CN107178075A CN201710401673.1A CN201710401673A CN107178075A CN 107178075 A CN107178075 A CN 107178075A CN 201710401673 A CN201710401673 A CN 201710401673A CN 107178075 A CN107178075 A CN 107178075A
Authority
CN
China
Prior art keywords
protection post
protecting tube
pipe
template
scale
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710401673.1A
Other languages
Chinese (zh)
Other versions
CN107178075B (en
Inventor
节彦旭
张忠德
邹卫东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Original Assignee
Sixth Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd filed Critical Sixth Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Priority to CN201710401673.1A priority Critical patent/CN107178075B/en
Publication of CN107178075A publication Critical patent/CN107178075A/en
Application granted granted Critical
Publication of CN107178075B publication Critical patent/CN107178075B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D1/00Investigation of foundation soil in situ
    • E02D1/08Investigation of foundation soil in situ after finishing the foundation structure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0007Production methods using a mold

Abstract

The invention discloses a kind of railroad bed settlement observation scale protection post and its making application method, solve the problem of observation scale clamping stagnation easily occurs during railway roadbed settlement monitoring.In fixing pipe base(2)On be plugged with protecting tube hypomere pipe(3), in protecting tube hypomere pipe(3)Top be fixedly welded with the diameter protecting tube epimere pipe equal with fixing pipe base diameter(4), it is provided with three location of the core cantilevers at equal intervals on the lateral wall of protecting tube epimere pipe radian(5), in fixing pipe base(2)The protection post in outside pours end template(1)On be provided with the movable jackscrews of four location of the core(6), protection post pours tubular outboard template(7)It is arranged on protecting tube hypomere pipe(3)Outside, poured concrete between the lateral wall and protection post of protecting tube hypomere pipe pour the madial wall of tubular outboard template(8).This protection column production is simple, deposits and easy for installation, manufacturing cost is low.

Description

Railroad bed settlement observes scale protection post and its makes application method
Technical field
The present invention relates to a kind of high-speed railway subgrade settlement monitoring device, more particularly to a kind of railroad bed settlement observation mark Chi protection post and its making application method.
Background technology
In railway bed construction, after the completion of roadbed filling, the observation of a period of time, note are carried out to the sedimentation of roadbed Record observation data, provide the Settlement Observation assessment report, settling data meets after design requirement, could carry out applying for next step Work.Existing the Settlement Observation means are the laying settlement observation scales on roadbed, pass through settling amount of the total powerstation to scale Record is observed, settlement observation scale follows roadbed filling synchronously embedded, during roadbed filling, easily touched The phenomenon of askew observation scale is damaged or touched, causes observation data inaccurate;In order to overcome problem above, scene is by scale overcoat Connect a bigbore pvc pipe to be protected, as roadbed filling highly increases, solve to see by spreading scale and protecting tube The problem of chi exposes road bed is surveyed, but in protecting tube connection procedure, because pvc pipe is lightweight, it is difficult in roadbed filling process In remain plumbness, easily occur extruding tilt phenomenon, cause the observation scale that wherein patches to occur catching phenomenon, when During surface subsidence, sight gauge upper end will not follow surface subsidence, directly contribute observation data distortion, bring the weight of subsequent construction Big hidden danger.Further, since connection is insecure at the pvc pipe plug receptacle of segmentation grafting, easily occurs filler and enter showing for pvc pipe As the filler of entrance can also cause observation scale clamping stagnation, will also result in observation scale and do not occur with the phenomenon of surface subsidence.
The content of the invention
The invention provides a kind of railroad bed settlement observation scale protection post and its making application method, solve in iron The technical problem of observation scale clamping stagnation easily occurs in road subgrade settlement monitoring process.
The present invention is to solve above-mentioned technical problem by the following technical programs:
A kind of railroad bed settlement observes scale protection post, including protection post pours end template, and end template is poured in protection post Centre is fixedly installed fixing pipe base, and protecting tube hypomere pipe is plugged with fixing pipe base, in protecting tube hypomere pipe Top is fixedly welded with the diameter protecting tube epimere pipe equal with fixing pipe base diameter, on the lateral wall of protecting tube epimere pipe It is provided with three location of the core cantilevers radian at equal intervals, pours and set on end template in the protection post of fixing pipe chassis outer side There is the movable jackscrew of four location of the core, protection post pours the outside that tubular outboard template is arranged on protecting tube hypomere pipe, center The outboard end apical grafting of point location cantilever on the medial surface that protection post pours tubular outboard template, location of the core activity jackscrew with Protection post pours the lateral surface apical grafting of tubular outboard template together;Cylinder is poured in the lateral wall and protection post of protecting tube hypomere pipe Between the madial wall of shape outboard template, and pour in tubular outboard template in lateral wall and the protection post of protecting tube epimere pipe Concrete has been poured between the wall of side.
The height of fixing pipe base is 20 centimetres, and the height that protection post pours tubular outboard template is 60 centimetres, protecting tube The top end face of epimere pipe pours the distance between end template for 80 centimetres with protection post.
A kind of railroad bed settlement observes the making application method of scale protection post, comprises the following steps:
Fixing pipe base is fixedly installed in the first step, the centre for pouring end template in protection post, and grafting is prevented on fixing pipe base Pillar hypomere pipe, the weld diameter protecting tube epimere equal with fixing pipe base diameter is fixed on the top of protecting tube hypomere pipe Pipe, sets three location of the core cantilevers, outside fixing pipe base radian at equal intervals on the lateral wall of protecting tube epimere pipe The protection post of side, which is poured, sets the movable jackscrew of four location of the core on end template, protection post pours tubular outboard template and is arranged on The outside of protecting tube hypomere pipe, the outboard end apical grafting of location of the core cantilever pours the medial surface of tubular outboard template in protection post On, location of the core activity jackscrew is together with the lateral surface apical grafting that protection post pours tubular outboard template;In protecting tube hypomere The lateral wall and protection post of pipe are poured between the madial wall of tubular outboard template, and protecting tube epimere pipe lateral wall with it is anti- Guard post pours between the madial wall of tubular outboard template casting concrete;
Second step, after the casting concrete intensity that protection post is poured in tubular outboard template reaches requirement, unclamp four centers Point location activity jackscrew, and protection post pours the dismounting of tubular outboard template, sets lifting eye at protecting tube epimere tube top end, passes through The protection post that making is finished is hung making platform by suspender, and is left concentratedly, makes next according to above step on the table Protection post;
After 3rd step, at the construction field (site) settlement observation scale bottom plate are embedded, make first railroad bed settlement is observed Scale protection post is placed on sight gauge bottom plate, and first paragraph observation scale is connected into protecting tube hypomere pipe and protecting tube epimere pipe Middle position, after filling roadbed first layer filler to 30 cm heights, second railroad bed settlement is observed into scale protection Post is lifted into the surface that first railroad bed settlement observes scale protection post, slowly falls second railroad bed settlement sight Mark chi protection post, makes protecting tube hypomere pipe madial wall institute shape on second railroad bed settlement observation scale protection post bottom surface Into borehole jack be connected on the top pipeline section of the protecting tube epimere pipe of first railroad bed settlement observation scale protection post so that complete Into the vertical butt joint of two protection posts, second segment is observed into scale and is attached with first paragraph observation scale, and ensures that second segment is seen Mark chi is arranged on the mesopore center that second railroad bed settlement observes scale protection post, continues to fill filling roadbed the Two layers of filler;So circulation is until roadbed filling is completed.
The present invention is by way of the vertical socket joint connection of protection post, it is ensured that the observation scale in its mesopore is not damaged by construction It is bad, and plumbness all the time is kept, extruding catching phenomenon will not occur in entirely observation connection procedure, measurement accuracy is high, surveys Measure data true and reliable, it is ensured that the high-quality operation of subsequent construction.This protection column production is simple, storage and easy for installation, system Make expense low, be particularly suitable for using in railway bed field settlement observation.
Brief description of the drawings
Fig. 1 is that the railroad bed settlement of the present invention observes the structural representation of scale protection post;
Fig. 2 is structural representation of the present invention in overlook direction.
Embodiment
The present invention is described in detail below in conjunction with the accompanying drawings:
A kind of railroad bed settlement observes scale protection post, including protection post pours end template 1, and end template 1 is poured in protection post Centre be fixedly installed fixing pipe base 2, protecting tube hypomere pipe 3 is plugged with fixing pipe base 2, in protecting tube hypomere The top of pipe 3 is fixedly welded with the diameter protecting tube epimere pipe 4 equal with the diameter of fixing pipe base 2, in protecting tube epimere pipe 4 Three location of the core cantilevers 5 are provided with lateral wall at equal intervals, the protection post in the outside of fixing pipe base 2 pours bottom radian The movable jackscrew 6 of four location of the core is provided with template 1, protection post pours tubular outboard template 7 and is arranged on protecting tube hypomere The outside of pipe 3, the outboard end apical grafting of location of the core cantilever 5 is on the medial surface that protection post pours tubular outboard template 7, center Point location activity jackscrew 6 is together with the lateral surface apical grafting that protection post pours tubular outboard template 7;In protecting tube hypomere pipe 3 Lateral wall and protection post are poured between the madial wall of tubular outboard template 7, and the lateral wall in protecting tube epimere pipe 4 and protection Post has poured concrete eight between pouring the madial wall of tubular outboard template 7.
The height of fixing pipe base 2 is 20 centimetres, and the height that protection post pours tubular outboard template 7 is 60 centimetres, protection The top end face of pipe epimere pipe 4 pours the distance between end template 1 for 80 centimetres with protection post.
A kind of railroad bed settlement observes the making application method of scale protection post, comprises the following steps:
Fixing pipe base 2 is fixedly installed in the first step, the centre for pouring end template 1 in protection post, the grafting on fixing pipe base 2 Protecting tube hypomere pipe 3, the weld diameter protecting tube equal with the diameter of fixing pipe base 2 is fixed on the top of protecting tube hypomere pipe 3 Epimere pipe 4, sets three location of the core cantilevers 5, in fixing pipe radian at equal intervals on the lateral wall of protecting tube epimere pipe 4 The protection post in the outside of base 2, which is poured, sets the movable jackscrew 6 of four location of the core on end template 1, protection post is poured on the outside of tubular Template 7 is arranged on the outside of protecting tube hypomere pipe 3, and the outboard end apical grafting of location of the core cantilever 5 is poured outside tubular in protection post On the medial surface of side template 7, the lateral surface apical grafting that location of the core activity jackscrew 6 pours tubular outboard template 7 with protection post exists Together;Poured in the lateral wall and protection post of protecting tube hypomere pipe 3 between the madial wall of tubular outboard template 7, and in protection The lateral wall and protection post of pipe epimere pipe 4 pour between the madial wall of tubular outboard template 7 casting concrete 8;
Second step, after the casting concrete Final 8 degree that protection post is poured in tubular outboard template 7 reaches requirement, unclamp four in Heart point location activity jackscrew 6, and protection post pours tubular outboard template 7 and removes, and sets and lifts by crane on the top of protecting tube epimere pipe 4 Hole, making platform is hung by suspender by the protection post finished is made, and is left concentratedly, is made on the table according to above step Next protection post;
After 3rd step, at the construction field (site) settlement observation scale bottom plate are embedded, make first railroad bed settlement is observed Scale protection post is placed on sight gauge bottom plate, and first paragraph observation scale is connected into protecting tube hypomere pipe 3 and protecting tube epimere After the middle position of pipe 4, filling roadbed first layer filler to 30 cm heights, second railroad bed settlement is observed into scale and prevented Guard post is lifted into the surface that first railroad bed settlement observes scale protection post, slowly falls second railroad bed settlement Scale protection post is observed, makes the madial wall of protecting tube hypomere pipe 3 on second railroad bed settlement observation scale protection post bottom surface The borehole jack formed is connected on the top pipeline section of the protecting tube epimere pipe 4 of first railroad bed settlement observation scale protection post, So as to complete the vertical butt joints of two protection posts, second segment is observed into scale and is attached with first paragraph observation scale, and guarantee the Two sections of observation scales are arranged on the mesopore center that second railroad bed settlement observes scale protection post, continue to fill Roadbed second layer filler;So circulation is until roadbed filling is completed.

Claims (3)

1. a kind of railroad bed settlement observes scale protection post, including protection post pours end template(1), bed die is poured in protection post Plate(1)Centre be fixedly installed fixing pipe base(2), it is characterised in that in fixing pipe base(2)On be plugged with protecting tube Hypomere pipe(3), in protecting tube hypomere pipe(3)Top be fixedly welded with diameter and fixing pipe base(2)The equal protection of diameter Pipe epimere pipe(4), in protecting tube epimere pipe(4)Lateral wall on be provided with three location of the core cantilevers at equal intervals radian (5), in fixing pipe base(2)The protection post in outside pours end template(1)On be provided with the movable jackscrews of four location of the core (6), protection post pours tubular outboard template(7)It is arranged on protecting tube hypomere pipe(3)Outside, location of the core cantilever(5)'s Outboard end apical grafting pours tubular outboard template in protection post(7)Medial surface on, location of the core activity jackscrew(6)With protection post Pour tubular outboard template(7)Lateral surface apical grafting together;In protecting tube hypomere pipe(3)Lateral wall and protection post pour cylinder Shape outboard template(7)Madial wall between, and in protecting tube epimere pipe(4)Lateral wall and protection post pour tubular outer side mold Plate(7)Madial wall between poured concrete(8).
2. a kind of railroad bed settlement observation scale protection post according to claim 1, it is characterised in that fixing pipe base (2)Height be 20 centimetres, protection post pours tubular outboard template(7)Height be 60 centimetres, protecting tube epimere pipe(4)Top End face pours end template with protection post(1)The distance between be 80 centimetres.
3. a kind of railroad bed settlement observes the making application method of scale protection post, comprise the following steps:
The first step, in protection post pour end template(1)Centre fixing pipe base is fixedly installed(2), in fixing pipe base(2) Upper grafting protecting tube hypomere pipe(3), in protecting tube hypomere pipe(3)Top fix weld diameter and fixing pipe base(2)Diameter Equal protecting tube epimere pipe(4), in protecting tube epimere pipe(4)Lateral wall on set at equal intervals radian three central points determine Position cantilever(5), in fixing pipe base(2)The protection post in outside pours end template(1)Four location of the core movable tops of upper setting Silk(6), protection post pours tubular outboard template(7)It is arranged on protecting tube hypomere pipe(3)Outside, location of the core cantilever(5) Outboard end apical grafting pour tubular outboard template in protection post(7)Medial surface on, location of the core activity jackscrew(6)With protection Post pours tubular outboard template(7)Lateral surface apical grafting together;In protecting tube hypomere pipe(3)Lateral wall poured with protection post Tubular outboard template(7)Madial wall between, and in protecting tube epimere pipe(4)Lateral wall and protection post pour on the outside of tubular Template(7)Madial wall between casting concrete(8);
Second step, pour tubular outboard template when protection post(7)In casting concrete(8)Intensity is reached after requirement, unclamps four The movable jackscrew of individual location of the core(6), and protection post pours tubular outboard template(7)Remove, in protecting tube epimere pipe(4)Top Lifting eye is set, making platform is hung by the protection post finished is made by suspender, and is left concentratedly, on the table according to the above Step makes next protection post;
After 3rd step, at the construction field (site) settlement observation scale bottom plate are embedded, make first railroad bed settlement is observed Scale protection post is placed on sight gauge bottom plate, and first paragraph observation scale is connected into protecting tube hypomere pipe(3)On protecting tube Duan Guan(4)Middle position, after filling roadbed first layer filler to 30 cm heights, by second railroad bed settlement observation mark Chi protection post is lifted into the surface that first railroad bed settlement observes scale protection post, slowly falls second railway bed Settlement observation scale protection post, makes protecting tube hypomere pipe on second railroad bed settlement observation scale protection post bottom surface(3) The borehole jack that madial wall is formed is connected on the protecting tube epimere pipe that first railroad bed settlement observes scale protection post(4)Top On pipeline section, so as to complete the vertical butt joint of two protection posts, second segment is observed into scale is attached with first paragraph observation scale, and Ensure that second segment observation scale is arranged on the mesopore center that second railroad bed settlement observes scale protection post, continue to fill out Build filling roadbed second layer filler;So circulation is until roadbed filling is completed.
CN201710401673.1A 2017-05-31 2017-05-31 Railway subgrade settlement observation scale protection column and manufacturing and using method thereof Active CN107178075B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710401673.1A CN107178075B (en) 2017-05-31 2017-05-31 Railway subgrade settlement observation scale protection column and manufacturing and using method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710401673.1A CN107178075B (en) 2017-05-31 2017-05-31 Railway subgrade settlement observation scale protection column and manufacturing and using method thereof

Publications (2)

Publication Number Publication Date
CN107178075A true CN107178075A (en) 2017-09-19
CN107178075B CN107178075B (en) 2023-05-26

Family

ID=59835115

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710401673.1A Active CN107178075B (en) 2017-05-31 2017-05-31 Railway subgrade settlement observation scale protection column and manufacturing and using method thereof

Country Status (1)

Country Link
CN (1) CN107178075B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113756138A (en) * 2021-10-08 2021-12-07 重庆交通职业学院 Anti-settling subway rail

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU808586A1 (en) * 1978-12-18 1981-02-28 Белорусский Технологический Институтим.C.M.Кирова Device for measuring sagging of embankment base
CN2624180Y (en) * 2003-04-28 2004-07-07 长安大学 Multifunctional settlement plate for highway roadbed settlement observation device
CN103174123A (en) * 2013-03-25 2013-06-26 长沙理工大学 Soft foundation settlement observation method based on reverse excavation settlement plates
CN203132533U (en) * 2013-03-29 2013-08-14 中铁十二局集团有限公司 Roadbed settlement deformation observation device
CN204555955U (en) * 2015-04-16 2015-08-12 上海申元岩土工程有限公司 A kind of magnet ring type deep soil settlement survey device
CN205605223U (en) * 2016-02-01 2016-09-28 中铁建大桥工程局集团第三工程有限公司 Prefabricated tube coupling fluid pressure type combination steel form
CN205642355U (en) * 2016-05-25 2016-10-12 张泽伟 Festival segmentation settlement plate
CN207079562U (en) * 2017-05-31 2018-03-09 中铁二十一局集团第六工程有限公司 Railroad bed settlement observes scale protection post

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU808586A1 (en) * 1978-12-18 1981-02-28 Белорусский Технологический Институтим.C.M.Кирова Device for measuring sagging of embankment base
CN2624180Y (en) * 2003-04-28 2004-07-07 长安大学 Multifunctional settlement plate for highway roadbed settlement observation device
CN103174123A (en) * 2013-03-25 2013-06-26 长沙理工大学 Soft foundation settlement observation method based on reverse excavation settlement plates
CN203132533U (en) * 2013-03-29 2013-08-14 中铁十二局集团有限公司 Roadbed settlement deformation observation device
CN204555955U (en) * 2015-04-16 2015-08-12 上海申元岩土工程有限公司 A kind of magnet ring type deep soil settlement survey device
CN205605223U (en) * 2016-02-01 2016-09-28 中铁建大桥工程局集团第三工程有限公司 Prefabricated tube coupling fluid pressure type combination steel form
CN205642355U (en) * 2016-05-25 2016-10-12 张泽伟 Festival segmentation settlement plate
CN207079562U (en) * 2017-05-31 2018-03-09 中铁二十一局集团第六工程有限公司 Railroad bed settlement observes scale protection post

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
韩伟;: "风化岩路基填料沉降观测试验研究" *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113756138A (en) * 2021-10-08 2021-12-07 重庆交通职业学院 Anti-settling subway rail

Also Published As

Publication number Publication date
CN107178075B (en) 2023-05-26

Similar Documents

Publication Publication Date Title
CN105887811B (en) Ultra-deep weak soil pile integral construction method is monitored based on precise informationization
CN106401207B (en) The overlapping connection structure and its construction method on pillar basis are added for existing building
CN104264902B (en) Structure for connecting concrete filled steel tubular column with pile foundation
CN104389268B (en) A kind of steel tower column with location structure and construction method for hanging thereof
CN112900450A (en) Rotary drilling and full-rotation combined back-inserting method positioning method for steel pipe structure pile by reverse construction method
CN104727223B (en) A kind of hoop platform for bridge pier column construction and construction method
CN202298628U (en) Automatic steel pipe column perpendicularity adjusting device using reverse construction method
CN109295982A (en) The construction method of binder steel jacket box in water
CN110230328A (en) Pile foundation underpinning System information construction electronic monitoring method
CN103374923A (en) Method for prefabricating and mounting underwater pier
CN108643217B (en) Construction method for high-speed railway roadbed contact net stand column foundation
CN105926672A (en) Mined metro station steel pipe column construction method
CN207079562U (en) Railroad bed settlement observes scale protection post
CN107178075A (en) Railroad bed settlement observes scale protection post and its makes application method
CN102587386A (en) Reverse HPE (hydraulic perpendicular embedding) construction method for steel pipe columns in basement
CN113863166A (en) Reverse construction method for mounting support after rotating
CN102296600B (en) Method for positioning middle pile of spread built subway station
CN112458905A (en) Splicing adjustment method for prefabricated capping beam and prefabricated stand column
CN212224683U (en) Positioning device for pre-buried foundation bolt
CN109162204A (en) A kind of construction method of the quick spelling of bridge substructure transverse direction piecemeal
CN103147402B (en) For bracing or strutting arrangement and the height regulation method of continuous box girder bridge construction
CN110331672A (en) Across the pier bale handle holder device in bridge side position and its simple and fast construction method
CN206815854U (en) A kind of Height marker for improving the smooth thickness construction first-time qualification rate of cast-in-situ floor
CN110055957A (en) A kind of strong development ultra-fine hole pile construction method in karst region
CN108677751A (en) A kind of Bridge Rotation Construction Technique beam body lifting system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant