CN107190753A - A kind of I-steel gabion assembles counterfort supporting construction - Google Patents

A kind of I-steel gabion assembles counterfort supporting construction Download PDF

Info

Publication number
CN107190753A
CN107190753A CN201710407857.9A CN201710407857A CN107190753A CN 107190753 A CN107190753 A CN 107190753A CN 201710407857 A CN201710407857 A CN 201710407857A CN 107190753 A CN107190753 A CN 107190753A
Authority
CN
China
Prior art keywords
steel
column
gabion
fixed
supporting construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710407857.9A
Other languages
Chinese (zh)
Inventor
徐平
黄琳炎
盛楠
董世钊
杨春节
李西峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou University
Original Assignee
Zhengzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou University filed Critical Zhengzhou University
Priority to CN201710407857.9A priority Critical patent/CN107190753A/en
Publication of CN107190753A publication Critical patent/CN107190753A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0208Gabions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Abstract

Counterfort supporting construction is assembled the invention discloses a kind of I-steel gabion, including two column I-steel being parallel to each other being vertically arranged, the bottom of two column I-steel is connected by connecting I-steel, and the bottom side of two column I-steel is provided with respectively with column I-steel and being connected the vertical fixation I-steel of I-steel, one end upper surface of the fixed I-steel away from column I-steel is provided with movable I-steel, one end both sides of the fixed I-steel away from column I-steel are equipped with connecting rod, the end of the connecting rod is fixedly connected with sliding block, the sliding block is located in the groove of movable I-steel both sides, and the flank threads of sliding block are connected with the first trip bolt.This I-steel gabion assembles counterfort supporting construction, and assembling is easy to, speed of application is fast, and intensity is big, pollution-free, repeats and utilizes, and inside is piled up using gabion, and good water permeability is conducive to draining in the angle of inclination of convenient regulation floor I-steel.

Description

A kind of I-steel gabion assembles counterfort supporting construction
Technical field
The present invention relates to technical field of civil engineering, specially a kind of I-steel gabion assembling counterfort supporting construction.
Background technology
In the prior art, diaphram wall is widely used in foundation ditch construction, because in excavation of foundation pit, underground is continuous Wall can be born than larger soil pressure, can avoid occurring settlement of foundation or cave in accident, as must in Deep Foundation Pit Supporting Project Indispensable soil-baffling structure.However, continuing to develop and building, it is necessary to constantly to underground development space with city.House The lower room number of plies is more and more, and foundation ditch is also more and more deeper.Therefore, in foundation ditch construction, diaphram wall needs the pressure born to get over Come bigger, the continuous underground wall structure of prior art has been difficult to the soil pressure for bearing deep basal pit, it is necessary to be set to diaphram wall Put supporting construction.
In the prior art, because supporting construction is welding mostly, it is impossible to adjusted according to actual conditions, it is not easy to repeat profit With, and welded and installed speed is slow, water penetration is also very poor.
The content of the invention
The technical problem to be solved in the present invention is to overcome existing defect to assemble counterfort supporting there is provided a kind of I-steel gabion Structure, speed of application is fast, and intensity is big, pollution-free, repeats and utilizes, and good water permeability is conducive to draining, can effectively solve background The problem of in technology.
To achieve the above object, the present invention provides following technical scheme:A kind of I-steel gabion assembles counterfort supporting construction, Including two column I-steel being parallel to each other being vertically arranged, the bottom of two column I-steel is connected by connecting I-steel Connect, and two column I-steel bottom side provided with respectively with column I-steel and being connected the vertical fixation I-shaped of I-steel Steel, one end upper surface of the fixed I-steel away from column I-steel is provided with movable I-steel, and the fixed I-steel is remote One end both sides of column I-steel are equipped with connecting rod, and the end of the connecting rod is fixedly connected with sliding block, and the sliding block is located at work In the groove of dynamic I-steel both sides, and the flank threads of sliding block are connected with the first trip bolt, and two movable I-steel are away from solid The one end for determining I-steel is connected by connecting I-steel, is equipped with the top of the connection I-steel two ends being connected with movable I-steel solid Vertical square bar is slidably connected in fixed board, the top grooves on two sides of the column I-steel, each column I-steel both sides The top-side of vertical square bar is connected by fixed block, and the bottom side of vertical square bar is threaded with the second fastening spiral shell Nail, the vertical square bar of each column I-steel both sides is connected by the first bearing pin and the rotation of connecting rod one end, connecting rod it is another One end is connected with one end of floor I-steel, and the other end of floor I-steel is rotated by the second bearing pin with fixed plate to be connected, institute Being piled up in the space for stating column I-steel, fixed I-steel, movable I-steel and floor I-steel composition has gabion.
As a preferred technical solution of the present invention, the bottom of two movable I-steel is connected by bottom I-steel
As a preferred technical solution of the present invention, the side of two column I-steel is connected by horizontal I-steel, Horizontal I-steel is no less than three and is spaced substantially equidistant.
As a preferred technical solution of the present invention, connected between two floor I-steel by oblique I-steel, and Oblique I-steel is no less than two and is spaced substantially equidistant.
As a preferred technical solution of the present invention, the connection I-steel, fixed I-steel and bottom I-steel Bottom is equidistantly provided with fixed column.
As a preferred technical solution of the present invention, the gabion include iron cage and unweathered rock, the iron cage by Stainless steel is made, and unweathered rock is located inside iron cage.
Compared with prior art, the beneficial effects of the invention are as follows:This I-steel gabion assembles counterfort supporting construction, convenient to adjust The angle of inclination of floor I-steel is saved, is easy to assembling, speed of application is fast, and intensity is big, pollution-free, repeats and utilizes, and inside is used Gabion is piled up, good water permeability, is conducive to draining.
Brief description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is partial enlargement structural representation at the A of the present invention.
In figure:I-steel, 4 connecting rods, 5 first trip bolts, 6 movable I-shapeds are fixed in 1 column I-steel, 2 fixed columns, 3 Steel, 7 bottom I-steel, 8 fixed plates, 9 gabions, 10 second trip bolts, 11 vertical square bars, 12 fixed blocks, 13 connecting rods, 14 One bearing pin, 15 floor I-steel, 16 oblique I-steel, 17 second bearing pins, 18 sliding blocks, 19 horizontal I-steel.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
Fig. 1-2 is referred to, the present invention provides a kind of technical scheme:A kind of I-steel gabion assembles counterfort supporting construction, bag Two column I-steel 1 being parallel to each other being vertically arranged are included, the side of two column I-steel 1 is connected by horizontal I-steel 19 Connect, horizontal I-steel 19 is no less than three and is spaced substantially equidistant, and horizontal I-steel 19 can play connection function, and can be right Gabion 9 cited below is stopped that the bottom of two column I-steel 1 is connected by connecting I-steel, and two column works The bottom side of word steel 1 is provided with respectively with column I-steel 1 and being connected the vertical fixation I-steel 3 of I-steel, fixation I-steel 3 One end upper surface away from column I-steel 1 is provided with movable I-steel 6, and the bottom of two movable I-steel 6 passes through bottom I-shaped Steel 7 is connected, and bottom I-steel 7 can be attached to two movable I-steel 6, it is ensured that it is same that two movable I-steel 6 are moved Step property, fixed one end both sides of the I-steel 3 away from column I-steel 1 are equipped with connecting rod 4, and the end of connecting rod 4 is fixedly connected Sliding block 18, sliding block 18 is located in the groove of the movable both sides of I-steel 6, and movable I-steel 6 can be made to be slided along fixed I-steel 3 It is dynamic, and the stationarity during movement of guarantee activity I-steel 6, and the flank threads of sliding block 18 are connected with the first trip bolt 5, Movable I-steel 6, which is moved to behind suitable position, can be fixed movable I-steel 6 by the first trip bolt 5, it is ensured that its is steady Qualitative, two one end of movable I-steel 6 away from fixed I-steel 3 are connected by connecting I-steel, are connected with movable I-steel 6 Connection I-steel two ends at the top of be equipped with fixed plate 8, the top grooves on two sides of column I-steel 1 slidably connect it is vertical Square bar 11, the top-side of the vertical square bar 11 of each both sides of column I-steel 1 is connected by fixed block 12, vertical by two Square bar 11 is fixed, and the bottom side of vertical square bar 11 is threaded with the second trip bolt 10, passes through the second trip bolt 10 Vertical square bar 11 can be fixed on to the top of column I-steel 1, the vertical square bar 11 of each both sides of column I-steel 1 passes through First bearing pin 14 is rotated with the one end of connecting rod 13 and is connected, and the other end of connecting rod 13 is connected with one end of floor I-steel 15, rib The other end of plate I-steel 15 is rotated with fixed plate 8 by the second bearing pin 17 and is connected, and can change rib according to the depth of foundation ditch The angle of inclination of plate I-steel 15, vertical square bar 11 and movable I-steel 6 are adjusted according to the change of the angle of floor I-steel 15 Position, then vertical square bar 11 and movable I-steel 6 are consolidated by the first trip bolt 5 and the second trip bolt 10 respectively Determine, easy disassembly, connected between two floor I-steel 15 by oblique I-steel 16, and oblique I-steel 16 is no less than two And be spaced substantially equidistant, floor I-steel 15 can be made more firmly, column I-steel 1, fixed I-steel 3, movable I-steel 6 and rib Being piled up in the space that plate I-steel 15 is constituted has gabion 9, can facilitate draining, and good water permeability, gabion 9 includes iron cage and non-weathering Rock, iron cage is made of stainless steel, it is not easy to got rusty, and can be reused, and unweathered rock is located inside iron cage, connects work The bottom of word steel, fixed I-steel 3 and bottom I-steel 7 is equidistantly provided with fixed column 2, can make supporting knot by fixed column 2 The fixation of structure fastness, prevents supporting construction from being offset in the presence of side force.
The present invention, the angle of inclination of convenient regulation floor I-steel 15, is easy to assembling, and speed of application is fast, and intensity is big, no dirt Dye, is repeated and utilizes, and inside is piled up using gabion, and good water permeability is conducive to draining.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of changes, modification can be carried out to these embodiments, replace without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (6)

1. a kind of I-steel gabion assembles counterfort supporting construction, including two column I-steel being parallel to each other being vertically arranged (1), it is characterised in that:The bottom of two column I-steel (1) is connected by connecting I-steel, and two column I-steel (1) Bottom side provided with respectively with column I-steel (1) and being connected the vertical fixation I-steel (3) of I-steel, the fixed I-shaped One end upper surface of the steel (3) away from column I-steel (1) is provided with movable I-steel (6), and the fixed I-steel (3) is away from column One end both sides of I-steel (1) are equipped with connecting rod (4), and the end of the connecting rod (4) is fixedly connected with sliding block (18), the cunning Block (18) is located in the groove of movable I-steel (6) both sides, and the flank threads of sliding block (18) are connected with the first trip bolt (5), two one end of movable I-steel (6) away from fixed I-steel (3) are connected by connecting I-steel, with movable I-steel (6) it is equipped with the top of the connection I-steel two ends of connection in fixed plate (8), the top grooves on two sides of the column I-steel (1) Vertical square bar (11) is slidably connected, the top-side of the vertical square bar (11) of each column I-steel (1) both sides passes through Fixed block (12) is connected, and the bottom side of vertical square bar (11) is threaded with the second trip bolt (10), each column work The vertical square bar (11) of word steel (1) both sides is rotated with connecting rod (13) one end by the first bearing pin (14) and is connected, connecting rod (13) the other end is connected with the one end of floor I-steel (15), and the other end of floor I-steel (15) passes through the second bearing pin (17) Rotate and be connected with fixed plate (8), the column I-steel (1), fixed I-steel (3), movable I-steel (6) and floor I-steel (15) being piled up in the space constituted has gabion (9).
2. a kind of I-steel gabion assembling counterfort supporting construction according to claim 1, it is characterised in that:Two activity works The bottom of word steel (6) is connected by bottom I-steel (7).
3. a kind of I-steel gabion assembling counterfort supporting construction according to claim 1, it is characterised in that:Two column works The side of word steel (1) is connected by horizontal I-steel (19), and horizontal I-steel (19) is no less than three and is spaced substantially equidistant.
4. a kind of I-steel gabion assembling counterfort supporting construction according to claim 1, it is characterised in that:Two floor works Connected between word steel (15) by oblique I-steel (16), and oblique I-steel (16) is no less than two and is spaced substantially equidistant.
5. a kind of I-steel gabion assembling counterfort supporting construction according to claim 1 or 2, it is characterised in that:The company The bottom for connecing I-steel, fixed I-steel (3) and bottom I-steel (7) is equidistantly provided with fixed column (2).
6. a kind of I-steel gabion assembling counterfort supporting construction according to claim 1, it is characterised in that:The gabion (9) iron cage and unweathered rock are included, the iron cage is made of stainless steel, and unweathered rock is located inside iron cage.
CN201710407857.9A 2017-06-02 2017-06-02 A kind of I-steel gabion assembles counterfort supporting construction Pending CN107190753A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710407857.9A CN107190753A (en) 2017-06-02 2017-06-02 A kind of I-steel gabion assembles counterfort supporting construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710407857.9A CN107190753A (en) 2017-06-02 2017-06-02 A kind of I-steel gabion assembles counterfort supporting construction

Publications (1)

Publication Number Publication Date
CN107190753A true CN107190753A (en) 2017-09-22

Family

ID=59876907

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710407857.9A Pending CN107190753A (en) 2017-06-02 2017-06-02 A kind of I-steel gabion assembles counterfort supporting construction

Country Status (1)

Country Link
CN (1) CN107190753A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107859054A (en) * 2017-10-30 2018-03-30 浙江鑫直建筑有限公司 The construction method of environmental lattice guest gabion baffling
CN108930254A (en) * 2018-08-24 2018-12-04 佛山市南力工程监理有限公司 A kind of gabion box ruggedized equipment for water conservancy river dykes and dams

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB8502803D0 (en) * 1985-02-04 1985-03-06 Mabey Hire Co Soldier propping system
CN103255773A (en) * 2013-06-05 2013-08-21 姜建玲 Combined type template support and application method thereof
CN203296215U (en) * 2013-05-08 2013-11-20 罗盛 Height-adjustable building partition wall
CN203741771U (en) * 2014-03-24 2014-07-30 张军 Portable assembled flood preventing and wave screening dyke
CN104328766A (en) * 2014-10-31 2015-02-04 杭州市市政工程集团有限公司 Ecological stone cage net box retaining wall and construction method
CN204325856U (en) * 2014-10-31 2015-05-13 西安达刚路面机械股份有限公司 A kind of stable type road widens machine
CN204919474U (en) * 2015-07-21 2015-12-30 汩鸿(上海)环保工程设备有限公司 Portable flood control baffle
KR101640795B1 (en) * 2015-09-18 2016-07-19 주식회사 세기엔지니어링 Furlable earth retaining structure for provisional facilities and construction method thereof
CN206000198U (en) * 2016-07-20 2017-03-08 李菲菲 A kind of adjustable construction wall supporting construction
CN206768836U (en) * 2017-06-02 2017-12-19 郑州大学 A kind of I-steel gabion assembles counterfort supporting construction

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB8502803D0 (en) * 1985-02-04 1985-03-06 Mabey Hire Co Soldier propping system
CN203296215U (en) * 2013-05-08 2013-11-20 罗盛 Height-adjustable building partition wall
CN103255773A (en) * 2013-06-05 2013-08-21 姜建玲 Combined type template support and application method thereof
CN203741771U (en) * 2014-03-24 2014-07-30 张军 Portable assembled flood preventing and wave screening dyke
CN104328766A (en) * 2014-10-31 2015-02-04 杭州市市政工程集团有限公司 Ecological stone cage net box retaining wall and construction method
CN204325856U (en) * 2014-10-31 2015-05-13 西安达刚路面机械股份有限公司 A kind of stable type road widens machine
CN204919474U (en) * 2015-07-21 2015-12-30 汩鸿(上海)环保工程设备有限公司 Portable flood control baffle
KR101640795B1 (en) * 2015-09-18 2016-07-19 주식회사 세기엔지니어링 Furlable earth retaining structure for provisional facilities and construction method thereof
CN206000198U (en) * 2016-07-20 2017-03-08 李菲菲 A kind of adjustable construction wall supporting construction
CN206768836U (en) * 2017-06-02 2017-12-19 郑州大学 A kind of I-steel gabion assembles counterfort supporting construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107859054A (en) * 2017-10-30 2018-03-30 浙江鑫直建筑有限公司 The construction method of environmental lattice guest gabion baffling
CN107859054B (en) * 2017-10-30 2019-12-20 宁波顺行园林建设有限公司 Construction method of ecological gabion retaining wall
CN108930254A (en) * 2018-08-24 2018-12-04 佛山市南力工程监理有限公司 A kind of gabion box ruggedized equipment for water conservancy river dykes and dams

Similar Documents

Publication Publication Date Title
CN108278116B (en) Shallow-buried large-span pipe curtain supporting system and construction method thereof
CN205776347U (en) Novel cover for subway station digs against making structural system
CN104947682A (en) Foundation pit support construction method and device thereof
CN203654294U (en) Foundation pit supporting structure used in reverse building method
CN105089061A (en) Ultra-deep foundation pit supporting method
CN206768836U (en) A kind of I-steel gabion assembles counterfort supporting construction
CN104878786B (en) Tiltedly orthogonal is for group's Pile-soil-structure Interaction experimental model
CN107190753A (en) A kind of I-steel gabion assembles counterfort supporting construction
CN102182276B (en) Manufacturing method of mega column in shape of double Chinese characters ya
CN205676882U (en) A kind of novel supporting construction
CN208545763U (en) A kind of steel pipe pile cofferdam for bridge deepwater foundation
CN103031861B (en) Test device for simulating six-direction load action on raft of raft base
CN212175797U (en) Large-span underground space deep foundation pit supporting system
CN205676913U (en) Lattice pillar tower-crane foundation structure
CN205529843U (en) Landing stage anchor structure
CN216379955U (en) Steel construction building box beam column connected node
CN203924362U (en) Outer annular-stiffer formula beam-column node structure
CN204000885U (en) Metro Deep Excavation concrete support hangs mould mould
CN216586578U (en) Supporting structure in foundation
CN206635780U (en) A kind of soil nailed wall retaining structure
CN202055413U (en) Huge column shaped like double Chinese character YA
CN204000819U (en) A kind of horizontal load-bearing body top-driven type soil pressure is surveyed die device
CN211257025U (en) Steel sheet pile cofferdam with slip casting platform
CN203846494U (en) Breast beam soil anchor rod segmented connection structure
CN203429557U (en) Anchor pole back beam applied to underpass bridge jacking construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170922