CN206448285U - Without bottom concrete combined type cofferdam under the conditions of formation geology - Google Patents

Without bottom concrete combined type cofferdam under the conditions of formation geology Download PDF

Info

Publication number
CN206448285U
CN206448285U CN201720086277.XU CN201720086277U CN206448285U CN 206448285 U CN206448285 U CN 206448285U CN 201720086277 U CN201720086277 U CN 201720086277U CN 206448285 U CN206448285 U CN 206448285U
Authority
CN
China
Prior art keywords
steel
pipe pile
conditions
combined type
piles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720086277.XU
Other languages
Chinese (zh)
Inventor
李二伟
王英
殷爱国
刘建伟
桂文才
郝云超
侯泽兵
朱卫威
徐旭升
邢闯锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Survey and Design Research Institute of China Railway Seventh Group Co Ltd
Original Assignee
Survey and Design Research Institute of China Railway Seventh Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Survey and Design Research Institute of China Railway Seventh Group Co Ltd filed Critical Survey and Design Research Institute of China Railway Seventh Group Co Ltd
Priority to CN201720086277.XU priority Critical patent/CN206448285U/en
Application granted granted Critical
Publication of CN206448285U publication Critical patent/CN206448285U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses put without bottom concrete combined type cofferdam, including ring under the conditions of a kind of formation geology and be provided with closing fore shaft between the rectangular steel pipe row of piles being made up of in cushion cap surrounding many steel-pipe piles, adjacent two steel-pipe pile;The lower base opening inserting piling of steel-pipe pile to cushion cap bottom strong-weathered rock layer surface, there is reinforced concrete drilling stake in the lower end linking of steel-pipe pile, the upper end of reinforced concrete drilling stake is deeply to steel-pipe pile inner chamber, and its lower end is through strongly weathered sand-rock and extends in weak weathered stratum.The utility model is simple in construction, easy construction, without carrying out back cover using concrete again, simplifies construction technology, and the rigidity and stability in the overall cofferdam completed of constructing can meet the technical requirements of safe construction.

Description

Without bottom concrete combined type cofferdam under the conditions of formation geology
Technical field
The utility model is related to bridge deepwater foundation construction technology, more particularly, under the conditions of a kind of formation geology without back cover The box-like cofferdam of coagulation local soil type.
Background technology
In deep-water bridge foundation work progress, when run into close on have existing building basic when, be increase peace as far as possible Full distance, it is ensured that the safety of existing building, has stronger stress performance and obvious size advantage using steel pipe pile cofferdam. During normal steel-pipe pile cofferdam construction, its technological process is:Designed according to steel pipe pile cofferdam, carry out steel-pipe pile, fore shaft processing and spell Dress;Sinking steel-pipe pile(Leading truck is installed on operation platform periphery, the gradient of steel-pipe pile is controlled, by theoretical chi on leading truck Very little unwrapping wire makes the position of each steel-pipe pile, is impacted in place with vibro-pile driver);Underwater pouring bottom concrete;Water is installed Flat support;Pour into a mould concrete bearing platform and part pier shaft;Finally steel-pipe pile is pulled out again.But when the deeper rock stratum of excavation of foundation pit depth When geological conditions is regional, because rock stratum hardness is larger, steel pipe pile cofferdam inserting piling is difficult, and root, which is difficult to squeeze into scar, takes root, and causes Cofferdam structure system unstability, it is impossible to meet its force request.
The content of the invention
The purpose of this utility model is to provide under the conditions of a kind of formation geology without bottom concrete combined type cofferdam, can be with Solve steel-pipe pile to be difficult to squeeze into scar anchoring, it is impossible to the problem of meeting cofferdam structure system force request.
To achieve the above object, the utility model can take following technical proposals:
Put under the conditions of formation geology described in the utility model without bottom concrete combined type cofferdam, including ring in cushion cap four Closing fore shaft is provided between the rectangular steel pipe row of piles that week is made up of many steel-pipe piles, adjacent two steel-pipe pile;The steel-pipe pile Lower base opening inserting piling has reinforced concrete drill to the strong-weathered rock layer surface of the cushion cap bottom in the lower end linking of the steel-pipe pile Hole stake, the upper end of the reinforced concrete drilling stake is deeply to the steel-pipe pile inner chamber, and its lower end is through strongly weathered sand-rock and prolongs Extend in weak weathered stratum.
The reinforced concrete drilling stake height deeply entered in the steel-pipe pile inner chamber >=2 meters.
Depth >=1 meter that the reinforced concrete drilling stake lower end is injected in weak weathered stratum.
Frame-type support system is provided with the closing space that steel pipe row of piles is surrounded above the cushion cap.
Described frame-type support system includes spaced horizontal from top to bottom and is welded on the steel pipe row of piles madial wall At least two layers of support board and the rectangle collar tie beam being horizontally fixed in every layer of supporting plate, set in the middle part level of the rectangle collar tie beam It is equipped between transverse support bar, the transverse support bar of upper and lower layer collar tie beam and is provided with longitudinally connected bar;The four of the rectangle collar tie beam Angular position is respectively arranged with bearing diagonal.
The utility model has the advantage of simple in construction, easy construction, the rigidity and stability in overall cofferdam can meet peace The technical requirements constructed entirely.The specific strata structure run into according to bridge deepwater excavation of foundation pit, by fore shaft steel-pipe pile inserting piling to holding The strong-weathered rock layer surface of platform bottom, then does casing using steel-pipe pile, in the extension construction reinforced bar concrete drill hole stake of its lower end, And pass through strongly weathered sand-rock to extend into the anchor foundation in the weak weathered stratum of lower section as cofferdam reinforced concrete drilling stake, Cofferdam overall rigidity and stability are greatly improved, the technical requirements of safe construction are met;Simultaneously because weak-weathered rock High density and high intensity that layer has, significantly reduce the infiltration phenomenon of cofferdam bottom, without being sealed again using concrete Bottom, simplifies construction technology.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is Fig. 1 top view.
Embodiment
The utility model is described in more details below in conjunction with the accompanying drawings.
As shown in Figure 1, 2, put under the conditions of formation geology of the present utility model without bottom concrete combined type cofferdam, including ring Closing fore shaft is provided between the rectangular steel pipe row of piles being made up of in the surrounding of cushion cap 1 many steel-pipe piles 2, adjacent two steel-pipe pile 2;When When there is weathered rock formation below foundation ditch, for convenience of constructing, by the strong-weathered rock of the lower base opening inserting piling of steel-pipe pile 2 to the bottom of cushion cap 1 3 surface of layer(The base opening of steel-pipe pile 2 should be more than 0.5 meter less than 1 elevation of bottom of cushion cap), have reinforcing bar in the lower end linking of steel-pipe pile 2 Concrete drill hole stake 4, to ensure the rigidity and stability of cofferdam entirety, the upper end of reinforced concrete drilling stake 4 is deeply to steel pipe Height in 2 inner chambers of stake is not less than 2 meters, and its lower end is extended in weak weathered stratum 5 after passing through strongly weathered sand-rock 3, to ensure anchor Gu stable, the height for the reinforced concrete drilling stake deeply entered in weak weathered stratum 5 is not less than 1 meter;In the top of cushion cap 1 by steel pipe Frame-type support system is provided with the closing space that row of piles is surrounded:The frame-type support system that the utility model is used is included certainly Three layers of supporting plate 6 and be horizontally fixed in every layer of supporting plate 6 that upper and lower spaced horizontal is welded on steel pipe row of piles madial wall Rectangle collar tie beam 7, have a transverse support bar 8 the middle part of rectangle collar tie beam 7 is horizontally disposed, the transverse support bar 8 of upper and lower layer collar tie beam it Between be provided with longitudinally connected bar 9;Bearing diagonal 10 is respectively arranged with the corner location of rectangle collar tie beam 7.
During cofferdam construction of the present utility model, first by steel-pipe pile 2 by root from the inserting piling of riverbed face 11 to the bottom surface of coating 12 At position, after surrounding is closed up, it is allowed to penetrate strongly weathered sand-rock 3 to weak in every steel-pipe pile internal drilling successively using rotary drilling rig Certain depth in weathered rock formation 5, then construction reinforced bar concrete drill hole stake 4(Descending reinforcing cage simultaneously pours into a mould concrete), it is fully completed Afterwards, that is, the combined type cofferdam that top is steel-pipe pile 2, bottom is reinforced concrete drilling stake 4 is formed.

Claims (5)

1. without bottom concrete combined type cofferdam under the conditions of a kind of formation geology, including ring is put in cushion cap surrounding by many steel-pipe piles Closing fore shaft is provided between the rectangular steel pipe row of piles of composition, adjacent two steel-pipe pile;It is characterized in that:The bottom of the steel-pipe pile Mouth inserting piling has reinforced concrete drilling to the strong-weathered rock layer surface of the cushion cap bottom in the lower end linking of the steel-pipe pile Stake, the upper end of the reinforced concrete drilling stake is deeply to the steel-pipe pile inner chamber, and its lower end is through strongly weathered sand-rock and extends To weak weathered stratum.
2. without bottom concrete combined type cofferdam under the conditions of formation geology according to claim 1, it is characterised in that:Deeply The reinforced concrete drilling stake height entered in the steel-pipe pile inner chamber >=2 meters.
3. without bottom concrete combined type cofferdam under the conditions of formation geology according to claim 1, it is characterised in that:It is described Depth >=1 meter that reinforced concrete drilling stake lower end is injected in weak weathered stratum.
4. without bottom concrete combined type cofferdam under the conditions of the formation geology according to claim 1,2 or 3, its feature exists In:Frame-type support system is provided with the closing space that steel pipe row of piles is surrounded above the cushion cap.
5. without bottom concrete combined type cofferdam under the conditions of formation geology according to claim 4, it is characterised in that:It is described Frame-type support system include spaced horizontal from top to bottom and be welded at least two layers on steel pipe row of piles madial wall support Plate and the rectangle collar tie beam being horizontally fixed in every layer of supporting plate, being horizontally disposed with the middle part of the rectangle collar tie beam has cross-brace Longitudinally connected bar is provided between bar, the transverse support bar of upper and lower layer collar tie beam;Distinguish at the corner location of the rectangle collar tie beam It is provided with bearing diagonal.
CN201720086277.XU 2017-01-23 2017-01-23 Without bottom concrete combined type cofferdam under the conditions of formation geology Active CN206448285U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720086277.XU CN206448285U (en) 2017-01-23 2017-01-23 Without bottom concrete combined type cofferdam under the conditions of formation geology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720086277.XU CN206448285U (en) 2017-01-23 2017-01-23 Without bottom concrete combined type cofferdam under the conditions of formation geology

Publications (1)

Publication Number Publication Date
CN206448285U true CN206448285U (en) 2017-08-29

Family

ID=59667261

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720086277.XU Active CN206448285U (en) 2017-01-23 2017-01-23 Without bottom concrete combined type cofferdam under the conditions of formation geology

Country Status (1)

Country Link
CN (1) CN206448285U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109653226A (en) * 2019-01-02 2019-04-19 中铁大桥局集团有限公司 A kind of cofferdam structure based on the double steel sheet pile of core filling type
CN111663546A (en) * 2020-05-18 2020-09-15 中交路桥建设有限公司 Bottom-sealing-free embedded rock-socketed steel pipe pile cofferdam with inner protection leg and construction method thereof
WO2022141388A1 (en) * 2020-12-28 2022-07-07 中铁广州工程局集团有限公司 Fixed inner support ring beam of locking steel pipe pile cofferdam

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109653226A (en) * 2019-01-02 2019-04-19 中铁大桥局集团有限公司 A kind of cofferdam structure based on the double steel sheet pile of core filling type
CN111663546A (en) * 2020-05-18 2020-09-15 中交路桥建设有限公司 Bottom-sealing-free embedded rock-socketed steel pipe pile cofferdam with inner protection leg and construction method thereof
CN111663546B (en) * 2020-05-18 2024-05-24 中交路桥建设有限公司 Non-bottom-sealing steel pipe pile cofferdam with inner leg protection rock-socketed and construction method thereof
WO2022141388A1 (en) * 2020-12-28 2022-07-07 中铁广州工程局集团有限公司 Fixed inner support ring beam of locking steel pipe pile cofferdam

Similar Documents

Publication Publication Date Title
CN106638640B (en) Construction method without bottom concrete combined type cofferdam under the conditions of formation geology
CN103967031B (en) A kind of caisson of consolidated subsoil and stake combination foundation and construction method thereof
CN102953341B (en) A kind of high-order trestle work structure be arranged in deep water torrent intectate steep bare rock
CN103410156B (en) Support space enclosing structure and application process thereof before a kind of recyclable vertical type steel pipe
CN105239586B (en) Method for supporting foundation pit by adopting support structure
CN102953362B (en) A kind of drilled pile platform be arranged in deep water torrent intectate steep bare rock
CN203213136U (en) Caisson and pile combined foundation of consolidated subsoil
CN103422510B (en) Steel pipe frame type cofferdam structure and construction method
CN108532586A (en) A kind of construction method of garage parking diaphram wall
CN105239578B (en) Water-rich sand layer deep foundation pit underwater construction method
CN102979039B (en) Elevated trestle bridge construction method on covering-free steep bare rock in deepwater and rapid stream
CN110924433A (en) Design method of subway foundation pit foot-hanging pile enclosure structure in upper-soft lower-hard rock stratum
CN107514006A (en) It is a kind of to build island operation construction method for shallow sea or shallow river bridge foundation
CN102134853A (en) CT sealed steel pipe pile foundation pit water stop supporting device and construction method thereof
CN101457526A (en) Circular deep foundation ditch concrete pile arranging support and major structure inversing construction method
CN107503362A (en) A kind of compound antiskid piling wall retaining structure and construction method suitable for reservoir stability
CN206448285U (en) Without bottom concrete combined type cofferdam under the conditions of formation geology
CN113550322A (en) Enclosure system next to deep and shallow foundation pit and construction method
CN104264683A (en) Concave ultra-deep foundation pit zoned supporting method for three-side surrounded cultural protection building
CN105714748A (en) Excavating construction method for surge shaft in gravel and sandy soil layer
CN109577322A (en) A kind of constructing device for inside soil body existing pile foundation pile extension
CN202323960U (en) Shallow foundation pit forming construction structure capable of ensuring slope stability
CN201943077U (en) Waterproof curtain of CT-type fore shaft steel pipe pile
CN205576990U (en) Cross section and wear bridge pier tunnel slip casting supporting construction
CN105544597B (en) Suitable for the combination foundation structure and its construction method under Diarrhea lacustrine facies islands and reefs environment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No. 1225, nautical East Road, Henan economic and Technological Development Zone, Zhengzhou, Henan

Patentee after: China Railway seven Bureau Limited Company Limited company survey and Design Research Institute

Address before: No. 1225, nautical East Road, Henan economic and Technological Development Zone, Zhengzhou, Henan

Patentee before: Survey and Design Institute of China Railway seven Bureau Group Co., Ltd.