CN212052780U - Oblique supporting type deep foundation pit supporting structure - Google Patents

Oblique supporting type deep foundation pit supporting structure Download PDF

Info

Publication number
CN212052780U
CN212052780U CN201922482653.9U CN201922482653U CN212052780U CN 212052780 U CN212052780 U CN 212052780U CN 201922482653 U CN201922482653 U CN 201922482653U CN 212052780 U CN212052780 U CN 212052780U
Authority
CN
China
Prior art keywords
foundation pit
piles
inclined support
temporary
type deep
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922482653.9U
Other languages
Chinese (zh)
Inventor
苗恩新
龙敏健
金学胜
柏志诚
吴彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd, Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN201922482653.9U priority Critical patent/CN212052780U/en
Application granted granted Critical
Publication of CN212052780U publication Critical patent/CN212052780U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses an inclined support type deep foundation pit supporting structure, which comprises a foundation pit (13); arranging piles (2) which are arranged at intervals along the edge of the foundation pit and used for resisting a soil body (1) outside the foundation pit; the tops of all the row piles are connected into a whole through the crown beam (3), and the middle upper parts of all the row piles are connected into a whole through the waist beam (4); a connecting steel plate (14) for connecting the temporary inclined support lattice column (5) is embedded in one side of the waist rail close to the foundation pit; double anchor piles (7) which are arranged at intervals are arranged at the bottom of the foundation pit and close to the row piles, the tops of the double anchor piles are connected into a whole through a bearing platform (6), and a connecting steel plate (14) for connecting the temporary inclined support lattice column is embedded at one side of the bearing platform close to the row piles; two ends of the temporary inclined supporting lattice column are respectively welded with the waist beam and a connecting steel plate (14) on the bearing platform. The utility model discloses convenient for material collection, construction are simple, both practice thrift the cost of labor, can be under construction fast again, do not influence underground structure construction, need not the foundation ditch limit and reserve soil, are fit for generally promoting.

Description

Oblique supporting type deep foundation pit supporting structure
Technical Field
The utility model relates to an oblique supporting formula deep basal pit supporting construction belongs to building engineering technical field.
Background
In the aspects of underground space engineering, building foundation pit engineering and the like, under the condition that the depth of a foundation pit exceeds 5m, an inner support is generally required to be arranged on a foundation pit support to resist the lateral pressure of the foundation pit and control the deformation of the foundation pit. In the prior art, a reinforced concrete inner support is generally adopted, and the concrete support has the defects of resource waste, difficulty in construction and dismantling, long construction period, high cost and the like. Along with the continuous development of the technology, the steel pipe support or the steel structure support is also applied to a certain extent, but large-scale hoisting equipment is needed for installation, the installation is difficult, the deformation of the steel structure after stress causes the deformation of a foundation pit to be large, and the safety risk exists. Therefore, the existing technologies are not perfect enough and are expected to be further improved.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing an inclined support type deep foundation pit supporting structure to solve the defects of resource waste, difficult construction and dismantling, long construction period, high cost and the like of the existing reinforced concrete inner support; the problems that the existing steel pipe or steel structure support needs large-scale hoisting equipment for installation and is difficult to install, and the steel structure deforms after stress to cause larger foundation pit deformation and safety risk exist are solved, so that the defects of the prior art are overcome.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model relates to an inclined support type deep foundation pit supporting structure; comprises a foundation pit; arranging piles at intervals along the edge of the foundation pit for resisting soil outside the pit; the tops of all the row piles are connected into a whole through the crown beam, and the middle upper parts of all the row piles are connected into a whole through the waist beam; a connecting steel plate for connecting the temporary inclined support lattice column is embedded in one side of the waist rail close to the foundation pit; double-anchor piles which are arranged at intervals are arranged at the bottom of the foundation pit close to the row piles, the tops of the double-anchor piles are connected into a whole through a bearing platform, and connecting steel plates for connecting temporary inclined support lattice columns are pre-embedded at one side of the bearing platform close to the row piles; and two ends of the temporary inclined supporting lattice column are respectively welded with the waist beam and the connecting steel plate on the bearing platform.
Among the aforementioned oblique supporting formula deep basal pit supporting construction, the waist rail leans on foundation ditch one side to be downward inclined plane, and the cushion cap leans on campshed one side to be upward inclined plane, and downward inclined plane is parallel with the upward inclined plane, connects on the pre-buried two inclined planes of steel sheet.
In the inclined support type deep foundation pit supporting structure, the row piles and the double anchor piles are reinforced concrete cast-in-situ bored piles; and cement soil stirring layers are arranged on the outer sides of the row piles and around the double-anchor piles.
In the inclined support type deep foundation pit supporting structure, the temporary inclined support lattice column is a columnar member formed by welding angle steel and steel plates; the included angle between the temporary oblique supporting lattice column and the ground plane is not more than 45 degrees.
In the inclined support type deep foundation pit supporting structure, the bearing platform is of a reinforced concrete cast-in-place structure, and the height of the top of the bearing platform is more than 200mm lower than the bottom surface of the foundation pit.
Since the technical scheme is used, the utility model discloses compare with prior art, the utility model discloses utilize the campshed to add the water earth stirring layer as the enclosure, block the outer soil body of hole and groundwater through the enclosure. The lateral pressure of the soil body outside the pit and the underground water is finally born by the double-anchor pile through the row piles, the waist beams, the temporary inclined supporting lattice column and the bearing platform, and the double-anchor pile has the characteristics of reasonable stress and strong stability. Materials are convenient to obtain in the construction process, the construction is simple, the labor cost is saved, the construction can be carried out quickly, and the construction of an underground structure is not influenced. The construction method of arranging the upright post piles and the reinforced concrete diagonal braces or corner braces in the foundation pit in the prior art can be replaced. Is suitable for being popularized.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
The labels in the figures are: the method comprises the following steps of 1-soil outside a pit, 2-row piles, 3-crown beams, 4-waist beams, 5-temporary inclined supporting lattice columns, 6-bearing platforms, 7-double anchor piles, 8-corner reserved soil, 9-foundation pit bottom plates, 10-bottom plate support replacing plate strips, 11-negative two-layer floor slabs, 12-negative two-layer support replacing plate strips, 13-foundation pits, 14-connecting steel plates and 15-cement soil stirring layers.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and examples.
The utility model relates to an inclined support type deep foundation pit supporting structure; as shown in fig. 1, includes a foundation pit 13; arranging piles 2 which are arranged at intervals along the edge of the foundation pit 13 and used for resisting soil bodies 1 outside the foundation pit are arranged at the edge of the foundation pit 13; the tops of all the row piles 2 are connected into a whole through the crown beam 3, and the middle upper parts of all the row piles 2 are connected into a whole through the waist beam 4; a connecting steel plate 14 for connecting the temporary inclined support lattice column 5 is embedded in one side of the waist beam 4 close to the foundation pit 13; double anchor piles 7 which are arranged at intervals are arranged at the bottom of the foundation pit 13 and close to the row piles 2, the tops of the double anchor piles 7 are connected into a whole through bearing platforms 6, and connecting steel plates 14 for connecting the temporary inclined supporting lattice columns 5 are embedded in one sides of the bearing platforms 6 close to the row piles 2; and two ends of the temporary inclined supporting lattice column 5 are respectively welded with the waist rail 4 and the connecting steel plate 14 on the bearing platform 6. The side of the waist rail 4 close to the foundation pit 13 is a downward inclined plane, the side of the bearing platform 6 close to the row piles 2 is an upward inclined plane, the downward inclined plane is parallel to the upward inclined plane, and the connecting steel plates 14 are embedded on the two inclined planes. The row piles 2 and the double anchor piles 7 are reinforced concrete cast-in-situ bored piles; and cement soil stirring layers 15 are arranged on the outer sides of the row piles 2 and around the double-anchor piles 7. The temporary inclined support lattice column 5 is a columnar member formed by welding angle steel and steel plates; the included angle between the temporary oblique supporting lattice column 5 and the ground plane is not more than 45 degrees. The bearing platform 6 is a reinforced concrete cast-in-place structure, and the height of the top of the bearing platform 6 is more than 200mm lower than the bottom surface of the foundation pit 13.
A construction method for the inclined supporting deep foundation pit supporting structure of the present invention, as shown in fig. 1, is performed according to the following steps:
a) drilling a row of pouring holes at the edge of the designed foundation pit, and constructing a row of piles 2 in a reinforced concrete cast-in-place pile mode;
b) drilling pouring holes on the inner side of the edge of the designed foundation pit corresponding to each row of piles 2 to construct a double-anchor pile 7 in a reinforced concrete cast-in-place pile mode; the pouring elevation of the concrete of the double anchor piles 7 is controlled below the bottom surface of the foundation pit 13;
c) slotting the ground at the tops of the row piles 2, constructing the crown beam 3, and connecting the tops of all the row piles 2 into a whole;
d) excavating foundation pits 13 in layers to reach the elevation of the waist rail 4, and constructing the waist rail 4; embedding the connecting steel plate 14 when pouring the waist beam concrete;
e) excavating a foundation pit 13 to the bottom of the pit in a layered mode, and reserving a corner reserved soil body 8 with a right trapezoid cross section at the edge of the foundation pit 13 and the corner of the bottom of the pit in the excavation process;
f) digging the position of the double anchor piles 7 to the elevation of the surface of the bearing platform 6, constructing the bearing platform 6, and embedding the connecting steel plates 14 when pouring concrete on the bearing platform 6;
g) excavating a chute on the corner reserved soil body 8, and welding two ends of the temporary inclined supporting lattice column 5 with the waist beam 4 and the connecting steel plate 14 on the bearing platform 6;
h) excavating a corner reserved soil body 8, and constructing a bottom plate 9 and a bottom plate support plate replacement belt 10 of a foundation pit 13;
i) constructing a negative second-layer wall column, a negative second-layer floor 11 and a negative second-layer support plate replacing belt 12;
j) after the supporting plate belt 12 of the second layer reaches the design strength, the temporary inclined supporting lattice column 5 is removed;
k) and backfilling soil between the outer wall of the structure and the row piles 2.
In the construction method of the inclined support type deep foundation pit supporting structure, when the foundation pit 13 is excavated in layers to reach the elevation of the waist beam 4 and the soil body 8 is reserved at the excavation corner, the construction of the cement-soil stirring layer 15 is carried out on the outer side of the row piles 2. When the position of the double anchor piles 7 is dug to the elevation of the surface of the bearing platform 6, the construction of the cement soil stirring layer 15 is firstly carried out around the double anchor piles 7, and then the construction of the bearing platform 6 is carried out. The soil cement mixing layer 15 is a waterproof curtain formed by mixing concrete and cement formed by three-axis mixing or five-axis mixing.
The utility model discloses the side pressure that the outer soil body of well hole produced transmits the campshed, transmits the waist rail through the campshed, transmits the oblique lattice column through the waist rail, transmits the cushion cap again, undertakes by anchor pile and lower part soil body at last, need not to set up upright post pile and reinforced concrete in the foundation ditch to propping or the corner brace. The utility model discloses convenient for material collection, construction are simple, both practice thrift the cost of labor, can be under construction fast again, do not influence underground structure construction, need not the foundation ditch limit and reserve soil, are fit for generally promoting.

Claims (5)

1. An inclined support type deep foundation pit supporting structure comprises a foundation pit (13); the method is characterized in that: arranging piles (2) which are arranged at intervals along the edge of the foundation pit (13) and used for resisting a soil body (1) outside the foundation pit; the tops of all the row piles (2) are connected into a whole through the crown beam (3), and the middle upper parts of all the row piles (2) are connected into a whole through the waist beam (4); a connecting steel plate (14) for connecting the temporary inclined support lattice column (5) is embedded in one side of the waist beam (4) close to the foundation pit (13); double anchor piles (7) which are arranged at intervals are arranged at the bottom of the foundation pit (13) and close to the row piles (2), the tops of the double anchor piles (7) are connected into a whole through bearing platforms (6), and connecting steel plates (14) used for connecting temporary inclined supporting lattice columns (5) are embedded in one sides of the bearing platforms (6) close to the row piles (2); two ends of the temporary inclined supporting lattice column (5) are respectively welded with the waist beam (4) and the connecting steel plate (14) on the bearing platform (6).
2. The inclined support type deep foundation pit supporting structure according to claim 1, wherein: waist rail (4) lean on foundation ditch (13) one side to be down inclined plane, cushion cap (6) lean on campshed (2) one side to be the inclined plane that makes progress, and the inclined plane that makes progress is parallel with the inclined plane that makes progress, on two pre-buried inclined planes of connecting steel sheet (14).
3. The inclined support type deep foundation pit supporting structure according to claim 1, wherein: the row piles (2) and the double anchor piles (7) are reinforced concrete cast-in-situ bored piles; and cement soil stirring layers (15) are arranged on the outer sides of the row piles (2) and the peripheries of the double-anchor piles (7).
4. The inclined support type deep foundation pit supporting structure according to claim 1, wherein: the temporary inclined support lattice column (5) is a columnar member formed by welding angle steel and steel plates; the included angle between the temporary oblique supporting lattice column (5) and the ground plane is not more than 45 degrees.
5. The inclined support type deep foundation pit supporting structure according to claim 1, wherein: the bearing platform (6) is of a reinforced concrete cast-in-place structure, and the height of the top of the bearing platform (6) is more than 200mm lower than the bottom surface of the foundation pit (13).
CN201922482653.9U 2019-12-30 2019-12-30 Oblique supporting type deep foundation pit supporting structure Expired - Fee Related CN212052780U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922482653.9U CN212052780U (en) 2019-12-30 2019-12-30 Oblique supporting type deep foundation pit supporting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922482653.9U CN212052780U (en) 2019-12-30 2019-12-30 Oblique supporting type deep foundation pit supporting structure

Publications (1)

Publication Number Publication Date
CN212052780U true CN212052780U (en) 2020-12-01

Family

ID=73535502

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922482653.9U Expired - Fee Related CN212052780U (en) 2019-12-30 2019-12-30 Oblique supporting type deep foundation pit supporting structure

Country Status (1)

Country Link
CN (1) CN212052780U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110952569A (en) * 2019-12-30 2020-04-03 中国建筑第四工程局有限公司 Inclined support type deep foundation pit supporting structure and construction method
CN113216204A (en) * 2021-04-30 2021-08-06 中建四局第六建设有限公司 Device for reinforcing horizontal support replacing structure and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110952569A (en) * 2019-12-30 2020-04-03 中国建筑第四工程局有限公司 Inclined support type deep foundation pit supporting structure and construction method
CN113216204A (en) * 2021-04-30 2021-08-06 中建四局第六建设有限公司 Device for reinforcing horizontal support replacing structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN109356210B (en) Pile foundation building inclination correction pile interception underpinning limiting structure and construction method thereof
CN105926669A (en) Construction method of subway station
CN110952569A (en) Inclined support type deep foundation pit supporting structure and construction method
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN110777806B (en) Multi-connecting-rod plane frame permanent supporting structure and construction process thereof
CN205024712U (en) Combined tower crane foundation
CN113550322A (en) Enclosure system next to deep and shallow foundation pit and construction method
CN212052780U (en) Oblique supporting type deep foundation pit supporting structure
CN111576247A (en) Double-wall steel cofferdam and short pile casing group integral positioning and mounting structure and construction method
CN110468873B (en) Underpinning structure for abutment pile foundation in small space and using method
CN216041201U (en) Earlier prop and dig double-deck diagonal bracing foundation ditch enclosure system afterwards
CN101509258B (en) Method for precontrolling subsidence slant of sinking well
CN213062136U (en) Independent foundation underpinning system for storey-adding building
CN103215965A (en) Laminate type high-rise platform pile tower crane foundation and construction method
CN211340800U (en) Super dark foundation ditch earthwork excavation platform structure
CN212175793U (en) Underground protective structure based on underground diaphragm wall and steel open caisson combination formula
CN212175797U (en) Large-span underground space deep foundation pit supporting system
CN112682045A (en) Bearing structure of underground tunnel ultra-shallow buried underpass highway and construction method
CN110241863B (en) Soft soil foundation pit excavation process pipe gallery deformation control device and control method thereof
CN110847188A (en) Ultra-deep foundation pit earth excavation platform structure and construction method thereof
CN210002410U (en) ring frame support enclosure system capable of being used as retaining wall
CN106400814A (en) Foundation pit supporting method
CN203821399U (en) Deep foundation pit supporting structure
CN112627002B (en) Continuous beam bridge suitable for tunnel to pass through giant karst cave and construction technical method thereof
CN211006702U (en) Inclined strut underground structure is thrown in soft soil foundation double-deck

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201201

Termination date: 20211230