CN103924611A - Prefabricated prestressed concrete frame inserting and connecting integrated high pile bearing platform foundation - Google Patents

Prefabricated prestressed concrete frame inserting and connecting integrated high pile bearing platform foundation Download PDF

Info

Publication number
CN103924611A
CN103924611A CN201410187490.0A CN201410187490A CN103924611A CN 103924611 A CN103924611 A CN 103924611A CN 201410187490 A CN201410187490 A CN 201410187490A CN 103924611 A CN103924611 A CN 103924611A
Authority
CN
China
Prior art keywords
steel pipe
precast prestressed
beam column
inserting groove
column framework
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410187490.0A
Other languages
Chinese (zh)
Other versions
CN103924611B (en
Inventor
马人乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Architecture Design and Research Institute of Tongji University Group Co Ltd
Original Assignee
Architecture Design and Research Institute of Tongji University Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Architecture Design and Research Institute of Tongji University Group Co Ltd filed Critical Architecture Design and Research Institute of Tongji University Group Co Ltd
Priority to CN201410187490.0A priority Critical patent/CN103924611B/en
Publication of CN103924611A publication Critical patent/CN103924611A/en
Application granted granted Critical
Publication of CN103924611B publication Critical patent/CN103924611B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)
  • Foundations (AREA)

Abstract

The invention relates to a prefabricated prestressed concrete frame inserting and connecting integrated high pile bearing platform foundation. The prefabricated prestressed concrete frame inserting and connecting integrated high pile bearing platform foundation is composed of a plurality of steel pipe piles provided with inserting and connecting grooves and studs. The river bottom or seabed mud surface and the bottom of a bearing platform are connected through a plurality of roof frame prefabricated prestressed concrete frames. The prefabricated prestressed concrete frames and the steel pipe piles are fixed between original sliding chutes through a high-strength grouting material, a curved shearing integrated space structure is formed by the independent steel pipe piles, and the upper portions of the steel pipe piles are connected into a whole through the reinforced concrete bearing platform. The prefabricated prestressed concrete frame inserting and connecting integrated high pile bearing platform foundation has the advantages that the stability is good, the overall rigidity is large, the pile body displacement and the inner force are small and the concrete frames are installed conveniently. Concrete frame cracks are small through the application of the prestress, and reinforcing steel bars in the concrete frame are good in corrosion-resisting performance.

Description

The precast prestressed concrete frame integrated High-Rise Pile Cap Foundation of pegging graft
Technical field
The present invention relates to technical field of civil engineering, be specifically related to a kind of with the precast prestressed concrete frame integrated High-Rise Pile Cap Foundation of pegging graft.
Background technology
The High-Rise Pile Cap Foundation using is at present by stake and is connected in the water that cushion cap that stake pushes up forms basicly, and at the bottom of cushion cap, is positioned at ground or more than erosion line.High-Rise Pile Cap Foundation is not because pile body exsertion part has native elastic resistance effect, and in the time that the depth of water is larger, Internal forces and displacement are large, poor stability, and integral rigidity is little.
Summary of the invention
The object of the invention is to propose a kind of precast prestressed concrete frame integrated High-Rise Pile Cap Foundation of pegging graft, solved at profundal zone tradition highrise pile cap Internal forces and displacement large, poor stability, the problem that globality rigidity is little.
The precast prestressed concrete frame integrated High-Rise Pile Cap Foundation of pegging graft that the present invention proposes, by several, the steel pipe pile 1 with inserting groove 3 and peg forms described integrated High-Rise Pile Cap Foundation, more than the mud face of at the bottom of rivers or seabed until between High-Rise Pile Cap Foundation bottom, be connected by inserting the precast prestressed beam column framework 7 of some Pin, precast prestressed beam column framework 7 is fixing by inserting groove 3 and high-strength grout 10 with steel pipe pile 1, make independently many steel pipe piles 1 form an integrated space structures of curved scissors, all steel pipe pile 1 tops are connected to entirety by reinforced concrete pile cap 12, below the mud face of at the bottom of rivers are squeezed in one end of some steel pipe piles or seabed, the every interior injection concrete 2 of steel pipe pile 1, adjacent steel pipe pile 1 corresponding position arranges inserting groove 3, inserting groove 3 outsides and steel pipe pile 1 outer wall junction arrange stiffener 4, are positioned on the steel pipe pile 1 of inserting groove 3 inner sides and are welded with the first peg 5, in the precast prestressed beam column framework 7 of each Pin, be provided with two precast prestressed supports 6, the pre-buried anchor slab 8 of arranged outside post side of precast prestressed beam column framework 7 center pillars, is welded with the second peg 9 on the pre-buried anchor slab 8 of post side, the both sides of precast prestressed beam column framework 7 are provided with T shape outstanding 14, the precast prestressed beam column framework 7 that some Pin are equipped with precast prestressed support 6 is put into the inserting groove 3 of two adjacent steel pipe piles 1 successively, and T shape outstanding 14 is positioned at and drags access slot 3, inserting groove 3 ends arrange watertight rubber bar 13 with precast prestressed beam column framework 7 position that contacts, and in the gap that inserting groove 3 is connected with prestressing force beam column framework 7, are marked with grouting material 10, steel pipe pile 1 top is by the 3rd peg 11 connecting reinforcement concrete bearing platforms 12.
In the present invention, described two precast prestressed supports 6 are circular array etc.
In the present invention, the precast prestressed beam column framework 7 that precast prestressed support 6 is housed is put into the inserting groove 3 of two adjacent steel pipe piles 1 successively, determines the quantity of the precast prestressed beam column framework 7 in inserting groove 3 according to desired height.
Tool of the present invention has the following advantages:
Compare with traditional profundal zone highrise pile cap, the precast prestressed concrete frame integrated High-Rise Pile Cap Foundation of pegging graft has good stability, and integral rigidity is large, the advantage that pile body displacement and internal force are little.Wherein, concrete frame is installed convenient, and prestressed applying makes concrete frame crack little, reinforcing bar corrosion resistance and good in concrete frame.
Brief description of the drawings
In order to be illustrated more clearly in the technical scheme in the embodiment of the present invention, below the accompanying drawing of required use during embodiment is described is briefly described, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, do not paying under the prerequisite of creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 is the peg graft schematic diagram of integrated High-Rise Pile Cap Foundation embodiment of precast prestressed concrete frame of the present invention;
Fig. 2 is the schematic diagram along A-A direction in Fig. 1;
Fig. 3 is the enlarged diagram of D part in Fig. 1;
Fig. 4 is the enlarged diagram along E part in Fig. 2;
Fig. 5 is the precast prestressed framework schematic diagram of single Pin;
Fig. 6 is the schematic diagram along B-B direction in Fig. 5;
Number in the figure: 1 is steel pipe pile, 2 is concrete, 3 is inserting groove, 4 is stiffener, and 5 is the first peg being connected with steel pipe pile, and 6 is precast prestressed support, 7 is precast prestressed beam column framework, 8 is the pre-buried anchor slab of post side, and 9 is the second peg being connected with post side anchor plate, and 10 is grouting material, 11 is steel pipe pile and cushion cap connected the 3rd peg, 12 is reinforced concrete pile cap, and 13 is sealing rubber strip, 14 for T shape outstanding.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is clearly and completely described, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiment.
Embodiment 1: as shown in Fig. 1-Fig. 6, comprise some steel pipe piles 1, note concrete 2 in steel pipe pile, inserting groove 3, stiffener 4, the first peg 5 being connected with steel pipe pile, some precast prestressed supports 6, some precast prestressed beam column frameworks 7, the pre-buried anchor slab 8 of post side, the second peg 9 being connected with post side anchor plate, grouting material 10, steel pipe pile and cushion cap connected the 3rd peg 11, reinforced concrete pile cap 12, watertight rubber bar 13, T shape outstanding 14.
Soil layer is squeezed in one end of some steel pipe piles 1, note concrete 2 in the interior injection steel pipe pile of steel pipe pile 1.Adjacent steel pile tube 1 corresponding position arranges inserting groove 3, inserting groove 3 outsides are with stiffener 4 is set between steel pipe pile outer wall, be positioned on the steel pipe pile of inserting groove 3 inner sides and weld the first peg 5, inserting groove 3 ends arrange watertight rubber bar 13 with precast prestressed beam column framework 7 position that contacts.The precast prestressed beam column framework 7 of a Pin is put in every two precast prestressed supports 6, the pre-buried anchor slab 8 of arranged outside post side of precast prestressed beam column framework 7 center pillars, and the pre-buried anchor slab 8 of post side welds the second peg 9.The both sides of precast prestressed beam column framework 7 have T shape outstanding 14, and the precast prestressed beam column framework 7 that some Pin are equipped with precast prestressed support 6 is put into the slot 3 of two adjacent steel pipe piles 1 successively.Grouting material 10 injects in the gap of slot 3 with prestressing force beam column framework 7.Steel pipe pile and peg that cushion cap connects 11 are placed in steel pipe pile 1 top, and reinforced concrete pile cap 12 is connected with steel pipe pile 1 by the 3rd peg 11.
Construction sequence of the present invention is as follows:
1, squeeze into some steel pipe piles 1 according to precalculated position.
2, in steel pipe pile, note concrete 2.
3, use pre-tensioning system to make precast prestressed support 6.
4, adopt post stretching to make the precast prestressed beam column framework 7 of single Pin.
5, precast prestressed support 6 and the pre-buried anchor slab 8 of post side are connected into entirety with precast prestressed beam column framework 7.
6, the second peg 9 is welded in to the pre-buried anchor slab 8 of post side.
7, precast prestressed some Pin beam column framework 7 is inserted in the inserting groove 3 of adjacent two steel pipe piles 1.
8, grouting material 10 is injected in the gap of inserting groove 3 with precast prestressed beam column framework 7.
9, make reinforced concrete pile cap 12.
The present embodiment precast prestressed concrete frame is pegged graft other structure of integrated High-Rise Pile Cap Foundation referring to prior art.

Claims (2)

1. a precast prestressed concrete frame integrated High-Rise Pile Cap Foundation of pegging graft, it is characterized in that described integrated High-Rise Pile Cap Foundation is made up of several steel pipe piles (1) with inserting groove (3) and peg, more than the mud face of at the bottom of rivers or seabed until between High-Rise Pile Cap Foundation bottom, be connected by inserting the precast prestressed beam column frameworks of some Pin (7), precast prestressed beam column framework (7) is fixing by inserting groove (3) and high-strength grout (10) with steel pipe pile (1), make independently many steel pipe piles (1) form an integrated space structures of curved scissors, all steel pipe pile (1) tops are connected to entirety by reinforced concrete pile cap (12), below the mud face of at the bottom of rivers are squeezed in one end of some steel pipe piles or seabed, in every steel pipe pile (1), inject concrete (2), adjacent steel pipe pile (1) corresponding position arranges inserting groove (3), inserting groove (3) outside arranges stiffener (4) with steel pipe pile (1) outer wall junction, is positioned on the steel pipe pile (1) of inserting groove (3) inner side and is welded with the first peg (5), in the precast prestressed beam column framework of each Pin (7), be provided with two precast prestressed supports (6), the pre-buried anchor slab of arranged outside post side (8) of precast prestressed beam column framework (7) center pillar, is welded with the second peg (9) on the pre-buried anchor slab of post side (8), the both sides of precast prestressed beam column framework (7) are provided with T shape outstanding (14), the precast prestressed beam column framework (7) that some Pin are equipped with precast prestressed support (6) is put into the inserting groove (3) of two adjacent steel pipe piles (1) successively, and T shape outstanding (14) is positioned at and drags access slot (3), inserting groove (3) end arranges watertight rubber bar (13) with precast prestressed beam column framework (7) position that contacts, and in the gap that inserting groove (3) is connected with prestressing force beam column framework (7), is marked with grouting material (10), steel pipe pile (1) top is by the 3rd peg (11) connecting reinforcement concrete bearing platform (12).
2. the precast prestressed concrete frame according to claim 1 integrated High-Rise Pile Cap Foundation of pegging graft, the precast prestressed beam column framework (7) that it is characterized in that being equipped with precast prestressed support (6) is put into the inserting groove (3) of two adjacent steel pipe piles (1) successively, determines to insert the quantity of the precast prestressed beam column framework (7) in inserting groove (3) according to desired height.
CN201410187490.0A 2014-05-06 2014-05-06 Precast prestressed concrete frame grafting integration High-Rise Pile Cap Foundation Active CN103924611B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410187490.0A CN103924611B (en) 2014-05-06 2014-05-06 Precast prestressed concrete frame grafting integration High-Rise Pile Cap Foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410187490.0A CN103924611B (en) 2014-05-06 2014-05-06 Precast prestressed concrete frame grafting integration High-Rise Pile Cap Foundation

Publications (2)

Publication Number Publication Date
CN103924611A true CN103924611A (en) 2014-07-16
CN103924611B CN103924611B (en) 2015-10-21

Family

ID=51142991

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410187490.0A Active CN103924611B (en) 2014-05-06 2014-05-06 Precast prestressed concrete frame grafting integration High-Rise Pile Cap Foundation

Country Status (1)

Country Link
CN (1) CN103924611B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107700424A (en) * 2017-11-15 2018-02-16 中船第九设计研究院工程有限公司 A kind of yacht wharf pontoon bridge pile holding structure
CN109853584A (en) * 2019-02-25 2019-06-07 上海智平基础工程有限公司 Prefabricated concrete support beam
CN115787697A (en) * 2022-12-13 2023-03-14 福建永福电力设计股份有限公司 Pile foundation and foundation integrated prefabricated cabin foundation and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4174414B2 (en) * 2003-11-21 2008-10-29 清水建設株式会社 Hybrid pile and method for constructing hybrid pile
CN201292535Y (en) * 2008-11-18 2009-08-19 中铁大桥局集团第二工程有限公司 Abysmal sea naked rock pier protecting barrel, spud and underwater cofferdam integration platform
CN201358468Y (en) * 2008-12-25 2009-12-09 马人乐 Grillage-type bearing platform wind power generation tower pile foundation
CN201495555U (en) * 2009-08-18 2010-06-02 天津二建建筑工程有限公司 Cap tower-crane foundation of concrete cast-in-place high pile for tower erection at the house center
CN202519697U (en) * 2012-01-31 2012-11-07 中天建设集团有限公司天津分公司 Steel hoop truss high pile-cap tower crane basic structure
CN203213140U (en) * 2013-04-10 2013-09-25 中国建筑第八工程局有限公司 Laminate-type high pile cap tower crane foundation structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4174414B2 (en) * 2003-11-21 2008-10-29 清水建設株式会社 Hybrid pile and method for constructing hybrid pile
CN201292535Y (en) * 2008-11-18 2009-08-19 中铁大桥局集团第二工程有限公司 Abysmal sea naked rock pier protecting barrel, spud and underwater cofferdam integration platform
CN201358468Y (en) * 2008-12-25 2009-12-09 马人乐 Grillage-type bearing platform wind power generation tower pile foundation
CN201495555U (en) * 2009-08-18 2010-06-02 天津二建建筑工程有限公司 Cap tower-crane foundation of concrete cast-in-place high pile for tower erection at the house center
CN202519697U (en) * 2012-01-31 2012-11-07 中天建设集团有限公司天津分公司 Steel hoop truss high pile-cap tower crane basic structure
CN203213140U (en) * 2013-04-10 2013-09-25 中国建筑第八工程局有限公司 Laminate-type high pile cap tower crane foundation structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107700424A (en) * 2017-11-15 2018-02-16 中船第九设计研究院工程有限公司 A kind of yacht wharf pontoon bridge pile holding structure
CN109853584A (en) * 2019-02-25 2019-06-07 上海智平基础工程有限公司 Prefabricated concrete support beam
CN115787697A (en) * 2022-12-13 2023-03-14 福建永福电力设计股份有限公司 Pile foundation and foundation integrated prefabricated cabin foundation and construction method thereof

Also Published As

Publication number Publication date
CN103924611B (en) 2015-10-21

Similar Documents

Publication Publication Date Title
CN104790424B (en) The hardened system on generation power foundation of wind power ring basis and reinforcement means thereof
CN104018518B (en) The method of prefabricated diaphragm wall and construction outer wall of basement and floor
KR101058520B1 (en) Earth retaining wall using phc pile and construction method of the same
JP2006291575A (en) Retaining wall and method of constructing the same
KR100768031B1 (en) Complex pile commected integral steel pile to prestressed concrete composite pile and method for working using it
CN103924611B (en) Precast prestressed concrete frame grafting integration High-Rise Pile Cap Foundation
CN115045181A (en) Socket joint type node connection method and structure for prefabricated pier column and bearing platform in middle and high intensity region
US3209510A (en) Method of constructing a column or frame
JP7149919B2 (en) Improvement structure and improvement method of existing wharf
CN112982432A (en) Prestressed concrete foundation pit supporting structure and construction method
CN202730749U (en) Prefabricated reinforced concrete H-shaped support pile
KR102075202B1 (en) Retaining Walls, and Construction Method of Underground Structure
KR101169462B1 (en) Top-down construction method using post member
CN211113674U (en) Double-row column supporting structure of foundation pit
CN108894235B (en) Frame anchor rod assembly type supporting structure without retaining plate and construction method
CN102828503A (en) H-shaped supporting pile made of prefabricated reinforced concrete
CN115262637B (en) Subway station platform board assembled structure system
CN103485348A (en) Lateral-force-resisting pier body combined-type fender structure in large-area pit excavation
CN203429640U (en) Enclosure structure for large-range underground engineering foundation pit excavation project
CN203373753U (en) Pile anchor retaining wall concrete anchor cable top beam structure of foundation ditches
CN214460462U (en) Foundation pit supporting structure
CN115652798A (en) Manufacturing method of wet joint prefabricated assembly type pier based on steel bar lapping and pier
CN109056739A (en) The retaining piles of support pile and composition
CN210263063U (en) Unearthed ramp based on deep foundation pit supporting structure
KR101131631B1 (en) Assembling bridge construction method using Prestressed concrete girder with plural steel wires disposed at shear surface of tension port

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant