CN101851923B - Support pillar construction and erection method - Google Patents

Support pillar construction and erection method Download PDF

Info

Publication number
CN101851923B
CN101851923B CN2010102071963A CN201010207196A CN101851923B CN 101851923 B CN101851923 B CN 101851923B CN 2010102071963 A CN2010102071963 A CN 2010102071963A CN 201010207196 A CN201010207196 A CN 201010207196A CN 101851923 B CN101851923 B CN 101851923B
Authority
CN
China
Prior art keywords
support column
end plate
support pillar
support
top end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2010102071963A
Other languages
Chinese (zh)
Other versions
CN101851923A (en
Inventor
张成才
王存贵
王文彪
王丽梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Engineering Bureau Civil Engineering Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Engineering Bureau Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd, China Construction Sixth Engineering Bureau Civil Engineering Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN2010102071963A priority Critical patent/CN101851923B/en
Publication of CN101851923A publication Critical patent/CN101851923A/en
Application granted granted Critical
Publication of CN101851923B publication Critical patent/CN101851923B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a support pillar construction and erection method. The method comprises the following steps of: (a) preparing a support structure which comprises a support pillar; respectively welding a top end plate and a bottom end plate at the top end and the bottom end of the support pillar; welding an upper stiffening plate on the support pillar positioned on the lower side of the top end plate; and welding a lower stiffening plate and a water-stop ring on the support pillar positioned on the upper side of the bottom end plate in turn; (b) pushing the pillar foot of the support pillar to the position at the top of an engineering pile; and righting and straightening the support pillar; and (c) connecting the bottom end plate of the support pillar with the engineering pile in a welding way so that the engineering pile extends into an anchor rod of a plummer to connect the support pillar in a welding way; and inserting a steel wedge is inserted between the top end plate of the support pillar and the bottom of a horizontal support beam back to back. The method has the advantages of convenient operation, low cost, high strength and high applicability; and crackles appearing at an included angle of the support beam of a triangular support system at the corner of a foundation pit can be avoided effectively.

Description

A kind of support pillar construction and erection method
Technical field
The present invention relates to a kind of construction and installation method, relate in particular to a kind of support pillar construction and erection method.
Background technology
When building foundation pit is constructed, for guaranteeing construction safety, prevent that the landslide accident from taking place, must take supporting measure to the building foundation pit of excavation.The building foundation pit supporting design and construction should be taken all factors into consideration engineering geology and hydrogeological conditions, foundation ditch type, the excavation of foundation pit pick degree of depth, falls drainage condition, surrounding enviroment are to the requirement of foundation pit side-wall displacement, factors such as all side loads of foundation ditch, construction seasons, supporting and protection structure useful life are accomplished appropriate design, well construction, economic security.
In recent years, the rapid rise of highrise building had promoted the development of deep foundation pit support technology.Various places are accumulating abundant design and construction experience aspect deep pit digging and the support technology, new technology, new construction, new technology continue to bring out.But present urban architecture spacing is very little, and the foundation ditch edge that has brings very big difficulty far from only tens meters even several meters of existed buildings to basic engineering construction, brings very big threat to surrounding environment, has also correspondingly increased construction period and operating expenses.Foundation ditch corner gusseted system brace summer is prone to crack phenomenon in pattern foundation pit supporting structure, still finds no the method that effectively addresses this problem at present.
Summary of the invention
The objective of the invention is to overcome the deficiencies in the prior art, provide a kind of easy to operate, cost is low, intensity is high, applicability is strong, can effectively solve a kind of support pillar construction and erection method that crackle appears in foundation ditch corner gusseted system brace summer angle.
A kind of support pillar construction and erection method of the present invention, it may further comprise the steps:
(a) preparation braced structures, described braced structures comprises support column, top, bottom at described support column are welded top end plate, bottom end plate respectively, on the support column that is positioned at described top end plate downside, weld stiffener, stiffener and seal ring under welding successively on the support column that is positioned at described bottom end plate upside;
(b) suspension column of support column is shifted onto engineering piles tip position and support column set upright alignment;
(c) described support column bottom end plate and engineering piles are welded to connect, and dowel and support column that engineering piles stretches in the cushion cap are welded to connect; Between at the bottom of support column top end plate and the horizontal shore, insert the gad back of the body tightly at last.
Adopt the beneficial effect of the inventive method to be: easy to operate, cost is low, intensity is high, applicability is strong, can effectively solve foundation ditch corner gusseted system brace summer angle and crackle occur.
Description of drawings
Fig. 1 is the structural representation of the braced structures that adopts of the present invention;
Fig. 2 (a) and (b), (c), (d), (e) adopt the present invention's braced structures shown in Figure 1 to carry out the process schematic diagram of the method for construction and installation.
The specific embodiment
Below in conjunction with specific embodiment, and with reference to accompanying drawing, the present invention is described further:
A kind of support pillar construction and erection method of the present invention, it may further comprise the steps: (a) prepare braced structures as shown in Figure 1, described braced structures comprises support column 1, weld top end plate 2-1, bottom end plate 2-2 respectively in top, the bottom of described support column, on the support column that is positioned at described top end plate downside, weld stiffener 3-1, stiffener 3-2 and seal ring 7 under welding successively on the support column that is positioned at described bottom end plate upside; (b) suspension column of support column is shifted onto engineering piles 4 tip positions and support column set upright alignment; (c) described support column bottom end plate and engineering piles 4 are welded to connect, and the dowel 6 that engineering piles stretches in the cushion cap 5 is welded to connect with support column; Insert the gad back of the body tightly at support column top end plate and horizontal shore at last at 8 the end.Described support column 1 can be steel pipe.
Shown in Fig. 2 (a)-(e), described step (b) can comprise step: (1) is set up tripod 9 and tripod is placed on a side of horizontal shore to be supported, and carries out the colligation of post suspension centre and safe stay cord 12 is fixing on support column; (2) with jack 10 described support column is slowly sling by the post suspension centre; (3) shift the suspension column of support column onto the engineering piles tip position; (4) all directions safety stay cord on the support column is fixed, and added bridging 11 support column shoveing jail; (5) opposite side that tripod is moved to described horizontal shore carries out described step (c) then so that support column is set upright alignment.Safe stay cord in the described step (4) can be tied up on around the engineering piles.
Embodiment 1
(a) preparation braced structures, described braced structures comprises support column 1, weld top end plate 2-1, bottom end plate 2-2 respectively in top, the bottom of described support column, on the support column that is positioned at described top end plate downside, weld stiffener 3-1, stiffener 3-2 and seal ring 7 under welding successively on the support column that is positioned at described bottom end plate upside; (b) set up tripod and tripod is placed on a side of horizontal shore to be supported, on support column, carry out the colligation of post suspension centre and safe stay cord is fixed; (c) with jack described support column is slowly sling by the post suspension centre; (d) shift the suspension column of support column onto the engineering piles tip position; (e) all directions safety stay cord on the support column is fixed, and added bridging support column shoveing jail; (f) tripod is moved to the opposite side of described horizontal shore so that support column is set upright alignment; (g) described support column bottom end plate and engineering piles 4 are welded to connect, and the dowel 6 that engineering piles stretches in the cushion cap 5 is welded to connect with support column; Insert the gad back of the body tightly at support column top end plate and horizontal shore at last at 8 the end.
Adopt this method effectively to solve the problem that crackle appears in foundation ditch corner gusseted system horizontal shore angle after tested, set in advance this Horizontal Branch dagger, can guarantee that the crack does not appear in brace summer.

Claims (2)

1. support pillar construction and erection method is characterized in that it may further comprise the steps:
(a) preparation braced structures, described braced structures comprises support column, top, bottom at described support column are welded top end plate, bottom end plate respectively, on the support column that is positioned at described top end plate downside, weld stiffener, stiffener and seal ring under welding successively on the support column that is positioned at described bottom end plate upside;
(b) suspension column of support column is shifted onto engineering piles tip position and support column set upright alignment;
(c) described support column bottom end plate and engineering piles are welded to connect, and dowel and support column that engineering piles stretches in the cushion cap are welded to connect; Between at the bottom of support column top end plate and the horizontal shore, insert the gad back of the body tightly at last.
2. support pillar construction and erection method according to claim 1 is characterized in that the step that described step (b) comprises is:
(1) sets up tripod and tripod is placed on a side of horizontal shore to be supported, on support column, carry out the colligation of post suspension centre and safe stay cord is fixed;
(2) with jack described support column is slowly sling by the post suspension centre;
(3) shift the suspension column of support column onto the engineering piles tip position;
(4) all directions safety stay cord on the support column is fixed, and added bridging support column shoveing jail;
(5) opposite side that tripod is moved to described horizontal shore carries out described step (c) then so that support column is set upright alignment.
CN2010102071963A 2010-06-23 2010-06-23 Support pillar construction and erection method Active CN101851923B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102071963A CN101851923B (en) 2010-06-23 2010-06-23 Support pillar construction and erection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102071963A CN101851923B (en) 2010-06-23 2010-06-23 Support pillar construction and erection method

