CN107840256A - A kind of steel platform of derrick crane - Google Patents
A kind of steel platform of derrick crane Download PDFInfo
- Publication number
- CN107840256A CN107840256A CN201711129363.5A CN201711129363A CN107840256A CN 107840256 A CN107840256 A CN 107840256A CN 201711129363 A CN201711129363 A CN 201711129363A CN 107840256 A CN107840256 A CN 107840256A
- Authority
- CN
- China
- Prior art keywords
- steel
- basic framework
- derrick crane
- steels
- support steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 92
- 239000010959 steel Substances 0.000 title claims abstract description 92
- 238000010276 construction Methods 0.000 abstract description 11
- 238000003466 welding Methods 0.000 abstract description 7
- 239000004567 concrete Substances 0.000 abstract description 5
- 238000004519 manufacturing process Methods 0.000 abstract description 5
- 238000009434 installation Methods 0.000 abstract description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000004364 calculation method Methods 0.000 description 2
- 238000011065 in-situ storage Methods 0.000 description 2
- 239000003351 stiffener Substances 0.000 description 2
- 229910000984 420 stainless steel Inorganic materials 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
- B66C23/72—Counterweights or supports for balancing lifting couples
- B66C23/78—Supports, e.g. outriggers, for mobile cranes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/44—Foundations for machines, engines or ordnance
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Piles And Underground Anchors (AREA)
Abstract
A kind of steel platform of derrick crane, it is related to construction, the production of large scale equipment, technical field of transportation, coaxial steel latticework part is set up respectively in four groups of pile foundations of derrick crane, it is fixedly connected four groups of steel latticework part upper ends and is connected with each other the hollow basic framework formed by four auxiliary girder steels, hollow basic framework is in horizontally disposed, aid in respectively symmetrically welding two support steel beams on girder steel in relative two piece of hollow basic framework, two support steel beams are mutually perpendicular to this two auxiliary girder steels respectively, two channel-section steels are symmetrically welded between two support steel beams, two channel-section steels are mutually perpendicular to two support steel beams respectively.The gross area that the present invention is formed using four pile bases, the weight of whole derrick crane and the goods of lifting is shared to the larger area, reduce pressure, with the purpose for reaching safety, reducing foundation cost cost, it is also reusable in addition, installation, dismounting speed are superior to girder steel concrete platform, accelerating construction progress.
Description
Technical field
The present invention relates to the peace of technical field, the particularly derrick cranes such as construction, the production of large scale equipment, transport
Fill basic technology field.
Background technology
In modern architecture, production, transportation, derrick crane is largely widely used, and it gives full play to its lifting
The advantages that amount is big, and height is high, and transport coverage is big.But due to the importance and own characteristic of derrick crane, its basis
Safety and stability problem also turns into the major issue that must take into consideration in construction, production process.
Existing derrick crane uses steel platform tower crane, there is cross type and the class of hollow two.
Derrick crane suspension column counter-force is being delivered to capital via girder steel, and the amount of calculation of various operating mode lower girder steels is larger.It is existing
The centre-to-centre spacing of pile foundation is reduced to and is equal with tower crane column middle-range or slightly larger, in this way to avoid this calculating by real many projects
Cross type and hollow steel platform produce in succession.So processing will increase the counter-force value of stake top, increase lattice column and pile foundation
Cost.And because derrick crane column spacing is little, causes pile foundation centre-to-centre spacing to be less than code requirement, do not meet《Build stake
Technical specification》(JGJ94-2008)Regulation, and the middle microcardia of pile foundation causes the deformation of pile foundation to increase because of efficiency of pile groups, stake
The vertical supporting rigidity of base reduces because of pile-soil interaction, it is impossible to effectively plays the bearing capacity of stake.
Such as:One derrick crane, model QTZ80, its performance see the table below
| FV(kN) | Fh(kN) | M(kN.m) | |
| Off working state | 449 | 71 | 1668 |
| Working condition | 509 | 31 | 1039 |
In upper table, FVFor vertical axle power;FhFor horizontal force;M is tilting moment.
Through research, pile foundation centre distance determines the size of Pile top force, also have impact on the diameter of pile foundation, length, cost.
Pilespacing is smaller, and Pile top force is bigger, and bearing capacity of single pile is smaller.To make full use of bearing capacity of single pile, should try one's best increasing
Pilespacing, and pilespacing increases, calculating cross steel joist support platform is more complicated, and general construction technical staff is difficult to be competent at, and now girder steel
Deform, shake the excessive derrick crane that easily causes and be unable to normal use.
《Build stake technical specification》(JGJ94-2008)To the existing concrete regulation of bearing pile, see the table below:
A such as derrick crane pile foundation uses the bored concrete piles of Φ 800, is learnt from table, non-crowded figure bored concrete pile spacing should be a diameter 3
Times, i.e. 3 × 0.8=2.4m.
It is numerous and diverse to avoid calculating, the centre-to-centre spacing of pile foundation is reduced to and is equal with tower crane column middle-range or slightly larger.Thus increase
Add diameter, the length of pile foundation, and increase construction costs cost.
The content of the invention
The present invention seeks to propose a kind of tower for can effectively reducing tower crane foundation cost, improving its stability
A kind of steel platform of heavy-duty machine.
The present invention includes four groups of pile foundations, coaxial steel latticework part is set up respectively in each group pile foundation, in four groups of steel latticework parts
Upper end be fixedly connected and be connected with each other the hollow basic frameworks that form by four auxiliary girder steels, the hollow basic framework is in
It is horizontally disposed, it is characterised in that:Aid in respectively symmetrically welding two branch on girder steel in relative two piece of hollow basic framework
Girder steel is supportted, two support steel beams are mutually perpendicular to this two auxiliary girder steels respectively, right between two support steel beams
Claim welding two channel-section steels, two channel-section steels are mutually perpendicular to two support steel beams respectively.
The present invention forms one big hollow framework by hollow basic framework, by two first auxiliary steel thereon
The setting of beam and two second auxiliary girder steels, the small hollow framework formed in big hollow framework, one is formd with this
The steel platform of three-back-shaped derrick crane.
Derrick crane is arranged in the steel platform of the three-back-shaped derrick crane, and its advantage is:Be advantageous to pile foundation stress
Make full use of, steel platform is reusable, and installation, dismounting speed are superior to reinforced concrete platform, so as to reduce cost, accelerate
Construction speed, reduce labor intensity;Existing safety devices software for calculation can use to calculate again, the work for reducing technical staff is strong
Degree, improve correctness, integrality, the reliability for calculating data;And pilespacing also is compliant with《Build stake technical specification》(JGJ94-
2008)Regulation requirement.
The present invention makes full use of the gross area that four pile bases are formed, by the weight of whole derrick crane and the goods of lifting
Share to the larger area, reduce pressure, with the purpose for reaching safety, reducing foundation cost cost, the in addition steel platform
Reusable, installation, dismounting speed are superior to girder steel concrete platform, accelerating construction progress.
Brief description of the drawings
Fig. 1 is a kind of structural representation of the present invention.
Fig. 2 is Fig. 1 A-A to cut-away view.
Embodiment
First, project profile:
Somewhere medical center building, it is 8 layers on the ground of a building between two building buildings against riverside highway, the framework that 2 layers of underground
Structure, overall floorage are 17920 ㎡.Fabric structure type is frame-shear structure, height 40.6m.
This engineering design absolute altitude ± 0.000 is equivalent to absolute altitude 3.450m, outdoor nature terrace absolute altitude -0.400m.
Basement foundation ditch thing is about 75.9m, north and south the widest part about 47.8m, most narrow place about 46.1m;Foundation ditch shoveling absolute altitude-
13.000m base plate thickness 1000mm.
According to construction style, between the axis of basement 5~6 and B~C axis, 1 QTZ63 tower crane is arranged(See horizontal layout
Figure);QTZ63 tower crane brachium 56m, the vertical transportation machinery as Construction stage.
1.1.5 tower crane is using stake based on 4 Φ 800, long 20 meters of cast-in-situ bored piles, interpolation 420*420 steel lattice columns.
It is determined that using structure of the present invention as derrick crane steel platform.
2nd, steel platform is constructed:
1st, four groups of pile foundations are built:
Tower crane is using stake based on 4 Φ 800, long 20 meters of cast-in-situ bored piles, the interior insertion 470*470 steel lattice columns of stake.By lattice
Structure post is fixed with the electric welding of girder steel cage, and girder steel cage field fabrication, lattice column anchors into 3m in stake, wears setting sealing piece at bottom plate.It is located at
Lattice column four sides in base surface with [25C channel-section steels make bridging reinforcing, per pass bridging height 3.5m, totally three.
The four groups of pile foundations formed are arranged symmetrically in four directions, and the centre-to-centre spacing of adjacent two groups of pile foundations is 2400mm.
2nd, four groups of steel latticework parts are welded:
One group of steel latticework part of coaxial welding above each group of pile foundation.Each group steel latticework part is respectively perpendicular to horizontal plane.And make each
The top of group steel latticework part is in same level.
Welded respectively by the triangle stiffener below steel lattice column cap and pile foundation in the upper end of each group steel latticework part.
3rd, big hollow basic framework is built:
In the upper end of two adjacent groups steel latticework part, by die flange, the I-shaped auxiliary girder steel of bolt connection one, with this,
Four auxiliary girder steels reach interconnection, form big hollow basic framework, and make big hollow basic framework in horizontally disposed.
4th, small hollow basic framework is built:
Aid in respectively symmetrically welding two support steel beams on girder steel in relative two piece of big hollow basic framework, two supports
Girder steel is mutually perpendicular to this two auxiliary girder steels respectively, two channel-section steels is symmetrically welded between two support steel beams, two grooves
Steel is mutually perpendicular to two support steel beams respectively.
Two support steel beams and two channel-section steels form small hollow basic framework, and the small hollow basic framework is established big
In hollow basic framework, also, small hollow basic framework is also in horizontally disposed.
3rd, shown in the structure as Fig. 1 of the steel platform formed, 2:
Provided with four groups of pile foundations 1, coaxial steel latticework part 2 is set up respectively in each group pile foundation 1, in the upper end of four groups of steel latticework parts 2
Four auxiliary girder steels 3, this four auxiliary girder steels 3 are respectively welded by being arranged on the triangle stiffener 6 below steel lattice column cap
It is connected with each other the big hollow basic framework of composition.
Aid in respectively symmetrically welding two support steel beams 4 on girder steel 3 in relative two piece of big hollow basic framework, two
Root support steel beam is mutually perpendicular to this two auxiliary girder steels respectively, and two channel-section steels 5 are symmetrically welded between two support steel beams 4,
Two channel-section steels 5 are mutually perpendicular to two support steel beams 4 respectively.
4th, the application of steel platform:
Four supporting legs 7 of derrick crane are fixed on to four angles of small Back Word type basic framework correspondingly, you can enter
Row hoisting construction.
The present invention not only improves making full use of for pile foundation, so as to reduce cost;It can use existing software to calculate again, reduce skill
The labor intensity of art personnel, improve correctness, integrality, the reliability for calculating data;And pilespacing also is compliant with《Build stake technology
Specification》(JGJ94-2008)Regulation requirement.
Claims (1)
1. a kind of steel platform of derrick crane, including four groups of pile foundations, set up coaxial steel latticework part respectively in each group pile foundation,
It is fixedly connected in the upper end of four groups of steel latticework parts and is connected with each other the hollow basic framework formed, the mouth by four auxiliary girder steels
Font basic framework is in horizontally disposed, it is characterised in that:Aided in relative two piece of hollow basic framework on girder steel respectively
Two support steel beams are symmetrically welded, two support steel beams are mutually perpendicular to this two auxiliary girder steels respectively, at described two
Two channel-section steels are symmetrically welded between support steel beam, two channel-section steels are mutually perpendicular to two support steel beams respectively.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201711129363.5A CN107840256A (en) | 2017-11-15 | 2017-11-15 | A kind of steel platform of derrick crane |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201711129363.5A CN107840256A (en) | 2017-11-15 | 2017-11-15 | A kind of steel platform of derrick crane |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN107840256A true CN107840256A (en) | 2018-03-27 |
Family
ID=61678969
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201711129363.5A Pending CN107840256A (en) | 2017-11-15 | 2017-11-15 | A kind of steel platform of derrick crane |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN107840256A (en) |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2734716Y (en) * | 2003-11-10 | 2005-10-19 | 陈宽诚 | Assembling steel structure tower type crane foundation |
| CN202038822U (en) * | 2010-12-29 | 2011-11-16 | 广东金辉华集团有限公司 | Tower crane installation connecting device |
| CN203145038U (en) * | 2013-03-19 | 2013-08-21 | 中建保华建筑有限责任公司 | lattice column type tower crane foundation |
| CN103866784A (en) * | 2014-03-28 | 2014-06-18 | 上海绿地建设(集团)有限公司 | Adjustable tower crane steel platform foundation |
| CN203808094U (en) * | 2014-03-28 | 2014-09-03 | 上海绿地建设(集团)有限公司 | Adjustable tower crane steel platform foundation |
| CN205802813U (en) * | 2016-07-19 | 2016-12-14 | 中天建设集团有限公司 | The double pre-buried joint of a kind of tower crane |
| CN205975658U (en) * | 2016-08-18 | 2017-02-22 | 中国建筑第八工程局有限公司 | Steel platform tower crane foundation |
-
2017
- 2017-11-15 CN CN201711129363.5A patent/CN107840256A/en active Pending
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2734716Y (en) * | 2003-11-10 | 2005-10-19 | 陈宽诚 | Assembling steel structure tower type crane foundation |
| CN202038822U (en) * | 2010-12-29 | 2011-11-16 | 广东金辉华集团有限公司 | Tower crane installation connecting device |
| CN203145038U (en) * | 2013-03-19 | 2013-08-21 | 中建保华建筑有限责任公司 | lattice column type tower crane foundation |
| CN103866784A (en) * | 2014-03-28 | 2014-06-18 | 上海绿地建设(集团)有限公司 | Adjustable tower crane steel platform foundation |
| CN203808094U (en) * | 2014-03-28 | 2014-09-03 | 上海绿地建设(集团)有限公司 | Adjustable tower crane steel platform foundation |
| CN205802813U (en) * | 2016-07-19 | 2016-12-14 | 中天建设集团有限公司 | The double pre-buried joint of a kind of tower crane |
| CN205975658U (en) * | 2016-08-18 | 2017-02-22 | 中国建筑第八工程局有限公司 | Steel platform tower crane foundation |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109853849B (en) | Embedded column base joint with profile steel short beam and construction method thereof | |
| CN107989447A (en) | A kind of large-scale earthing concrete tank dome steel support structure and installation method | |
| CN103866784A (en) | Adjustable tower crane steel platform foundation | |
| CN203808094U (en) | Adjustable tower crane steel platform foundation | |
| CN202131600U (en) | Dual cross fixing end | |
| CN102828616B (en) | High-formwork support system for roof | |
| CN115305946A (en) | Overhead rib beam fan foundation in mountainous area | |
| CN112412002B (en) | A leaping formwork support system | |
| CN106193101A (en) | Tower Crane Steel Platform Pile Foundation and Its Construction Method | |
| CN222162127U (en) | Overload basement roof returning supporting structure | |
| CN107840256A (en) | A kind of steel platform of derrick crane | |
| CN209603163U (en) | A kind of tower crane bearing platform ruggedized construction | |
| CN219909305U (en) | Ultra-high V-shaped support column for steel structure corridor | |
| CN213418233U (en) | A rigid column structure | |
| CN217149855U (en) | Steel trestle | |
| CN216238152U (en) | Prefabricated beam erection temporary buttress platform of variable width bridge | |
| CN204040058U (en) | Combined tower crane foundation structure | |
| CN109750686B (en) | Construction method and structure of tower crane foundation and support connected shared column pile | |
| CN216157148U (en) | Reverse-jacking supporting structure of concrete floor | |
| RU230989U1 (en) | Fixing device for power transmission line support | |
| CN114718082A (en) | Combined supporting structure of large-span foundation pit and construction method thereof | |
| CN222975926U (en) | Iron tower pile foundation for deep miscellaneous fill foundation | |
| CN219826285U (en) | Supporting system for building jacket storey-adding transformation | |
| CN114622480A (en) | A kind of bridge pier structure and construction method | |
| CN207131053U (en) | Shaped steel platform for construction |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180327 |
|
| RJ01 | Rejection of invention patent application after publication |