CN203132533U - Roadbed settlement deformation observation device - Google Patents
Roadbed settlement deformation observation device Download PDFInfo
- Publication number
- CN203132533U CN203132533U CN 201320148936 CN201320148936U CN203132533U CN 203132533 U CN203132533 U CN 203132533U CN 201320148936 CN201320148936 CN 201320148936 CN 201320148936 U CN201320148936 U CN 201320148936U CN 203132533 U CN203132533 U CN 203132533U
- Authority
- CN
- China
- Prior art keywords
- settlement
- observation device
- construction
- metal hollow
- settlement deformation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model relates to the field of railway construction, and specifically relates to a roadbed settlement deformation observation device to solve the problems that an existing settlement plate for observing roadbed settlement deformation is seriously damaged in construction, complex in structure, inconvenient to operate, high in cost and the like. The roadbed settlement deformation observation device comprises a settlement base plate, a measuring bar which is fixed on the settlement base plate, and a protection sleeve which sleeves the measuring bar, wherein the measuring bar is made of metal hollow pipes which are movably connected with one another section by section and end to end; the adjacent sections of the metal hollow pipes are connected with each other by adopting an inner joint; the protection sleeve is made of non-metal hollow pipes which are movably connected with one another section by section and end to end; the adjacent sections of non-metal hollow pipes are connected with each other by adopting an outer joint; the pipe orifice of the protection sleeve is lower than that of the measuring bar; and a sealing cover is arranged on the pipe orifice of the protection sleeve. The roadbed settlement deformation observation device is simple in structure, reasonable in design, low in manufacturing cost, simple and reliable in connection mode, and simple and convenient to operate on a job site, ensures the minimal impact on the surrounding environment, ensures the construction quality, improves the construction progress, and has certain popularization and application values.
Description
Technical field
The utility model relates to the construction of railways field, is specially a kind of subgrade settlement deformation observation device.
Background technology
High-speed railway has now become the preferably selection that many countries solve trip communications and transportation problem.China is vast in territory, populous, the high-speed railway of China is established development rapidly, the construction of high-speed railway has far-reaching influence to the economic construction of China, recent years, China has built up Beijing-Shanghai express railway, the military wide visitor high-speed railway with high technology content such as special, the soft soil roadbed excessively probability of its link tester is bigger, because the compressibility height of soft soil foundation, natural moisture content are big, poor permeability, consolidation deformation longer duration, so the settlement after construction of roadbed is all most important in work progress, construction later stage and later stage observation, affect the operation in railway later stage.
For the ride comfort and stability that guarantees high-speed railway, standard is very strict to the sedimentation and deformation control of roadbed, except taking the rational and effective method for processing foundation, guaranteeing the construction quality, must carry out the sedimentation and deformation monitoring in the construction, and then according to deformation measurement data, take rational Forecasting Methodology, predict contingent settlement after construction, instruct squeeze time and definite ballastless track structure construction according to predicting the outcome and lay a railway track the time.Therefore, the sedimentation and deformation accuracy of observation of high-speed railway subgrade section is the key factor that concerns the long-term operation security of high ferro and comfortableness.
At present, the observation of subgrade engineering sedimentation and deformation is observed the master with road bed settlement observation and settlement of foundation, mainly concrete conditions such as the structure position that designs with drawing, embankment height, foundation condition, piling prepressing arrange the sedimentation and deformation measuring frequency section, should or set up measuring frequency section according to the landform of grasping in the work progress, the adjustment of geology situation of change simultaneously.General embankment location measuring frequency section comprises settlement observation stake and settlement plate, and the every section of settlement plate arranges 1, is arranged in two-wire roadbed center, and the every section of settlement observation stake arranges 3, is arranged in two-wire roadbed center and both sides, line center, the left and right sides.Yet, owing to arrange so intensive settlement plate on the roadbed, paving of roadbed brought great inconvenience with the compacting construction, big machinery construction simultaneously destroys serious to settlement plate, repeatedly spot check finds have more than half settlement plates to meet with destruction in work progress, and this has directly influenced the precision of settlement observation, in addition, existing settlement plate complex structural designs, execute-in-place inconvenience, cost height are unfavorable for promoting on a large scale.
Summary of the invention
The utility model for solve existing subgrade settlement deformation observation with settlement plate in construction, destroy seriously, problems such as complex structure, operation inconvenience and cost height, a kind of subgrade settlement deformation observation device is provided.
The utility model is to adopt following technical scheme to realize: subgrade settlement deformation observation device; comprise the sedimentation base plate; the protective casing that is fixed on the measuring staff on the sedimentation base plate and is sleeved on the measuring staff outside; innovative point of the present utility model is that measuring staff is flexibly connected from beginning to end piecemeal and made by the metal hollow pipe; adopt nipple to connect between the adjacent segment metal hollow pipe; protective casing is flexibly connected from beginning to end piecemeal and is made by nonmetal hollow tubular; adopt coupling to connect between the nonmetal hollow tubular of adjacent segment; wherein the protective casing mouth of pipe is lower than the measuring staff mouth of pipe, and the protective casing mouth of pipe is provided with gland bonnet.Described nipple and coupling are existing known features, can adopt multiple version to realize.
Described every section metal hollow length of tube is 50mm, can satisfy the spreading requirement, and it is longer to avoid again elevating above the soil, and influences the working-yard normal construction.
Adopt structural design of the present utility model, measure and bury settlement plate measuring staff masthead absolute altitude reading in place underground as initial reading, along with the roadbed filling construction connects high measuring staff and protective casing gradually, spreading fore-and-aft survey masthead absolute altitude variable quantity determines to connect a large amount.
Compared with prior art; protective casing described in the utility model is in the outside of measuring staff; and set up gland bonnet at the top; for measuring staff provides a cavity freely; make settlement plate in the subgrade construction process, be in and the contactless state of subgrade soil; effectively avoided in the work progress damage to measuring staff; the utility model is simple in structure; reasonable in design; cost of manufacture is lower; and connected mode is simple and reliable; the working-yard is easy and simple to handle, has guaranteed the minimum influence to surrounding environment, has guaranteed construction quality; improve construction speed, had certain popularization value and using value.
Description of drawings
Fig. 1 is structural representation of the present utility model;
Among the figure: 1-sedimentation base plate; The 2-measuring staff; The 3-protective casing; The 4-gland bonnet; The 5-nipple; The 6-coupling.
Embodiment
Subgrade settlement deformation observation device; as shown in Figure 1; comprise sedimentation base plate 1; the protective casing 3 that is fixed on the measuring staff 2 on the sedimentation base plate and is sleeved on the measuring staff outside; falling base plate size is 30 * 30cm; thick 1.0cm; measuring staff 2 is flexibly connected from beginning to end piecemeal and is made by the metal hollow pipe; every section metal hollow length of tube is 50mm; can adopt φ 40 galvanized iron conduits; adopt nipple 5 to connect between the adjacent segment metal hollow pipe; protective casing 3 is flexibly connected from beginning to end piecemeal and is made by nonmetal hollow tubular; can adopt φ 80 pvc pipes; adopt coupling 6 to connect between the nonmetal hollow tubular of adjacent segment, wherein the protective casing mouth of pipe is lower than the measuring staff mouth of pipe, and the protective casing mouth of pipe is provided with gland bonnet 4.
During concrete construction survey, can carry out according to the following step:
1, the levelling of 10cm sand bedding course can be filled up by sedimentation base plate burial place place, guarantees level and the verticality of base plate when burying underground, guarantees that measuring staff is perpendicular to the ground.
2, put the sedimentation base plate well after, the certain thickness bed course of backfill puts protective casing again, protective casing is a little less than measuring staff, the gland bonnet that adds suitable for reading seals the mouth of pipe, and fills corresponding filler around it and stablize sleeve pipe, finishes the work of burying underground of settlement plate.
3, measurement is buried measuring staff masthead absolute altitude reading in place underground as initial reading, and along with the roadbed filling construction connects high measuring staff and protective casing gradually, each spreading height is advisable with 0.5m, and spreading fore-and-aft survey masthead absolute altitude variable quantity determines to connect a large amount.The metal measuring staff connects with nipple, and protective casing connects with the pvc pipe coupling.
4, should guarantee during the spreading protective casing vertically, avoid factor such as mechanical execution to cause sleeve pipe to tilt.
Claims (2)
1. subgrade settlement deformation observation device; comprise sedimentation base plate (1); the protective casing (3) that is fixed on the measuring staff (2) on the sedimentation base plate and is sleeved on the measuring staff outside; it is characterized in that measuring staff (2) is flexibly connected from beginning to end piecemeal and made by the metal hollow pipe; adopt nipple (5) to connect between the adjacent segment metal hollow pipe; protective casing (3) is flexibly connected from beginning to end piecemeal and is made by nonmetal hollow tubular; adopt coupling (6) to connect between the nonmetal hollow tubular of adjacent segment; wherein the protective casing mouth of pipe is lower than the measuring staff mouth of pipe, and the protective casing mouth of pipe is provided with gland bonnet (4).
2. subgrade settlement deformation observation device according to claim 1 is characterized in that every section metal hollow length of tube is 50mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320148936 CN203132533U (en) | 2013-03-29 | 2013-03-29 | Roadbed settlement deformation observation device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320148936 CN203132533U (en) | 2013-03-29 | 2013-03-29 | Roadbed settlement deformation observation device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203132533U true CN203132533U (en) | 2013-08-14 |
Family
ID=48940505
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320148936 Expired - Fee Related CN203132533U (en) | 2013-03-29 | 2013-03-29 | Roadbed settlement deformation observation device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203132533U (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105862702A (en) * | 2015-01-23 | 2016-08-17 | 长沙理工大学 | Settlement measuring method under water pre-pressing condition |
CN106524996A (en) * | 2016-12-23 | 2017-03-22 | 宁波建工建乐工程有限公司 | Soil settlement observation and measurement system based on Bragg grating |
CN106759218A (en) * | 2016-12-12 | 2017-05-31 | 同济大学 | Sinking deformation monitoring pier and its install construction method |
CN106869000A (en) * | 2017-04-11 | 2017-06-20 | 中交第二航务工程局有限公司 | A kind of device and setting out method for roadbed setting-out |
CN107178075A (en) * | 2017-05-31 | 2017-09-19 | 中铁二十局集团第六工程有限公司 | Railroad bed settlement observes scale protection post and its makes application method |
CN108470225A (en) * | 2018-03-21 | 2018-08-31 | 广东省交通规划设计研究院股份有限公司 | The sedimentation information forecasting method and forecasting system of roadbed |
CN109297461A (en) * | 2018-09-17 | 2019-02-01 | 河南工业大学 | A kind of monitoring device and application method of the sedimentation of collapsible loess high-filled embankment |
CN110485223A (en) * | 2019-08-22 | 2019-11-22 | 朔黄铁路发展有限责任公司 | Ballast track subgrade settlement monitoring device and Ballast track roadbed settlement monitoring method |
CN110670568A (en) * | 2019-09-09 | 2020-01-10 | 中国二十冶集团有限公司 | Method for observing vertical deformation of roadbed filling in soft foundation area and settlement plate |
-
2013
- 2013-03-29 CN CN 201320148936 patent/CN203132533U/en not_active Expired - Fee Related
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105862702A (en) * | 2015-01-23 | 2016-08-17 | 长沙理工大学 | Settlement measuring method under water pre-pressing condition |
CN106759218A (en) * | 2016-12-12 | 2017-05-31 | 同济大学 | Sinking deformation monitoring pier and its install construction method |
CN106759218B (en) * | 2016-12-12 | 2019-03-29 | 同济大学 | Sinking deformation monitoring pier and its install construction method |
CN106524996A (en) * | 2016-12-23 | 2017-03-22 | 宁波建工建乐工程有限公司 | Soil settlement observation and measurement system based on Bragg grating |
CN106869000A (en) * | 2017-04-11 | 2017-06-20 | 中交第二航务工程局有限公司 | A kind of device and setting out method for roadbed setting-out |
CN107178075A (en) * | 2017-05-31 | 2017-09-19 | 中铁二十局集团第六工程有限公司 | Railroad bed settlement observes scale protection post and its makes application method |
CN107178075B (en) * | 2017-05-31 | 2023-05-26 | 中铁二十一局集团第六工程有限公司 | Railway subgrade settlement observation scale protection column and manufacturing and using method thereof |
CN108470225A (en) * | 2018-03-21 | 2018-08-31 | 广东省交通规划设计研究院股份有限公司 | The sedimentation information forecasting method and forecasting system of roadbed |
CN108470225B (en) * | 2018-03-21 | 2021-03-02 | 广东省交通规划设计研究院股份有限公司 | Roadbed settlement information prediction method and prediction system |
CN109297461A (en) * | 2018-09-17 | 2019-02-01 | 河南工业大学 | A kind of monitoring device and application method of the sedimentation of collapsible loess high-filled embankment |
CN110485223A (en) * | 2019-08-22 | 2019-11-22 | 朔黄铁路发展有限责任公司 | Ballast track subgrade settlement monitoring device and Ballast track roadbed settlement monitoring method |
CN110670568A (en) * | 2019-09-09 | 2020-01-10 | 中国二十冶集团有限公司 | Method for observing vertical deformation of roadbed filling in soft foundation area and settlement plate |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203132533U (en) | Roadbed settlement deformation observation device | |
CN207079558U (en) | High-speed railway subgrade settlement monitoring element protection | |
CN106801417B (en) | Tunnel Passing structures steel pipe isolation pile stratum consolidation system and its construction method | |
CN105696427B (en) | The construction method and its road structure of a kind of consolidation process newly built railway karst foundation | |
Yoo et al. | Tunnelling-induced ground settlements in a groundwater drawdown environment–A case history | |
CN102767194B (en) | Construction method for treating operating metro tunnel settlement by using anchor cable method | |
CN106649912A (en) | Settlement prediction method for metro tunnel shield undercrossing existing railway facilities | |
CN111706362A (en) | Karst cave treatment method for tunnel construction | |
CN108843333A (en) | Collapsible Loess District tunneling double-arched tunnel passes through the construction method of existing railway | |
CN204199335U (en) | A kind of pressure release well reducing PHC tube pile construction soil compaction effect | |
CN105673025A (en) | Underground engineering loess tunnel ground surface settlement control construction process | |
CN106372292A (en) | Calculation method for building settlement caused by shield tunnel construction | |
Shan et al. | Semi-automatic construction of pile-supported subgrade adjacent to existing railway | |
CN204228155U (en) | A kind of shallow-depth-excavation tunnel construction land tenure table settlement monitoring point buries structure underground | |
Tao et al. | Construction analysis of Guiyang Metro passing across Guiyang Railway Station in karst zone | |
CN102383346A (en) | Construction interference-free railroad bed settlement test device and test method thereof | |
Yu et al. | Analysis of excavating foundation pit to nearby bridge foundation | |
CN206683621U (en) | Settlement monitoring levelling rod adapter | |
Jiao et al. | Analysis of existing railway deformation caused by double shield tunnel construction in soil–rock composite stratum | |
CN202814388U (en) | Device for tunnel pipe shed support deformation testing | |
CN205175392U (en) | Tunnel earth's surface settlement monitoring device based on distributed optical fiber sensing | |
Ma et al. | Construction stability and reinforcement technology for the super-large rectangular pipe-jacking tunnel passing beneath the operational high-speed railway in composite stratum | |
CN115217487A (en) | Earth pressure balance circular pipe jacking construction method for underpass railway roadbed stratum | |
CN206298896U (en) | A kind of Tunnel Passing structures steel pipe isolation pile stratum consolidation system | |
CN205576638U (en) | Consolidate roadbed structure who handles newly -built railway karst foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130814 Termination date: 20210329 |
|
CF01 | Termination of patent right due to non-payment of annual fee |