Publications (2)

Publication Number Publication Date
CN101851923A CN101851923A (en) 2010-10-06
CN101851923B true CN101851923B (en) 2011-08-17

Family

ID=42803593

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102071963A Active CN101851923B (en) 2010-06-23 2010-06-23 Support pillar construction and erection method

Country Status (1)

Country Link
CN (1) CN101851923B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103321246B (en) * 2013-06-14 2015-07-15 孔志坚 Underground diaphragm wall based foundation pit construction method
CN104278678A (en) * 2013-07-05 2015-01-14 天津城建设计院有限公司 Horizontal displacement control device of large foundation ditch bracket column
CN106948351A (en) * 2017-04-21 2017-07-14 深圳市工勘岩土集团有限公司 Foundation ditch support pit prop stake underpinning construction method
CN110761194B (en) * 2019-10-31 2020-06-12 苏州群业建设工程有限公司 Steel structure material connecting system for bridge construction
CN112392051A (en) * 2020-09-24 2021-02-23 云南建投第一勘察设计有限公司 Foundation pit supporting and reinforcing structure and construction method
CN115324377A (en) * 2022-09-02 2022-11-11 浙江广厦建设职业技术大学 House reinforcing structure

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101280631A (en) * 2008-04-02 2008-10-08 中铁建工集团有限公司 Supporting apparatus for building
CN201162357Y (en) * 2008-03-07 2008-12-10 长业建设集团有限公司 Early form-removing bracing column
KR100930001B1 (en) * 2009-08-24 2009-12-07 지원건설(주) Withstanding apparatus for supporting earth pressure to maintain drainage system and constructing method thereof

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2652137B2 (en) * 1994-08-01 1997-09-10 三男 佐々木 support

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201162357Y (en) * 2008-03-07 2008-12-10 长业建设集团有限公司 Early form-removing bracing column
CN101280631A (en) * 2008-04-02 2008-10-08 中铁建工集团有限公司 Supporting apparatus for building
KR100930001B1 (en) * 2009-08-24 2009-12-07 지원건설(주) Withstanding apparatus for supporting earth pressure to maintain drainage system and constructing method thereof

Also Published As

Publication number Publication date
CN101851923A (en) 2010-10-06

Similar Documents

Publication Publication Date Title
CN203145038U (en) Latticed column type tower crane foundation
CN101851923B (en) Support pillar construction and erection method
CN102127974B (en) Design and construction method of additional cellar under existing building
CN201794079U (en) Foundation pit supporting system
CN103882869A (en) Inclined supporting pile structure for foundation pit support and construction method thereof
CN103469802A (en) Combined lattice steel frame spray anchoring supporting method and combined lattice steel frame spray anchoring supporting structure
CN103103988A (en) Foundation ditch construction method of horizontal bracing structure of central island floor slaps
CN102864780A (en) Supporting structure and supporting method of foundation pit
CN104947681A (en) Super large super deep basement ground pit construction method
CN111851523B (en) Settlement deviation prevention method for foundation pit construction
CN206829148U (en) A kind of combined type shaped steel, concrete square pile bearing diagonal foundation pit enclosure structure
CN203583493U (en) Combined lattice steel frame spray anchoring foundation pit supporting structure
CN104805828B (en) W-shaped steel sheet pile structure
CN201771514U (en) Concealed tunneling structure with pile foundation
CN203768914U (en) Foundation pit bracing diagonal support pile structure
CN205024712U (en) Modular tower crane basis
CN111395353A (en) Foundation pit supporting device and method based on combination of steel sheet piles and vertical inclined struts
CN203821248U (en) Steel pipe arch main arch assembling supporting system
CN206091360U (en) Shaped steel bracing basis underpins structure
CN201722700U (en) Infrastructure of tower crane
CN206635801U (en) A kind of deep water waters bridge construction tower-crane foundation structure
CN102134856B (en) Tower crane foundation
CN204780892U (en) Tubular pile crack reinforcement structure of high strength
CN203846494U (en) Breast beam soil anchor rod segmented connection structure
CN209923935U (en) Co-location combined pile wall supporting structure in upper-soft and lower-hard stratum

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant