CN107165173A - A kind of foundation pit supporting system and its construction method - Google Patents

A kind of foundation pit supporting system and its construction method Download PDF

Info

Publication number
CN107165173A
CN107165173A CN201710585673.1A CN201710585673A CN107165173A CN 107165173 A CN107165173 A CN 107165173A CN 201710585673 A CN201710585673 A CN 201710585673A CN 107165173 A CN107165173 A CN 107165173A
Authority
CN
China
Prior art keywords
pile
prestressed pipe
anchor pole
ground cover
foundation pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710585673.1A
Other languages
Chinese (zh)
Inventor
高亮
刘彦辰
陈超
芮斌
吴亚新
许建宝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huatian Engineering and Technology Corp MCC
Original Assignee
Huatian Engineering and Technology Corp MCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huatian Engineering and Technology Corp MCC filed Critical Huatian Engineering and Technology Corp MCC
Priority to CN201710585673.1A priority Critical patent/CN107165173A/en
Publication of CN107165173A publication Critical patent/CN107165173A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles

Abstract

The invention discloses a kind of foundation pit supporting system, including pile for prestressed pipe cement soil wall, prestressing force balance anchor pole, ground cover and ribbed stiffener;The pile for prestressed pipe cement soil wall includes pile for prestressed pipe and triaxial cement mixing pile, and the pile for prestressed pipe is inserted in triaxial cement mixing pile;Connection is consolidated between the pile for prestressed pipe cement soil wall and ground cover;The ribbed stiffener is arranged on the boundary corner of pile for prestressed pipe cement soil wall and ground cover;The end anchorage of the prestressing force balance anchor pole is in hard soil layer, and its other end, which is worn, to be fixed on ground cover;The invention also discloses a kind of construction method of foundation pit supporting system;The present invention is simple in construction, easy to operate, safe and reliable, with low cost, and especially suitable construction space is narrow, urban central zone pattern foundation pit supporting structures close to existing buildings or structures, and practicality is very strong.

Description

A kind of foundation pit supporting system and its construction method
Technical field
The invention belongs to the pattern foundation pit supporting structure field in Geotechnical Engineering, and in particular to a kind of foundation pit supporting system and its construction party Method, more particularly to a kind of narrow place foundation pit supporting system and its construction method.
Background technology
With Chinese Urbanization level improve, the underground space extensively efficiently using be used as solution urban population, resource, environment Three big crises and the important channel for implementing urban sustainable development.Due to the limitation of town site, surrounding enviroment it is tight High property and base pit engineering complexity and uncertainty involved during excavating and going along with sb. to guard him the problem of, base pit engineering is still One extremely challenging, excessive risk, highly difficult problem.
In building foundation pit supporting design, flexible support and rigid protection common are.Flexible support includes plate brad supporting, hanged The board-like supporting of arm, rigid protection is generally by enclosure wall, water seal curtain, horizontal inner support system (or anchor rod system) and support Vertical supporting system is constituted.The species of enclosure wall is more, including diaphram wall, perfusion campshed enclosure wall, shaped steel soil cement are stirred Mix wall, steel sheet pile enclosure wall and reinforced concrete sheet pile enclosure wall etc.;Traditional enclosure wall is typically perpendicular to the ground, and construction is compared Convenient but so suffered soil pressure is maximum, and bored concrete pile belongs to non-prestressed present walling pile, and this pile quality is not allowed easily-controllable System, bearing capacity of pile are low, it is not easy to give full play to the intensity of stake itself;
The inner support of enclosure wall combination inner support system can use bracing members or reinforced concrete support, in foundation ditch area not When big, its Technical Economy is preferable, but when foundation ditch area reaches certain scale, due to that need to set and remove substantial amounts of interim branch Support, thus it is economical poor, while main structure construction inconvenience in foundation ditch is easily caused using inner support, and to branch during dismounting The destruction of shield, the construction site in general city is narrow, and foundation ditch is nearer away from existing buildings or structures, therefore can not in pattern foundation pit supporting structure Traditional wide-angle tilt anchor pole is set, and sets wide-angle tilt anchor pole to can easily exceed construction red line;In addition, supporter Secondary deformation can occur for enclosure wall when system removes, and tearing support explosion open and tearing the broken concrete discarded after support open can all produce to environment Adverse effect.
The content of the invention
The technical problem to be solved in the present invention is:A kind of foundation pit supporting system and its construction method are provided, it is above-mentioned to solve The problem of in background technology.
The technical scheme that the present invention solves technical problem is as follows:
A kind of foundation pit supporting system of the present invention, is characterized in:Including pile for prestressed pipe cement soil wall, prestressing force balance anchor Bar, ground cover and ribbed stiffener;The pile for prestressed pipe cement soil wall includes pile for prestressed pipe and triaxial cement mixing pile, should Pile for prestressed pipe is inserted in triaxial cement mixing pile;The company of consolidation between the pile for prestressed pipe cement soil wall and ground cover Connect;The ribbed stiffener is arranged on the boundary corner of pile for prestressed pipe cement soil wall and ground cover;The prestressing force balance anchor The end anchorage of bar is in hard soil layer, and its other end, which is worn, to be fixed on ground cover.
Further, described pile for prestressed pipe cement soil wall is faces upward inclined, and it faces upward oblique angle ≯ 15 °.
Further, described ribbed stiffener is reinforced concrete structure.
Further, described ribbed stiffener is arranged on below ground cover or more than ground cover.
Further, the range of tilt angles of described prestressing force balance anchor pole is ≯ 45 °.
Further, described prestressing force balance anchor pole steel strand wires or churning anchor tube are substituted.
Another technical scheme that the present invention solves technical problem is as follows:
The present invention plants the construction method of foundation pit supporting system, it is characterised in that:Comprise the following steps:
A. well-points dewatering;Precipitation is carried out to the well point of foundation ditch in earth excavation the last fortnight or so the time, underground water potential drop is treated Earth excavation is as little as carried out after construction requirement;
B. surveying setting-out;The coordinate basis point provided according to designing unit, setting-out and height are carried out according to design drawing Journey pilot measurement works, and carries out permanent mark and temporary sign;
C. guide groove is excavated;Excavate guide groove and reach construction requirement;
D. triaxial cement mixing pile machine is constructed in place;Carried out by the way of tri-axial deep stirring pile machine is by one hole of socket The construction of triaxial cement mixing pile, and make inclination according to the angle requirement in design drawing;
E. pile for prestressed pipe is inserted;After triaxial cement mixing pile construction is finished, by pile for prestressed pipe before cement initial set Insertion, the pile for prestressed pipe should keep identical angle of inclination with triaxial cement mixing pile, be collectively forming pile for prestressed pipe water Soil wall;
F., ribbed stiffener is set;After the construction of pile for prestressed pipe cement soil wall terminates, according to design requirement, ribbed stiffener is poured;
G. ground cover is poured;After the completion of ribbed stiffener construction, ground cover is poured, the reinforcing bar of the ground cover should be anchored It is connected in pile for prestressed pipe cement soil wall, and with ribbed stiffener.
H. the hole position of prestressing force balance anchor pole is determined;Using total powerstation setting-out go out prestressing force balance anchor pole hole position, and It is marked and numbers on ground cover.
I. pore-forming and borehole cleaning;Using the drilling row drilling of pore-forming anchor pole and after pore-forming reaches design requirement, using water under high pressure Empty, sediment in evacuation aperture, untill the more clean water without a large amount of sediments is returned out in aperture;
J. slip casting;The prestressing force made balance anchor pole is transferred to pore-forming, it is ensured that prestressing force balances anchor pole in hole Between two parties, it must not keep to the side, then prestressing force balance anchor boom end is transferred to away from bottom hole about 0.5m or so, noted with grouting pump Slurry, after the completion of slip casting, using high-strength bolt or OVM anchorages, balances anchor pole upper end by prestressing force and is fixed on ground cover.
Further, level of ground water is reduced to 0.5m~0.8m below foundation ditch in described step a.
Further, in the step c width of guide groove according to the thickness exactness of pile for prestressed pipe cement soil wall, its depth For 1m.
What the length of heretofore described ground cover can be asked with formula H/2tan (45+ φ/2), H is that foundation ditch is deep in formula Degree, φ is soil body weighting internal friction angle in foundation ditch.
Relative to prior art, enclosure wall of the present invention be pile for prestressed pipe soil cement composite wall, pile for prestressed pipe have compared with High tension, compression strength, and after being combined with cement mixing method, horizontal shear strength is also greatly improved, so undoubtedly gram The shortcoming of pile for prestressed pipe has been taken, its advantage has been played, and after building enclosure facing upward tiltedly suitably, soil pressure can be significantly reduced Power, further reduces the shear stress that pile for prestressed pipe is subject to, and improves overall security;In addition, the present invention goes along with sb. to guard him wall construction, it is beneficial to The rapid construction in scene, the outer row's mud amount in scene is substantially less than normal, is conducive to constructing in urban district;The prestressing force balance that the present invention is set Anchor pole angle can be adjusted according to actual conditions, it may be necessary to be vertically arranged, and save space.Initial fastening force causes pre- Stress equilibrium anchor pole tension, enclosure wall is by towards the moment of flexure on the outside of foundation ditch, tension on the inside of the foundation ditch of enclosure wall, this and enclosure wall The moment of flexure that the soil mass of foundation pit being subject to is produced can improve enclosure wall stress so that the strength of materials of enclosure wall with partial equilibrium It can play to a high degree.This support system belongs to overall application of the prestressing force in pattern foundation pit supporting structure, and system stress is clear and definite, cost warp It is Ji, easy construction, safe and reliable.
Foundation pit supporting system of the present invention is suitable for narrow field construction, but is not limited only to narrow place, can also Pattern foundation pit supporting structure for other places.
Brief description of the drawings
Fig. 1 is the structural representation of foundation pit supporting system facade of the present invention;
Fig. 2 is the structural representation of foundation pit supporting system plane of the present invention;
In figure:1. triaxial cement mixing pile, 2. pile for prestressed pipe, 3. ground covers, 4. prestressing force balance anchor pole, 5. are led Groove, 6. pile for prestressed pipe cement soil walls, 7. ribbed stiffeners.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
Embodiment 1:
As depicted in figs. 1 and 2, a kind of foundation pit supporting system of the invention, including pile for prestressed pipe cement soil wall 6, prestressing force Balance anchor pole 4, ground cover 3 and ribbed stiffener 7;The pile for prestressed pipe cement soil wall 6 includes the axle cement of pile for prestressed pipe 2 and three Native mixing pile 1, the pile for prestressed pipe 2 is inserted in triaxial cement mixing pile 1;The pile for prestressed pipe cement soil wall 6 and ground Connection is consolidated between cover plate 3;The ribbed stiffener 7 is arranged on the boundary corner of pile for prestressed pipe cement soil wall 6 and ground cover 3 Place;The end anchorage of the prestressing force balance anchor pole 4 is in hard soil layer, and its other end, which is worn, to be fixed on ground cover 3.
Pile for prestressed pipe cement soil wall 6 described in the present embodiment is faces upward inclined, and it faces upward oblique angle ≯ 15 °, i.e., it faces upward oblique angle not More than 15 degree, its specific dip angle base area the factor such as size, geological conditions and surrounding environment determine.
Ribbed stiffener 7 described in the present embodiment is reinforced concrete structure, the ribbed stiffener 7 can be arranged on ground cover 3 with Under, ground cover more than 3 can also be arranged on.Here ribbed stiffener 7 can be arranged on ground cover below 3 according to actual conditions Or ground cover more than 3.
