CN102953341A - Overhead trestle structure built on non-covering steep bare rocks in deep rapids - Google Patents

Overhead trestle structure built on non-covering steep bare rocks in deep rapids Download PDF

Info

Publication number
CN102953341A
CN102953341A CN2012105361505A CN201210536150A CN102953341A CN 102953341 A CN102953341 A CN 102953341A CN 2012105361505 A CN2012105361505 A CN 2012105361505A CN 201210536150 A CN201210536150 A CN 201210536150A CN 102953341 A CN102953341 A CN 102953341A
Authority
CN
China
Prior art keywords
steel pipe
trestle
pipe pile
rock
precipitous
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012105361505A
Other languages
Chinese (zh)
Other versions
CN102953341B (en
Inventor
刘学明
文献
何中华
陈理平
孙振华
曹明雾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Civil Engineering Co Ltd of CREC
Municipal Environmental Protection Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Original Assignee
Shanghai Civil Engineering Co Ltd of CREC
Second Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Civil Engineering Co Ltd of CREC, Second Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC filed Critical Shanghai Civil Engineering Co Ltd of CREC
Priority to CN201210536150.5A priority Critical patent/CN102953341B/en
Publication of CN102953341A publication Critical patent/CN102953341A/en
Application granted granted Critical
Publication of CN102953341B publication Critical patent/CN102953341B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention belongs to the field of bridge construction and particularly relates to an overhead trestle structure built on non-covering steep bare rocks in deep rapids. The invention adopts the technical scheme that the overhead trestle specifically comprises a trestle body and steel pipe piles for supporting the trestle body, wherein the steel pipe piles are arranged on the surfaces of the steep bare rocks, bottom cavities of the steel pipe piles are connected and anchored with the steep bare rocks by anchor rods in a connected way, and the steel pipe piles, the steep bare rocks and the anchor rods are fixedly connected into an integral structure by a poured underwater concrete layer. The overhead trestle structure has the advantages that the steel pipe piles are connected with the surfaces of the steep bare rocks by a grouted and rock-socketed anchor rod structure, so that the steel pipe piles are firmly anchored to the surfaces of the steep bare rocks by the holding force of underwater concrete pulp andwith the holding force of the anchor rods, pile bottom concrete and river bed rocks; and the construction has a short period, is at a low cost and is safe and efficient.

Description

A kind of high-order trestle work structure that is arranged on the precipitous naked rock of deep water torrent intectate
Technical field
The invention belongs to field of bridge construction, be specifically related to a kind of high-order trestle work structure that is arranged on the precipitous naked rock of deep water torrent intectate.
Background technology
Along with socioeconomic development, demand for convenient traffic is further strong, it is also more and more to be built in various geologic bridge engineering, in bridge water in the foundation construction, extensively adopt trestle as material, equipment and personnel's construction passage, domestic trestle adopts steel pipe pile to add the frame mode of Bailey truss more.But trestle in the past generally all is built on the rivers and lake that have than thick-covering, under this geological conditions, the Conveyor belt construction of leading to major project is general adopts traditional " halieutics " to carry out, be about to steel pipe pile in place after, by pile hammer inserted to play steel pipe pile to the covering layer design elevation.But, it is inclined uncovered rock face and shallow overburden inclination scar that a lot of rivers, lake and Marine Geology situation are arranged, as adopt conventional method to construct, because the role and influence of current, stormy waves and wind load, the anchoring of mouth can't be guaranteed at the bottom of the stable and steel pipe pile of Conveyor belt, thereby affects the security performance of trestle and the construction speed of major project.
For the geological condition of the precipitous naked rock of above-mentioned intectate, prior art often adopts underwater demolition, artificial covering layer, jacket, scar preexisting hole to be embedded into the schemes such as steel pipe.
Underwater demolition: Wuhan-Guangzhou passenger-dedicated line emphasis Bridge Project, the depth of water 18m of place, pier position in the water, naked scar is inclined to 35 °, adopt the drilling platform scheme, at first with the scar explosion leveling of tilting, arrange the steel casing, the throwing sandbag is buried casing underground on the riverbed again, rely on the existing stake of nearly Dun Chu to come stabilized platform, thereby form the drilled pile platform.This scheme needs underwater demolition, and the scarfing cinder workload is large, and the cycle is large, and cost is high, and needs existing stake to keep the stable of platform.
Artificial covering layer: certain Bridge Project on the Liujiang of Liuzhou, the depth of water 15m of place, pier position in the water, naked scar is inclined to 15 °, adopts the drilling platform scheme, first at the thick earth bag of the pier position throwing 3m of place, again inserted to play steel pipe pile.Artificial covering layer scheme needs a large amount of earth bags of throwing in flat roof area, and engineering quantity is large, and construction cost is high.
Jacket: the nearly island of Shanghai Bridge at Sea section engineering, the bridge location sea bed is shallow overburden and naked rock, adopting the jacket trestle is the subaqueous work passage, adopt jacket platform as the drilling platform of main pier in the water, the steel pipe with many diameter 1.1m during construction is linked to be jacket by land, and shipping is located to the pier position again, hang ship with large 1500t and hang installation, this scheme needs large-tonnage to hang ship and workboat, and steel using amount is large, and construction period is longer.
The scar preexisting hole is embedded into steel pipe: the pier in water depth of water 26m of Zhejiang bridge, the riverbed intectate, scar is 45 ° of inclinations, trestle, platform construction adopt preexisting hole to be embedded into the fixing constructure scheme of steel casing, namely use the percussive drill preexisting hole greater than the pile tube diameter in the trestle steel pipe pile position, outside the pile tube of preexisting hole, pour into a mould underwater concrete after putting into steel pipe pile, it directly is stabilized in the rock stratum.This scheme construction period is longer, needs operation on floating platform, and water level needs more stable, and flow velocity is little.
The shortcomings such as in sum, above scheme exists all that workload is large, long construction period, cost are large.
Therefore those skilled in the art is badly in need of a kind of high-order trestle job practices and structure setting thereof that can effectively solve the connectivity problem of steel pipe pile and precipitous hard naked rock river bed, and the while can reach low, the purpose safely and efficiently of short construction period, cost.
Summary of the invention
The objective of the invention is according to above-mentioned the deficiencies in the prior art part, a kind of high-order trestle work structure that is arranged on the precipitous naked rock of deep water torrent intectate is provided, this high position trestle work structure is by cutting into the shape suitable with precipitous naked scar with mouth at the bottom of the described steel pipe pile on the coast, build the underwater concrete layer within it, rely on the bond stress of underwater concrete slurry and anchor pole, stake base concrete and riverbed basement rock, to reach anchoring, the Against Sliding Stability problem of steel pipe pile on precipitous hard naked rock that solve.
The object of the invention realizes being finished by following technical scheme:
A kind of high-order trestle work structure that is arranged on the precipitous naked rock of deep water torrent intectate, be specifically related to precipitous naked rock, be positioned at abutment on the bank, be positioned at bridge pier on the bank, steel pipe pile and Bailey truss, it is characterized in that bridge pier and some steel pipe piles that described high-order trestle specifically comprises the pontic of trestle and supports described pontic, described steel pipe pile top is fixedly connected with described pontic, described steel pipe pile bottom is arranged on the precipitous naked scar, be connected by the anchor pole grappling between the bottom inner chamber of described steel pipe pile and the described precipitous naked rock, and fixed being structure as a whole of underwater concrete layer by building between the three.
Mouth-shaped and described precipitous naked scar shape are suitable at the bottom of the described steel pipe pile.
The underwater concrete layer height of described steel pipe pile bottom is not less than described anchor pole and enters the rock degree of depth.
The length of described anchor pole more than precipitous naked scar is not less than the length that it gos deep into precipitous naked rock.
Be provided with connection structure between stake between described each steel pipe pile.
Advantage of the present invention is, (1) adopt undersea detection technology and by detection data on the coast at the bottom of the precut steel pipe pile mouth make itself and precipitous naked scar suitable, safe and efficient, reduce the deep diving workload, the reduction construction risk; (2) steel pipe pile is connected employing slip casting embedding rock anchors structure with precipitous naked scar simultaneously, rely on the bond stress of underwater concrete slurry and anchor pole, stake base concrete and riverbed basement rock, so that steel pipe pile firmly is anchored on the precipitous naked scar, short construction period, cost are low, safe and efficient; (3) adopt cantilever method construction bridge, namely prior to the first hole trestle of constructing on the bank, follow-up trestle is installed Bailey truss, steel pipe pile by the crawler crane cantilever, and whole trestle is set up only needs a pedrail crane to cooperate, need not to employ large-scale above-water hoisting equipment, remarkable in economical benefits; (4) steel pipe pile is at the bank spreading, and whole long lifting puts in place, avoids weld job waterborne, reduces security risk, is conducive to the control of steel pipe pile verticality, welding quality etc.
Description of drawings
Fig. 1 is construction flow chart of the present invention;
Fig. 2 is high-order trestle lateral view among the present invention;
Fig. 3 is high-order trestle front view among the present invention;
Fig. 4 is high-order trestle top view among the present invention;
Fig. 5 is abutment structural representation among the present invention;
Fig. 6 is leading truck structural layout plan among the present invention;
Fig. 7 is steel pipe pile spreading schematic diagram among the present invention;
Fig. 8 is rockbolt installation schematic diagram among the present invention;
Fig. 9 is anchor pole steel tube pile embeded in rock schematic diagram among the present invention.
The specific embodiment
Feature of the present invention and other correlated characteristic are described in further detail by embodiment below in conjunction with accompanying drawing, so that technician's of the same trade understanding:
Such as Fig. 1-9, mark 1-27 is respectively among the figure: abutment 1, the first hole trestle 2, bridge pier 3, the second hole trestle 4, connection structure 5, steel pipe pile 6, underwater concrete layer 7, precipitous naked scar 8, checkered plates 9, vertical distribution beam 10, transverse distribution beam 11, Bailey truss 12, stake head piece 13, anchor pole 14, block 15, block rubber 16, anchor pole 17, bracing frame 18, leading truck 19, stiffening plate 20, short steel pipes stake 21, madjack pipe 22, drilling rod 23, dry-mix concrete bag 24, anchor hole 25, cement paste 26, pontic 27.
Embodiment: present embodiment is specifically related to a kind of high-order trestle work structure that is arranged on the precipitous naked rock of deep water torrent intectate, and the high-order trestle work structure of this kind is applicable to that deep water river, flow velocity are large, rise suddenly and sharply flood season, and mountain stream, intectate river and riverbed are precipitous or tilt hard naked rock hydrogeological conditions.Present embodiment is that example is elaborated in connection with Qianjiang grand bridge engineering, and Qianjiang belongs to mountain stream, and flow is large, current are anxious, and Peak Flow Rate reaches 3.21m/s, the riverbed intectate, basement rock is middle Baiyun rock mantle, compressive strength 80 MPa extend to the bank always, and the riverbed is precipitous in the 65m scope of offshore limit, scar is 35~53 ° of inclinations, pier place scar tilts about about 25 ° in the water, and the riverbed just rises and falls, and stalagmite stands in great numbers.Enter for the convenient construction personnel on the bridge pier of Jiang Zhongxin and construct, need to set up trestle towards bridge pier at both sides, river bank slope.
Be depicted as the concrete structure of high-order trestle in the present embodiment such as Fig. 2,9, high-order trestle specifically comprises the pontic 27 of trestle and the steel pipe pile 6 that supports pontic 27, steel pipe pile 6 is arranged on the precipitous naked scar 8, built underwater concrete layer 7 in steel pipe pile 6 bottoms, offer the anchor hole 25 that is through to precipitous naked scar 8 inside from the upper surface of underwater concrete layer 7, be provided with simultaneously anchor pole 17 in anchor hole 25, anchor pole 17 is integrated by underwater concrete layer 7 anchoring of cement paste 26 with precipitous naked scar 8 inner basement rock and steel pipe pile 6 bottoms.
Shown in Fig. 1-9, below be the structure of the high-order trestle on the precipitous naked rock of deep water torrent intectate and the concrete steps of construction thereof:
1. carry out at first on the coast the construction of abutment 1, abutment 1 can adopt inverted T shape or L-type structure, and at the boring of riverbank scar and skyhook 17, the upper end of anchor pole 17 is stretched in the abutment 1, the anchoring of perfusion M35 cement mortar; At the pre-buried shaped steel in the position of Bailey truss 12 or steel plate, Bailey truss 12 is installed after, welding shaped steel restriction Bailey truss moves to, direction across bridge, vertical direction along bridge.
2. bridge pier 3 constructions on the bank, bridge pier 3 is positioned on the exposed riverbank basement rock, adopt reinforced concrete strip foundation, scar is holed on the riverbank, and skyhook stretches into strip foundation, the anchoring of perfusion M35 cement mortar, described strip foundation steel pipe pile position pre-embedded steel slab behind the concreting, is installed connection structure 5 between steel pipe pile, stake, stake head piece 13.
3. at abutment 1 and bridge pier 3 Bailey truss 12, the vertical distribution beam 10 of bridge floor, transverse distribution beam 11, checkered plates 9, railing are installed thereafter, are finished the setting up of pontic 27 of the first hole trestle 2 on the bank; On the coast next hole Bailey truss 12 to be installed is spliced into integral body, crawler crane is to the Bailey truss 12 of middle of the river side free cantilever erection the second hole trestle 4.Number row's Bailey truss 12 are spliced into the whole pontic 27 that consists of the second hole trestle 4, the gradation rigging out, and 12 of Bailey truss bracing frame 18 is set, in order to increase the integral rigidity of bracketed part Bailey truss 12.When the second hole trestle 4 set up complete after, in its end near the middle of the river one side leading truck 19 is set, leading truck 19 adopts channel-section steels to make, and is bolted, and fastens on the upper and lower chord member of Bailey truss 12 by U-shaped.
4. before steel pipe pile 6 is installed, probe and the wire of depth-sounder are fixed on the Metallic rod, its probe is not in underwater 30cm, along mounted leading truck 19 eight equal parts point, measure the inclination scar depth of water of precipitous naked scar 8, can determine length and the end mouth discrepancy in elevation thereof of steel pipe pile 6 according to the each point depth of water that records, on the coast the end mouth of steel pipe pile 6 is cut into the shape suitable with precipitous naked scar 8 according to this end mouth discrepancy in elevation, steel pipe pile 6 is spliced by some short steel pipes stake 21 spreadings, during short steel pipes stake 21 docking, end face is opened groove, guarantees welding quality, simultaneously weld reinforcement plate 20 and be evenly arranged along steel pipe pile 6 girths when spreading; The concrete model of wherein said underwater bathy metry instrument is the portable depth-sounder of HD-360; Install at precipitous naked scar 8 simultaneously and set up a soundd navigation and ranging, this soundd navigation and ranging can show the mode with image of scar situation under water, the concrete engineering of building that is used for the installing of follow-up steel pipe pile 6, underwater concrete layer 7 under water, check the implantation situation of steel pipe pile 6 and the situation of building of underwater concrete layer 7, replaced diver's operation.
5. select water flow stationary, according to the order that is from upstream to the downstream steel pipe pile 6 be installed when flow velocity is low; According to absolute altitude at the bottom of the riverbed, at steel pipe pile 6 marks of carrying out suitable for reading, indicate direction, in order to avoid steel pipe pile 6 directions deflect behind the lower water, misfit with precipitous naked scar 8; Rely on steel pipe pile 6 self gravitations, guarantee the verticality of steel pipe pile 6 by the crawler crane slight shift; After steel pipe pile 6 installs, confirm the implantation situation of steel pipe pile 6 by soundd navigation and ranging, simultaneously the space between the suitable for reading and leading truck 19 of steel pipe pile 6 is carved extremely with iron plate, prevent from that steel pipe pile 6 from producing to rock in follow-up construction.
6. sending diver's entry along 50cm place, the mouth outside, the end pile one circle dry-mix concrete bag 24 of steel pipe pile 6, highly is 50~80cm; Adopt vertical conduit method C30 concrete under steel pipe pile 6 interior priming petocks, along with concrete in steel pipe pile 6 interior risings, concrete is under the inside and outside differential pressure effect, outwards flow out in slit between steel pipe pile 6 and precipitous naked scar 8, be filled between the dry-mix concrete bag 24, form a under water little cofferdam, simultaneously at the end of steel pipe pile 6 interruption-forming underwater concrete layer 7, the height of underwater concrete layer 7 is not less than the thereafter degree of depth of anchor pole 14 embedding rocks; During pouring underwater concrete, can utilize underwater detectoscope that the inside and outside concreting situations of steel pipe pile 6 are monitored, abnormal conditions appear or build finish after, in time arrange the diver to stake at the bottom of situation confirm to check.
7. after steel pipe pile 6 interior underwater concrete layer 7 placing intensity reached 70%, geological drilling rig moved to the leading truck place, in the steel pipe pile internal drilling; The drill bit of geological drilling rig is after passing through the underwater concrete layer 7 of steel pipe pile 6 bottoms, and at a slow speed drilling well prevents the drill bit sideslip; After drill bit enters competent bed 50cm, can pass through counterweight, strengthen the pressure of the drill, accelerate rate of penetration; When entering basement rock, answer core taking inspection, confirm starting point and the degree of depth of rock stratum face, in the pore forming process, when joint fissure is intensive, broken serious when the rock stratum, should take first pressure injection high-strength cement slurry to make rock mass fixed, redrilling after slurry reaches some strength is until anchor hole 25 is to design elevation.
8. at anchor pole 14 binding pressure-resistant plastic madjack pipes 22, madjack pipe 22 bottoms are apart from anchor pole 14 bottom 100mm, in case the pipe laying that back-silts of holing, the trestle top is stayed on the top; Drilling rod 23 by geological drilling rig is seated to anchor pole 14 in the anchor hole 25, removes subsequently the drilling rod 23 of described geological drilling rig.To anchor hole 25 interior compressed water slurries 26, when mud jacking began, the system of mixing had also been laid in cement paste 26, guaranteed the continuity of mud jacking process, after cement paste 26 stirs, with pneumatic mortar machine from plastics madjack pipe 22 to anchor hole 25 bottom mud jacking.Be the seepage that satisfies borehole anchorage section crevice water mud 26 and the water enchroachment (invasion) that prevents top water mud, the size of groundwater increment is determined by field experiment.Utilize underwater detectoscope to observe the mud jacking situation in the mud jacking process, underwater concrete layer 7 end face that cement paste 26 is depressed in the steel pipe pile 6 get final product.Carry out anchor pole 14 resistance to plucking static loading tests thereafter.
9. when steel pipe pile 6 bottom water mud 26 anchoring body compressive strength reach 70%, remove leading truck 19, steel pipe pile 6 bracing 5, a head piece 13 between each are installed; Continue the assembly unit truss to the middle of the river direction pontic 27 that the vertical distribution beam 10 of bridge floor, transverse distribution beam 11, checkered plates 9 and bridge floor railing consist of the 3rd hole trestle is installed simultaneously.
10. still be at the 3rd hole trestle tail end three leading trucks in location to be installed after, by 3. above-mentioned~in 9. same method by that analogy, until finish the construction of bed rearrangement trestle.
The characteristics of this high-order trestle work structure and job practices thereof can be classified as following some:
(1) rise suddenly and sharply at flood season level, flow velocity is large, the riverbed is on the mountain area tachydromile of precipitous hard naked rock, adopts trestle scheme waterborne, has solved the construction access issues of pier in the water, convenient construction, save hang fare with, accelerated progress.
(2) be on the deep water river of precipitous hard naked rock in the riverbed, conventional underwater demolition and artificial covering layer technique have been broken, adopt slip casting embedding rock anchors technology to set up trestle, its construction technology is simple, the cycle is short, cost is low, has solved safely, efficiently, reliably the connectivity problem of steel pipe pile and precipitous hard naked rock river bed.
(3) trestle need not to arrange braking pier in the water, and with abutment and riverbed basement rock anchoring, opposing to horizontal force, is saved material along bridge, reduces cost.
(4) adopt cantilever method construction bridge, namely one stride trestle prior to constructing on the bank, follow-up trestle is installed Bailey truss, steel pipe pile by the crawler crane cantilever, and whole trestle is set up only needs a pedrail crane to cooperate, need not to employ large-scale above-water hoisting equipment, remarkable in economical benefits.
(5) steel pipe pile is at the bank spreading, and whole long lifting puts in place, avoids weld job waterborne, reduces security risk, is conducive to the control of steel pipe pile verticality, welding quality etc.

Claims (5)

1. high-order trestle work structure that is arranged on the precipitous naked rock of deep water torrent intectate, be specifically related to precipitous naked rock, be positioned at abutment on the bank, be positioned at bridge pier on the bank, steel pipe pile and Bailey truss, it is characterized in that bridge pier and some steel pipe piles that described high-order trestle specifically comprises the pontic of trestle and supports described pontic, described steel pipe pile top is fixedly connected with described pontic, described steel pipe pile bottom is arranged on the precipitous naked scar, be connected by the anchor pole grappling between the bottom inner chamber of described steel pipe pile and the described precipitous naked rock, and fixed being structure as a whole of underwater concrete layer by building between the three.
2. a kind of high-order trestle work structure that is arranged on the precipitous naked rock of deep water torrent intectate according to claim 1 is characterized in that mouth-shaped and described precipitous naked scar shape are suitable at the bottom of the described steel pipe pile.
3. a kind of high-order trestle work structure that is arranged on the precipitous naked rock of deep water torrent intectate according to claim 1, the underwater concrete layer height that it is characterized in that described steel pipe pile bottom is not less than described anchor pole and enters the rock degree of depth.
4. a kind of high-order trestle work structure that is arranged on the precipitous naked rock of deep water torrent intectate according to claim 1 is characterized in that the length of described anchor pole more than precipitous naked scar is not less than the length that it gos deep into precipitous naked rock.
5. a kind of high-order trestle work structure that is arranged on the precipitous naked rock of deep water torrent intectate according to claim 1 is characterized in that being provided with connection structure between stake between described each steel pipe pile.
CN201210536150.5A 2012-12-13 2012-12-13 A kind of high-order trestle work structure be arranged in deep water torrent intectate steep bare rock Active CN102953341B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210536150.5A CN102953341B (en) 2012-12-13 2012-12-13 A kind of high-order trestle work structure be arranged in deep water torrent intectate steep bare rock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210536150.5A CN102953341B (en) 2012-12-13 2012-12-13 A kind of high-order trestle work structure be arranged in deep water torrent intectate steep bare rock

Publications (2)

Publication Number Publication Date
CN102953341A true CN102953341A (en) 2013-03-06
CN102953341B CN102953341B (en) 2015-10-21

Family

ID=47762684

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210536150.5A Active CN102953341B (en) 2012-12-13 2012-12-13 A kind of high-order trestle work structure be arranged in deep water torrent intectate steep bare rock

Country Status (1)

Country Link
CN (1) CN102953341B (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103306202A (en) * 2013-06-14 2013-09-18 中铁大桥局集团第二工程有限公司 Steel panel used in fabricated Bailey truss in matching manner
CN103898910A (en) * 2014-03-10 2014-07-02 中交一航局第三工程有限公司 Method for anchoring trestle steel pipe piles on seabed rock bare landform
CN104047222A (en) * 2013-03-14 2014-09-17 上海市政工程设计研究总院(集团)有限公司 Bridge structure near mountain and by river and construction method of bridge
CN104929044A (en) * 2014-04-04 2015-09-23 重庆建工桥梁工程有限责任公司 Construction method for offshore steel trestle
CN104922825A (en) * 2015-06-15 2015-09-23 徐州工程学院 Quick laying cart for earthquake rescue emergency access
CN107386285A (en) * 2017-08-03 2017-11-24 中铁六局集团有限公司 A kind of novel steel tube pile foundation rock borehole anchorage method
CN107574813A (en) * 2017-08-09 2018-01-12 贵州正业工程技术投资有限公司 The device and construction method of Soil-rock combined ground are passed through in a kind of karst area
CN107700366A (en) * 2017-11-20 2018-02-16 中铁二十局集团第工程有限公司 Deep water high-block bridge degree the bridge construction naked rock river bed trestle of hard stone and construction method
CN108547276A (en) * 2018-05-28 2018-09-18 宁波交通工程建设集团有限公司 It is waterborne to fill sand steel tube pile embeded in rock workbench and its construction method
CN108625365A (en) * 2018-06-20 2018-10-09 湖南建工交通建设有限公司 Improve prestress and cultivation stake composite structure and the construction method of steel trestle antidumping
CN108660909A (en) * 2018-07-24 2018-10-16 东北大学 A kind of prefabricated steel and concrete combination beam trestle and construction method
CN110409281A (en) * 2019-08-12 2019-11-05 中交隧道工程局有限公司 A kind of deep water drift net steel trestle
CN110847047A (en) * 2019-11-21 2020-02-28 中交第二航务工程局有限公司 Open sea bare rock trestle construction method
CN111364492A (en) * 2020-03-11 2020-07-03 中国建筑第六工程局有限公司 Deep-water shallow-covering-layer steel pipe anchoring construction device and method
CN114855588A (en) * 2022-04-14 2022-08-05 中建铁路投资建设集团有限公司 Temporary construction transfer platform ramp trestle combination
CN114960651A (en) * 2022-04-29 2022-08-30 中国铁建港航局集团有限公司 Bored concrete pile drilling platform and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54156312A (en) * 1978-05-31 1979-12-10 Kahee Shimomura Underwater polystyle foundation provided with multilayer footing
US20050084338A1 (en) * 2003-10-15 2005-04-21 Fmc Technologies, Inc. Mudmat foundation for subsea equipment
CN101078211A (en) * 2007-04-23 2007-11-28 中铁大桥局集团第二工程有限公司 Underwater anchorage system auxiliary wooden stool structure platform and construction method thereof
KR20100005830A (en) * 2008-07-08 2010-01-18 고려대학교 산학협력단 Development of a set bridge post connector using unit filled concrete with internally confined hollow and a method for construction
CN101666081A (en) * 2009-09-23 2010-03-10 中交二公局第六工程有限公司 Abrupt slope bare rock drilling platform and technology in huge reservoir
CN102619206A (en) * 2012-04-06 2012-08-01 中铁二十二局集团第三工程有限公司 Foundation platform structure of bare rock and karst pile in deep water

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54156312A (en) * 1978-05-31 1979-12-10 Kahee Shimomura Underwater polystyle foundation provided with multilayer footing
US20050084338A1 (en) * 2003-10-15 2005-04-21 Fmc Technologies, Inc. Mudmat foundation for subsea equipment
CN101078211A (en) * 2007-04-23 2007-11-28 中铁大桥局集团第二工程有限公司 Underwater anchorage system auxiliary wooden stool structure platform and construction method thereof
KR20100005830A (en) * 2008-07-08 2010-01-18 고려대학교 산학협력단 Development of a set bridge post connector using unit filled concrete with internally confined hollow and a method for construction
CN101666081A (en) * 2009-09-23 2010-03-10 中交二公局第六工程有限公司 Abrupt slope bare rock drilling platform and technology in huge reservoir
CN102619206A (en) * 2012-04-06 2012-08-01 中铁二十二局集团第三工程有限公司 Foundation platform structure of bare rock and karst pile in deep water

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
罗根传: "钻孔平台(栈桥)钢管及桩基钢护筒底部固结方案", 《西部交通科技》 *

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104047222A (en) * 2013-03-14 2014-09-17 上海市政工程设计研究总院(集团)有限公司 Bridge structure near mountain and by river and construction method of bridge
CN103306202A (en) * 2013-06-14 2013-09-18 中铁大桥局集团第二工程有限公司 Steel panel used in fabricated Bailey truss in matching manner
CN103306202B (en) * 2013-06-14 2015-04-29 中铁大桥局集团第二工程有限公司 Steel panel used in fabricated Bailey truss in matching manner
CN103898910A (en) * 2014-03-10 2014-07-02 中交一航局第三工程有限公司 Method for anchoring trestle steel pipe piles on seabed rock bare landform
CN104929044A (en) * 2014-04-04 2015-09-23 重庆建工桥梁工程有限责任公司 Construction method for offshore steel trestle
CN104922825A (en) * 2015-06-15 2015-09-23 徐州工程学院 Quick laying cart for earthquake rescue emergency access
CN104922825B (en) * 2015-06-15 2018-02-06 齐鲁工业大学 Earthquake rescue emergency access quickly lays car
CN107386285A (en) * 2017-08-03 2017-11-24 中铁六局集团有限公司 A kind of novel steel tube pile foundation rock borehole anchorage method
CN107574813A (en) * 2017-08-09 2018-01-12 贵州正业工程技术投资有限公司 The device and construction method of Soil-rock combined ground are passed through in a kind of karst area
CN107700366A (en) * 2017-11-20 2018-02-16 中铁二十局集团第工程有限公司 Deep water high-block bridge degree the bridge construction naked rock river bed trestle of hard stone and construction method
CN108547276A (en) * 2018-05-28 2018-09-18 宁波交通工程建设集团有限公司 It is waterborne to fill sand steel tube pile embeded in rock workbench and its construction method
CN108547276B (en) * 2018-05-28 2023-11-28 宁波交通工程建设集团有限公司 Water sand-filled rock-socketed steel pipe pile working platform and construction method thereof
CN108625365A (en) * 2018-06-20 2018-10-09 湖南建工交通建设有限公司 Improve prestress and cultivation stake composite structure and the construction method of steel trestle antidumping
CN108660909A (en) * 2018-07-24 2018-10-16 东北大学 A kind of prefabricated steel and concrete combination beam trestle and construction method
CN110409281A (en) * 2019-08-12 2019-11-05 中交隧道工程局有限公司 A kind of deep water drift net steel trestle
CN110409281B (en) * 2019-08-12 2024-03-15 中交隧道工程局有限公司 Deepwater bare rock steel trestle
CN110847047A (en) * 2019-11-21 2020-02-28 中交第二航务工程局有限公司 Open sea bare rock trestle construction method
CN110847047B (en) * 2019-11-21 2021-11-26 中交二航局第一工程有限公司 Open sea bare rock trestle construction method
CN111364492A (en) * 2020-03-11 2020-07-03 中国建筑第六工程局有限公司 Deep-water shallow-covering-layer steel pipe anchoring construction device and method
CN114855588A (en) * 2022-04-14 2022-08-05 中建铁路投资建设集团有限公司 Temporary construction transfer platform ramp trestle combination
CN114960651A (en) * 2022-04-29 2022-08-30 中国铁建港航局集团有限公司 Bored concrete pile drilling platform and construction method thereof

Also Published As

Publication number Publication date
CN102953341B (en) 2015-10-21

Similar Documents

Publication Publication Date Title
CN102953341B (en) A kind of high-order trestle work structure be arranged in deep water torrent intectate steep bare rock
CN102979039B (en) Elevated trestle bridge construction method on covering-free steep bare rock in deepwater and rapid stream
CN104612162B (en) A kind of Deep Foundation Pit of Metro Stations excavation construction method
CN105386408B (en) Deep-water bridge pile foundation construction method
CN102979069A (en) Bored pile platform construction method on covering-free steep bare rock in deepwater and rapid stream
CN102953362B (en) A kind of drilled pile platform be arranged in deep water torrent intectate steep bare rock
CN101864773B (en) Deep foundation pit support process
CN102966111B (en) A kind of steel pipe pile anchoring construction method in deep water torrent intectate steep bare rock
CN101666081B (en) Abrupt slope bare rock drilling platform and technology in huge reservoir
CN203049443U (en) High level trestle structure arranged on steep bare rock of deepwater torrent unsheathed layer
CN107700366B (en) Deep water high-block bridge degree the bridge construction naked rock river bed trestle of hard stone and construction method
CN109780325A (en) A kind of water factory's water intaking tunnel submarine pipeline installation method
CN105040715A (en) Method for building bridge construction cofferdam through steel sheet piles
CN107503362A (en) A kind of compound antiskid piling wall retaining structure and construction method suitable for reservoir stability
CN102561371A (en) Steel caisson enclosure structure at island-tunnel combination part
CN109797749A (en) Underwater foundation pit construction device and construction method
CN104164881A (en) Piling wall overlapping cantilever foundation pit support construction method and structure
CN113174958A (en) Construction method for foundation pit of adjacent road under poor ground condition
CN104912065A (en) Underwater anchor pile construction method
CN109610473A (en) A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration
CN106758759B (en) A kind of trestle pile foundation and its anchoring process for deep water drift net riverbed
CN201502056U (en) Bare rock drilling platform for steep slope of deep reservoir area
CN207452738U (en) The deep water high-block bridge degree bridge construction naked rock river bed trestle of hard stone
CN201459749U (en) Stable structure for construction platform of deep water steel pipe pile
CN202989949U (en) Steel casing fixing structure on steep bare rock without covering layer in deep water and rapids

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 200436 Shanghai, Zhabei District, West Lane Road, Lane Lane, central Times Square, building 9, floor 2, layer 299

Applicant after: Shanghai Civil Engineering Co., Ltd. of Crec

Applicant after: CRECSHANGHAI CIVIL ENGINEERING GROUP NO.2 ENGINEERING CO., LTD.

Address before: 200436 Shanghai, Zhabei District, West Lane Road, Lane Lane, central Times Square, building 9, floor 2, layer 299

Applicant before: Shanghai Civil Engineering Co., Ltd. of CREC

Applicant before: No.2 Engineering Company, Shanghai Civil Engineering Co., Ltd. of CREC

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: SHANGHAI CIVIL ENGINEERING CO., LTD. OF CREC TO: SHANGHAI CIVIL ENGINEERING CO., LTD. OF CREC

C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 200436, 9 floor, building 2, Times Square, central Times Square, Lane 299, Shanghai Road, Zhabei District

Co-patentee after: China Railway Shanghai Engineering Bureau Group Municipal Environmental Protection Engineering Co.,Ltd.

Patentee after: SHANGHAI CIVIL ENGINEERING Co.,Ltd. OF CREC

Address before: 200436, 9 floor, building 2, Times Square, central Times Square, Lane 299, Shanghai Road, Zhabei District

Co-patentee before: NO 2 ENGINEERING Co.,Ltd. SHANGHAI CIVIL ENGINEERING CO LTD OF CREC

Patentee before: SHANGHAI CIVIL ENGINEERING Co.,Ltd. OF CREC

CP01 Change in the name or title of a patent holder