CN205742216U - A kind of Unfavorable geology foundation ditch that is used for puts slope excavation combined bearing structure - Google Patents
A kind of Unfavorable geology foundation ditch that is used for puts slope excavation combined bearing structure Download PDFInfo
- Publication number
- CN205742216U CN205742216U CN201620452220.2U CN201620452220U CN205742216U CN 205742216 U CN205742216 U CN 205742216U CN 201620452220 U CN201620452220 U CN 201620452220U CN 205742216 U CN205742216 U CN 205742216U
- Authority
- CN
- China
- Prior art keywords
- side slope
- slope
- foundation ditch
- layer
- bearing structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
The utility model discloses one and put slope excavation combined bearing structure for Unfavorable geology foundation ditch, including side slope, it is characterized in that: in described side slope, be arranged at intervals with the most equally spaced horizontal and vertical multiple stakes, side slope is inserted in each described stake before every layer of earth excavation vertically downward, the most equally spaced horizontal and vertical multiple soil nailings it are arranged at intervals with in described side slope, each described soil nailing inserts side slope, described stake and described soil nailing interlaced arrangement in side slope after every layer of earth excavation.It carries out bank protection process by successively excavating front construction stake in side slope to soft layer, ensure to exist for supporting construction before every layer of earth excavation, and soil nailing of constructing is further ensured that the stability of side slope, solve Unfavorable geology foundation ditch and put local side slope destabilization problems in the digging process of slope, there is the advantages such as design is simple, it is convenient to construct, guarantee side slope safety.
Description
Technical field
This utility model relates to one and puts slope excavation combined bearing structure for Unfavorable geology foundation ditch, is applied to city's political and ideological work
Journey, building engineering foundation ditch, it is adaptable to Unfavorable geology foundation ditch uses the pattern putting slope excavation.
Background technology
Generally use in the case of foundation depth 4~about 6m, periphery site condition spaciousness and put slope excavation, put slope excavation
Typically use soil nailing or anchor pole as the measure of bank protection.Unfavorable geology is moulded to muck soil or the punching of shape especially in the presence of stream
In the case of banketing, need the soil body carries out consolidation process and slope, slope will be put than very big (the generally reaching 1:3~1:5) controlled
The calculating requirement of slope stability could be met.During site operation, it is usually after first successively carrying out earth excavation soil nailing of constructing again
Or anchor pole, the most easily causes the unstability of local side slope, the safety of meeting serious threat to base pit engineering.How at Unfavorable geology
Under the conditions of use relatively clivia ratio to put slope excavation, and ensure in digging process that the stability of local side slope is to need in engineering reality to solve
Important Problems certainly.
Summary of the invention
The purpose of this utility model is that providing a kind of puts slope excavation combined bearing structure for Unfavorable geology foundation ditch.It
By successively excavating front construction stake in side slope, soft layer is carried out bank protection process, it is ensured that exist for propping up before every layer of earth excavation
Protection structure, and soil nailing of constructing is further ensured that the stability of side slope, solves Unfavorable geology foundation ditch and puts local edge in the digging process of slope
Slope destabilization problems.
The purpose of this utility model is reached by following measure: a kind of Unfavorable geology foundation ditch that is used for puts slope excavation group
Box-like supporting construction, including side slope, it is characterised in that: it is arranged at intervals with horizontal and vertical the most equally spaced multiple in described side slope
Stake, each described stake is inserted side slope before every layer of earth excavation vertically downward, described side slope is arranged at intervals with horizontal and vertical
The most equally spaced multiple soil nailing, each described soil nailing inserts side slope, described stake and described soil nailing on limit after every layer of earth excavation
Interlaced arrangement on slope, described stake is log pile, and described soil nailing inserts side slope the most obliquely, the incline direction of soil nailing
Contrary with the incline direction of side slope, described soil nailing is horizontal by 10 °~25 ° of angles.
Further, described side slope is inserted with at least one tapping pipe.
Further, described side slope is covered with net spray plane layer.
Further, described net spray plane layer is bar-mat reinforcement.
Further, described net spray plane layer is covered with concrete layer.
Further, top, slope and the toe of described side slope is equipped with gutter.
Further, reversely incline relative to side slope in the ground connecting place between the gutter on described side slope and top, slope
Tiltedly.
Further, a length of 6m of described log pile, a diameter of 200mm of described log pile.
This utility model has the advantage that as follows: this utility model utilizes stake, before slope excavating, the soil body has been carried out bank protection
Process, it is ensured that before every layer of earth excavation, exist for supporting construction, and then use less slope ratio to carry out putting slope excavation, in the earthwork
Soil nailing of constructing after excavation is further ensured that the stability of side slope, solves Unfavorable geology foundation ditch and puts local side slope in the digging process of slope
Destabilization problems, adds the slope stability of layered soil in Excavation Process.It has, and design is simple, it is convenient to construct, guarantor
The advantages such as card side slope safety, and use the foundation ditch field putting slope excavation to have preferable application prospect at Unfavorable geology.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
In figure: 1, gutter, 2, net spray plane layer, 3, soil nailing, 4, log pile, 5, tapping pipe, 6, side slope, A, place leveling mark
Height, B, ground floor earthwork top mark are high, and C, second layer earthwork top mark are high, and D, third layer earthwork top mark are high, E, the 4th layer of earthwork top mark
Height, absolute altitude at the bottom of F, side slope.
Detailed description of the invention
Describe performance of the present utility model below in conjunction with the accompanying drawings in detail, but it is not intended that limit of the present utility model
Fixed, only illustrate.Simultaneously by explanation, advantage of the present utility model will become clearer from easy to understand.
As shown in Figure 1: a kind of Unfavorable geology foundation ditch that is used for puts slope excavation combined bearing structure, including side slope 6, side slope 6
On be arranged at intervals with the most equally spaced horizontal and vertical multiple stakes, side slope is inserted in each stake before every layer of earth excavation vertically downward
6, side slope 6 is arranged at intervals with the most equally spaced horizontal and vertical multiple soil nailings 3, each described soil nailing 3 is at every layer of earth excavation
Rear insertion side slope 6, described stake and described soil nailing 3 interlaced arrangement in side slope 6.In the present embodiment, described stake is log pile 4,
The most equally spaced horizontal and vertical four row's log piles 4 it are arranged at intervals with in side slope 6, a length of 6m of log pile 4, log pile 4
A diameter of 200mm, in actual mechanical process, can carry out spreading process according to field condition to log pile.
As shown in Figure 1: four row's log piles 4 are respectively in ground floor earthwork top mark height B, second layer earthwork top mark height C, third layer
Side slope 6 is inserted vertically downward before earth excavation, it is ensured that open every layer of earthwork at earthwork top mark height D and the 4th layer of earthwork top mark height E
Supporting construction is existed for before digging.Being arranged at intervals with the most equally spaced horizontal and vertical four casting nails 3 in side slope 6, four casting nails 3 exist
Soil at ground floor earthwork top mark height B, second layer earthwork top mark height C, third layer earthwork top mark height D and the 4th layer of earthwork top mark height E
Insert side slope 6 after side's excavation, be further ensured that the stability of side slope.Wherein, in actual applications, each layer earthwork top mark coca evidence
At the bottom of place leveling absolute altitude A, side slope, absolute altitude F, the slope when earthwork layering number of plies determines, place leveling absolute altitude A and ground floor earthwork top
The height of absolute altitude B is concordant.
Soil nailing 3 inserts side slope 6 the most obliquely, the incline direction phase of the incline direction of soil nailing 3 and side slope 6
Instead, described soil nailing 3 is horizontal by 10 °~25 ° of angles.Soil nailing 3, horizontal by 10 °~25 ° of angles, increases stablizing of side slope
Property.
Being inserted with at least one tapping pipe 5 in side slope 6, the hydrops in side slope 6 flows out.
Being covered with net spray plane layer 2 in side slope 6, wherein, net spray plane layer 2 is bar-mat reinforcement, and net spray plane layer 2 is covered with concrete layer,
Strengthen the stability of side slope further.
The top, slope of side slope 6 and toe are equipped with gutter 1, the ground connecting place between side slope 6 and top row ditch, slope 1
Relative to side slope 6 reversed dip, it is simple to the hydrops connecting place flows into top row ditch, slope 1.
As it is shown in figure 1, this utility model working procedure is:
1, at place leveling absolute altitude A, place is flattened, top row ditch, slope 1 of constructing;
2, according to calculating slope than first row log pile 4 of constructing at the ground floor high B of earthwork top mark, first row of constructing after excavation
Soil nailing 3, construct the net spray plane layer 2 of bank protection, tapping pipe 5, it is excavated to second layer earthwork top mark height C, and at second layer earthwork top mark
Construction second row log pile 4 at high C;
3, after second layer earth excavation construct second row soil nailing 3, construction and excavation to third layer earthwork top mark height D, and
Construction the 3rd row's log pile 4 at third layer earthwork top mark height D;
4, construction the 3rd casting nail 3, tapping pipe 5 after third layer earth excavation, be excavated to the 4th layer of earthwork top mark height E,
And the 4th row's log pile 4 of constructing at the 4th layer of earthwork top mark height E, the 4th casting nail 3 of constructing after the 4th layer of earth excavation;
5, excavation of foundation pit is at absolute altitude F at the bottom of side slope, sough 1 of constructing.
Claims (8)
1. put a slope excavation combined bearing structure for Unfavorable geology foundation ditch, including side slope (6), it is characterised in that: described
Being arranged at intervals with the most equally spaced horizontal and vertical multiple stakes in side slope (6), each described stake is vertical before every layer of earth excavation
It is downwardly into side slope (6), described side slope (6) is arranged at intervals with the most equally spaced horizontal and vertical multiple soil nailings (3), Mei Gesuo
State soil nailing (3) after every layer of earth excavation, insert side slope (6), described stake and described soil nailing (3) interlaced arrangement in side slope (6),
Described stake is log pile (4), and described soil nailing (3) inserts side slope (6), the incline direction of soil nailing (3) the most obliquely
Contrary with the incline direction of side slope (6), described soil nailing (3) is horizontal by 10 °~25 ° of angles.
The most according to claim 1 for Unfavorable geology foundation ditch put slope excavation combined bearing structure, it is characterised in that: institute
State and in side slope (6), be inserted with at least one tapping pipe (5).
The most according to claim 1 for Unfavorable geology foundation ditch put slope excavation combined bearing structure, it is characterised in that: institute
State and in side slope (6), be covered with net spray plane layer (2).
The most according to claim 3 for Unfavorable geology foundation ditch put slope excavation combined bearing structure, it is characterised in that: institute
Stating net spray plane layer (2) is bar-mat reinforcement.
5. according to described in claim 3 or 4 for Unfavorable geology foundation ditch put slope excavation combined bearing structure, its feature exists
In: it is covered with concrete layer on described net spray plane layer (2).
The most according to claim 1 for Unfavorable geology foundation ditch put slope excavation combined bearing structure, it is characterised in that: institute
Top, slope and the toe of stating side slope (6) are equipped with gutter (1).
The most according to claim 6 for Unfavorable geology foundation ditch put slope excavation combined bearing structure, it is characterised in that: institute
State the ground connecting place between the gutter (1) on side slope (6) and top, slope relative to side slope (6) reversed dip.
The most according to claim 1 for Unfavorable geology foundation ditch put slope excavation combined bearing structure, it is characterised in that: institute
State a length of 6m of log pile (4), a diameter of 200mm of described log pile (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620452220.2U CN205742216U (en) | 2016-05-18 | 2016-05-18 | A kind of Unfavorable geology foundation ditch that is used for puts slope excavation combined bearing structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620452220.2U CN205742216U (en) | 2016-05-18 | 2016-05-18 | A kind of Unfavorable geology foundation ditch that is used for puts slope excavation combined bearing structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205742216U true CN205742216U (en) | 2016-11-30 |
Family
ID=57363860
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620452220.2U Active CN205742216U (en) | 2016-05-18 | 2016-05-18 | A kind of Unfavorable geology foundation ditch that is used for puts slope excavation combined bearing structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205742216U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106703044A (en) * | 2017-01-11 | 2017-05-24 | 北京建工土木工程有限公司 | Flow-plastic-shaped flushing and filling soil weak stratum sloping combination support method |
CN107858934A (en) * | 2017-12-13 | 2018-03-30 | 中铁二十三局集团有限公司 | The small spacing abutment constructing structure and its construction method of neighbouring running railway line |
CN108643191A (en) * | 2018-04-18 | 2018-10-12 | 中国十七冶集团有限公司 | A kind of supporting construction and its construction method of ultra-deep piping lane foundation pit |
CN112281877A (en) * | 2020-11-26 | 2021-01-29 | 中铁二院工程集团有限责任公司 | Cutting high slope construction method |
CN113417297A (en) * | 2021-06-30 | 2021-09-21 | 中铁建工集团有限公司 | Foundation pit slope supporting structure and construction method thereof |
-
2016
- 2016-05-18 CN CN201620452220.2U patent/CN205742216U/en active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106703044A (en) * | 2017-01-11 | 2017-05-24 | 北京建工土木工程有限公司 | Flow-plastic-shaped flushing and filling soil weak stratum sloping combination support method |
CN107858934A (en) * | 2017-12-13 | 2018-03-30 | 中铁二十三局集团有限公司 | The small spacing abutment constructing structure and its construction method of neighbouring running railway line |
CN108643191A (en) * | 2018-04-18 | 2018-10-12 | 中国十七冶集团有限公司 | A kind of supporting construction and its construction method of ultra-deep piping lane foundation pit |
CN112281877A (en) * | 2020-11-26 | 2021-01-29 | 中铁二院工程集团有限责任公司 | Cutting high slope construction method |
CN113417297A (en) * | 2021-06-30 | 2021-09-21 | 中铁建工集团有限公司 | Foundation pit slope supporting structure and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205742216U (en) | A kind of Unfavorable geology foundation ditch that is used for puts slope excavation combined bearing structure | |
CN201137148Y (en) | Double rows bamboo pile composite soil nail defending system | |
CN100564700C (en) | The job practices of lattice type steel column tower crane pedestal | |
CN103255771B (en) | Method for excavating super-deep foundation pit engineering piles in graded mode and graded composite supporting of supporting piles | |
CN205617353U (en) | Miniature compound soil nail wall that intercepts water by force | |
CN112281877B (en) | Cutting high slope construction method | |
CN103410152B (en) | A kind of construction method for long and narrow deep foundation pit earthwork digging | |
CN104929133B (en) | The construction method of sloping timbering at the bottom of a kind of deep basal pit Larsen steel sheet pile stake | |
CN206034454U (en) | Supporting construction | |
CN104631468A (en) | Supporting method for foundation pit excavation project | |
CN103290850A (en) | Arch combination foundation pit retaining and protection system and construction method thereof | |
CN104695445A (en) | Basement earth excavation method adopting reverse construction method | |
CN203716156U (en) | Pit-in-pit city gate hole type excavation construction structure in deep foundation pit | |
CN102995643A (en) | Underground-space steel truss foundation pit supporting structure and construction method thereof | |
CN107386453B (en) | High-rise House on stilts construction method | |
CN204780938U (en) | Novel recoverable anchor formula double row pile supporting construction that draws | |
CN107700519A (en) | One kind lifting tower crane installation method | |
CN101824825B (en) | Deep foundation pit open cutting construction method | |
CN202401461U (en) | Novel foundation pit shoring structure | |
CN106245916A (en) | The three-dimensional construction method of Group Buildings | |
CN106245677A (en) | The construction method of the Group Buildings underground space | |
CN103215965A (en) | Laminate type high-rise platform pile tower crane foundation and construction method | |
CN106013174A (en) | Oblique supporting method for foundation pit shoring and oblique supporting structure | |
CN204456182U (en) | Vertical anchorage pile retaining wall | |
CN105241320B (en) | A kind of both sides, Gao Dou valley, scenic spot bridge abutment controlled blasting and means of defence |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |