CN206448285U - Without bottom concrete combined type cofferdam under the conditions of formation geology - Google Patents
Without bottom concrete combined type cofferdam under the conditions of formation geology Download PDFInfo
- Publication number
- CN206448285U CN206448285U CN201720086277.XU CN201720086277U CN206448285U CN 206448285 U CN206448285 U CN 206448285U CN 201720086277 U CN201720086277 U CN 201720086277U CN 206448285 U CN206448285 U CN 206448285U
- Authority
- CN
- China
- Prior art keywords
- steel
- pipe pile
- conditions
- combined type
- piles
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000004567 concrete Substances 0.000 title claims abstract description 19
- 230000015572 biosynthetic process Effects 0.000 title claims abstract description 14
- 238000005755 formation reaction Methods 0.000 title claims abstract description 14
- 239000011435 rock Substances 0.000 claims abstract description 16
- 238000005553 drilling Methods 0.000 claims abstract description 15
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 14
- 239000011150 reinforced concrete Substances 0.000 claims abstract description 14
- 239000010959 steel Substances 0.000 claims abstract description 14
- 239000000203 mixture Substances 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 13
- 238000005516 engineering process Methods 0.000 abstract description 4
- 238000009412 basement excavation Methods 0.000 description 2
- 230000003014 reinforcing Effects 0.000 description 2
- 231100000241 scar Toxicity 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000004873 anchoring Methods 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 238000001764 infiltration Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Abstract
The utility model discloses put without bottom concrete combined type cofferdam, including ring under the conditions of a kind of formation geology and be provided with closing fore shaft between the rectangular steel pipe row of piles being made up of in cushion cap surrounding many steel-pipe piles, adjacent two steel-pipe pile;The lower base opening inserting piling of steel-pipe pile to cushion cap bottom strong-weathered rock layer surface, there is reinforced concrete drilling stake in the lower end linking of steel-pipe pile, the upper end of reinforced concrete drilling stake is deeply to steel-pipe pile inner chamber, and its lower end is through strongly weathered sand-rock and extends in weak weathered stratum.The utility model is simple in construction, easy construction, without carrying out back cover using concrete again, simplifies construction technology, and the rigidity and stability in the overall cofferdam completed of constructing can meet the technical requirements of safe construction.
Description
Technical field
The utility model is related to bridge deepwater foundation construction technology, more particularly, under the conditions of a kind of formation geology without back cover
The box-like cofferdam of coagulation local soil type.
Background technology
In deep-water bridge foundation work progress, when run into close on have existing building basic when, be increase peace as far as possible
Full distance, it is ensured that the safety of existing building, has stronger stress performance and obvious size advantage using steel pipe pile cofferdam.
During normal steel-pipe pile cofferdam construction, its technological process is:Designed according to steel pipe pile cofferdam, carry out steel-pipe pile, fore shaft processing and spell
Dress;Sinking steel-pipe pile(Leading truck is installed on operation platform periphery, the gradient of steel-pipe pile is controlled, by theoretical chi on leading truck
Very little unwrapping wire makes the position of each steel-pipe pile, is impacted in place with vibro-pile driver);Underwater pouring bottom concrete;Water is installed
Flat support;Pour into a mould concrete bearing platform and part pier shaft;Finally steel-pipe pile is pulled out again.But when the deeper rock stratum of excavation of foundation pit depth
When geological conditions is regional, because rock stratum hardness is larger, steel pipe pile cofferdam inserting piling is difficult, and root, which is difficult to squeeze into scar, takes root, and causes
Cofferdam structure system unstability, it is impossible to meet its force request.
The content of the invention
The purpose of this utility model is to provide under the conditions of a kind of formation geology without bottom concrete combined type cofferdam, can be with
Solve steel-pipe pile to be difficult to squeeze into scar anchoring, it is impossible to the problem of meeting cofferdam structure system force request.
To achieve the above object, the utility model can take following technical proposals:
Put under the conditions of formation geology described in the utility model without bottom concrete combined type cofferdam, including ring in cushion cap four
Closing fore shaft is provided between the rectangular steel pipe row of piles that week is made up of many steel-pipe piles, adjacent two steel-pipe pile;The steel-pipe pile
Lower base opening inserting piling has reinforced concrete drill to the strong-weathered rock layer surface of the cushion cap bottom in the lower end linking of the steel-pipe pile
Hole stake, the upper end of the reinforced concrete drilling stake is deeply to the steel-pipe pile inner chamber, and its lower end is through strongly weathered sand-rock and prolongs
Extend in weak weathered stratum.
The reinforced concrete drilling stake height deeply entered in the steel-pipe pile inner chamber >=2 meters.
Depth >=1 meter that the reinforced concrete drilling stake lower end is injected in weak weathered stratum.
Frame-type support system is provided with the closing space that steel pipe row of piles is surrounded above the cushion cap.
Described frame-type support system includes spaced horizontal from top to bottom and is welded on the steel pipe row of piles madial wall
At least two layers of support board and the rectangle collar tie beam being horizontally fixed in every layer of supporting plate, set in the middle part level of the rectangle collar tie beam
It is equipped between transverse support bar, the transverse support bar of upper and lower layer collar tie beam and is provided with longitudinally connected bar;The four of the rectangle collar tie beam
Angular position is respectively arranged with bearing diagonal.
The utility model has the advantage of simple in construction, easy construction, the rigidity and stability in overall cofferdam can meet peace
The technical requirements constructed entirely.The specific strata structure run into according to bridge deepwater excavation of foundation pit, by fore shaft steel-pipe pile inserting piling to holding
The strong-weathered rock layer surface of platform bottom, then does casing using steel-pipe pile, in the extension construction reinforced bar concrete drill hole stake of its lower end,
And pass through strongly weathered sand-rock to extend into the anchor foundation in the weak weathered stratum of lower section as cofferdam reinforced concrete drilling stake,
Cofferdam overall rigidity and stability are greatly improved, the technical requirements of safe construction are met;Simultaneously because weak-weathered rock
High density and high intensity that layer has, significantly reduce the infiltration phenomenon of cofferdam bottom, without being sealed again using concrete
Bottom, simplifies construction technology.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is Fig. 1 top view.
Embodiment
The utility model is described in more details below in conjunction with the accompanying drawings.
As shown in Figure 1, 2, put under the conditions of formation geology of the present utility model without bottom concrete combined type cofferdam, including ring
Closing fore shaft is provided between the rectangular steel pipe row of piles being made up of in the surrounding of cushion cap 1 many steel-pipe piles 2, adjacent two steel-pipe pile 2;When
When there is weathered rock formation below foundation ditch, for convenience of constructing, by the strong-weathered rock of the lower base opening inserting piling of steel-pipe pile 2 to the bottom of cushion cap 1
3 surface of layer(The base opening of steel-pipe pile 2 should be more than 0.5 meter less than 1 elevation of bottom of cushion cap), have reinforcing bar in the lower end linking of steel-pipe pile 2
Concrete drill hole stake 4, to ensure the rigidity and stability of cofferdam entirety, the upper end of reinforced concrete drilling stake 4 is deeply to steel pipe
Height in 2 inner chambers of stake is not less than 2 meters, and its lower end is extended in weak weathered stratum 5 after passing through strongly weathered sand-rock 3, to ensure anchor
Gu stable, the height for the reinforced concrete drilling stake deeply entered in weak weathered stratum 5 is not less than 1 meter;In the top of cushion cap 1 by steel pipe
Frame-type support system is provided with the closing space that row of piles is surrounded:The frame-type support system that the utility model is used is included certainly
Three layers of supporting plate 6 and be horizontally fixed in every layer of supporting plate 6 that upper and lower spaced horizontal is welded on steel pipe row of piles madial wall
Rectangle collar tie beam 7, have a transverse support bar 8 the middle part of rectangle collar tie beam 7 is horizontally disposed, the transverse support bar 8 of upper and lower layer collar tie beam it
Between be provided with longitudinally connected bar 9;Bearing diagonal 10 is respectively arranged with the corner location of rectangle collar tie beam 7.
During cofferdam construction of the present utility model, first by steel-pipe pile 2 by root from the inserting piling of riverbed face 11 to the bottom surface of coating 12
At position, after surrounding is closed up, it is allowed to penetrate strongly weathered sand-rock 3 to weak in every steel-pipe pile internal drilling successively using rotary drilling rig
Certain depth in weathered rock formation 5, then construction reinforced bar concrete drill hole stake 4(Descending reinforcing cage simultaneously pours into a mould concrete), it is fully completed
Afterwards, that is, the combined type cofferdam that top is steel-pipe pile 2, bottom is reinforced concrete drilling stake 4 is formed.
Claims (5)
1. without bottom concrete combined type cofferdam under the conditions of a kind of formation geology, including ring is put in cushion cap surrounding by many steel-pipe piles
Closing fore shaft is provided between the rectangular steel pipe row of piles of composition, adjacent two steel-pipe pile;It is characterized in that:The bottom of the steel-pipe pile
Mouth inserting piling has reinforced concrete drilling to the strong-weathered rock layer surface of the cushion cap bottom in the lower end linking of the steel-pipe pile
Stake, the upper end of the reinforced concrete drilling stake is deeply to the steel-pipe pile inner chamber, and its lower end is through strongly weathered sand-rock and extends
To weak weathered stratum.
2. without bottom concrete combined type cofferdam under the conditions of formation geology according to claim 1, it is characterised in that:Deeply
The reinforced concrete drilling stake height entered in the steel-pipe pile inner chamber >=2 meters.
3. without bottom concrete combined type cofferdam under the conditions of formation geology according to claim 1, it is characterised in that:It is described
Depth >=1 meter that reinforced concrete drilling stake lower end is injected in weak weathered stratum.
4. without bottom concrete combined type cofferdam under the conditions of the formation geology according to claim 1,2 or 3, its feature exists
In:Frame-type support system is provided with the closing space that steel pipe row of piles is surrounded above the cushion cap.
5. without bottom concrete combined type cofferdam under the conditions of formation geology according to claim 4, it is characterised in that:It is described
Frame-type support system include spaced horizontal from top to bottom and be welded at least two layers on steel pipe row of piles madial wall support
Plate and the rectangle collar tie beam being horizontally fixed in every layer of supporting plate, being horizontally disposed with the middle part of the rectangle collar tie beam has cross-brace
Longitudinally connected bar is provided between bar, the transverse support bar of upper and lower layer collar tie beam;Distinguish at the corner location of the rectangle collar tie beam
It is provided with bearing diagonal.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720086277.XU CN206448285U (en) | 2017-01-23 | 2017-01-23 | Without bottom concrete combined type cofferdam under the conditions of formation geology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720086277.XU CN206448285U (en) | 2017-01-23 | 2017-01-23 | Without bottom concrete combined type cofferdam under the conditions of formation geology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206448285U true CN206448285U (en) | 2017-08-29 |
Family
ID=59667261
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720086277.XU Active CN206448285U (en) | 2017-01-23 | 2017-01-23 | Without bottom concrete combined type cofferdam under the conditions of formation geology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206448285U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2022141388A1 (en) * | 2020-12-28 | 2022-07-07 | 中铁广州工程局集团有限公司 | Fixed inner support ring beam of locking steel pipe pile cofferdam |
-
2017
- 2017-01-23 CN CN201720086277.XU patent/CN206448285U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2022141388A1 (en) * | 2020-12-28 | 2022-07-07 | 中铁广州工程局集团有限公司 | Fixed inner support ring beam of locking steel pipe pile cofferdam |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106638640B (en) | Construction method without bottom concrete combined type cofferdam under the conditions of formation geology | |
CN103967031B (en) | A kind of caisson of consolidated subsoil and stake combination foundation and construction method thereof | |
CN105239586B (en) | Method for supporting foundation pit by adopting support structure | |
CN102953341B (en) | A kind of high-order trestle work structure be arranged in deep water torrent intectate steep bare rock | |
CN102979039B (en) | Elevated trestle bridge construction method on covering-free steep bare rock in deepwater and rapid stream | |
CN103422510B (en) | Steel pipe frame type cofferdam structure and construction method | |
CN108532586A (en) | A kind of construction method of garage parking diaphram wall | |
CN102953362B (en) | A kind of drilled pile platform be arranged in deep water torrent intectate steep bare rock | |
CN107514006A (en) | It is a kind of to build island operation construction method for shallow sea or shallow river bridge foundation | |
CN101457526A (en) | Circular deep foundation ditch concrete pile arranging support and major structure inversing construction method | |
CN103410156B (en) | Support space enclosing structure and application process thereof before a kind of recyclable vertical type steel pipe | |
CN105239578B (en) | Water-rich sand layer deep foundation pit underwater construction method | |
CN102134853A (en) | CT sealed steel pipe pile foundation pit water stop supporting device and construction method thereof | |
CN203213136U (en) | Caisson and pile combined foundation of consolidated subsoil | |
CN110924433A (en) | Design method of subway foundation pit foot-hanging pile enclosure structure in upper-soft lower-hard rock stratum | |
CN105064381B (en) | A kind of back cover construction method of high-low cutting curb Double-Wall Steel Boxed Cofferdam armored concrete | |
CN201943077U (en) | Waterproof curtain of CT-type fore shaft steel pipe pile | |
CN105714748A (en) | Excavating construction method for surge shaft in gravel and sandy soil layer | |
CN206448285U (en) | Without bottom concrete combined type cofferdam under the conditions of formation geology | |
CN105544597B (en) | Suitable for the combination foundation structure and its construction method under Diarrhea lacustrine facies islands and reefs environment | |
CN104264683A (en) | Concave ultra-deep foundation pit zoned supporting method for three-side surrounded cultural protection building | |
CN202323960U (en) | Shallow foundation pit forming construction structure capable of ensuring slope stability | |
CN205576990U (en) | Cross section and wear bridge pier tunnel slip casting supporting construction | |
CN107503362A (en) | A kind of compound antiskid piling wall retaining structure and construction method suitable for reservoir stability | |
CN112049117B (en) | Earth-rock binary foundation pit supporting structure system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: No. 1225, nautical East Road, Henan economic and Technological Development Zone, Zhengzhou, Henan Patentee after: China Railway seven Bureau Limited Company Limited company survey and Design Research Institute Address before: No. 1225, nautical East Road, Henan economic and Technological Development Zone, Zhengzhou, Henan Patentee before: Survey and Design Institute of China Railway seven Bureau Group Co., Ltd. |