Prestressing force described in the present embodiment balances angle of inclination ≯ 45 ° of anchor pole 4, i.e. its angle of inclination is not more than 45 degree, Generally, the angle of inclination is smaller, in especially narrow field construction, and prestressing force balance anchor pole 4 if necessary can be with It is vertically arranged with foundation ditch ground.
Prestressing force balance anchor pole 4 described in the present embodiment can be substituted with steel strand wires or churning anchor tube, with steel strand wires or rotation Spray anchor tube can reach the equal effect of prestressing force balance anchor pole 4.
As shown in figure 1, the length of ground cover described in the present embodiment could be arranged to formula H/2tan (45+ φ/2) institute Evaluation, H is foundation depth in formula, and φ is soil body weighting internal friction angle in foundation ditch, with the formula income value with for floor lid The length of plate 3 can cause the coverage to foundation pit supporting system of the outer additional load of ground cover 3, and control is in foundation ditch height Less than half.
Embodiment 2:
A kind of construction method of foundation pit supporting system of the present invention, before construction, ensures the three supplies and one leveling in place, i.e. water first Logical, electric logical, Lu Tong and levelling of the land, it is ensured that electricity consumption, water safety.The construction technology of the foundation pit supporting system is followed successively by:Well point Precipitation, surveying setting-out, excavation guide groove 5, triaxial cement mixing pile machine construct, insert pile for prestressed pipe 2, pour ground cover in place Plate 3, the hole position of prestressing force balance anchor pole 4 are determined, pore-forming simultaneously borehole cleaning, slip casting, are comprised the following steps that:
A. well-points dewatering;Precipitation is carried out to the well point of foundation ditch in earth excavation the last fortnight or so the time, underground water potential drop is treated Earth excavation is as little as carried out after construction requirement, level of ground water is typically reduced to 0.5m~0.8m below foundation ditch;
B. surveying setting-out;The coordinate basis point provided according to designing unit, setting-out and height are carried out according to design drawing Journey pilot measurement works, and carries out permanent mark and temporary sign;
C. guide groove 5 is excavated;Excavate guide groove 5 and reach construction requirement, the width of the guide groove 5 is according to pile for prestressed pipe soil cement The thickness exactness of wall (6), its depth is 1m, and the important role of the guide groove 5 had both played a part of tentatively being oriented to, and is storage again The need for arch slurry;
D. triaxial cement mixing pile machine is constructed in place;Carried out by the way of tri-axial deep stirring pile machine is by one hole of socket The construction of triaxial cement mixing pile 1, i.e., after first constructing first pass (being commonly called as " significantly ") along the stirring of the hole of barricade direction interval one, tightly Then " significantly " construction spacer holes bit position in a hole continues to construct for socket, and makes and inclining according to the angle requirement in design drawing Tiltedly;
E. pile for prestressed pipe 2 is inserted;After the construction of triaxial cement mixing pile 1 is finished, by pile for prestressed pipe 2 in cement initial set Preceding insertion, the pile for prestressed pipe 2 should keep identical angle of inclination with triaxial cement mixing pile 1, be collectively forming prestressed pipe Stake cement soil wall 6;
F., ribbed stiffener 7 is set;After the construction of pile for prestressed pipe cement soil wall 6 terminates, to reduce the load of corner, According to design requirement, ribbed stiffener 7 is poured;
G. ground cover 3 is poured;After the completion of the construction of ribbed stiffener 7, ground cover 3 is poured, the reinforcing bar of the ground cover 3 should It is anchored in pile for prestressed pipe cement soil wall 6, and is connected with ribbed stiffener 7 so that ground cover 3 and pile for prestressed pipe cement soil wall 6 consolidation connections, while can transmit moment of flexure in building enclosure stress, and are acted on enclosure wall;
H. the hole position of prestressing force balance anchor pole 4 is determined;The hole position that prestressing force balances anchor pole 4 is gone out using total powerstation setting-out, and It is marked and numbers on ground cover 3;
I. pore-forming and borehole cleaning;Using the drilling row drilling of pore-forming anchor pole, bore diameter, position, depth etc. should meet design will Ask, and after pore-forming reaches projected depth, emptied using water under high pressure, exclude inner hole deposition
Slag, untill the more clean water without a large amount of sediments is returned out in aperture;
J. slip casting;The prestressing force made balance anchor pole 4 is transferred to pore-forming, it is ensured that prestressing force balances anchor pole 4 in hole In it is placed in the middle, must not keep to the side, prestressing force then is balanced into the end of anchor pole 4 transfers to away from bottom hole about 0.5m or so, this is pre- for general warranty Then the end of stress equilibrium anchor pole 4 carries out slip casting away from bottom hole 0.4m~0.6m with grouting pump, after the completion of slip casting, using height Strength bolt or OVM anchorages, balance the upper end of anchor pole 4 by prestressing force and are fixed on ground cover 3, treat that slurry intensity reaches design requirement When, tensioning operation can be carried out to prestressing force balance anchor pole 4.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of changes, modification can be carried out to these embodiments, replace without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.
Part is not described in detail by the present invention, is the known technology of those skilled in the art of the present technique.

Claims (9)

1. a kind of foundation pit supporting system, it is characterised in that:Including pile for prestressed pipe cement soil wall (6), prestressing force balance anchor pole (4), ground cover (3) and ribbed stiffener (7);The pile for prestressed pipe cement soil wall (6) includes pile for prestressed pipe (2) and three axle water Soil mixing pile (1), the pile for prestressed pipe (2) is inserted in triaxial cement mixing pile (1);The pile for prestressed pipe cement soil wall (6) consolidate and be connected between ground cover (3);The ribbed stiffener (7) is arranged on pile for prestressed pipe cement soil wall (6) and ground cover The boundary corner of plate (3);The end anchorage of the prestressing force balance anchor pole (4) is in hard soil layer, and its other end wears solid Due on ground cover (3).
2. a kind of foundation pit supporting system according to claim 1, it is characterised in that:Described pile for prestressed pipe cement soil wall (6) to face upward inclined, it faces upward oblique angle ≯ 15 °.
3. a kind of foundation pit supporting system according to claim 1, it is characterised in that:Described ribbed stiffener (7) is mixed for reinforcing bar Xtah Crude Clay structure.
4. a kind of foundation pit supporting system according to claim 1, it is characterised in that:Described ribbed stiffener (7) is arranged on ground Surface cover (3) is below or more than ground cover (3).
5. a kind of foundation pit supporting system according to claim 1, it is characterised in that:Described prestressing force balance anchor pole (4) Angle of inclination ≯ 45 °.
6. a kind of foundation pit supporting system according to claim 1, it is characterised in that:Described prestressing force balance anchor pole (4) Substituted with steel strand wires or churning anchor tube.
7. a kind of construction method of foundation pit supporting system, it is characterised in that:Comprise the following steps:
A. well-points dewatering;Precipitation is carried out to the well point of foundation ditch in earth excavation the last fortnight or so the time, treats that level of ground water is reduced to Earth excavation is carried out after construction requirement;
B. surveying setting-out;The coordinate basis point provided according to designing unit, carries out setting-out according to design drawing and elevation draws Work is surveyed, and carries out permanent mark and temporary sign;
C. guide groove (5) is excavated;Excavate guide groove (5) and reach construction requirement;
D. triaxial cement mixing pile machine is constructed in place;Three axles are carried out by the way of tri-axial deep stirring pile machine is by one hole of socket The construction of cement mixing method (1), and make inclination according to the angle requirement in design drawing;
E. pile for prestressed pipe (2) is inserted;After triaxial cement mixing pile (1) construction is finished, by pile for prestressed pipe (2) at the beginning of cement Inserted before solidifying, the pile for prestressed pipe (2) should keep identical angle of inclination with triaxial cement mixing pile (1), be collectively forming pre- Stress pile tube cement soil wall (6);
F., ribbed stiffener (7) is set;After pile for prestressed pipe cement soil wall (6) construction terminates, according to design requirement, ribbed stiffener is poured (7);
G. ground cover (3) is poured;After the completion of ribbed stiffener (7) construction, ground cover (3) is poured, the steel of the ground cover (3) Muscle should be anchored in pile for prestressed pipe cement soil wall (6), and is connected with ribbed stiffener (7).
H. the hole position of prestressing force balance anchor pole (4) is determined;Go out the hole position of prestressing force balance anchor pole (4) using total powerstation setting-out, and It is marked and numbers on ground cover (3).
I. pore-forming and borehole cleaning;Using the drilling row drilling of pore-forming anchor pole and after pore-forming reaches design requirement, emptied using water under high pressure, Sediment in evacuation aperture, untill the more clean water without a large amount of sediments is returned out in aperture;
J. slip casting;By in the prestressing force made balance anchor pole (4) decentralization to pore-forming, it is ensured that prestressing force balance anchor pole (4) is in hole In it is placed in the middle, must not keep to the side, then prestressing force balance anchor pole (4) end is transferred to away from bottom hole about 0.5m or so, entered with grouting pump Row slip casting, after the completion of slip casting, using high-strength bolt or OVM anchorages, ground cover is fixed on by prestressing force balance anchor pole (4) upper end (3) on.
8. a kind of construction method of foundation pit supporting system according to claim 7, it is characterised in that:In described step a Level of ground water is reduced to 0.5m~0.8m below foundation ditch.
9. a kind of construction method of foundation pit supporting system according to claim 7, it is characterised in that:Led in the step c The width of groove (5) is according to the thickness exactness of pile for prestressed pipe cement soil wall (6), and its depth is 1m.
CN201710585673.1A 2017-07-18 2017-07-18 A kind of foundation pit supporting system and its construction method Pending CN107165173A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710585673.1A CN107165173A (en) 2017-07-18 2017-07-18 A kind of foundation pit supporting system and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710585673.1A CN107165173A (en) 2017-07-18 2017-07-18 A kind of foundation pit supporting system and its construction method

Publications (1)

Publication Number Publication Date
CN107165173A true CN107165173A (en) 2017-09-15

Family

ID=59817043

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710585673.1A Pending CN107165173A (en) 2017-07-18 2017-07-18 A kind of foundation pit supporting system and its construction method

Country Status (1)

Country Link
CN (1) CN107165173A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643189A (en) * 2018-04-10 2018-10-12 浙江坤德创新岩土工程有限公司 Outer anchor head fixed structure, foundation pit support system and construction method
CN110468850A (en) * 2019-08-29 2019-11-19 天津大学 A kind of oblique cement mixing method foundation pit supporting system and method for protecting support
CN114319369A (en) * 2020-11-15 2022-04-12 重庆广播电视大学重庆工商职业学院 Dig lining integral type foundation ditch vertical supporting device
CN114658001A (en) * 2022-03-15 2022-06-24 中建科技集团有限公司 Quicksand soil foundation pit excavation supporting technology and supporting structure

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101519880A (en) * 2009-03-02 2009-09-02 浙江大学 Method of using rotational multiaxial borehole pouring concrete occluding pile wall for enclosing deep foundation pit and slope protection project
CN101775807A (en) * 2010-03-03 2010-07-14 天津二十冶建设有限公司 Structure for supporting deep foundation pit of soft soil foundation
CN101798810A (en) * 2009-02-20 2010-08-11 上海强劲基础工程有限公司 Cement-soil composite pile inserted into reinforced concrete core materials
CN104164881A (en) * 2014-07-28 2014-11-26 中国建筑第四工程局有限公司 Piling wall overlapping cantilever foundation pit support construction method and structure
CN104278679A (en) * 2013-07-01 2015-01-14 上海城地建设股份有限公司 Envelope structure combining five (six) shaft mixing piles with precast tubular piles and construction method
CN104563095A (en) * 2014-12-18 2015-04-29 上海建工二建集团有限公司 Novel enclosure system of soft-hard occlusion piles and construction method
CN204608798U (en) * 2015-04-24 2015-09-02 南京市测绘勘察研究院有限公司 A kind of water-seal pile/within the walls inserts the foundation pit supporting construction that H profile steel and prefabricated tubular pile are formed
CN205259194U (en) * 2015-12-23 2016-05-25 张红兵 Supporting structure of foundation pit
CN106638619A (en) * 2016-12-20 2017-05-10 王志华 Foundation-pit support building structure
CN206902721U (en) * 2017-07-18 2018-01-19 中冶华天南京工程技术有限公司 A kind of foundation pit supporting system

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101798810A (en) * 2009-02-20 2010-08-11 上海强劲基础工程有限公司 Cement-soil composite pile inserted into reinforced concrete core materials
CN101519880A (en) * 2009-03-02 2009-09-02 浙江大学 Method of using rotational multiaxial borehole pouring concrete occluding pile wall for enclosing deep foundation pit and slope protection project
CN101775807A (en) * 2010-03-03 2010-07-14 天津二十冶建设有限公司 Structure for supporting deep foundation pit of soft soil foundation
CN104278679A (en) * 2013-07-01 2015-01-14 上海城地建设股份有限公司 Envelope structure combining five (six) shaft mixing piles with precast tubular piles and construction method
CN104164881A (en) * 2014-07-28 2014-11-26 中国建筑第四工程局有限公司 Piling wall overlapping cantilever foundation pit support construction method and structure
CN104563095A (en) * 2014-12-18 2015-04-29 上海建工二建集团有限公司 Novel enclosure system of soft-hard occlusion piles and construction method
CN204608798U (en) * 2015-04-24 2015-09-02 南京市测绘勘察研究院有限公司 A kind of water-seal pile/within the walls inserts the foundation pit supporting construction that H profile steel and prefabricated tubular pile are formed
CN205259194U (en) * 2015-12-23 2016-05-25 张红兵 Supporting structure of foundation pit
CN106638619A (en) * 2016-12-20 2017-05-10 王志华 Foundation-pit support building structure
CN206902721U (en) * 2017-07-18 2018-01-19 中冶华天南京工程技术有限公司 A kind of foundation pit supporting system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643189A (en) * 2018-04-10 2018-10-12 浙江坤德创新岩土工程有限公司 Outer anchor head fixed structure, foundation pit support system and construction method
CN110468850A (en) * 2019-08-29 2019-11-19 天津大学 A kind of oblique cement mixing method foundation pit supporting system and method for protecting support
CN114319369A (en) * 2020-11-15 2022-04-12 重庆广播电视大学重庆工商职业学院 Dig lining integral type foundation ditch vertical supporting device
CN114658001A (en) * 2022-03-15 2022-06-24 中建科技集团有限公司 Quicksand soil foundation pit excavation supporting technology and supporting structure

Similar Documents

Publication Publication Date Title
CN104612162B (en) A kind of Deep Foundation Pit of Metro Stations excavation construction method
CN102094425B (en) Foundation pit construction method adopting shallow buried depth Larsen steel plate pile as protective cofferdam
CN103774675B (en) Combined double-row-pile combined vertical prestress anchor rod supporting system and construction method thereof
CN204491626U (en) The foundation pit enclosure structure that Larsen steel sheet pile and prestressed anchor combine
CN106013171B (en) A kind of semi-rigid supporting construction semi-flexible and method of deep-foundation side wall
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN103046557A (en) Foundation pit water-sealing supporting method by using long spiral cement soil mixing structural steel pile
CN105756091B (en) A kind of Metro station excavation construction method of control adjacent building composition deformation
CN107165173A (en) A kind of foundation pit supporting system and its construction method
CN105155602B (en) A kind of many fulcrums foundation stabilization synthesis inclination correction method
CN109630127A (en) A kind of construction method of rich water soft stratum ultra-deep shield vertical shaft
CN107299650B (en) A kind of remote open caisson casting method for correcting error
CN106812150A (en) A kind of mountain area steep slope region Road Bridge Pile Foundation construction method
CN110629671A (en) Suspension bridge anchorage and construction method thereof
CN103215889A (en) Arch bridge foundation used on bad geological conditions and construction method of arch bridge foundation
CN110055973B (en) Foundation pit enclosure structure under high-speed railway bridge with limited construction space and water stopping method
CN109610473A (en) A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration
CN207092107U (en) A kind of anti-subsidence structure using diaphram wall
CN206902721U (en) A kind of foundation pit supporting system
CN208803460U (en) A kind of enhancing cement mixing method intercepts water the Prefabricated Concrete sheet pile of effect
CN110820756A (en) Shield well and vertical shaft deep foundation pit excavation safety construction method
CN105484270A (en) Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit
CN102605801A (en) Suspension semi-reverse-construction method for underground circular water tank
CN115717397A (en) Larsen steel sheet pile and prestressed anchor cable combined supporting construction method
CN109706970A (en) A kind of prefabricated square cable active well

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170915

RJ01 Rejection of invention patent application after publication