CN109775586A - A kind of removable steel hoop pile derrick crane - Google Patents

A kind of removable steel hoop pile derrick crane Download PDF

Info

Publication number
CN109775586A
CN109775586A CN201910192063.4A CN201910192063A CN109775586A CN 109775586 A CN109775586 A CN 109775586A CN 201910192063 A CN201910192063 A CN 201910192063A CN 109775586 A CN109775586 A CN 109775586A
Authority
CN
China
Prior art keywords
welded
block
wall
slot
steel hoop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910192063.4A
Other languages
Chinese (zh)
Other versions
CN109775586B (en
Inventor
陈对航
聂鲁军
张鹏松
白礼柱
武世霞
凌云
王艳
陈孝林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Hongzhi Construction Engineering Co Ltd
Original Assignee
Anhui Hongzhi Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Hongzhi Construction Engineering Co Ltd filed Critical Anhui Hongzhi Construction Engineering Co Ltd
Priority to CN201910192063.4A priority Critical patent/CN109775586B/en
Publication of CN109775586A publication Critical patent/CN109775586A/en
Application granted granted Critical
Publication of CN109775586B publication Critical patent/CN109775586B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention belongs to derrick crane fields, especially a kind of removable steel hoop pile derrick crane, it is unreasonable for existing foundation design of tower crane, it be easy to cause the duration to lag, the manpower of occupancy, material resources, financial resources increase the problem of investment of cost, each connector is by the way of being fixedly welded, it can not dismantle and increase construction cost, and it is not adjustable mutually between connector, the low problem of serious forgiveness, now propose following scheme, it includes concrete bearing platform, multiple bored concrete piles are fixedly installed at the top of the concrete bearing platform, equal fixing sleeve is equipped with steel hoop on multiple bored concrete piles.The configuration of the present invention is simple, easy to operate, the foundation design of tower crane is reasonable, has the innate advantage that cost input is low, Ke Xunhuanliyong, each connector uses removable combination, and connector is conveniently replaced when damaging, construction cost is reduced, and is mutually adjustable between connector, serious forgiveness is high.

Description

A kind of removable steel hoop pile derrick crane
Technical field
The present invention relates to derrick crane technical field more particularly to a kind of removable steel hoop pile derrick cranes.
Background technique
The rapid development of market economy has driven the skyscraper of large quantities of enlargements, complication to emerge in large numbers, and many buildings are not It is only that structure is complicated, height is high, the most important is to have merged that construction period is harsh, quality requirement is stringent, ambient enviroment is multiple A series of miscellaneous, problems such as construction space is narrow, increase difficulty to the selection of tower crane;
At present when traditional foundation design of tower crane, to planar dimension, vertically and horizontally size narrow regions, soft ought be especially encountered Weak soil layer region, often using tower crane cushion cap could be made after the completion of basement earth excavation, to meet tower crane to basis The requirement of bearing capacity, this results in the investment that duration lag, the human and material resources occupied, financial resources increase cost, each connector By the way of being fixedly welded, it can not be dismantled if construction after the completion, increase construction cost, and mutually cannot between connector It adjusts, serious forgiveness is low.
Summary of the invention
It is unreasonable the purpose of the present invention is to solve foundation design of tower crane exists in the prior art, it be easy to cause the duration stagnant Afterwards, the problem of human and material resources of occupancy, financial resources increase the investment of cost, each connector is by the way of being fixedly welded, nothing Method disassembly increases construction cost again, and is not adjustable mutually between connector, the low disadvantage of serious forgiveness, and the one kind proposed is removable Formula steel hoop pile derrick crane.
To achieve the goals above, present invention employs following technical solutions:
The top of a kind of removable steel hoop pile derrick crane, including concrete bearing platform, the concrete bearing platform is solid Dingan County is equipped with multiple bored concrete piles, and fixing sleeve is equipped with steel hoop, the two of them steel hoop of multiple steel hoops on multiple bored concrete piles Side close to each other is equipped with connecting column, and two steel hoop sides close to each other are welded with fixed plate, and the two of connecting column Side offers fixing groove, and fixed plate is movably arranged in corresponding fixing groove, and the two sides of fixed plate offer circular groove, The limiting slot of multiple equal column distributions is offered on the inner wall of the circular groove, offers cunning on the two sides inner wall of fixing groove Hole is slidably installed in slide opening and is equipped with slide post, and the two sides of slide post open up fluted, is slidably fitted in two grooves Limited block, one end that two limited blocks are located remotely from each other are slidably mounted in corresponding two limiting slots, and two grooves mutually lean on The same connecting hole is offered on close side inner wall, and turntable is rotatably equipped in connecting hole, is fixed on the outside side wall of turntable There are two symmetrically arranged connecting line, one end that two connecting lines are located remotely from each other is fixedly mounted on corresponding two limits for installation On block, rotation hole is offered on the side inner wall of the connecting hole, and rotating bar, one end of rotating bar are rotatably equipped in rotation hole It is welded on the side of turntable, the other end of rotating bar extends to the outside of slide post and is welded with control panel, the side of control panel It is rotatably installed on slide post, rotates fixed ring, fixed ring drives control panel rotation, and the rotation of driven by rotary disc turntable makes two companies Wiring pulls corresponding two limited blocks to slide in groove respectively, and limited block drives fixed block to slide in slot section and pull drawing Spring is stretched, extension spring occurs elastic deformation, skids off limited block out of limiting slot, rotates fixed plate, fixed plate is in fixing groove Interior rotation, while slide post passively rotates in circular groove, after regulating the angle between fixed plate and connecting column, unclamps Fixed ring can fix fixed plate in fixation because the elastic reaction of extension spring drives limited block to slide into limiting slot again Position in slot.
Preferably, the slide post offers annular groove close to the side of control panel, and control panel is close to the side of slide post It is welded with movable block, the side walls connection of movable block and annular groove, control panel is welded with fixed ring far from the side of slide post, Control panel drives movable block to slide in a ring groove in rotation, and position when sliding control panel will not deviate, and fixed ring exists It can play the role of assisting power-assisted when rotation.
Preferably, rotation slot is offered on the side inner wall of the connecting hole, the side of turntable is welded with rotating block, rotation Block is rotatably installed in rotation slot, and slot section is offered on the two sides inner wall of groove, and the two sides of limited block are welded with fixed block, Fixed block is slidably mounted in corresponding slot section, and when rotating bar drives turntable to rotate in connecting hole, driven by rotary disc rotating block exists Rotation in rotation slot can make turntable will not deviation post in rotation.
Preferably, the side of the fixed block offers through-hole, is welded with the same fixed link on the two sides inner wall of slot section, Fixed link is through through-hole and is arranged with extension spring, and one end of extension spring is welded on the side inner wall of slot section, extension spring The other end be welded on the side of fixed block, offer sliding slot on the two sides inner wall of slide opening, the two sides of slide post are welded with Sliding block, sliding block are slidably mounted in corresponding sliding slot, and fixed block presses extension spring when sliding in slot section, because of extension spring Elastic reaction fixed block can be driven to slide into home position, band movable slider is sliding in sliding slot when slide post slides in slide opening It is dynamic, can Stable sliding column position.
Preferably, multiple card slots are offered on the side inner wall of the sliding slot, the side of sliding block offers spring groove, spring Fixture block is slidably fitted in slot, one end of fixture block is slidably mounted in card slot, and the other end of fixture block is welded with one end of spring, bullet The other end of spring is welded on the inner wall of spring groove, is driven fixture block to slide in sliding slot when sliding block slides in sliding slot, is worked as fixture block Because the elastic reaction of spring drives fixture block to slide into card slot when sliding into the position of card slot, position of the sliding block in sliding slot can be fixed It sets.
In the present invention, a kind of removable steel hoop pile derrick crane is embraced by concrete bearing platform, bored concrete pile, steel Hoop, connecting column, fixed plate, fixing groove, circular groove, limiting slot, slide opening, slide post, groove, limited block, connecting hole, turntable, Connecting line, rotating bar, control panel, fixture block and card slot cooperation under, pass through what bored concrete pile, concrete bearing platform and steel hoop formed Tower-crane foundation structure can pour the machinery for providing and vertically and horizontally transporting not only for earth excavation and Base isolation system, but also can be with The working radius of tower crane is increased, to save the duration, improve work efficiency, secondly, rotation fixed ring, fixed ring drive control panel to turn Dynamic, driven by rotary disc turntable rotation, two connecting lines of driven by rotary disc reversely rotated winding on turntable draws two connecting lines respectively It moves corresponding two limited blocks to slide in groove, limited block drives fixed block that extension spring is slided and pulled in slot section, draws It stretches spring and elastic deformation occurs, skid off limited block out of limiting slot, rotate fixed plate, fixed plate rotates in fixing groove, together When slide post passively rotated in circular groove, after regulating the angle between fixed plate and connecting column, unclamp fixed ring, because It drives limited block to slide into limiting slot again for the elastic reaction of extension spring, position of the fixed plate in fixing groove can be fixed It sets, when needing to remove accessory, rotates fixed ring, fixed ring, fixed ring band are pulled after skidding off limited block out of limiting slot Dynamic slide post skids off in circular groove, fixed plate can be taken out out of fixing groove, dismounting can be completed;
The configuration of the present invention is simple, easy to operate, the foundation design of tower crane is reasonable, and it is low, recyclable to have cost input Innate advantage, each connector use removable combination, connector damage when it is conveniently replaced, reduce construction at This, and be mutually adjustable between connector, serious forgiveness is high.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of removable steel hoop pile derrick crane proposed by the present invention;
Fig. 2 is a kind of connecting column of removable steel hoop pile derrick crane proposed by the present invention and the side view of fixed plate Structural schematic diagram;
Fig. 3 is a kind of part A structural schematic diagram of removable steel hoop pile derrick crane proposed by the present invention;
Fig. 4 is a kind of part B structural schematic diagram of removable steel hoop pile derrick crane proposed by the present invention.
In figure: 1 concrete bearing platform, 2 bored concrete piles, 3 steel hoops, 4 connecting columns, 5 fixed plates, 6 fixing grooves, 7 circular grooves, 8 Limiting slot, 9 slide openings, 10 slide posts, 11 grooves, 12 limited blocks, 13 connecting holes, 14 turntables, 15 connecting lines, 16 rotating bars, 17 controls Disk processed, 18 fixture blocks, 19 card slots.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
Referring to Fig.1-4, a kind of removable steel hoop pile derrick crane, including concrete bearing platform 1, concrete bearing platform 1 Top be fixedly installed with multiple bored concrete piles 2, fixing sleeve is equipped with steel hoop 3 on multiple bored concrete piles 2, multiple steel hoops 3 its In two sides close to each other of steel hoop 3 be equipped with connecting column 4, two steel hoops 3 side close to each other is welded with solid Fixed board 5, the two sides of connecting column 4 offer fixing groove 6, and fixed plate 5 is movably arranged in corresponding fixing groove 6, fixed plate 5 Two sides offer circular groove 7, and the limiting slot 8 of multiple equal column distributions is offered on the inner wall of circular groove 7, fixing groove 6 Slide opening 9 is offered on the inner wall of two sides, is slidably installed in slide opening 9 and slide post 10 is installed, and the two sides of slide post 10 offer Groove 11 is slidably fitted with limited block 12 in two grooves 11, and one end that two limited blocks 12 are located remotely from each other is slidably installed In corresponding two limiting slots 8, the same connecting hole 13 is offered on two grooves 11 side inner wall close to each other, is connected Turntable 14 is rotatably equipped in hole 13, symmetrically arranged connecting line 15 there are two fixed installations on the outside side wall of turntable 14, two One end that a connecting line 15 is located remotely from each other is fixedly mounted on corresponding two limited blocks 12, on the side inner wall of connecting hole 13 Rotation hole is offered, rotating bar 16 is rotatably equipped in rotation hole, one end of rotating bar 16 is welded on the side of turntable 14, rotation The other end of bar 16 extends to the outside of slide post 10 and is welded with control panel 17, and the side of control panel 17 is rotatably installed in sliding On column 10.
In the present invention, slide post 10 offers annular groove close to the side of control panel 17, and control panel 17 is close to slide post 10 Side be welded with movable block, the side walls of movable block and annular groove connect, and control panel 17 is welded far from the side of slide post 10 It is connected to fixed ring, control panel 17 drives movable block to slide in a ring groove in rotation, and position when sliding control panel 17 is not It can deviate, fixed ring can play the role of assisting power-assisted in rotation.
In the present invention, rotation slot is offered on the side inner wall of connecting hole 13, the side of turntable 14 is welded with rotating block, turns Motion block is rotatably installed in rotation slot, and slot section is offered on the two sides inner wall of groove 11, and the two sides of limited block 12 are welded with Fixed block, fixed block are slidably mounted in corresponding slot section, when rotating bar 16 drives turntable 14 to rotate in connecting hole 13, turntable 14 drive rotating blocks rotate in rotation slot, can make turntable 14 will not deviation post in rotation.
In the present invention, the side of fixed block offers through-hole, is welded with the same fixed link on the two sides inner wall of slot section, Gu Fixed pole is through through-hole and is arranged with extension spring, and one end of extension spring is welded on the side inner wall of slot section, extension spring The other end is welded on the side of fixed block, and sliding slot is offered on the two sides inner wall of slide opening 9, and the two sides of slide post 10 are welded with Sliding block, sliding block are slidably mounted in corresponding sliding slot, and fixed block presses extension spring when sliding in slot section, because of extension spring Elastic reaction fixed block can be driven to slide into home position, when slide post 10 slides in slide opening 9 band movable slider in sliding slot Sliding, can Stable sliding column 10 position.
In the present invention, multiple card slots 19 are offered on the side inner wall of sliding slot, the side of sliding block offers spring groove, spring Fixture block 18 is slidably fitted in slot, one end of fixture block 18 is slidably mounted in card slot 19, and the other end of fixture block 18 is welded with spring One end, the other end of spring is welded on the inner wall of spring groove, drives fixture block 18 in sliding slot when sliding block slides in sliding slot Sliding can when fixture block 18 slides into the position of card slot 19 because the elastic reaction of spring drives fixture block 18 to slide into card slot 19 Position of the fixed sliding block in sliding slot.
In the present invention, the tower-crane foundation structure being made up of bored concrete pile 2, concrete bearing platform 1 and steel hoop 3 can be not only soil Side is excavated and Base isolation system pours the machinery for providing and vertically and horizontally transporting, but also can increase the working radius of tower crane, from And save the duration, improve work efficiency, secondly, rotation fixed ring, fixed ring drive control panel 17 to rotate, turntable 14 drives rotating bar 16 It is rotated in rotation hole, rotating bar 16 drives turntable 14 to rotate, and turntable 14 drives two phase reversals on turntable 14 of connecting line 15 Dynamic winding, makes two connecting lines 15 that corresponding two limited blocks 12 be pulled to slide in groove 11 respectively, and limited block 12 drives solid Determine block and extension spring is slided and pulled in slot section, elastic deformation occurs for extension spring, keeps limited block 12 sliding out of limiting slot 8 Out, fixed plate 5 is rotated, fixed plate 5 rotates in fixing groove 6, while slide post 10 passively rotates in circular groove 7, works as tune After having saved the angle between fixed plate 5 and connecting column 4, fixed ring is unclamped, because the elastic reaction of extension spring drives limited block 12 slide into limiting slot 8 again, can fix position of the fixed plate 5 in fixing groove 6, when needing to remove accessory, rotation Fixed ring, pulls fixed ring after skidding off limited block 12 out of limiting slot 8, fixed ring drives slide post 10 to skid off circular groove 7 Interior, at the same time, band movable slider slides in sliding slot when slide post 10 slides, and sliding block drives fixture block 18 from one of card slot 19 Spring is inside skidded off and presses, when fixture block 18 slides into the position of card slot 19 because the elastic reaction of spring drives fixture block 18 to slide into In card slot 19, position of the sliding block in sliding slot can be fixed, fixed plate 5 can be taken out out of fixing groove 6, dismounting can be completed; The configuration of the present invention is simple, easy to operate, the foundation design of tower crane is reasonable, and it is low, can be recycled congenital excellent to have cost input Gesture, each connector use removable combination, and connector is conveniently replaced when damaging, and reduce construction cost, and connect It is mutually adjustable between part, serious forgiveness is high.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (5)

1. a kind of removable steel hoop pile derrick crane, including concrete bearing platform (1), which is characterized in that the concrete It is fixedly installed at the top of cushion cap (1) multiple bored concrete piles (2), equal fixing sleeve is equipped with steel hoop (3) on multiple bored concrete piles (2), more The side that the two of them steel hoop (3) of a steel hoop (3) is close to each other is equipped with connecting column (4), and two steel hoops (3) are mutual Close side is welded with fixed plate (5), and the two sides of connecting column (4) offer fixing groove (6), fixed plate (5) activity peace In the corresponding fixing groove (6), the two sides of fixed plate (5) are offered circular groove (7), the circular groove (7) it is interior The limiting slot (8) of multiple equal column distributions is offered on wall, offers slide opening (9) on the two sides inner wall of fixing groove (6), slide opening (9) it is slidably installed and is equipped with slide post (10) in, the two sides of slide post (10) open up fluted (11), in two grooves (11) It is slidably fitted with limited block (12), one end that two limited blocks (12) are located remotely from each other is slidably mounted on corresponding two limits It in slot (8), offers the same connecting hole (13) on two grooves (11) side inner wall close to each other, turns in connecting hole (13) It is dynamic to be equipped with turntable (14), on the outside side wall of turntable (14) there are two fixed installations symmetrically arranged connecting line (15), two One end that connecting line (15) is located remotely from each other is fixedly mounted on corresponding two limited blocks (12), and the one of the connecting hole (13) Rotation hole is offered on the inner wall of side, is rotatably equipped in rotation hole rotating bar (16), and one end of rotating bar (16) is welded on turntable (14) side, the other end of rotating bar (16) extend to the outside of slide post (10) and are welded with control panel (17), control panel (17) side is rotatably installed on slide post (10).
2. a kind of removable steel hoop pile derrick crane according to claim 1, which is characterized in that the slide post (10) side close to control panel (17) offers annular groove, and control panel (17) is welded with movement close to the side of slide post (10) The side walls of block, movable block and annular groove connect, and control panel (17) is welded with fixed ring far from the side of slide post (10).
3. a kind of removable steel hoop pile derrick crane according to claim 1, which is characterized in that the connecting hole (13) rotation slot is offered on side inner wall, the side of turntable (14) is welded with rotating block, and rotating block is rotatably installed in rotation In slot, slot section is offered on the two sides inner wall of groove (11), the two sides of limited block (12) are welded with fixed block, and fixed block is sliding It is dynamic to be mounted in corresponding slot section.
4. a kind of removable steel hoop pile derrick crane according to claim 3, which is characterized in that the fixed block Side offer through-hole, be welded with the same fixed link on the two sides inner wall of slot section, fixed link is through through-hole and is arranged with drawing Spring is stretched, one end of extension spring is welded on the side inner wall of slot section, and the other end of extension spring is welded on the one of fixed block Side offers sliding slot on the two sides inner wall of slide opening (9), and the two sides of slide post (10) are welded with sliding block, and sliding block is slidably installed In corresponding sliding slot.
5. a kind of removable steel hoop pile derrick crane according to claim 4, which is characterized in that the sliding slot It is offered on the inner wall of side multiple card slots (19), the side of sliding block offers spring groove, is slidably fitted with fixture block in spring groove (18), one end of fixture block (18) is slidably mounted in card slot (19), and the other end of fixture block (18) is welded with one end of spring, spring The other end be welded on the inner wall of spring groove.
CN201910192063.4A 2019-03-14 2019-03-14 Detachable steel hoop pile column tower crane Active CN109775586B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910192063.4A CN109775586B (en) 2019-03-14 2019-03-14 Detachable steel hoop pile column tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910192063.4A CN109775586B (en) 2019-03-14 2019-03-14 Detachable steel hoop pile column tower crane

Publications (2)

Publication Number Publication Date
CN109775586A true CN109775586A (en) 2019-05-21
CN109775586B CN109775586B (en) 2023-11-03

Family

ID=66489224

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910192063.4A Active CN109775586B (en) 2019-03-14 2019-03-14 Detachable steel hoop pile column tower crane

Country Status (1)

Country Link
CN (1) CN109775586B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114541464A (en) * 2022-03-24 2022-05-27 浙江省特种设备科学研究院 Novel tower crane basis lattice column is consolidated device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561384A (en) * 2012-01-31 2012-07-11 中天建设集团有限公司天津分公司 Steel hoop truss type elevated pile cap tower crane foundation construction method and structure
CN107299643A (en) * 2017-07-10 2017-10-27 杭州江润科技有限公司 Steel lattice column combined type tower crane foundation structure in foundation pit and construction method
CN107503367A (en) * 2017-09-21 2017-12-22 西安聚投未来网络科技有限公司 A kind of ground for possessing function of seismic resistance
CN108298423A (en) * 2018-01-31 2018-07-20 刘冲 A kind of construction material combined hanging equipment
CN207759945U (en) * 2017-11-29 2018-08-24 惠安网信通技术开发有限公司 A kind of safe and reliable tower crane being easily installed
CN108792967A (en) * 2018-06-25 2018-11-13 马鞍山艾诚电子科技有限公司 A kind of assembled architecture intelligence hanging device
CN108899947A (en) * 2018-06-26 2018-11-27 边会婷 A kind of collection of energy mechanism of computer key

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561384A (en) * 2012-01-31 2012-07-11 中天建设集团有限公司天津分公司 Steel hoop truss type elevated pile cap tower crane foundation construction method and structure
CN107299643A (en) * 2017-07-10 2017-10-27 杭州江润科技有限公司 Steel lattice column combined type tower crane foundation structure in foundation pit and construction method
CN107503367A (en) * 2017-09-21 2017-12-22 西安聚投未来网络科技有限公司 A kind of ground for possessing function of seismic resistance
CN207759945U (en) * 2017-11-29 2018-08-24 惠安网信通技术开发有限公司 A kind of safe and reliable tower crane being easily installed
CN108298423A (en) * 2018-01-31 2018-07-20 刘冲 A kind of construction material combined hanging equipment
CN108792967A (en) * 2018-06-25 2018-11-13 马鞍山艾诚电子科技有限公司 A kind of assembled architecture intelligence hanging device
CN108899947A (en) * 2018-06-26 2018-11-27 边会婷 A kind of collection of energy mechanism of computer key

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114541464A (en) * 2022-03-24 2022-05-27 浙江省特种设备科学研究院 Novel tower crane basis lattice column is consolidated device
CN114541464B (en) * 2022-03-24 2023-12-01 浙江省特种设备科学研究院 Novel tower crane foundation lattice column reinforcing device

Also Published As

Publication number Publication date
CN109775586B (en) 2023-11-03

Similar Documents

Publication Publication Date Title
CN107299643B (en) Steel lattice column combined type tower crane foundation structure in foundation pit and construction method
CN209620046U (en) A kind of assembled pile board wall foundation pit supporting construction
CN104264685A (en) Construction method for mid-partition wall area structure closure
CN109775586A (en) A kind of removable steel hoop pile derrick crane
CN204827176U (en) Concatenation cantilever translation door
CN205676882U (en) A kind of novel supporting construction
CN209651761U (en) A kind of removable steel hoop pile derrick crane
CN203200745U (en) Strengthening support of underground diaphragm wall in inverse construction method
CN217076793U (en) Tower crane installation adjusting base
CN112502134B (en) Reinforced steel pipe pile system and method
CN203654880U (en) Safety fence
CN204849759U (en) Cluster anchor rope composite pile structure as major structure stand
CN201588413U (en) Reinforcing structure for concrete bracket in original workshop
CN107190753A (en) A kind of I-steel gabion assembles counterfort supporting construction
CN211621728U (en) Light steel structure house foundation stabilization connecting piece
CN207176719U (en) Steel lattice column combined type tower-crane foundation structure in a kind of foundation ditch
CN218346835U (en) Inner supporting device for deformation joint between double columns
CN211057888U (en) Steel-pipe pile foundation reinforced structure
CN105019456A (en) Pile driving frame of comprehensive pile driver
CN219949039U (en) Storage device for building construction based on BIM
CN209603117U (en) A kind of pile foundation hole-forming device
CN220908486U (en) Foundation anchor rod anti-pulling detection device
CN219909014U (en) Water conservancy construction cofferdam device
CN203654292U (en) Reverse building plate construction structure
CN219175649U (en) Building steel structure column convenient to assemble

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: Building 1, Management Committee of Longgang Development Zone, Yaohai District, Hefei City, Anhui Province, 230000

Applicant after: Anhui Hongzhi Construction Group Co.,Ltd.

Address before: Rooms 703 and 706, Fortune Plaza, No. 278 Suixi Road, Luyang District, Hefei City, Anhui Province, 230041

Applicant before: ANHUI HONGZHI CONSTRUCTION ENGINEERING Co.,Ltd.

GR01 Patent grant
GR01 Patent grant