2011-04-15 | 2011-10-19 | 上海天演建筑物移位工程有限公司 | System and method for underpinning and jacking building and adding storeys downwards |
CN103104101A (en) * | 2013-01-18 | 2013-05-15 | 大连久鼎特种建筑工程有限公司 | Construction deviation correcting method utilizing recursion top pressing method |
CN103161183A (en) * | 2011-12-13 | 2013-06-19 | 河南省电力勘测设计院 | Foundation reinforcement method of dry ash bank building |
CN103397668A (en) * | 2013-08-06 | 2013-11-20 | 中铁第一勘察设计院集团有限公司 | Method for treatment of differential settlement of foundations of all sections of railway tunnel |
CN104032777A (en) * | 2014-05-14 | 2014-09-10 | 中冶集团武汉勘察研究院有限公司 | Method for rectifying slant of buildings through geotechnical cloth bags combined with mini pile jacking |
CN105133676A (en) * | 2015-09-29 | 2015-12-09 | 胡忠志 | Building inclination rectification construction method |
CN105155867A (en) * | 2015-09-30 | 2015-12-16 | 贵州正业工程技术投资有限公司 | Underpinning device for tunnel to pass through existing large-diameter pile building |
CN105178368A (en) * | 2015-06-15 | 2015-12-23 | 山东建筑大学 | Method for correcting deviation of building in miniature pile hole earth taking manner |
CN106592615A (en) * | 2016-11-17 | 2017-04-26 | 叶香雄 | Deviation rectification construction method for inclined sink |
CN106638648A (en) * | 2016-12-13 | 2017-05-10 | 叶香竹 | Deviation rectifying method of open caisson |
CN107313602A (en) * | 2016-04-26 | 2017-11-03 | 湖北建科结构加固有限责任公司 | Building substrate is that sand changes the jetting forced falling rectifying deviation method filled out |
CN108086346A (en) * | 2018-01-26 | 2018-05-29 | 广东省建筑工程机械施工有限公司 | A kind of tower crane differential settlement bracing means and conquering method |
CN108867723A (en) * | 2018-07-24 | 2018-11-23 | 山东建筑大学 | The method of frame structure building rectification and underground increasing layer |
CN109184172A (en) * | 2018-09-28 | 2019-01-11 | 上海建工集团股份有限公司 | Integral steel platform mould bases vertical structure column verticality regulation device and construction method |
CN109881722A (en) * | 2019-03-20 | 2019-06-14 | 上海华铸地基技术有限公司 | It is a kind of to utilize Large-diameter Steel open caisson deviation rectification construction method |
-
1991
- 1991-06-26 CN CN 91104382 patent/CN1021982C/en not_active Expired - Fee Related
Cited By (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1078651C (en) * | 1996-12-31 | 2002-01-30 | 林礼 | Straightening method for inclined house on soft ground foundation |
CN100359100C (en) * | 2005-12-29 | 2008-01-02 | 徐士龙 | Method for treating soft foundition by fast 'high vacuum impacting dense, pile base' compound method |
CN102220769A (en) * | 2011-04-15 | 2011-10-19 | 上海天演建筑物移位工程有限公司 | System and method for underpinning and jacking building and adding storeys downwards |
CN103161183A (en) * | 2011-12-13 | 2013-06-19 | 河南省电力勘测设计院 | Foundation reinforcement method of dry ash bank building |
CN103104101A (en) * | 2013-01-18 | 2013-05-15 | 大连久鼎特种建筑工程有限公司 | Construction deviation correcting method utilizing recursion top pressing method |
CN103104101B (en) * | 2013-01-18 | 2015-01-21 | 大连久鼎特种建筑工程有限公司 | Construction deviation correcting method utilizing recursion top pressing method |
CN103397668B (en) * | 2013-08-06 | 2015-07-29 | 中铁第一勘察设计院集团有限公司 | The regulation method of each sections uneven settlement of foundation of a kind of railway tunnels |
CN103397668A (en) * | 2013-08-06 | 2013-11-20 | 中铁第一勘察设计院集团有限公司 | Method for treatment of differential settlement of foundations of all sections of railway tunnel |
CN104032777B (en) * | 2014-05-14 | 2016-01-20 | 中冶集团武汉勘察研究院有限公司 | Geotechnique's cloth bag combined miniature stake lifting inclination-correcting builds/method of structure |
CN104032777A (en) * | 2014-05-14 | 2014-09-10 | 中冶集团武汉勘察研究院有限公司 | Method for rectifying slant of buildings through geotechnical cloth bags combined with mini pile jacking |
CN105178368A (en) * | 2015-06-15 | 2015-12-23 | 山东建筑大学 | Method for correcting deviation of building in miniature pile hole earth taking manner |
CN105178368B (en) * | 2015-06-15 | 2017-03-08 | 山东建筑大学 | Mini pile stake holes fetches earth building inclination rectification method |
CN105133676A (en) * | 2015-09-29 | 2015-12-09 | 胡忠志 | Building inclination rectification construction method |
CN105155867A (en) * | 2015-09-30 | 2015-12-16 | 贵州正业工程技术投资有限公司 | Underpinning device for tunnel to pass through existing large-diameter pile building |
