CN103410156B - Support space enclosing structure and application process thereof before a kind of recyclable vertical type steel pipe - Google Patents

Support space enclosing structure and application process thereof before a kind of recyclable vertical type steel pipe Download PDF

Info

Publication number
CN103410156B
CN103410156B CN201310380449.0A CN201310380449A CN103410156B CN 103410156 B CN103410156 B CN 103410156B CN 201310380449 A CN201310380449 A CN 201310380449A CN 103410156 B CN103410156 B CN 103410156B
Authority
CN
China
Prior art keywords
steel pipe
soil
group
tie beam
collar tie
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310380449.0A
Other languages
Chinese (zh)
Other versions
CN103410156A (en
Inventor
顾国荣
杨石飞
许杰
梁振宁
苏辉
陈晖�
王恺敏
郭星宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Survey Design And Research Institute Group Co ltd
SGIDI Engineering Consulting Group Co Ltd
Original Assignee
Shanghai Geotechnical Investigations and Design Institute Co Ltd
Shanghai Changkai Geotechnical Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Geotechnical Investigations and Design Institute Co Ltd, Shanghai Changkai Geotechnical Engineering Co Ltd filed Critical Shanghai Geotechnical Investigations and Design Institute Co Ltd
Priority to CN201310380449.0A priority Critical patent/CN103410156B/en
Publication of CN103410156A publication Critical patent/CN103410156A/en
Application granted granted Critical
Publication of CN103410156B publication Critical patent/CN103410156B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention belongs to base pit engineering technical field, support space enclosing structure and application process thereof before being specifically related to a kind of recyclable vertical type steel pipe, it is characterized in that described space enclosing structure comprises the collar tie beam that bears down on one, Soil-cement Wall and at least three group steel pipes; Described Soil-cement Wall is positioned at centre position and vertically with the described collar tie beam that bears down on one arranges, one end of steel pipe described in three groups is connected and fixed with the described collar tie beam that bears down on one respectively, in steel pipe described in three groups, the group steel pipe being arranged in centre position is vertical with the described collar tie beam that bears down on one to be arranged and is positioned at described Soil-cement Wall inside, other two groups of steel pipes lay respectively at the inside and outside both sides of described middle group of steel pipe, and angularly arrange with described middle group of steel pipe.Advantage of the present invention is, structure installment is simple with dismounting, constructability, reusable edible, environmental protection; Cost is low, and it is convenient to promote; Have reinforcement antiskid, gear soil, sealing multiple action concurrently, anti-slide performance, the resistance capacity to deformation of going along with sb. to guard him the soil body in scope significantly improve.

Description

Support space enclosing structure and application process thereof before a kind of recyclable vertical type steel pipe
Technical field
The invention belongs to base pit engineering technical field, being specifically related to a kind of for supportting space enclosing structure and application process thereof before the recyclable vertical type steel pipe of soft soil foundation pit.
Background technology
For the base pit engineering within the scope of the cutting depth 5m of soft clay area, the space enclosing structure form used in current existing support technology generally adopts Cement-soil Gravity enclosure wall, shaped steel Soil-cement Wall, puts slope excavation.
To be this soil-baffling structure be made up of multiple row lap connection " grid-like " cement earth pile in length and breadth Cement-soil Gravity enclosure wall feature, described cement earth pile is for curing compound with cement based material, shotcrete construction is adopted curing compound and foundation soil to be stirred by force by Mixing Machine, reinforcing body barricade that form lap connection, that have certain thickness and building-in depth, rely on the passive earth pressure stabilization wall of the following soil body in excavation of foundation pit face before body of wall deadweight, frictional resistance at the bottom of wall and wall, to meet the requirements such as the monolithic stability of enclosure wall, stability against over turning, Against Sliding Stability and control deformation of wall.Its advantage is: without supporting in general hole, be convenient to quick shoveling, has the dual-use function of gear soil and sealing concurrently.Shortcoming is that Bit andits control ability is more weak, construction quality is difficult to control, economy is general.
Shaped steel Soil-cement Wall is that the compound inserting shaped steel formation in the triaxial cement stake of lap connection keeps off native waterproof structure.There is applicable soil property scope comparatively wide, the advantages such as, barrier performance good, environmental protection and energy saving, suitable soil layer scope wide, duration short, reduced investment little to surrounding environment influence.But higher for the foundation ditch every meter cost within 5m, and construction requirement is higher, cement piling quality is wayward.
Putting slope excavation is that the Pit Excavation Methods establishing oblique slight slope is stayed in a kind of employing, it is characterized in that under non-support measure, by strengthening width suitable for reading of cutting the earth, taking classification to put the ancillary method of the maintenance stabilities of slope such as slope, bank protection, precipitation simultaneously, native wall avalanche can be prevented, keep stability of slope in digging process, have the duration shorter, the advantage that cost is low, shortcoming puts slope, slope ratio to require larger, stability of slope requirement and width requirement suitable for reading need be met simultaneously, and larger on surrounding enviroment impact.
In sum, current foundation pit supporting construction also cannot recycle and reuse, to reduce construction cost.
Summary of the invention
The object of the invention is according to above-mentioned the deficiencies in the prior art part, space enclosing structure and application process thereof is supportted before a kind of recyclable vertical type steel pipe is provided, this space enclosing structure arranges by certain distance foundation ditch sideline outside the fabricated construction be made up of the collar tie beam that bears down on one, Soil-cement Wall and at least three group steel pipes, to reach enhancing Foundation Pit wall stability and the recyclable object of space enclosing structure.
The object of the invention realizes being completed by following technical scheme:
Before a kind of recyclable vertical type steel pipe, support space enclosing structure, relates to soft soil foundation pit, it is characterized in that described space enclosing structure comprises the collar tie beam that bears down on one, Soil-cement Wall and at least three group steel pipes; Described Soil-cement Wall is positioned at centre position and vertically with the described collar tie beam that bears down on one arranges, one end of steel pipe described in three groups is connected and fixed with the described collar tie beam that bears down on one respectively, in steel pipe described in three groups, the group steel pipe being arranged in centre position is vertical with the described collar tie beam that bears down on one to be arranged and is positioned at described Soil-cement Wall inside, other two groups of steel pipes lay respectively at the inside and outside both sides of described middle group of steel pipe, and angularly arrange with described middle group of steel pipe.
Often organize described steel pipe to be at least made up of row's steel pipe.
Described Soil-cement Wall is made up of two row's Double shaft stirring stakes of lap connection, has described middle group of steel pipe in described Soil-cement Wall.
Described middle group of steel pipe comprises two row's steel pipes, often arranges steel pipe and arranges formation by long and short steel pipe alternate intervals.
Described be connected and fixed refer to described in bear down on one on collar tie beam there is at least one group of locating hole, in steel pipe described in three groups, outer group of steel pipe stretches in described locating hole corresponding with it, and fixed by bolt and backing plate and the described collar tie beam that bears down on one, steel pipe described in all the other two groups and the described collar tie beam that bears down on one are structure as a whole.
A kind of application process relating to above-mentioned recyclable vertical type steel pipe front support space enclosing structure, it is characterized in that at least comprising the steps: that stepping back a distance in foundation ditch sideline applies described Soil-cement Wall, described middle group of steel pipe is vertically inserted in described Soil-cement Wall inner, and its top certain length is reserved outside described Soil-cement Wall; Go deep into the soil body inside foundation ditch until certain depth bottom foundation ditch by oblique for interior group of steel pipe, by a slip casting steel pipe to described interior group of steel pipe bottom slip casting to form anchoring body, described oblique concrete finger is towards the excavation direction of described foundation ditch; The collar tie beam that bears down on one described in building is integrally formed structure to make the top of described middle group of steel pipe and interior group of steel pipe with it, at least reserves one group of locating hole thereon simultaneously; Bear down on one described in being passed by outer group of steel pipe locating hole on collar tie beam obliquely go deep into the soil body, and its bottom is connected with the earth anchor in the soil body, and its top is fixed by bolt and backing plate and the described collar tie beam that bears down on one, the excavation direction of described oblique concrete finger described foundation ditch dorsad; The soil body inside the described Soil-cement Wall of the upright excavation of fluting, and build reinforced bed in time at the end, hole, put slope excavation in described foundation ditch after the soil body.
Described Soil-cement Wall apply the cutting depth that the degree of depth is greater than described foundation ditch.
The oblique degree of depth going deep into the soil body of described outer group of steel pipe is greater than the cutting depth of described foundation ditch.
Advantage of the present invention is, have both reinforcement, gear soil, sealing multiple action, constrain soil deformation, enhance Foundation Pit wall stability, can uprightly excavate, avoid routine and put the large problem in excavation method occupied ground face, slope, significantly reduce traditional cements soil gravity enclosure wall and the shaped steel Soil-cement Wall scale of construction, overcome its speed of application slow, cost is high simultaneously, the shortcomings such as wall quality is wayward, widely can be applied to base pit engineering within the 7m of soft clay area; Utilize the feature that steel tubular structure can conveniently be pulled out, recyclable after construction, disposable input, recycles, and economy can strengthen greatly.
Accompanying drawing explanation
Fig. 1 is the overall schematic of space enclosing structure in the present invention;
Fig. 2 is the floor map of collar tie beam of bearing down on one in the present invention.
Detailed description of the invention
Feature of the present invention and other correlated characteristic are described in further detail by embodiment below in conjunction with accompanying drawing, so that the understanding of technician of the same trade:
Be respectively as marked 1-12 in Fig. 1-2, figure: the collar tie beam 1 that bears down on one, Soil-cement Wall 2, middle group leader's steel pipe 3, middle group of short steel pipes 4, outer group of steel pipe 5, earth anchor 6, bolt and cushion block 7, locating hole 8, interior group of steel pipe 9, slip casting steel pipe 10, anchoring body 11, reinforced bed 12.
Embodiment: as Fig. 1, shown in 2, the present embodiment is specifically related to a kind of for supportting space enclosing structure and application process thereof before the recyclable vertical type steel pipe of soft soil foundation pit, this space enclosing structure is by the collar tie beam 1 that bears down on one, Soil-cement Wall 2, outer group of steel pipe 5, middle group of steel pipe 3 and 4, interior group of steel pipe 9, reinforced bed 12 is combined to form, have both reinforcement, gear soil, sealing multiple action, constrain soil deformation, enhance Foundation Pit wall stability, can uprightly excavate, avoid routine and put the large problem in excavation method occupied ground face, slope, significantly reduce traditional cements soil gravity enclosure wall and the shaped steel Soil-cement Wall scale of construction simultaneously, overcome its speed of application slow, cost is high, the shortcomings such as wall quality is wayward, utilize the feature that steel tubular structure can conveniently be pulled out, recyclable after construction, disposable input, recycles, and economy can strengthen greatly.
As shown in Figure 1, 2, the collar tie beam 1 that bears down on one, for monolithic reinforced concrete structure, is specifically arranged along ground foundation ditch sideline, is reserved with one group of locating hole 8 in position in the outer part at it.
As shown in Figure 1, 2, Soil-cement Wall 2 is arranged in certain distance outside excavation of foundation pit sideline equally, and arrange perpendicular to the collar tie beam 1 that bears down on one, the body of wall that it is specifically made up of two row's dual spindle soil-cement agitation piles of lap connection, possess gear soil and sealing double action, about its length going deep into the soil body is about the twice of the excavation of foundation pit degree of depth.In order to refinforced cement soil stirs the horizontal shearing resistance of wall 2, bending resistance, and improve the ability of body of wall in the resistance to deformation of excavation of foundation pit stage, often arrange in cement mixing method in Soil-cement Wall 2 inside and vertically replace group leader's steel pipe 3 and middle group of short steel pipes 4 in uniform intervals interpolation at a certain distance, form two row's steel pipes, wherein the diameter of middle group leader's steel pipe 3 is more than or equal to the diameter of middle group of short steel pipes 4, middle group leader's steel pipe 3 intubating length extends at the bottom of the wall of Soil-cement Wall 2, middle group of short steel pipes 4 intubating length extends to excavation of foundation pit depth, the steel pipe of both all reserved certain distances in top is exposed to body of wall, to fix with follow-up collar tie beam 1 formed by integrally casting that bears down on one of building.The steel pipe of long and short combination can the shearing resistance of refinforced cement soil agitation pile, bending resistance, there is certain economy simultaneously.
As shown in Figure 1, interior group of steel pipe 9 is as inner support, improve retaining wall resistance to capsizing, and retrain soil deformation, the row of this interior group of steel pipe 9 is a row, certainly many rows can also be selected according to the actual conditions of body of wall and soil mass of foundation pit, it is arranged in the foundation ditch soil body and below the collar tie beam 1 that bears down on one, towards excavation of foundation pit direction every the oblique layout of certain level spacing, its top is fixed with collar tie beam 1 formed by integrally casting that bears down on one, bottom connects slip casting steel pipe 10 and is positioned among the following soil body in the end, hole, anchoring body 11 is formed in its bottom by slip casting, to strengthen the restriction ability of the interior group of steel pipe 9 bottom soil body, to improve base pit stability.
As shown in Figure 1, 2, outer group of steel pipe 5 is for preventing soil body slipping, strengthen soil strength, its row is at least one row, is positioned at the outer soil body of foundation ditch, and in the below of bearing down on one collar tie beam 1, excavation of foundation pit direction is every the oblique layout of certain level spacing dorsad, its top is stretched in the reserved locating hole 8 that bears down on one on collar tie beam 1, and is fixed on by bolt and cushion block 7 and bears down on one on collar tie beam 1, forms fabricated construction in order to recovery.Outer group of steel pipe 5 bottom connects earth anchor 6, by the fastening effect of earth anchor 6 with deep soil, strengthens resistance to plucking and the anti-slide performance of outer group steel pipe 5.
It should be noted that, the width of Soil-cement Wall 2 and the degree of depth, the level interval of middle group leader's steel pipe 3, middle group of short steel pipes 4, outer group of steel pipe 5, interior group of steel pipe 9, the row of outer group of steel pipe 5, length and inclination angle, the length of internal resistance steel pipe 9 and inclination angle, all need to determine according to foundation soil body character, and meet the requirement of deep pit monitor stable calculation.It is required to determine that it; no matter be Soil-cement Wall; or middle group leader's steel pipe 3, middle group of short steel pipes 4, outer group of steel pipe 5; and interior group of steel pipe 9; its degree of depth going deep into the soil body is all greater than the degree of depth of excavation of foundation pit; the object done so effectively can guarantee that the soil body in the excavation of foundation pit degree of depth obtains effective support and enhancing, to avoid instability of foundation pit phenomenon occurs within the scope of cutting depth.
As shown in Figure 1, 2, before above-mentioned recyclable vertical type steel pipe, support construction method of enclosure structure specifically comprises the steps:
1. before excavation of foundation pit, the construction that certain distance carries out Soil-cement Wall 2 is stepped back in foundation ditch sideline, period, for strengthening the shearing resistance of body of wall, bending resistance and resistance capacity to deformation, middle group leader's steel pipe 3 and middle group of short steel pipes 4 are replaced uniform intervals by certain level interval vertical and inserts body of wall inside, simultaneously, the top of group leader's steel pipe 3 and middle group of short steel pipes 4 is reserved certain length and is exposed to outside Soil-cement Wall 2, and row is similarly two rows;
2. by interior group of steel pipe 9 towards excavation of foundation pit direction, be spaced by certain level, obliquely squeeze into (press-in) soil body, until, its bottom connects slip casting steel pipe 10 at the end, hole, forms anchoring body 11, to strengthen the anchored force between steel pipe and the soil body by slip casting;
3. certain distance outside foundation ditch sideline, the collar tie beam 1 that bears down on one of pouring reinforcement concrete structure of namely slotting above Soil-cement Wall 2, the top one of period and middle group leader's steel pipe 3, middle group of short steel pipes 4 and interior group of steel pipe 9 is cast-in-place build fixing, simultaneously at the reserved one group of locating hole 8 of its Outboard Sections;
4. by outer group of steel pipe 5 through locating hole 8 reserved on the collar tie beam 1 that bears down on one, the excavation direction of foundation ditch dorsad, be spaced by certain level, obliquely squeeze into (press-in) soil body, the bottom of outer group of steel pipe 5 connects earth anchor 6, by the fastening effect of earth anchor 6 with deep soil, strengthen resistance to plucking and the anti-slide performance of outer group steel pipe 5; Outer group of steel pipe 5 mainly plays reinforcement AsA-GSH cycle, and strengthen the ability of soil body shearing resistance and resistance to deformation, whole slope stability when guaranteeing that foundation ditch puts slope, its length adopted, level interval, level inclination, row need determine according to foundation soil body character, and meet base pit stability calculation requirement; After construction that it is squeezed into (press-in), top utilizes bolt and cushion block 7 to be locked with the collar tie beam 1 that bears down on one;
5. because said structure is to the enhancing of soil body antiskid, shearing resistance, deformability, foundation ditch can excavate by vertical type fluting, when being excavated to the end, builds reinforced bed 12 in time, and in hole, the soil body carries out putting slope excavation;
6. after foundation construction in foundation ditch, detachable and reclaim above-mentioned steel pipe, to be re-used in next base pit engineering.
As can be seen from the present embodiment, space enclosing structure is supportted before utilizing above-mentioned recyclable vertical type steel pipe, reinforcement, gear soil, sealing effect can be played, constrain soil deformation, strengthen space enclosing structure resistance capacity to deformation, improve its security and stability, solving routine, to put slope excavation method mesoslope larger than excessive, occupied ground face, and other problem that vertical type fender body scale of construction is large, cost is high.Meanwhile, adopt the prefabricated units of recyclable recycling, site assembly speed of application is fast, and readily removablely removes, and possesses environmental protection, economic advantage.

Claims (8)

1. a support space enclosing structure before recyclable vertical type steel pipe, relates to soft soil foundation pit, it is characterized in that described space enclosing structure comprises the collar tie beam that bears down on one, Soil-cement Wall and at least three group steel pipes, described Soil-cement Wall is positioned at centre position and vertically with the described collar tie beam that bears down on one arranges, one end of steel pipe described in three groups is connected and fixed with the described collar tie beam that bears down on one respectively, in steel pipe described in three groups, the group steel pipe being arranged in centre position is vertical with the described collar tie beam that bears down on one to be arranged and is positioned at described Soil-cement Wall inside, other two groups of steel pipes lay respectively in described middle group of steel pipe, outer both sides, and angularly arrange with described middle group of steel pipe, interior group of steel pipe bottom connects slip casting steel pipe and is positioned among the following soil body in the end, hole, anchoring body is formed in its bottom by slip casting, outer group of steel pipe bottom is connected with the earth anchor in the soil body.
2. support space enclosing structure before the recyclable vertical type steel pipe of one according to claim 1, is characterized in that often organizing described steel pipe is at least made up of row's steel pipe.
3. support space enclosing structure before the recyclable vertical type steel pipe of one according to claim 1, is characterized in that described Soil-cement Wall is made up of two row's Double shaft stirring stakes of lap connection, has described middle group of steel pipe in described Soil-cement Wall.
4. support space enclosing structure before the recyclable vertical type steel pipe of the one according to claim 1 or 3, it is characterized in that described middle group of steel pipe comprises two row's steel pipes, often arrange steel pipe and arrange formation by long and short steel pipe alternate intervals.
5. support space enclosing structure before the recyclable vertical type steel pipe of one according to claim 1, it is characterized in that described being connected and fixed is beared down on one on collar tie beam and had at least one group of locating hole described in referring to, in steel pipe described in three groups, outer group of steel pipe stretches in described locating hole corresponding with it, fixed by bolt and backing plate and the described collar tie beam that bears down on one, steel pipe described in all the other two groups and the described collar tie beam that bears down on one are structure as a whole.
6. before relating to a kind of recyclable vertical type steel pipe according to any one of claim 1-5, support the application process of space enclosing structure, it is characterized in that at least comprising the steps: that stepping back a distance in foundation ditch sideline applies described Soil-cement Wall, described middle group of steel pipe is vertically inserted in described Soil-cement Wall inner, and its top certain length is reserved outside described Soil-cement Wall; Go deep into the soil body inside foundation ditch until certain depth bottom foundation ditch by oblique for interior group of steel pipe, by a slip casting steel pipe to described interior group of steel pipe bottom slip casting to form anchoring body, described oblique concrete finger is towards the excavation direction of described foundation ditch; The collar tie beam that bears down on one described in building is integrally formed structure to make the top of described middle group of steel pipe and interior group of steel pipe with it, at least reserves one group of locating hole thereon simultaneously; Bear down on one described in being passed by outer group of steel pipe locating hole on collar tie beam obliquely go deep into the soil body, and its bottom is connected with the earth anchor in the soil body, and its top is fixed by bolt and backing plate and the described collar tie beam that bears down on one, the excavation direction of described oblique concrete finger described foundation ditch dorsad; The soil body inside the described Soil-cement Wall of the upright excavation of fluting, and build reinforced bed in time at the end, hole, in described foundation ditch, the soil body puts slope excavation afterwards.
7. the application process of support space enclosing structure before a kind of recyclable vertical type steel pipe according to claim 6, what it is characterized in that described Soil-cement Wall applies the cutting depth that the degree of depth is greater than described foundation ditch.
8. support the application process of space enclosing structure before a kind of recyclable vertical type steel pipe according to claim 6, it is characterized in that the oblique degree of depth going deep into the soil body of described outer group of steel pipe is greater than the cutting depth of described foundation ditch.
CN201310380449.0A 2013-08-28 2013-08-28 Support space enclosing structure and application process thereof before a kind of recyclable vertical type steel pipe Active CN103410156B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310380449.0A CN103410156B (en) 2013-08-28 2013-08-28 Support space enclosing structure and application process thereof before a kind of recyclable vertical type steel pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310380449.0A CN103410156B (en) 2013-08-28 2013-08-28 Support space enclosing structure and application process thereof before a kind of recyclable vertical type steel pipe

Publications (2)

Publication Number Publication Date
CN103410156A CN103410156A (en) 2013-11-27
CN103410156B true CN103410156B (en) 2016-01-27

Family

ID=49603194

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310380449.0A Active CN103410156B (en) 2013-08-28 2013-08-28 Support space enclosing structure and application process thereof before a kind of recyclable vertical type steel pipe

Country Status (1)

Country Link
CN (1) CN103410156B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103882869A (en) * 2014-03-21 2014-06-25 郭永 Inclined supporting pile structure for foundation pit support and construction method thereof
CN105544554A (en) * 2015-10-26 2016-05-04 张继红 Assembly type foundation pit bracing structure and construction method thereof
CN105544558A (en) * 2016-01-08 2016-05-04 上海岩土工程勘察设计研究院有限公司 Design method for vertical type foundation pit supporting structure
CN105442618B (en) * 2016-01-08 2018-03-16 上海岩土工程勘察设计研究院有限公司 Accessible vertical type foundation pit supporting construction in hole
CN105970969B (en) * 2016-07-08 2018-02-23 上海长凯岩土工程有限公司 A kind of base pit engineering assembled cushion layer structure and its application process
CN107882039A (en) * 2016-09-30 2018-04-06 上海城地建设股份有限公司 H type component building enclosures and its construction method are supportted before a kind of steel pipe
CN108265726A (en) * 2017-01-04 2018-07-10 上海城地建设股份有限公司 Support, anchor cable post-tensioning HU types building enclosure and its application process before a kind of steel pipe
CN108277808A (en) * 2017-01-05 2018-07-13 上海城地建设股份有限公司 Support, anchor cable post-tensioning H-type component building enclosure and its application process before a kind of steel pipe
CN110172966A (en) * 2019-05-23 2019-08-27 上海长凯岩土工程有限公司 A kind of oblique steel pipe composite structure forms the construction method of beaer
CN114622573B (en) * 2022-03-17 2023-09-01 深圳宏业基岩土科技股份有限公司 Construction method of reinforced concrete inner support stiffening plate
CN115094907A (en) * 2022-07-13 2022-09-23 上海勘察设计研究院(集团)有限公司 Layered sectional type upright self-stabilizing enclosure structure and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101368388A (en) * 2008-09-23 2009-02-18 中铁西北科学研究院有限公司 Anchor pipe skeleton and its support method
CN101560771A (en) * 2009-05-11 2009-10-21 周治国 Reclaimable foundation pit bracing system and construction method thereof
CN101892667A (en) * 2010-07-23 2010-11-24 中国建筑第二工程局有限公司 Foundation pit support device and construction method
JP2012162968A (en) * 2011-02-09 2012-08-30 Takenaka Komuten Co Ltd Construction supporting structure
CN102677679A (en) * 2011-03-07 2012-09-19 温州长城基础工程公司 Cement-soil diaphragm wall with cast-in-situ special-shaped reinforced concrete pile cores for construction of foundation pits
CN103015431A (en) * 2012-12-04 2013-04-03 北京建材地质工程公司 Foundation pit supporting method for manual dig-hole cement-soil steel pile

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202543945U (en) * 2012-03-22 2012-11-21 中建七局第二建筑有限公司 Mixing pile structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101368388A (en) * 2008-09-23 2009-02-18 中铁西北科学研究院有限公司 Anchor pipe skeleton and its support method
CN101560771A (en) * 2009-05-11 2009-10-21 周治国 Reclaimable foundation pit bracing system and construction method thereof
CN101892667A (en) * 2010-07-23 2010-11-24 中国建筑第二工程局有限公司 Foundation pit support device and construction method
JP2012162968A (en) * 2011-02-09 2012-08-30 Takenaka Komuten Co Ltd Construction supporting structure
CN102677679A (en) * 2011-03-07 2012-09-19 温州长城基础工程公司 Cement-soil diaphragm wall with cast-in-situ special-shaped reinforced concrete pile cores for construction of foundation pits
CN103015431A (en) * 2012-12-04 2013-04-03 北京建材地质工程公司 Foundation pit supporting method for manual dig-hole cement-soil steel pile

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
基坑竖向斜支撑基础设计;简浩等;《地下空间》;20041231;第24卷(第5期);第692页第1节、第693页第3节及图1 *
水泥土搅拌连续墙施工应用技术;何凤阳;《山西建筑》;20081130;第34卷(第33期);第150页第2-4节 *

Also Published As

Publication number Publication date
CN103410156A (en) 2013-11-27

Similar Documents

Publication Publication Date Title
CN103410156B (en) Support space enclosing structure and application process thereof before a kind of recyclable vertical type steel pipe
CN1837511B (en) Double-rowed cofferdam and method for manufacturing the same
CN108193642B (en) Revetment reinforcing facility and construction method thereof
CN104389320B (en) Construction method of pile foundation anchor rope prestress high retaining wall
CN103774675A (en) Combined double-row-pile combined vertical prestress anchor rod supporting system and construction method thereof
CN105714831A (en) Abnormal-shape double-row pile for supporting foundation pit side wall and construction method of abnormal-shape double-row pile
CN102953341A (en) Overhead trestle structure built on non-covering steep bare rocks in deep rapids
CN105178327A (en) Composite retaining structure of foundation pit project and construction method thereof
CN103410158A (en) Recoverable vertical type portal self-stabilizing enveloping structure and application method thereof
CN105089670B (en) Construction method for enlarging and excavating subway station on basis of parallel interval shield tunnel
CN107503362A (en) A kind of compound antiskid piling wall retaining structure and construction method suitable for reservoir stability
CN207211165U (en) A kind of compound antiskid piling wall retaining structure suitable for reservoir stability
CN204780938U (en) Novel recoverable anchor formula double row pile supporting construction that draws
CN204940298U (en) A kind of Composite Enclosure Structure of base pit engineering
CN203729309U (en) Support system with combined double-row piles combined with vertical prestressed anchor bolts
CN109610473A (en) A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration
CN205975646U (en) Shallow water territory steel pipe pile holder fortifield village weir structure
CN103410155B (en) A kind of recyclable preposition assembling braced cuts structure and application process thereof
CN107675698A (en) Cofferdam closing structure and operating method in Larsen steel sheet pile water
CN111021378A (en) Highway subgrade slope broken line type anchoring pile retaining structure and construction method thereof
CN206768832U (en) Support, anchor cable post-tensioning H type component building enclosures before a kind of steel pipe
CN206448285U (en) Without bottom concrete combined type cofferdam under the conditions of formation geology
CN105484270A (en) Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit
CN206768831U (en) Support, anchor cable post-tensioning HU type building enclosures before a kind of steel pipe
CN205421276U (en) Strut heterotypic double row pile of foundation ditch lateral wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 200093 No. 38 Shui Feng Road, Yangpu District, Shanghai.

Co-patentee after: SHANGHAI CHANGKAI GEOTECHNICAL ENGINEERING Co.,Ltd.

Patentee after: SGIDI ENGINEERING CONSULTING (Group) Co.,Ltd.

Address before: 200032 18, building 681, Xiao Mu Qiao Road, Xuhui District, Shanghai.

Co-patentee before: SHANGHAI CHANGKAI GEOTECHNICAL ENGINEERING Co.,Ltd.

Patentee before: SHANGHAI GEOTECHNICAL INVESTIGATIONS & DESIGN INSTITUTE Co.,Ltd.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: Shangkan Building, No. 38, Shuifeng Road, Yangpu District, Shanghai 200093

Patentee after: Shanghai Survey, Design and Research Institute (Group) Co.,Ltd.

Address before: 200093 No. 38 Shui Feng Road, Yangpu District, Shanghai.

Patentee before: SGIDI ENGINEERING CONSULTING (Group) Co.,Ltd.

CP03 Change of name, title or address
TR01 Transfer of patent right

Effective date of registration: 20231102

Address after: 200093 No. 38 Shui Feng Road, Yangpu District, Shanghai.

Patentee after: SGIDI ENGINEERING CONSULTING (Group) Co.,Ltd.

Address before: 200093 No. 38 Shui Feng Road, Yangpu District, Shanghai.

Patentee before: SGIDI ENGINEERING CONSULTING (Group) Co.,Ltd.

Patentee before: SHANGHAI CHANGKAI GEOTECHNICAL ENGINEERING Co.,Ltd.

TR01 Transfer of patent right