CN203213140U - Laminate-type high pile cap tower crane foundation structure - Google Patents

Laminate-type high pile cap tower crane foundation structure Download PDF

Info

Publication number
CN203213140U
CN203213140U CN 201320175505 CN201320175505U CN203213140U CN 203213140 U CN203213140 U CN 203213140U CN 201320175505 CN201320175505 CN 201320175505 CN 201320175505 U CN201320175505 U CN 201320175505U CN 203213140 U CN203213140 U CN 203213140U
Authority
CN
China
Prior art keywords
tower crane
cast
place concrete
foundation
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320175505
Other languages
Chinese (zh)
Inventor
裴鸿斌
张宏建
钟福新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN 201320175505 priority Critical patent/CN203213140U/en
Application granted granted Critical
Publication of CN203213140U publication Critical patent/CN203213140U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model provides a laminate-type high pile cap tower crane foundation structure which comprises four cast-in-place concrete piles arranged in a foundation pit. The cast-in-place concrete piles penetrate through a foundation mat, a reinforced concrete pile cap is fixedly arranged on pile tops of the cast-in-place concrete piles, a tower crane foundation joint is fixedly arranged in the reinforced concrete pile cap, a plurality of concrete laminate structures are formed on the cast-in-place concrete piles located above the foundation mat, and the cast-in-place concrete piles are arranged in the concrete laminate structures in a penetrating mode. The laminate-type high pile cap tower crane foundation structure well solves the problems that a tower crane is utilized to carry out vertical transportation in the whole process of the construction process of the foundation pit and the tower crane is poor in performance, the tower crane can be installed in advance for operating before engineering piles are constructed or before foundation pit earth excavation, foundation pit excavation time is effectively shortened, work efficiency of foundation pit construction is improved, the foundation pit construction period can be greatly shortened, and advantages for smooth proceeding of follow-up working procedures are provided.

Description

Laminated board type highrise pile cap tower crane structure
Technical field
The utility model relates to a kind of tower crane structure, particularly relates to a kind of laminated board type highrise pile cap tower crane structure.
Background technology
At present, the comparatively common a kind of mode of large-scale construction method of deep foundation ditch is: before soil excavation, four concrete filled steel tube castinplace piles of elder generation's construction or cast-in-place concrete pile, stake top mark height is located at below the tower crane cushion cap, after treating that tower crane installs, carry out soil excavation again, the castinplace pile of support tower crane successively exposes with the intensification of the soil excavation degree of depth, form destabilizing factor, for addressing this problem, need between four steel tube concrete piles or concrete pile, to form bridging with the steel pipe welding, increase the resistance to overturning of high stake part.Though this method has increased the stability of tower crane, increase welding sequence, increased a large amount of other operations such as steel work welding engineering amount, make tower crane be subjected to certain limitation service time.
Summary of the invention
In view of the existing technical problem that exists, the utility model provide a kind of Stability Analysis of Structures, firmly, the efficiency of construction in the safety, raising foundation ditch, and easy construction, laminated board type highrise pile cap tower crane structure with low cost.
Laminated board type highrise pile cap tower crane structure of the present utility model, comprise four cast-in-place concrete piles that are arranged in the foundation ditch, described cast-in-place concrete pile runs through sole plate, the stake top of described cast-in-place concrete pile is installed with a steel concrete cushion cap, be installed with tower crane joint in the described steel concrete cushion cap, be on the cast-in-place concrete pile of described sole plate top and be formed with plural layer of concrete plated construction, and described cast-in-place concrete pile is arranged in the described layer of concrete plated construction.
The length that described cast-in-place concrete pile is positioned at the following anchoring section of sole plate is not less than 2 with the length ratio that exposes to the revealed section of foundation ditch.
Described layer of concrete plated construction comprises the reinforced mesh of double-layer double-direction.
The utility model makes its beneficial effect that has be owing to adopt above technical scheme:
Behind construction and mounted castinplace pile and concrete bearing platform, earth excavation is built then and is formed the plural layer veneer structure downwards, finishes the installation of tower crane.The utility model is by being arranged on each plated construction layer by layer on four castinplace piles, make tower crane Stability Analysis of Structures of the present utility model, firmly, safe, compare other highrise pile cap easy constructions, with low cost, preferably resolving in the foundation pit construction process overall process uses tower crane to carry out vertical transport, the difficult problem of tower crane poor stability, the engineering stake do not construct or pit earthwork excavation before just can install tower crane in advance and turn round, effectively shortened the excavation of foundation pit time, improved the operating efficiency of foundation pit construction, can shorten the foundation pit construction duration in a large number, carrying out smoothly for subsequent handling provides advantage.
Description of drawings
Fig. 1 is the utility model tower crane structure elevation;
Fig. 2 is the utility model tower crane structural laminate plate structural plan figure.
The specific embodiment
For the benefit of to the understanding of structure of the present utility model, describe below in conjunction with drawings and Examples.
In conjunction with Fig. 1 and shown in Figure 2, laminated board type highrise pile cap tower crane structure of the present utility model, comprise four cast-in-place concrete piles 1 that are arranged in the foundation ditch, become the four directions to arrange, a stake top mark high position is near ground surface, castinplace pile 1 wears in the sole plate 2, the length that every castinplace pile 1 is positioned at sole plate 2 following anchoring sections 11 is not less than 2 with the length ratio that exposes to the revealed section 12 of foundation ditch, guaranteed the stability of castinplace pile 1, and a steel concrete cushion cap 3 has been built in the stake top casting, pre-buried tower crane joint 4 in the concrete bearing platform 3, can make body of the tower and foundation structure is affixed is integral by tower crane joint 4, be on the castinplace pile 1 of sole plate 2 tops and be formed with plural layer of concrete plated construction 5, castinplace pile 1 is arranged in the veneer structure 5, and adjacent layer plated construction 5 is between the upper and lower every being not more than 2m, the every limit of planar dimension exceeds castinplace pile 1 and is not less than 0.5m, thick 250mm, configuration reinforcement diameter are not less than 25mm@150mm double-layer double-direction reinforced mesh, and the strength grade of concrete of veneer structure 5 is not less than C35.
Before the pit earthwork excavation, four cast-in-place concrete piles 1 of elder generation's construction, make castinplace pile 1 through sole plate 2, steel concrete cushion cap 3 is built in stake top casting at four castinplace piles 1, earlier pre-buried tower crane joint 4 is built then before concrete bearing platform 3 is built, and finishes the installation of tower crane, then excavation 500mm is dark downwards earlier around concrete bearing platform, substantially after smooth, lay common composite board, assembling reinforcement net sheet, template around installing then, build and form first floor veneer structure 5, the excavation pit earthwork then is in digging process, whenever dig 2m downwards, according to the identical step plated construction 5 from level to level of constructing, thereby finish the construction of tower crane structure, increased the resistance to overturning of high stake part, by tower crane joint 4 body of the tower is installed on the tower crane structure then, lifts hauling operation.
The utility model is by being arranged on each the layer concrete veneer structure 5 on four cast-in-place concrete piles 1, make tower crane Stability Analysis of Structures of the present utility model, firmly, safe, compare other highrise pile cap easy constructions, with low cost, preferably resolving in the foundation pit construction process overall process uses tower crane to carry out vertical transport, the difficult problem of tower crane poor stability, the engineering stake do not construct or pit earthwork excavation before just can install tower crane in advance and turn round, effectively shortened the excavation of foundation pit time, improved the operating efficiency of foundation pit construction, can shorten the foundation pit construction duration in a large number, carrying out smoothly for subsequent handling provides advantage.

Claims (3)

1. laminated board type highrise pile cap tower crane structure, comprise four cast-in-place concrete piles that are arranged in the foundation ditch, described cast-in-place concrete pile runs through sole plate, the stake top of described cast-in-place concrete pile is installed with a steel concrete cushion cap, be installed with tower crane joint in the described steel concrete cushion cap, it is characterized in that: be on the cast-in-place concrete pile of described sole plate top and be formed with plural layer of concrete plated construction, and described cast-in-place concrete pile is arranged in the described layer of concrete plated construction.
2. tower crane structure according to claim 1 is characterized in that: the length that described cast-in-place concrete pile is positioned at the following anchoring section of sole plate is not less than 2 with the length ratio that exposes to the revealed section of foundation ditch.
3. tower crane structure according to claim 1, it is characterized in that: described layer of concrete plated construction comprises the reinforced mesh of double-layer double-direction.
CN 201320175505 2013-04-10 2013-04-10 Laminate-type high pile cap tower crane foundation structure Expired - Fee Related CN203213140U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320175505 CN203213140U (en) 2013-04-10 2013-04-10 Laminate-type high pile cap tower crane foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320175505 CN203213140U (en) 2013-04-10 2013-04-10 Laminate-type high pile cap tower crane foundation structure

Publications (1)

Publication Number Publication Date
CN203213140U true CN203213140U (en) 2013-09-25

Family

ID=49202688

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320175505 Expired - Fee Related CN203213140U (en) 2013-04-10 2013-04-10 Laminate-type high pile cap tower crane foundation structure

Country Status (1)

Country Link
CN (1) CN203213140U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103215965A (en) * 2013-04-10 2013-07-24 中国建筑第八工程局有限公司 Laminate type high-rise platform pile tower crane foundation and construction method
CN103924611A (en) * 2014-05-06 2014-07-16 同济大学建筑设计研究院(集团)有限公司 Prefabricated prestressed concrete frame inserting and connecting integrated high pile bearing platform foundation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103215965A (en) * 2013-04-10 2013-07-24 中国建筑第八工程局有限公司 Laminate type high-rise platform pile tower crane foundation and construction method
CN103924611A (en) * 2014-05-06 2014-07-16 同济大学建筑设计研究院(集团)有限公司 Prefabricated prestressed concrete frame inserting and connecting integrated high pile bearing platform foundation

Similar Documents

Publication Publication Date Title
CN103437567B (en) Method for supporting existing building underground added storey through original pile foundations
CN104453274B (en) Utilize supporting and protection structure and underpinning structure to support existing building underground and increase layer method
US9359741B2 (en) Wind turbine generator foundation with pressure-dispersive high strength pre-stressed anchors
CN102191777B (en) Steel sheet pile coefferdam structure and topdown construction method thereof
CN107299643A (en) Steel lattice column combined type tower crane foundation structure in foundation pit and construction method
CN201132960Y (en) Composite batardeau of steel light structure
CN103225304B (en) A kind of marine foundation supporting structure and construction method thereof
CN110374111B (en) Slope releasing and steel pipe pile anchor cooperative supporting system
CN101240550A (en) Construction method for lattice type steel column tower crane pedestal
CN102561384A (en) Steel hoop truss type elevated pile cap tower crane foundation construction method and structure
CN102434717A (en) Construction method of joist steel pipe-jacking work pit
CN103938634A (en) Deep foundation pit supporting structure and construction method
CN103556651A (en) Precast concrete jacket type offshore wind turbine foundation
CN205024712U (en) Modular tower crane basis
CN202519697U (en) Steel hoop truss high pile-cap tower crane basic structure
CN203429648U (en) Large steel cylinder cofferdam structure
CN101498133B (en) Method and supporting construction for enlarging basement top-down method earth excavation space
CN203213140U (en) Laminate-type high pile cap tower crane foundation structure
CN204590059U (en) A kind of combined type tower-crane foundation structure
CN103215965A (en) Laminate type high-rise platform pile tower crane foundation and construction method
CN202745063U (en) Deep foundation pit steel plate pile and anchor cable shoring system construction structure
CN106400814A (en) Foundation pit supporting method
CN203821399U (en) Deep foundation pit supporting structure
CN201722700U (en) Infrastructure of tower crane
CN205205848U (en) Cavity gravity type marine wind power basis

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130925

Termination date: 20190410