CN107313602A (en) * | 2016-04-26 | 2017-11-03 | 湖北建科结构加固有限责任公司 | Building substrate is that sand changes the jetting forced falling rectifying deviation method filled out |
CN106592615A (en) * | 2016-11-17 | 2017-04-26 | 叶香雄 | Deviation rectification construction method for inclined sink |
CN108360545A (en) * | 2016-11-17 | 2018-08-03 | 叶香雄 | It tilts open caisson and combines deviation rectification construction method |
CN106638648B (en) * | 2016-12-13 | 2018-11-09 | 叶香竹 | The method for correcting error of open caisson |
CN106638648A (en) * | 2016-12-13 | 2017-05-10 | 叶香竹 | Deviation rectifying method of open caisson |
CN108086346A (en) * | 2018-01-26 | 2018-05-29 | 广东省建筑工程机械施工有限公司 | A kind of tower crane differential settlement bracing means and conquering method |
CN108086346B (en) * | 2018-01-26 | 2023-09-08 | 广东省建筑工程机械施工有限公司 | Uneven settlement reinforcing device and overcoming method for tower crane foundation |
CN108867723A (en) * | 2018-07-24 | 2018-11-23 | 山东建筑大学 | The method of frame structure building rectification and underground increasing layer |
CN109184172A (en) * | 2018-09-28 | 2019-01-11 | 上海建工集团股份有限公司 | Integral steel platform mould bases vertical structure column verticality regulation device and construction method |
CN109184172B (en) * | 2018-09-28 | 2020-09-04 | 上海建工集团股份有限公司 | Device for regulating and controlling verticality of vertical structural column of integral steel platform formwork and construction method |
CN109881722A (en) * | 2019-03-20 | 2019-06-14 | 上海华铸地基技术有限公司 | It is a kind of to utilize Large-diameter Steel open caisson deviation rectification construction method |
Also Published As
Publication number | Publication date |
---|---|
CN1021982C (en) | 1993-09-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1058069A (en) | The method of correcting and then reinforcing inclined house | |
CN107246006B (en) | The pile-filling method of concrete-pile | |
CN107119691B (en) | Square deep foundation pit suitable for high bearing pressure of water-rich sand egg layer and excavation method thereof | |
CN109440762B (en) | Construction method of filling pile for drainage pump station | |
CN108005084A (en) | The supporting of deep basal pit combined type and construction method | |
CN110359467A (en) | A kind of construction method that base pit engineering high-pressure rotary jet grouting pile is reinforced | |
CN108589707A (en) | A kind of full-sleeve long screw auger and churning driven combined type construction | |
CN110468833A (en) | Drilled grouting piles under water constructing device and its application method for cruiseway | |
CN109440763A (en) | Bored pile construction method below existing building | |
CN207567784U (en) | Deep basal pit combined type supporting | |
CN107299640A (en) | A kind of variable cross-section well shaft type ground continuous wall base and its construction method | |
CN207452889U (en) | Artificial digging pile assembled retaining wall | |
CN218148483U (en) | Tower crane foundation structure | |
CN207662389U (en) | A kind of sedimentation and deformation observation base point using covered culvert | |
CN211735404U (en) | Anti-over-irrigation system for long spiral bored pile | |
CN211646351U (en) | Cast-in-situ bored pile | |
CN113026801A (en) | Construction method for reinforcing steel pipe pile of construction elevator foundation | |
CN209620111U (en) | A kind of well construction that catchments of soft base hydraulic structure basement | |
CN112443342A (en) | Construction method for treating extra-large karst cave of karst developing long and large tunnel | |
CN208395830U (en) | A kind of recoverable foundation pit consolidates foot drainage arrangement | |
CN1074805C (en) | Foundation structure of hollow well digging and its practice | |
CN210216459U (en) | Complicated geological conditions foundation ditch falls drainage soil body protection and hinders mud protection cage that permeates water | |
CN211080210U (en) | Concrete bored concrete pile steel reinforcement cage anti-floating device | |
CN209585095U (en) | A kind of greenhouse basic stand column | |
CN1222613A (en) | Steel and plastic pipe pressure deposition design and construction method for the foundation of building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |