Underwater anchorage system auxiliary wooden stool structure platform and construction method thereof Download PDF

Info

Publication number
CN101078211A
CN101078211A CN 200710021676 CN200710021676A CN101078211A CN 101078211 A CN101078211 A CN 101078211A CN 200710021676 CN200710021676 CN 200710021676 CN 200710021676 A CN200710021676 A CN 200710021676A CN 101078211 A CN101078211 A CN 101078211A
Authority
CN
China
Prior art keywords
platform
anchorage
water
trusses
supporting pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200710021676
Other languages
Chinese (zh)
Inventor
许佳平
黄中华
农代培
童林鸿
邬宗平
燕明发
王晓敬
刘晓霞
陈长明
章国平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
2nd Engineering Co Ltd of MBEC
Original Assignee
2nd Engineering Co Ltd of MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 2nd Engineering Co Ltd of MBEC filed Critical 2nd Engineering Co Ltd of MBEC
Priority to CN 200710021676 priority Critical patent/CN101078211A/en
Publication of CN101078211A publication Critical patent/CN101078211A/en
Pending legal-status Critical Current

Links

Abstract

The invention relates to a stool platform assisting anchorage system in water and the construction method. The structure is that the upper end of support pile of steel pipe is fixed with the whole platform truss; anchor rope of anchorage system in water is fixed with the whole platform truss; the lower end of support pile of steel pipe is fixed with riverbed rock. The construction method is that the whole platform truss is assembled on assembling ship and anchorage system in water is set at the position of pier; the whole platform truss is transported to the pier position in floating and by using anchorage system in water the platform truss is located accurately; support piles of steel pipe are installed symmetrically; by using variety of water level the platform truss is fixed on the top of support pile to accomplish system transformation; by using anchor rod the support pile of steel pipe is fixed with the bedrock and by using prior anchorage system platform stability is increased. The invention is provided with simple structure, light weight, small water resistance surface and low cost. Simple and practical method is proposed for building basic construction platform under conditions of deep water, large flowing speed, strong tide, no covering layer for riverbed or less covering layer for riverbed.

Description

Auxiliary stool structure platform and the job practices thereof of anchorage system in the water
Technical field
What the present invention relates to is auxiliary stool structure platform and the job practices thereof of anchorage system in a kind of bridge water, it is applicable under deep water, big flow velocity, strong tide, riverbed intectate or few covering layer condition carries out in the bridge foundation construction, in the time of need setting up the over-water construction platform, adopt the auxiliary stool structural entity platform of anchorage system in the water.Belong to technical field of bridge construction.
Background technology
In the construction of bridge deep water foundation, The water is deep and the current fast owing to base position, it is frequent to be subjected to strong tide to influence SEA LEVEL VARIATION, and intectate or few covering layer on the riverbed, operation platform is difficult to build or keeps stable, the general plug in guide pile of beating that adopts forms constructure scheme such as platform, whole steel cofferdam platform or floating platform, but these schemes exist guide pile can't squeeze into the riverbed respectively or to insert the riverbed few and be difficult to stablize, whole steel cofferdam engineering quantity is big, hanging device requires high, problems such as floating platform poor stability have been brought certain difficulty to construction.
Summary of the invention
The objective of the invention is to change frequent at The water is deep and the current fast, influenced by strong tide and above-mentioned unfavorable conditions bridge foundation construction difficulties down such as riverbed intectate or few covering layer, propose anchorage system is assisted in the water stool structural entity platform structure and job practices thereof.This platform structure forms the stool structure with space steel truss girder and supporting steel pipe stake, and the steel anchor rod by the steel pipe pile bottom forms the effectively fixed of steel pipe pile and basement rock, and with the auxiliary rock-steady structure of anchorage system after as platform building and formation.
Technical solution of the present invention: the auxiliary stool structure platform of anchorage system in the water, its structure is to comprise anchorage system in integral platform trusses, steel pipe supporting pile and the water, wherein steel pipe support column upper end is affixed with the integral platform trusses, at the bottom of the positioning steel tube supporting pile mouth form by anchor pole in the anchorage system in the water and riverbed basement rock fixed, and with anchorage facility waterborne as the supplementary structure of stablizing the stool structure platform.
The job practices of the stool structure platform that anchorage system is assisted in the water, the construction sequence of this method is divided into, one, assembly unit integral platform trusses on the spliced ship, and lay anchorage system in the water in the pier position, and the strand anchor arrangement, anchorage system comprises the concrete weight anchor in the described water, anchor chain, anchor line, anchor pole, described strand anchor arrangement comprises hoist engine, tackle pulley etc.; Two, integral platform trusses transportation by driving is to the pier position, anchor line in the anchorage system in the water is carried out the transition on the platform trusses, by the folding and unfolding anchor line and to every Bower Anchor rope pretension is set, come the platform trusses is accurately located, grasp the displacement rule of platform, utilize in the water concrete weight anchor in the anchorage system platform trusses position to be adjusted and accurate location with tide bulge and fall; Three, the left and right sides of stool structure platform symmetry installing and locating steel pipe supporting pile selects flow velocity symmetry hour in the platform fixed frame to insert some positioning steel tube supporting piles, and this moment, the platform trusses still can slide along the supporting pile easy on and off; Four, utilize tide water level to change the platform trusses is consolidated in positioning steel tube supporting pile top, realize the system conversion of stool structure platform, the system conversion of described stool structure platform is meant that the weight of integral platform trusses is by being converted to positioning steel tube supporting pile top on the spliced ship, when high-tide level platform trusses rises to positioning steel tube supporting pile top, rapidly that positioning steel tube supporting pile top is fixing with the welding of platform trusses, the platform trusses is converted on the steel pipe supporting pile when water level falls, the assembly unit iron barge is with drawdown, and withdraw from spliced ship, finish the system conversion; Five, utilize anchor pole with positioning steel tube supporting pile and riverbed basement rock anchoring, and the concrete weight anchor increase stool structure platform in the anchorage system is stable in the existing water of utilization, utilize jumbolter to overlap the brill anchor hole under water during concrete the construction, insert anchor pole and slip casing by pressure anchoring, pour into the high early-strength of 3m concrete under water during slack tide in the positioning steel tube supporting pile steel pipe, realize steel pipe supporting pile and basement rock anchoring.
Advantage of the present invention: this platform structure is simple, weight is light, the face that blocks water is little, with low cost, utilize tidal range implementation platform Fast Installation, utilize anchorage waterborne location and increase platform stable, the processing method of succinct practicality has been proposed for the foundation construction platform building of deep water, big flow velocity, strong tide, riverbed intectate or few covering layer condition in the bridge construction, through suitably improving, also can be applicable to building of other pier, have bigger promotional value.Effectively having overcome in the prior art existing positioning steel tube supporting pile, to insert the riverbed few and be difficult to stablize, whole steel cofferdam engineering quantity is big, hanging device require high, floating platform poor stability, defective such as difficulty of construction is big.
Description of drawings
Accompanying drawing 1 is the perspective view of the stool structure platform that anchorage system is assisted in the water.
Accompanying drawing 2 is plane structure schematic diagrames of the stool structure platform that anchorage system is assisted in the water.
Accompanying drawing 3 is schematic diagrames of platform for lining trusses on the spliced ship.
Accompanying drawing 4 is schematic diagrames of integral platform trusses transportation by driving.
Accompanying drawing 5 is to insert positioning steel tube supporting pile schematic diagram.
Accompanying drawing 6 is system conversion schematic diagrames of stool structure platform.
Accompanying drawing 7 is positioning steel tube supporting pile and riverbed basement rock anchoring schematic diagram.
Among the figure 1 is platform trusses, the 2nd, positioning steel tube supporting pile, the 3rd, and riverbed basement rock, the 4th, anchor pole, the 5th, anchor line, the 6th, integral platform trusses, the 7th, strand anchor arrangement, the 8th connects trip tugboat, the 9th, iron barge, the 10th, tugboat, the 11st, dowel, the 12nd, assembly unit iron barge.
The specific embodiment
Contrast accompanying drawing 1,2, the auxiliary stool structure platform of anchorage system in the water, its structure is that this stool structure platform comprises anchorage system in integral platform trusses 6, positioning steel tube supporting pile 2 and the water, positioning steel tube supporting pile 2 upper ends and integral platform trusses 6 are affixed, form the stool structure, positioning steel tube supporting pile 2 lower ends and 3 anchorings of riverbed basement rock increase the stable of platform structure by anchorage system in addition.When the stool structure platform is built construction, be spliced ship platform for lining trusses 1 with iron barge 9; Transportation by driving utilizes the integral platform trusses 6 on the spliced ship of anchorage system location in the water to the pier position; Steel pipe supporting pile 2 is installed, synchronously platform trusses 1 is fixed in positioning steel tube supporting pile 2 tops during high water mark, low tide moves back ship, and positioning steel tube supporting pile 2 tops and platform trusses 1 are fixed, form the stool structure platform; 2 end of positioning steel tube supporting pile mouth forms fixed by anchor pole 4 and riverbed basement rock 3, and with anchorage waterborne as the supplementary structure of stablizing the stool structure platform.
The job practices of the stool structure platform that anchorage system is assisted in the water:
Contrast accompanying drawing 3 is arranged platform for lining, spelling integral platform trusses 6 on iron barge 9, platform trusses 1 is the whole trussed construction in space, positioning steel tube supporting pile 2 patchholes are reserved in both sides, and arrange strand anchor arrangement 7 on platform trusses 1 top, and described strand anchor position equipment 7 comprises hoist engine, tackle pulley etc.
Contrast accompanying drawing 4 is laid 8 according to calculation requirement The concrete weight anchor, and be equipped with anchor chain, anchor line; Integral platform trusses 6 transportation by drivings to the pier position, are utilized anchorage system to adjust stool structure platform position, and tighten up fixedly stool structure platform of anchor line 5.
Contrast accompanying drawing 5, stool structure platform be accurately behind the location, is chosen in slack tide favourable opportunity, and symmetry inserts 8 positioning steel tube supporting piles 2 in stool structure platform fixed frame, and this moment, the platform trusses 1 still can slide along positioning steel tube supporting pile 2 easy on and off.
Contrast accompanying drawing 6, when utilizing high-tide level platform trusses to rise to positioning steel tube supporting pile 2 tops, rapidly that positioning steel tube supporting pile 2 tops are fixing with 1 welding of platform trusses, platform trusses 1 is converted on the positioning steel tube supporting pile 2 when water level falls, assembly unit iron barge 12 is with drawdown, and withdraws from spliced ship.
Contrast accompanying drawing 7, utilize small-sized geological drilling rig in the riverbed basement rock 3 of positioning steel tube supporting pile 2 bottoms, to bore anchor hole, transfer slip casting in dowel 11 metapores, and when slack tide, in the steel pipe of positioning steel tube supporting pile 2, pour into 3m height concrete under water, realize positioning steel tube supporting pile 2 and 3 anchorings of riverbed basement rock.

Claims (6)

1, the auxiliary stool structure platform of anchorage system in the water, it is characterized in that comprising anchorage system in integral platform trusses, steel pipe supporting pile, steel anchor rod and the water, steel pipe supporting pile upper end is affixed with the integral platform trusses, mouth is fixed by anchor pole and riverbed basement rock at the bottom of the steel pipe supporting pile, anchor line in the anchorage system waterborne and integral platform trusses are affixed, and by anchorage system in the water integral platform are carried out assist location.
2, the job practices of the auxiliary stool structure platform of anchorage system in the water is characterized in that this method step is divided into, one, assembly unit integral platform trusses on the spliced ship, and lay anchorage system in the water, the strand anchor arrangement in the pier position; Two, integral platform trusses transportation by driving is to the pier position, utilizes in the water concrete weight anchor in the anchorage system platform trusses position to be adjusted and accurate location; Three, the and arranged on left and right sides of stool structure platform symmetry installing and locating steel pipe supporting pile; Four, utilize tide water level to change the platform trusses is consolidated in positioning steel tube supporting pile top, realize the system conversion of stool structure platform, the weight of integral platform trusses is by being converted to positioning steel tube supporting pile top on the spliced ship; Five, utilize anchor pole with positioning steel tube supporting pile and riverbed basement rock anchoring, and utilize the concrete weight anchor in the existing anchorage system to increase platform stable.
3, the job practices of the stool structure platform that anchorage system is assisted in the water according to claim 1, it is characterized in that construction sequence two, integral platform trusses transportation by driving are to the pier position, anchor line in the anchorage system in the water is carried out the transition on the platform trusses, by the folding and unfolding anchor line and to every Bower Anchor rope pretension is set, come the platform trusses is accurately located, grasp the displacement rule of platform, utilize in the water concrete weight anchor in the anchorage system platform trusses position to be adjusted and accurate location with tide bulge and fall;
4, the job practices of the stool structure platform that anchorage system is assisted in the water according to claim 1, the left and right sides symmetry installing and locating steel pipe supporting pile that it is characterized in that construction sequence three, stool structure platform, select flow velocity symmetry hour in the platform fixed frame to insert some positioning steel tube supporting piles, this moment, the platform trusses still can slide along the supporting pile easy on and off.
5, the job practices of the stool structure platform that anchorage system is assisted in the water according to claim 1, it is characterized in that construction sequence four, rise to positioning steel tube supporting pile when top when high-tide level platform trusses, rapidly that positioning steel tube supporting pile top is fixing with the welding of platform trusses, the platform trusses is converted on the steel pipe supporting pile when water level falls, the assembly unit iron barge is with drawdown, and withdraw from spliced ship, finish the system conversion.
6, the job practices of the stool structure platform that anchorage system is assisted in the water according to claim 1, it is characterized in that construction sequence five, utilize anchor pole positioning steel tube supporting pile and riverbed basement rock anchoring, and the concrete weight anchor increase stool structure platform in the anchorage system is stable in the existing water of utilization, utilize jumbolter to overlap the brill anchor hole under water during concrete the construction, insert anchor pole and slip casing by pressure anchoring, pour into the high early-strength of 3m concrete under water during slack tide in the positioning steel tube supporting pile steel pipe, realize steel pipe supporting pile and basement rock anchoring.
CN 200710021676 2007-04-23 2007-04-23 Underwater anchorage system auxiliary wooden stool structure platform and construction method thereof Pending CN101078211A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200710021676 CN101078211A (en) 2007-04-23 2007-04-23 Underwater anchorage system auxiliary wooden stool structure platform and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200710021676 CN101078211A (en) 2007-04-23 2007-04-23 Underwater anchorage system auxiliary wooden stool structure platform and construction method thereof

Publications (1)

Publication Number Publication Date
CN101078211A true CN101078211A (en) 2007-11-28

Family

ID=38905855

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200710021676 Pending CN101078211A (en) 2007-04-23 2007-04-23 Underwater anchorage system auxiliary wooden stool structure platform and construction method thereof

Country Status (1)

Country Link
CN (1) CN101078211A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102303691A (en) * 2011-06-17 2012-01-04 中铁一局集团有限公司 Floating drilling platform and construction technology used for bridge pier construction in water
CN102312442A (en) * 2011-07-01 2012-01-11 中铁大桥局股份有限公司 Construction method of trestle steel pipe pile foundation
CN102936894A (en) * 2012-11-27 2013-02-20 中铁上海工程局有限公司第五分公司 Method for anchoring small-diameter cast-in-place pile and bed rock
CN102953341A (en) * 2012-12-13 2013-03-06 中铁上海工程局有限公司 Overhead trestle structure built on non-covering steep bare rocks in deep rapids
CN102979039A (en) * 2012-12-13 2013-03-20 中铁上海工程局第二工程有限公司 Elevated trestle bridge construction method on covering-free steep bare rock in deepwater and rapid stream
CN104405422A (en) * 2014-11-27 2015-03-11 中国矿业大学 Convenient stable height-adjustable type roadway side portion anchor cable construction platform
CN104480922A (en) * 2014-11-05 2015-04-01 广州市恒盛建设工程有限公司 Space truss formwork supporting system and construction method thereof
CN105064381A (en) * 2015-08-06 2015-11-18 中铁一局集团有限公司 High-low cutting edge double-wall steel cofferdam reinforced concrete once bottom sealing construction method
CN111877271A (en) * 2020-07-23 2020-11-03 广东正方圆工程咨询有限公司 Bridge anti-collision device and using method thereof

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102303691A (en) * 2011-06-17 2012-01-04 中铁一局集团有限公司 Floating drilling platform and construction technology used for bridge pier construction in water
CN102312442A (en) * 2011-07-01 2012-01-11 中铁大桥局股份有限公司 Construction method of trestle steel pipe pile foundation
CN102936894A (en) * 2012-11-27 2013-02-20 中铁上海工程局有限公司第五分公司 Method for anchoring small-diameter cast-in-place pile and bed rock
CN102953341A (en) * 2012-12-13 2013-03-06 中铁上海工程局有限公司 Overhead trestle structure built on non-covering steep bare rocks in deep rapids
CN102979039A (en) * 2012-12-13 2013-03-20 中铁上海工程局第二工程有限公司 Elevated trestle bridge construction method on covering-free steep bare rock in deepwater and rapid stream
CN102953341B (en) * 2012-12-13 2015-10-21 中铁上海工程局集团有限公司 A kind of high-order trestle work structure be arranged in deep water torrent intectate steep bare rock
CN104480922A (en) * 2014-11-05 2015-04-01 广州市恒盛建设工程有限公司 Space truss formwork supporting system and construction method thereof
CN104480922B (en) * 2014-11-05 2016-01-20 广州市恒盛建设工程有限公司 Space truss formwork system and construction method thereof
CN104405422A (en) * 2014-11-27 2015-03-11 中国矿业大学 Convenient stable height-adjustable type roadway side portion anchor cable construction platform
CN105064381A (en) * 2015-08-06 2015-11-18 中铁一局集团有限公司 High-low cutting edge double-wall steel cofferdam reinforced concrete once bottom sealing construction method
CN111877271A (en) * 2020-07-23 2020-11-03 广东正方圆工程咨询有限公司 Bridge anti-collision device and using method thereof

Similar Documents

Publication Publication Date Title
CN101078211A (en) Underwater anchorage system auxiliary wooden stool structure platform and construction method thereof
CN105386408B (en) Deep-water bridge pile foundation construction method
CN101418543B (en) Self-anchored rope-suspension bridge inclined drawing construction method
CN106012797A (en) All-ground-anchor type single-tower double-span cable-stayed bridge structure and construction method thereof
CN103741657B (en) The construction method of large-sized multifunction waterborne traffic accident
CN102979039B (en) Elevated trestle bridge construction method on covering-free steep bare rock in deepwater and rapid stream
CN205399220U (en) Whole system of erectting of large -scale arched bridge over strait
CN102953341B (en) A kind of high-order trestle work structure be arranged in deep water torrent intectate steep bare rock
CN102322069B (en) Underwater combination base of open caisson and steel pipe piles and construction method
CN105603881B (en) A kind of the integral erection system and its construction method of large-scale arch bridge over strait
CN1528636A (en) Bridge under water fourdation floating-drilling platform construction method
CN1472399A (en) Method for positioning floatation transported heavy anchor of steel caisson of deep underwater foundation of bridge
CN203049443U (en) High level trestle structure arranged on steep bare rock of deepwater torrent unsheathed layer
CN201106155Y (en) Inclined guy cable auxiliary full cantaliver crane trussed steel beam device
CN105088957A (en) Construction method for underwater reinforced concrete composite pile of cast-in-situ support of concrete ballast box beam of cable-stayed bridge
CN1125214C (en) Platform for sinking combined simple turnnel pipe segments
CN203684099U (en) Floating drag anchoring positioning system of high-pier large-span steel truss girder bridge
CN202170512U (en) Underwater combined base for open caisson and steel pipe piles
CN201056668Y (en) Hidden floating type overhanging cable bridge
CN201106150Y (en) Hidden floating type rope tension bridge
CN111764418A (en) Steel cofferdam positioning system in deep water
CN202494491U (en) Float type inclined shaft water level observation platform
CN103362113A (en) Local buoyancy ocean platform of offshore wind power, bridge and ocean structure, and construction method
CN211340438U (en) Steel bridge pushing and pulling system in navigation water area
CN201288324Y (en) Wooden stool platform structure for deep water foundation construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20071128