CN107178075A - Railroad bed settlement observes scale protection post and its makes application method - Google Patents
Railroad bed settlement observes scale protection post and its makes application method Download PDFInfo
- Publication number
- CN107178075A CN107178075A CN201710401673.1A CN201710401673A CN107178075A CN 107178075 A CN107178075 A CN 107178075A CN 201710401673 A CN201710401673 A CN 201710401673A CN 107178075 A CN107178075 A CN 107178075A
- Authority
- CN
- China
- Prior art keywords
- protection post
- protecting tube
- pipe
- template
- scale
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D1/00—Investigation of foundation soil in situ
- E02D1/08—Investigation of foundation soil in situ after finishing the foundation structure
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0007—Production methods using a mold
Abstract
The invention discloses a kind of railroad bed settlement observation scale protection post and its making application method, solve the problem of observation scale clamping stagnation easily occurs during railway roadbed settlement monitoring.In fixing pipe base(2)On be plugged with protecting tube hypomere pipe(3), in protecting tube hypomere pipe(3)Top be fixedly welded with the diameter protecting tube epimere pipe equal with fixing pipe base diameter(4), it is provided with three location of the core cantilevers at equal intervals on the lateral wall of protecting tube epimere pipe radian(5), in fixing pipe base(2)The protection post in outside pours end template(1)On be provided with the movable jackscrews of four location of the core(6), protection post pours tubular outboard template(7)It is arranged on protecting tube hypomere pipe(3)Outside, poured concrete between the lateral wall and protection post of protecting tube hypomere pipe pour the madial wall of tubular outboard template(8).This protection column production is simple, deposits and easy for installation, manufacturing cost is low.
Description
Technical field
The present invention relates to a kind of high-speed railway subgrade settlement monitoring device, more particularly to a kind of railroad bed settlement observation mark
Chi protection post and its making application method.
Background technology
In railway bed construction, after the completion of roadbed filling, the observation of a period of time, note are carried out to the sedimentation of roadbed
Record observation data, provide the Settlement Observation assessment report, settling data meets after design requirement, could carry out applying for next step
Work.Existing the Settlement Observation means are the laying settlement observation scales on roadbed, pass through settling amount of the total powerstation to scale
Record is observed, settlement observation scale follows roadbed filling synchronously embedded, during roadbed filling, easily touched
The phenomenon of askew observation scale is damaged or touched, causes observation data inaccurate;In order to overcome problem above, scene is by scale overcoat
Connect a bigbore pvc pipe to be protected, as roadbed filling highly increases, solve to see by spreading scale and protecting tube
The problem of chi exposes road bed is surveyed, but in protecting tube connection procedure, because pvc pipe is lightweight, it is difficult in roadbed filling process
In remain plumbness, easily occur extruding tilt phenomenon, cause the observation scale that wherein patches to occur catching phenomenon, when
During surface subsidence, sight gauge upper end will not follow surface subsidence, directly contribute observation data distortion, bring the weight of subsequent construction
Big hidden danger.Further, since connection is insecure at the pvc pipe plug receptacle of segmentation grafting, easily occurs filler and enter showing for pvc pipe
As the filler of entrance can also cause observation scale clamping stagnation, will also result in observation scale and do not occur with the phenomenon of surface subsidence.
The content of the invention
The invention provides a kind of railroad bed settlement observation scale protection post and its making application method, solve in iron
The technical problem of observation scale clamping stagnation easily occurs in road subgrade settlement monitoring process.
The present invention is to solve above-mentioned technical problem by the following technical programs:
A kind of railroad bed settlement observes scale protection post, including protection post pours end template, and end template is poured in protection post
Centre is fixedly installed fixing pipe base, and protecting tube hypomere pipe is plugged with fixing pipe base, in protecting tube hypomere pipe
Top is fixedly welded with the diameter protecting tube epimere pipe equal with fixing pipe base diameter, on the lateral wall of protecting tube epimere pipe
It is provided with three location of the core cantilevers radian at equal intervals, pours and set on end template in the protection post of fixing pipe chassis outer side
There is the movable jackscrew of four location of the core, protection post pours the outside that tubular outboard template is arranged on protecting tube hypomere pipe, center
The outboard end apical grafting of point location cantilever on the medial surface that protection post pours tubular outboard template, location of the core activity jackscrew with
Protection post pours the lateral surface apical grafting of tubular outboard template together;Cylinder is poured in the lateral wall and protection post of protecting tube hypomere pipe
Between the madial wall of shape outboard template, and pour in tubular outboard template in lateral wall and the protection post of protecting tube epimere pipe
Concrete has been poured between the wall of side.
The height of fixing pipe base is 20 centimetres, and the height that protection post pours tubular outboard template is 60 centimetres, protecting tube
The top end face of epimere pipe pours the distance between end template for 80 centimetres with protection post.
A kind of railroad bed settlement observes the making application method of scale protection post, comprises the following steps:
Fixing pipe base is fixedly installed in the first step, the centre for pouring end template in protection post, and grafting is prevented on fixing pipe base
Pillar hypomere pipe, the weld diameter protecting tube epimere equal with fixing pipe base diameter is fixed on the top of protecting tube hypomere pipe
Pipe, sets three location of the core cantilevers, outside fixing pipe base radian at equal intervals on the lateral wall of protecting tube epimere pipe
The protection post of side, which is poured, sets the movable jackscrew of four location of the core on end template, protection post pours tubular outboard template and is arranged on
The outside of protecting tube hypomere pipe, the outboard end apical grafting of location of the core cantilever pours the medial surface of tubular outboard template in protection post
On, location of the core activity jackscrew is together with the lateral surface apical grafting that protection post pours tubular outboard template;In protecting tube hypomere
The lateral wall and protection post of pipe are poured between the madial wall of tubular outboard template, and protecting tube epimere pipe lateral wall with it is anti-
Guard post pours between the madial wall of tubular outboard template casting concrete;
Second step, after the casting concrete intensity that protection post is poured in tubular outboard template reaches requirement, unclamp four centers
Point location activity jackscrew, and protection post pours the dismounting of tubular outboard template, sets lifting eye at protecting tube epimere tube top end, passes through
The protection post that making is finished is hung making platform by suspender, and is left concentratedly, makes next according to above step on the table
Protection post;
After 3rd step, at the construction field (site) settlement observation scale bottom plate are embedded, make first railroad bed settlement is observed
Scale protection post is placed on sight gauge bottom plate, and first paragraph observation scale is connected into protecting tube hypomere pipe and protecting tube epimere pipe
Middle position, after filling roadbed first layer filler to 30 cm heights, second railroad bed settlement is observed into scale protection
Post is lifted into the surface that first railroad bed settlement observes scale protection post, slowly falls second railroad bed settlement sight
Mark chi protection post, makes protecting tube hypomere pipe madial wall institute shape on second railroad bed settlement observation scale protection post bottom surface
Into borehole jack be connected on the top pipeline section of the protecting tube epimere pipe of first railroad bed settlement observation scale protection post so that complete
Into the vertical butt joint of two protection posts, second segment is observed into scale and is attached with first paragraph observation scale, and ensures that second segment is seen
Mark chi is arranged on the mesopore center that second railroad bed settlement observes scale protection post, continues to fill filling roadbed the
Two layers of filler;So circulation is until roadbed filling is completed.
The present invention is by way of the vertical socket joint connection of protection post, it is ensured that the observation scale in its mesopore is not damaged by construction
It is bad, and plumbness all the time is kept, extruding catching phenomenon will not occur in entirely observation connection procedure, measurement accuracy is high, surveys
Measure data true and reliable, it is ensured that the high-quality operation of subsequent construction.This protection column production is simple, storage and easy for installation, system
Make expense low, be particularly suitable for using in railway bed field settlement observation.
Brief description of the drawings
Fig. 1 is that the railroad bed settlement of the present invention observes the structural representation of scale protection post;
Fig. 2 is structural representation of the present invention in overlook direction.
Embodiment
The present invention is described in detail below in conjunction with the accompanying drawings:
A kind of railroad bed settlement observes scale protection post, including protection post pours end template 1, and end template 1 is poured in protection post
Centre be fixedly installed fixing pipe base 2, protecting tube hypomere pipe 3 is plugged with fixing pipe base 2, in protecting tube hypomere
The top of pipe 3 is fixedly welded with the diameter protecting tube epimere pipe 4 equal with the diameter of fixing pipe base 2, in protecting tube epimere pipe 4
Three location of the core cantilevers 5 are provided with lateral wall at equal intervals, the protection post in the outside of fixing pipe base 2 pours bottom radian
The movable jackscrew 6 of four location of the core is provided with template 1, protection post pours tubular outboard template 7 and is arranged on protecting tube hypomere
The outside of pipe 3, the outboard end apical grafting of location of the core cantilever 5 is on the medial surface that protection post pours tubular outboard template 7, center
Point location activity jackscrew 6 is together with the lateral surface apical grafting that protection post pours tubular outboard template 7;In protecting tube hypomere pipe 3
Lateral wall and protection post are poured between the madial wall of tubular outboard template 7, and the lateral wall in protecting tube epimere pipe 4 and protection
Post has poured concrete eight between pouring the madial wall of tubular outboard template 7.
The height of fixing pipe base 2 is 20 centimetres, and the height that protection post pours tubular outboard template 7 is 60 centimetres, protection
The top end face of pipe epimere pipe 4 pours the distance between end template 1 for 80 centimetres with protection post.
A kind of railroad bed settlement observes the making application method of scale protection post, comprises the following steps:
Fixing pipe base 2 is fixedly installed in the first step, the centre for pouring end template 1 in protection post, the grafting on fixing pipe base 2
Protecting tube hypomere pipe 3, the weld diameter protecting tube equal with the diameter of fixing pipe base 2 is fixed on the top of protecting tube hypomere pipe 3
Epimere pipe 4, sets three location of the core cantilevers 5, in fixing pipe radian at equal intervals on the lateral wall of protecting tube epimere pipe 4
The protection post in the outside of base 2, which is poured, sets the movable jackscrew 6 of four location of the core on end template 1, protection post is poured on the outside of tubular
Template 7 is arranged on the outside of protecting tube hypomere pipe 3, and the outboard end apical grafting of location of the core cantilever 5 is poured outside tubular in protection post
On the medial surface of side template 7, the lateral surface apical grafting that location of the core activity jackscrew 6 pours tubular outboard template 7 with protection post exists
Together;Poured in the lateral wall and protection post of protecting tube hypomere pipe 3 between the madial wall of tubular outboard template 7, and in protection
The lateral wall and protection post of pipe epimere pipe 4 pour between the madial wall of tubular outboard template 7 casting concrete 8;
Second step, after the casting concrete Final 8 degree that protection post is poured in tubular outboard template 7 reaches requirement, unclamp four in
Heart point location activity jackscrew 6, and protection post pours tubular outboard template 7 and removes, and sets and lifts by crane on the top of protecting tube epimere pipe 4
Hole, making platform is hung by suspender by the protection post finished is made, and is left concentratedly, is made on the table according to above step
Next protection post;
After 3rd step, at the construction field (site) settlement observation scale bottom plate are embedded, make first railroad bed settlement is observed
Scale protection post is placed on sight gauge bottom plate, and first paragraph observation scale is connected into protecting tube hypomere pipe 3 and protecting tube epimere
After the middle position of pipe 4, filling roadbed first layer filler to 30 cm heights, second railroad bed settlement is observed into scale and prevented
Guard post is lifted into the surface that first railroad bed settlement observes scale protection post, slowly falls second railroad bed settlement
Scale protection post is observed, makes the madial wall of protecting tube hypomere pipe 3 on second railroad bed settlement observation scale protection post bottom surface
The borehole jack formed is connected on the top pipeline section of the protecting tube epimere pipe 4 of first railroad bed settlement observation scale protection post,
So as to complete the vertical butt joints of two protection posts, second segment is observed into scale and is attached with first paragraph observation scale, and guarantee the
Two sections of observation scales are arranged on the mesopore center that second railroad bed settlement observes scale protection post, continue to fill
Roadbed second layer filler;So circulation is until roadbed filling is completed.
Claims (3)
1. a kind of railroad bed settlement observes scale protection post, including protection post pours end template(1), bed die is poured in protection post
Plate(1)Centre be fixedly installed fixing pipe base(2), it is characterised in that in fixing pipe base(2)On be plugged with protecting tube
Hypomere pipe(3), in protecting tube hypomere pipe(3)Top be fixedly welded with diameter and fixing pipe base(2)The equal protection of diameter
Pipe epimere pipe(4), in protecting tube epimere pipe(4)Lateral wall on be provided with three location of the core cantilevers at equal intervals radian
(5), in fixing pipe base(2)The protection post in outside pours end template(1)On be provided with the movable jackscrews of four location of the core
(6), protection post pours tubular outboard template(7)It is arranged on protecting tube hypomere pipe(3)Outside, location of the core cantilever(5)'s
Outboard end apical grafting pours tubular outboard template in protection post(7)Medial surface on, location of the core activity jackscrew(6)With protection post
Pour tubular outboard template(7)Lateral surface apical grafting together;In protecting tube hypomere pipe(3)Lateral wall and protection post pour cylinder
Shape outboard template(7)Madial wall between, and in protecting tube epimere pipe(4)Lateral wall and protection post pour tubular outer side mold
Plate(7)Madial wall between poured concrete(8).
2. a kind of railroad bed settlement observation scale protection post according to claim 1, it is characterised in that fixing pipe base
(2)Height be 20 centimetres, protection post pours tubular outboard template(7)Height be 60 centimetres, protecting tube epimere pipe(4)Top
End face pours end template with protection post(1)The distance between be 80 centimetres.
3. a kind of railroad bed settlement observes the making application method of scale protection post, comprise the following steps:
The first step, in protection post pour end template(1)Centre fixing pipe base is fixedly installed(2), in fixing pipe base(2)
Upper grafting protecting tube hypomere pipe(3), in protecting tube hypomere pipe(3)Top fix weld diameter and fixing pipe base(2)Diameter
Equal protecting tube epimere pipe(4), in protecting tube epimere pipe(4)Lateral wall on set at equal intervals radian three central points determine
Position cantilever(5), in fixing pipe base(2)The protection post in outside pours end template(1)Four location of the core movable tops of upper setting
Silk(6), protection post pours tubular outboard template(7)It is arranged on protecting tube hypomere pipe(3)Outside, location of the core cantilever(5)
Outboard end apical grafting pour tubular outboard template in protection post(7)Medial surface on, location of the core activity jackscrew(6)With protection
Post pours tubular outboard template(7)Lateral surface apical grafting together;In protecting tube hypomere pipe(3)Lateral wall poured with protection post
Tubular outboard template(7)Madial wall between, and in protecting tube epimere pipe(4)Lateral wall and protection post pour on the outside of tubular
Template(7)Madial wall between casting concrete(8);
Second step, pour tubular outboard template when protection post(7)In casting concrete(8)Intensity is reached after requirement, unclamps four
The movable jackscrew of individual location of the core(6), and protection post pours tubular outboard template(7)Remove, in protecting tube epimere pipe(4)Top
Lifting eye is set, making platform is hung by the protection post finished is made by suspender, and is left concentratedly, on the table according to the above
Step makes next protection post;
After 3rd step, at the construction field (site) settlement observation scale bottom plate are embedded, make first railroad bed settlement is observed
Scale protection post is placed on sight gauge bottom plate, and first paragraph observation scale is connected into protecting tube hypomere pipe(3)On protecting tube
Duan Guan(4)Middle position, after filling roadbed first layer filler to 30 cm heights, by second railroad bed settlement observation mark
Chi protection post is lifted into the surface that first railroad bed settlement observes scale protection post, slowly falls second railway bed
Settlement observation scale protection post, makes protecting tube hypomere pipe on second railroad bed settlement observation scale protection post bottom surface(3)
The borehole jack that madial wall is formed is connected on the protecting tube epimere pipe that first railroad bed settlement observes scale protection post(4)Top
On pipeline section, so as to complete the vertical butt joint of two protection posts, second segment is observed into scale is attached with first paragraph observation scale, and
Ensure that second segment observation scale is arranged on the mesopore center that second railroad bed settlement observes scale protection post, continue to fill out
Build filling roadbed second layer filler;So circulation is until roadbed filling is completed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710401673.1A CN107178075B (en) | 2017-05-31 | 2017-05-31 | Railway subgrade settlement observation scale protection column and manufacturing and using method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710401673.1A CN107178075B (en) | 2017-05-31 | 2017-05-31 | Railway subgrade settlement observation scale protection column and manufacturing and using method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107178075A true CN107178075A (en) | 2017-09-19 |
CN107178075B CN107178075B (en) | 2023-05-26 |
Family
ID=59835115
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710401673.1A Active CN107178075B (en) | 2017-05-31 | 2017-05-31 | Railway subgrade settlement observation scale protection column and manufacturing and using method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107178075B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113756138A (en) * | 2021-10-08 | 2021-12-07 | 重庆交通职业学院 | Anti-settling subway rail |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU808586A1 (en) * | 1978-12-18 | 1981-02-28 | Белорусский Технологический Институтим.C.M.Кирова | Device for measuring sagging of embankment base |
CN2624180Y (en) * | 2003-04-28 | 2004-07-07 | 长安大学 | Multifunctional settlement plate for highway roadbed settlement observation device |
CN103174123A (en) * | 2013-03-25 | 2013-06-26 | 长沙理工大学 | Soft foundation settlement observation method based on reverse excavation settlement plates |
CN203132533U (en) * | 2013-03-29 | 2013-08-14 | 中铁十二局集团有限公司 | Roadbed settlement deformation observation device |
CN204555955U (en) * | 2015-04-16 | 2015-08-12 | 上海申元岩土工程有限公司 | A kind of magnet ring type deep soil settlement survey device |
CN205605223U (en) * | 2016-02-01 | 2016-09-28 | 中铁建大桥工程局集团第三工程有限公司 | Prefabricated tube coupling fluid pressure type combination steel form |
CN205642355U (en) * | 2016-05-25 | 2016-10-12 | 张泽伟 | Festival segmentation settlement plate |
CN207079562U (en) * | 2017-05-31 | 2018-03-09 | 中铁二十一局集团第六工程有限公司 | Railroad bed settlement observes scale protection post |
-
2017
- 2017-05-31 CN CN201710401673.1A patent/CN107178075B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU808586A1 (en) * | 1978-12-18 | 1981-02-28 | Белорусский Технологический Институтим.C.M.Кирова | Device for measuring sagging of embankment base |
CN2624180Y (en) * | 2003-04-28 | 2004-07-07 | 长安大学 | Multifunctional settlement plate for highway roadbed settlement observation device |
CN103174123A (en) * | 2013-03-25 | 2013-06-26 | 长沙理工大学 | Soft foundation settlement observation method based on reverse excavation settlement plates |
CN203132533U (en) * | 2013-03-29 | 2013-08-14 | 中铁十二局集团有限公司 | Roadbed settlement deformation observation device |
CN204555955U (en) * | 2015-04-16 | 2015-08-12 | 上海申元岩土工程有限公司 | A kind of magnet ring type deep soil settlement survey device |
CN205605223U (en) * | 2016-02-01 | 2016-09-28 | 中铁建大桥工程局集团第三工程有限公司 | Prefabricated tube coupling fluid pressure type combination steel form |
CN205642355U (en) * | 2016-05-25 | 2016-10-12 | 张泽伟 | Festival segmentation settlement plate |
CN207079562U (en) * | 2017-05-31 | 2018-03-09 | 中铁二十一局集团第六工程有限公司 | Railroad bed settlement observes scale protection post |
Non-Patent Citations (1)
Title |
---|
韩伟;: "风化岩路基填料沉降观测试验研究" * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113756138A (en) * | 2021-10-08 | 2021-12-07 | 重庆交通职业学院 | Anti-settling subway rail |
Also Published As
Publication number | Publication date |
---|---|
CN107178075B (en) | 2023-05-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105887811B (en) | Ultra-deep weak soil pile integral construction method is monitored based on precise informationization | |
CN106401207B (en) | The overlapping connection structure and its construction method on pillar basis are added for existing building | |
CN104264902B (en) | Structure for connecting concrete filled steel tubular column with pile foundation | |
CN104389268B (en) | A kind of steel tower column with location structure and construction method for hanging thereof | |
CN112900450A (en) | Rotary drilling and full-rotation combined back-inserting method positioning method for steel pipe structure pile by reverse construction method | |
CN104727223B (en) | A kind of hoop platform for bridge pier column construction and construction method | |
CN202298628U (en) | Automatic steel pipe column perpendicularity adjusting device using reverse construction method | |
CN109295982A (en) | The construction method of binder steel jacket box in water | |
CN110230328A (en) | Pile foundation underpinning System information construction electronic monitoring method | |
CN103374923A (en) | Method for prefabricating and mounting underwater pier | |
CN108643217B (en) | Construction method for high-speed railway roadbed contact net stand column foundation | |
CN105926672A (en) | Mined metro station steel pipe column construction method | |
CN207079562U (en) | Railroad bed settlement observes scale protection post | |
CN107178075A (en) | Railroad bed settlement observes scale protection post and its makes application method | |
CN102587386A (en) | Reverse HPE (hydraulic perpendicular embedding) construction method for steel pipe columns in basement | |
CN113863166A (en) | Reverse construction method for mounting support after rotating | |
CN102296600B (en) | Method for positioning middle pile of spread built subway station | |
CN112458905A (en) | Splicing adjustment method for prefabricated capping beam and prefabricated stand column | |
CN212224683U (en) | Positioning device for pre-buried foundation bolt | |
CN109162204A (en) | A kind of construction method of the quick spelling of bridge substructure transverse direction piecemeal | |
CN103147402B (en) | For bracing or strutting arrangement and the height regulation method of continuous box girder bridge construction | |
CN110331672A (en) | Across the pier bale handle holder device in bridge side position and its simple and fast construction method | |
CN206815854U (en) | A kind of Height marker for improving the smooth thickness construction first-time qualification rate of cast-in-situ floor | |
CN110055957A (en) | A kind of strong development ultra-fine hole pile construction method in karst region | |
CN108677751A (en) | A kind of Bridge Rotation Construction Technique beam body lifting system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |