CN203132533U - Roadbed settlement deformation observation device - Google Patents

Roadbed settlement deformation observation device Download PDF

Info

Publication number
CN203132533U
CN203132533U CN 201320148936 CN201320148936U CN203132533U CN 203132533 U CN203132533 U CN 203132533U CN 201320148936 CN201320148936 CN 201320148936 CN 201320148936 U CN201320148936 U CN 201320148936U CN 203132533 U CN203132533 U CN 203132533U
Authority
CN
China
Prior art keywords
settlement
observation device
construction
metal hollow
settlement deformation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320148936
Other languages
Chinese (zh)
Inventor
宗湛
王羽生
王关乔
边小亮
孔光学
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Building And Mounting Engineering Co Ltd No12 Bureau Ministry Of Railways
China Railway 12th Bureau Group Co Ltd
China Railway 12th Bureau Group Construction and Installation Engineering Co Ltd
Original Assignee
Building And Mounting Engineering Co Ltd No12 Bureau Ministry Of Railways
China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Building And Mounting Engineering Co Ltd No12 Bureau Ministry Of Railways, China Railway 12th Bureau Group Co Ltd filed Critical Building And Mounting Engineering Co Ltd No12 Bureau Ministry Of Railways
Priority to CN 201320148936 priority Critical patent/CN203132533U/en
Application granted granted Critical
Publication of CN203132533U publication Critical patent/CN203132533U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to the field of railway construction, and specifically relates to a roadbed settlement deformation observation device to solve the problems that an existing settlement plate for observing roadbed settlement deformation is seriously damaged in construction, complex in structure, inconvenient to operate, high in cost and the like. The roadbed settlement deformation observation device comprises a settlement base plate, a measuring bar which is fixed on the settlement base plate, and a protection sleeve which sleeves the measuring bar, wherein the measuring bar is made of metal hollow pipes which are movably connected with one another section by section and end to end; the adjacent sections of the metal hollow pipes are connected with each other by adopting an inner joint; the protection sleeve is made of non-metal hollow pipes which are movably connected with one another section by section and end to end; the adjacent sections of non-metal hollow pipes are connected with each other by adopting an outer joint; the pipe orifice of the protection sleeve is lower than that of the measuring bar; and a sealing cover is arranged on the pipe orifice of the protection sleeve. The roadbed settlement deformation observation device is simple in structure, reasonable in design, low in manufacturing cost, simple and reliable in connection mode, and simple and convenient to operate on a job site, ensures the minimal impact on the surrounding environment, ensures the construction quality, improves the construction progress, and has certain popularization and application values.

Description

Subgrade settlement deformation observation device
Technical field
The utility model relates to the construction of railways field, is specially a kind of subgrade settlement deformation observation device.
Background technology
High-speed railway has now become the preferably selection that many countries solve trip communications and transportation problem.China is vast in territory, populous, the high-speed railway of China is established development rapidly, the construction of high-speed railway has far-reaching influence to the economic construction of China, recent years, China has built up Beijing-Shanghai express railway, the military wide visitor high-speed railway with high technology content such as special, the soft soil roadbed excessively probability of its link tester is bigger, because the compressibility height of soft soil foundation, natural moisture content are big, poor permeability, consolidation deformation longer duration, so the settlement after construction of roadbed is all most important in work progress, construction later stage and later stage observation, affect the operation in railway later stage.
For the ride comfort and stability that guarantees high-speed railway, standard is very strict to the sedimentation and deformation control of roadbed, except taking the rational and effective method for processing foundation, guaranteeing the construction quality, must carry out the sedimentation and deformation monitoring in the construction, and then according to deformation measurement data, take rational Forecasting Methodology, predict contingent settlement after construction, instruct squeeze time and definite ballastless track structure construction according to predicting the outcome and lay a railway track the time.Therefore, the sedimentation and deformation accuracy of observation of high-speed railway subgrade section is the key factor that concerns the long-term operation security of high ferro and comfortableness.
At present, the observation of subgrade engineering sedimentation and deformation is observed the master with road bed settlement observation and settlement of foundation, mainly concrete conditions such as the structure position that designs with drawing, embankment height, foundation condition, piling prepressing arrange the sedimentation and deformation measuring frequency section, should or set up measuring frequency section according to the landform of grasping in the work progress, the adjustment of geology situation of change simultaneously.General embankment location measuring frequency section comprises settlement observation stake and settlement plate, and the every section of settlement plate arranges 1, is arranged in two-wire roadbed center, and the every section of settlement observation stake arranges 3, is arranged in two-wire roadbed center and both sides, line center, the left and right sides.Yet, owing to arrange so intensive settlement plate on the roadbed, paving of roadbed brought great inconvenience with the compacting construction, big machinery construction simultaneously destroys serious to settlement plate, repeatedly spot check finds have more than half settlement plates to meet with destruction in work progress, and this has directly influenced the precision of settlement observation, in addition, existing settlement plate complex structural designs, execute-in-place inconvenience, cost height are unfavorable for promoting on a large scale.
Summary of the invention
The utility model for solve existing subgrade settlement deformation observation with settlement plate in construction, destroy seriously, problems such as complex structure, operation inconvenience and cost height, a kind of subgrade settlement deformation observation device is provided.
The utility model is to adopt following technical scheme to realize: subgrade settlement deformation observation device; comprise the sedimentation base plate; the protective casing that is fixed on the measuring staff on the sedimentation base plate and is sleeved on the measuring staff outside; innovative point of the present utility model is that measuring staff is flexibly connected from beginning to end piecemeal and made by the metal hollow pipe; adopt nipple to connect between the adjacent segment metal hollow pipe; protective casing is flexibly connected from beginning to end piecemeal and is made by nonmetal hollow tubular; adopt coupling to connect between the nonmetal hollow tubular of adjacent segment; wherein the protective casing mouth of pipe is lower than the measuring staff mouth of pipe, and the protective casing mouth of pipe is provided with gland bonnet.Described nipple and coupling are existing known features, can adopt multiple version to realize.
Described every section metal hollow length of tube is 50mm, can satisfy the spreading requirement, and it is longer to avoid again elevating above the soil, and influences the working-yard normal construction.
Adopt structural design of the present utility model, measure and bury settlement plate measuring staff masthead absolute altitude reading in place underground as initial reading, along with the roadbed filling construction connects high measuring staff and protective casing gradually, spreading fore-and-aft survey masthead absolute altitude variable quantity determines to connect a large amount.
Compared with prior art; protective casing described in the utility model is in the outside of measuring staff; and set up gland bonnet at the top; for measuring staff provides a cavity freely; make settlement plate in the subgrade construction process, be in and the contactless state of subgrade soil; effectively avoided in the work progress damage to measuring staff; the utility model is simple in structure; reasonable in design; cost of manufacture is lower; and connected mode is simple and reliable; the working-yard is easy and simple to handle, has guaranteed the minimum influence to surrounding environment, has guaranteed construction quality; improve construction speed, had certain popularization value and using value.
Description of drawings
Fig. 1 is structural representation of the present utility model;
Among the figure: 1-sedimentation base plate; The 2-measuring staff; The 3-protective casing; The 4-gland bonnet; The 5-nipple; The 6-coupling.
Embodiment
Subgrade settlement deformation observation device; as shown in Figure 1; comprise sedimentation base plate 1; the protective casing 3 that is fixed on the measuring staff 2 on the sedimentation base plate and is sleeved on the measuring staff outside; falling base plate size is 30 * 30cm; thick 1.0cm; measuring staff 2 is flexibly connected from beginning to end piecemeal and is made by the metal hollow pipe; every section metal hollow length of tube is 50mm; can adopt φ 40 galvanized iron conduits; adopt nipple 5 to connect between the adjacent segment metal hollow pipe; protective casing 3 is flexibly connected from beginning to end piecemeal and is made by nonmetal hollow tubular; can adopt φ 80 pvc pipes; adopt coupling 6 to connect between the nonmetal hollow tubular of adjacent segment, wherein the protective casing mouth of pipe is lower than the measuring staff mouth of pipe, and the protective casing mouth of pipe is provided with gland bonnet 4.
During concrete construction survey, can carry out according to the following step:
1, the levelling of 10cm sand bedding course can be filled up by sedimentation base plate burial place place, guarantees level and the verticality of base plate when burying underground, guarantees that measuring staff is perpendicular to the ground.
2, put the sedimentation base plate well after, the certain thickness bed course of backfill puts protective casing again, protective casing is a little less than measuring staff, the gland bonnet that adds suitable for reading seals the mouth of pipe, and fills corresponding filler around it and stablize sleeve pipe, finishes the work of burying underground of settlement plate.
3, measurement is buried measuring staff masthead absolute altitude reading in place underground as initial reading, and along with the roadbed filling construction connects high measuring staff and protective casing gradually, each spreading height is advisable with 0.5m, and spreading fore-and-aft survey masthead absolute altitude variable quantity determines to connect a large amount.The metal measuring staff connects with nipple, and protective casing connects with the pvc pipe coupling.
4, should guarantee during the spreading protective casing vertically, avoid factor such as mechanical execution to cause sleeve pipe to tilt.

Claims (2)

1. subgrade settlement deformation observation device; comprise sedimentation base plate (1); the protective casing (3) that is fixed on the measuring staff (2) on the sedimentation base plate and is sleeved on the measuring staff outside; it is characterized in that measuring staff (2) is flexibly connected from beginning to end piecemeal and made by the metal hollow pipe; adopt nipple (5) to connect between the adjacent segment metal hollow pipe; protective casing (3) is flexibly connected from beginning to end piecemeal and is made by nonmetal hollow tubular; adopt coupling (6) to connect between the nonmetal hollow tubular of adjacent segment; wherein the protective casing mouth of pipe is lower than the measuring staff mouth of pipe, and the protective casing mouth of pipe is provided with gland bonnet (4).
2. subgrade settlement deformation observation device according to claim 1 is characterized in that every section metal hollow length of tube is 50mm.
CN 201320148936 2013-03-29 2013-03-29 Roadbed settlement deformation observation device Expired - Fee Related CN203132533U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320148936 CN203132533U (en) 2013-03-29 2013-03-29 Roadbed settlement deformation observation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320148936 CN203132533U (en) 2013-03-29 2013-03-29 Roadbed settlement deformation observation device

Publications (1)

Publication Number Publication Date
CN203132533U true CN203132533U (en) 2013-08-14

Family

ID=48940505

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320148936 Expired - Fee Related CN203132533U (en) 2013-03-29 2013-03-29 Roadbed settlement deformation observation device

Country Status (1)

Country Link
CN (1) CN203132533U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105862702A (en) * 2015-01-23 2016-08-17 长沙理工大学 Settlement measuring method under water pre-pressing condition
CN106524996A (en) * 2016-12-23 2017-03-22 宁波建工建乐工程有限公司 Soil settlement observation and measurement system based on Bragg grating
CN106759218A (en) * 2016-12-12 2017-05-31 同济大学 Sinking deformation monitoring pier and its install construction method
CN106869000A (en) * 2017-04-11 2017-06-20 中交第二航务工程局有限公司 A kind of device and setting out method for roadbed setting-out
CN107178075A (en) * 2017-05-31 2017-09-19 中铁二十局集团第六工程有限公司 Railroad bed settlement observes scale protection post and its makes application method
CN108470225A (en) * 2018-03-21 2018-08-31 广东省交通规划设计研究院股份有限公司 The sedimentation information forecasting method and forecasting system of roadbed
CN109297461A (en) * 2018-09-17 2019-02-01 河南工业大学 A kind of monitoring device and application method of the sedimentation of collapsible loess high-filled embankment
CN110485223A (en) * 2019-08-22 2019-11-22 朔黄铁路发展有限责任公司 Ballast track subgrade settlement monitoring device and Ballast track roadbed settlement monitoring method
CN110670568A (en) * 2019-09-09 2020-01-10 中国二十冶集团有限公司 Method for observing vertical deformation of roadbed filling in soft foundation area and settlement plate

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105862702A (en) * 2015-01-23 2016-08-17 长沙理工大学 Settlement measuring method under water pre-pressing condition
CN106759218A (en) * 2016-12-12 2017-05-31 同济大学 Sinking deformation monitoring pier and its install construction method
CN106759218B (en) * 2016-12-12 2019-03-29 同济大学 Sinking deformation monitoring pier and its install construction method
CN106524996A (en) * 2016-12-23 2017-03-22 宁波建工建乐工程有限公司 Soil settlement observation and measurement system based on Bragg grating
CN106869000A (en) * 2017-04-11 2017-06-20 中交第二航务工程局有限公司 A kind of device and setting out method for roadbed setting-out
CN107178075A (en) * 2017-05-31 2017-09-19 中铁二十局集团第六工程有限公司 Railroad bed settlement observes scale protection post and its makes application method
CN107178075B (en) * 2017-05-31 2023-05-26 中铁二十一局集团第六工程有限公司 Railway subgrade settlement observation scale protection column and manufacturing and using method thereof
CN108470225A (en) * 2018-03-21 2018-08-31 广东省交通规划设计研究院股份有限公司 The sedimentation information forecasting method and forecasting system of roadbed
CN108470225B (en) * 2018-03-21 2021-03-02 广东省交通规划设计研究院股份有限公司 Roadbed settlement information prediction method and prediction system
CN109297461A (en) * 2018-09-17 2019-02-01 河南工业大学 A kind of monitoring device and application method of the sedimentation of collapsible loess high-filled embankment
CN110485223A (en) * 2019-08-22 2019-11-22 朔黄铁路发展有限责任公司 Ballast track subgrade settlement monitoring device and Ballast track roadbed settlement monitoring method
CN110670568A (en) * 2019-09-09 2020-01-10 中国二十冶集团有限公司 Method for observing vertical deformation of roadbed filling in soft foundation area and settlement plate

Similar Documents

Publication Publication Date Title
CN203132533U (en) Roadbed settlement deformation observation device
CN207079558U (en) High-speed railway subgrade settlement monitoring element protection
CN106801417B (en) Tunnel Passing structures steel pipe isolation pile stratum consolidation system and its construction method
CN105696427B (en) The construction method and its road structure of a kind of consolidation process newly built railway karst foundation
Yoo et al. Tunnelling-induced ground settlements in a groundwater drawdown environment–A case history
CN102767194B (en) Construction method for treating operating metro tunnel settlement by using anchor cable method
CN106649912A (en) Settlement prediction method for metro tunnel shield undercrossing existing railway facilities
CN111706362A (en) Karst cave treatment method for tunnel construction
CN108843333A (en) Collapsible Loess District tunneling double-arched tunnel passes through the construction method of existing railway
CN204199335U (en) A kind of pressure release well reducing PHC tube pile construction soil compaction effect
CN105673025A (en) Underground engineering loess tunnel ground surface settlement control construction process
CN106372292A (en) Calculation method for building settlement caused by shield tunnel construction
Shan et al. Semi-automatic construction of pile-supported subgrade adjacent to existing railway
CN204228155U (en) A kind of shallow-depth-excavation tunnel construction land tenure table settlement monitoring point buries structure underground
Tao et al. Construction analysis of Guiyang Metro passing across Guiyang Railway Station in karst zone
CN102383346A (en) Construction interference-free railroad bed settlement test device and test method thereof
Yu et al. Analysis of excavating foundation pit to nearby bridge foundation
CN206683621U (en) Settlement monitoring levelling rod adapter
Jiao et al. Analysis of existing railway deformation caused by double shield tunnel construction in soil–rock composite stratum
CN202814388U (en) Device for tunnel pipe shed support deformation testing
CN205175392U (en) Tunnel earth's surface settlement monitoring device based on distributed optical fiber sensing
Ma et al. Construction stability and reinforcement technology for the super-large rectangular pipe-jacking tunnel passing beneath the operational high-speed railway in composite stratum
CN115217487A (en) Earth pressure balance circular pipe jacking construction method for underpass railway roadbed stratum
CN206298896U (en) A kind of Tunnel Passing structures steel pipe isolation pile stratum consolidation system
CN205576638U (en) Consolidate roadbed structure who handles newly -built railway karst foundation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130814

Termination date: 20210329

CF01 Termination of patent right due to non-payment of annual fee