CN103410156B - Support space enclosing structure and application process thereof before a kind of recyclable vertical type steel pipe - Google Patents
Support space enclosing structure and application process thereof before a kind of recyclable vertical type steel pipe Download PDFInfo
- Publication number
- CN103410156B CN103410156B CN201310380449.0A CN201310380449A CN103410156B CN 103410156 B CN103410156 B CN 103410156B CN 201310380449 A CN201310380449 A CN 201310380449A CN 103410156 B CN103410156 B CN 103410156B
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- soil
- group
- tie beam
- collar tie
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 135
- 239000010959 steel Substances 0.000 title claims abstract description 135
- 238000000034 method Methods 0.000 title claims abstract description 17
- 239000002689 soil Substances 0.000 claims abstract description 59
- 239000004568 cement Substances 0.000 claims abstract description 49
- 238000009412 basement excavation Methods 0.000 claims description 27
- 238000007569 slipcasting Methods 0.000 claims description 11
- 238000004873 anchoring Methods 0.000 claims description 6
- 239000004567 concrete Substances 0.000 claims description 5
- 230000015572 biosynthetic process Effects 0.000 claims description 3
- 238000003756 stirring Methods 0.000 claims description 3
- 230000002787 reinforcement Effects 0.000 abstract description 6
- 238000007789 sealing Methods 0.000 abstract description 6
- 230000007613 environmental effect Effects 0.000 abstract description 3
- 238000010276 construction Methods 0.000 description 16
- 238000010008 shearing Methods 0.000 description 5
- 230000005484 gravity Effects 0.000 description 4
- 238000005452 bending Methods 0.000 description 3
- 150000001875 compounds Chemical class 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 230000002708 enhancing effect Effects 0.000 description 3
- 238000013019 agitation Methods 0.000 description 2
- 238000005266 casting Methods 0.000 description 2
- 239000004927 clay Substances 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000002156 mixing Methods 0.000 description 2
- 238000005728 strengthening Methods 0.000 description 2
- 230000004888 barrier function Effects 0.000 description 1
- 230000002596 correlated effect Effects 0.000 description 1
- 230000000875 corresponding effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000001556 precipitation Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000011378 shotcrete Substances 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310380449.0A CN103410156B (en) | 2013-08-28 | 2013-08-28 | Support space enclosing structure and application process thereof before a kind of recyclable vertical type steel pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310380449.0A CN103410156B (en) | 2013-08-28 | 2013-08-28 | Support space enclosing structure and application process thereof before a kind of recyclable vertical type steel pipe |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103410156A CN103410156A (en) | 2013-11-27 |
CN103410156B true CN103410156B (en) | 2016-01-27 |
Family
ID=49603194
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310380449.0A Active CN103410156B (en) | 2013-08-28 | 2013-08-28 | Support space enclosing structure and application process thereof before a kind of recyclable vertical type steel pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103410156B (en) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103882869A (en) * | 2014-03-21 | 2014-06-25 | 郭永 | Inclined supporting pile structure for foundation pit support and construction method thereof |
CN105544554A (en) * | 2015-10-26 | 2016-05-04 | 张继红 | Assembly type foundation pit bracing structure and construction method thereof |
CN105544558A (en) * | 2016-01-08 | 2016-05-04 | 上海岩土工程勘察设计研究院有限公司 | Design method for vertical type foundation pit supporting structure |
CN105442618B (en) * | 2016-01-08 | 2018-03-16 | 上海岩土工程勘察设计研究院有限公司 | Accessible vertical type foundation pit supporting construction in hole |
CN105970969B (en) * | 2016-07-08 | 2018-02-23 | 上海长凯岩土工程有限公司 | A kind of base pit engineering assembled cushion layer structure and its application process |
CN107882039A (en) * | 2016-09-30 | 2018-04-06 | 上海城地建设股份有限公司 | H type component building enclosures and its construction method are supportted before a kind of steel pipe |
CN108265726A (en) * | 2017-01-04 | 2018-07-10 | 上海城地建设股份有限公司 | Support, anchor cable post-tensioning HU types building enclosure and its application process before a kind of steel pipe |
CN108277808A (en) * | 2017-01-05 | 2018-07-13 | 上海城地建设股份有限公司 | Support, anchor cable post-tensioning H-type component building enclosure and its application process before a kind of steel pipe |
CN110172966A (en) * | 2019-05-23 | 2019-08-27 | 上海长凯岩土工程有限公司 | A kind of oblique steel pipe composite structure forms the construction method of beaer |
CN114622573B (en) * | 2022-03-17 | 2023-09-01 | 深圳宏业基岩土科技股份有限公司 | Construction method of reinforced concrete inner support stiffening plate |
CN115094907A (en) * | 2022-07-13 | 2022-09-23 | 上海勘察设计研究院(集团)有限公司 | Layered sectional type upright self-stabilizing enclosure structure and construction method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101368388A (en) * | 2008-09-23 | 2009-02-18 | 中铁西北科学研究院有限公司 | Anchor pipe skeleton and its support method |
CN101560771A (en) * | 2009-05-11 | 2009-10-21 | 周治国 | Reclaimable foundation pit bracing system and construction method thereof |
CN101892667A (en) * | 2010-07-23 | 2010-11-24 | 中国建筑第二工程局有限公司 | Foundation pit support device and construction method |
JP2012162968A (en) * | 2011-02-09 | 2012-08-30 | Takenaka Komuten Co Ltd | Construction supporting structure |
CN102677679A (en) * | 2011-03-07 | 2012-09-19 | 温州长城基础工程公司 | Cement-soil diaphragm wall with cast-in-situ special-shaped reinforced concrete pile cores for construction of foundation pits |
CN103015431A (en) * | 2012-12-04 | 2013-04-03 | 北京建材地质工程公司 | Foundation pit supporting method for manual dig-hole cement-soil steel pile |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202543945U (en) * | 2012-03-22 | 2012-11-21 | 中建七局第二建筑有限公司 | Mixing pile structure |
-
2013
- 2013-08-28 CN CN201310380449.0A patent/CN103410156B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101368388A (en) * | 2008-09-23 | 2009-02-18 | 中铁西北科学研究院有限公司 | Anchor pipe skeleton and its support method |
CN101560771A (en) * | 2009-05-11 | 2009-10-21 | 周治国 | Reclaimable foundation pit bracing system and construction method thereof |
CN101892667A (en) * | 2010-07-23 | 2010-11-24 | 中国建筑第二工程局有限公司 | Foundation pit support device and construction method |
JP2012162968A (en) * | 2011-02-09 | 2012-08-30 | Takenaka Komuten Co Ltd | Construction supporting structure |
CN102677679A (en) * | 2011-03-07 | 2012-09-19 | 温州长城基础工程公司 | Cement-soil diaphragm wall with cast-in-situ special-shaped reinforced concrete pile cores for construction of foundation pits |
CN103015431A (en) * | 2012-12-04 | 2013-04-03 | 北京建材地质工程公司 | Foundation pit supporting method for manual dig-hole cement-soil steel pile |
Non-Patent Citations (2)
Title |
---|
基坑竖向斜支撑基础设计;简浩等;《地下空间》;20041231;第24卷(第5期);第692页第1节、第693页第3节及图1 * |
水泥土搅拌连续墙施工应用技术;何凤阳;《山西建筑》;20081130;第34卷(第33期);第150页第2-4节 * |
Also Published As
Publication number | Publication date |
---|---|
CN103410156A (en) | 2013-11-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103410156B (en) | Support space enclosing structure and application process thereof before a kind of recyclable vertical type steel pipe | |
CN1837511B (en) | Double-rowed cofferdam and method for manufacturing the same | |
CN108193642B (en) | Revetment reinforcing facility and construction method thereof | |
CN104389320B (en) | Construction method of pile foundation anchor rope prestress high retaining wall | |
CN103774675A (en) | Combined double-row-pile combined vertical prestress anchor rod supporting system and construction method thereof | |
CN105714831A (en) | Abnormal-shape double-row pile for supporting foundation pit side wall and construction method of abnormal-shape double-row pile | |
CN102953341A (en) | Overhead trestle structure built on non-covering steep bare rocks in deep rapids | |
CN105178327A (en) | Composite retaining structure of foundation pit project and construction method thereof | |
CN103410158A (en) | Recoverable vertical type portal self-stabilizing enveloping structure and application method thereof | |
CN105089670B (en) | Construction method for enlarging and excavating subway station on basis of parallel interval shield tunnel | |
CN107503362A (en) | A kind of compound antiskid piling wall retaining structure and construction method suitable for reservoir stability | |
CN207211165U (en) | A kind of compound antiskid piling wall retaining structure suitable for reservoir stability | |
CN204780938U (en) | Novel recoverable anchor formula double row pile supporting construction that draws | |
CN204940298U (en) | A kind of Composite Enclosure Structure of base pit engineering | |
CN203729309U (en) | Support system with combined double-row piles combined with vertical prestressed anchor bolts | |
CN109610473A (en) | A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration | |
CN205975646U (en) | Shallow water territory steel pipe pile holder fortifield village weir structure | |
CN103410155B (en) | A kind of recyclable preposition assembling braced cuts structure and application process thereof | |
CN107675698A (en) | Cofferdam closing structure and operating method in Larsen steel sheet pile water | |
CN111021378A (en) | Highway subgrade slope broken line type anchoring pile retaining structure and construction method thereof | |
CN206768832U (en) | Support, anchor cable post-tensioning H type component building enclosures before a kind of steel pipe | |
CN206448285U (en) | Without bottom concrete combined type cofferdam under the conditions of formation geology | |
CN105484270A (en) | Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit | |
CN206768831U (en) | Support, anchor cable post-tensioning HU type building enclosures before a kind of steel pipe | |
CN205421276U (en) | Strut heterotypic double row pile of foundation ditch lateral wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 200093 No. 38 Shui Feng Road, Yangpu District, Shanghai. Co-patentee after: SHANGHAI CHANGKAI GEOTECHNICAL ENGINEERING Co.,Ltd. Patentee after: SGIDI ENGINEERING CONSULTING (Group) Co.,Ltd. Address before: 200032 18, building 681, Xiao Mu Qiao Road, Xuhui District, Shanghai. Co-patentee before: SHANGHAI CHANGKAI GEOTECHNICAL ENGINEERING Co.,Ltd. Patentee before: SHANGHAI GEOTECHNICAL INVESTIGATIONS & DESIGN INSTITUTE Co.,Ltd. |
|
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: Shangkan Building, No. 38, Shuifeng Road, Yangpu District, Shanghai 200093 Patentee after: Shanghai Survey, Design and Research Institute (Group) Co.,Ltd. Address before: 200093 No. 38 Shui Feng Road, Yangpu District, Shanghai. Patentee before: SGIDI ENGINEERING CONSULTING (Group) Co.,Ltd. |
|
CP03 | Change of name, title or address | ||
TR01 | Transfer of patent right |
Effective date of registration: 20231102 Address after: 200093 No. 38 Shui Feng Road, Yangpu District, Shanghai. Patentee after: SGIDI ENGINEERING CONSULTING (Group) Co.,Ltd. Address before: 200093 No. 38 Shui Feng Road, Yangpu District, Shanghai. Patentee before: SGIDI ENGINEERING CONSULTING (Group) Co.,Ltd. Patentee before: SHANGHAI CHANGKAI GEOTECHNICAL ENGINEERING Co.,Ltd. |
|
TR01 | Transfer of patent right |