CN107178075B - Railway subgrade settlement observation scale protection column and manufacturing and using method thereof - Google Patents
Railway subgrade settlement observation scale protection column and manufacturing and using method thereof Download PDFInfo
- Publication number
- CN107178075B CN107178075B CN201710401673.1A CN201710401673A CN107178075B CN 107178075 B CN107178075 B CN 107178075B CN 201710401673 A CN201710401673 A CN 201710401673A CN 107178075 B CN107178075 B CN 107178075B
- Authority
- CN
- China
- Prior art keywords
- pipe
- outer side
- protection
- column
- protective
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D1/00—Investigation of foundation soil in situ
- E02D1/08—Investigation of foundation soil in situ after finishing the foundation structure
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0007—Production methods using a mold
Abstract
The invention discloses a railway subgrade settlement observation scale protection column and a manufacturing and using method thereof, which solve the problem that the observation scale is easy to be blocked in the railway subgrade settlement monitoring process. The protection pipe comprises a fixed pipe base (2), a protection pipe lower section pipe (3) is inserted on the fixed pipe base (2), a protection pipe upper section pipe (4) with the diameter equal to that of the fixed pipe base is fixedly welded at the top end of the protection pipe lower section pipe (3), three center point positioning cantilevers (5) are arranged on the outer side wall of the protection pipe upper section pipe at equal intervals in radian, four center point positioning movable jackscrews (6) are arranged on a protection column casting bottom formwork (1) on the outer side of the fixed pipe base (2), a protection column casting cylindrical outer side formwork (7) is arranged on the outer side of the protection pipe lower section pipe (3), and concrete (8) is cast between the outer side wall of the protection pipe lower section pipe and the inner side wall of the protection column casting cylindrical outer side formwork. The protective column is simple to manufacture, convenient to store and install and low in manufacturing cost.
Description
Technical Field
The invention relates to a high-speed railway subgrade settlement monitoring device, in particular to a protection column for a railway subgrade settlement observation scale and a manufacturing and using method thereof.
Background
In railway roadbed construction, after roadbed filling is completed, the settlement of the roadbed is observed for a period of time, observation data are recorded, a roadbed settlement observation evaluation report is provided, and the next construction can be performed after the settlement data meet the design requirements. The existing roadbed settlement observation means is that a settlement observation scale is arranged on a roadbed, the settlement amount of the scale is observed and recorded through a total station, the settlement observation scale is buried synchronously along with roadbed filling, and phenomena of collision damage or collision distortion of the observation scale easily occur in the roadbed filling process, so that the observation data is inaccurate; in order to overcome the problems, the on-site protection is carried out by sleeving a large-caliber PVC pipe outside the scale, the problem that the observation scale exposes out of the road base surface is solved by lengthening the scale and protecting the pipe along with the increase of the filling height of the roadbed, but in the connection process of the protecting pipe, the PVC pipe is difficult to keep in a vertical state all the time in the roadbed filling process due to light weight, the extrusion tilting phenomenon is easy to occur, the clamping stagnation phenomenon of the inserted observation scale is caused, when the ground subsides, the upper end of the observation scale cannot subside along with the ground, the distortion of observation data is directly caused, and the serious hidden trouble of subsequent construction is brought. In addition, the PVC pipe joint socket part of the sectional plug-in is not firmly connected, so that the phenomenon that the filler enters the PVC pipe easily occurs, the entering filler also causes the clamping stagnation of the observation scale, and the phenomenon that the observation scale does not sink along with the ground occurs.
Disclosure of Invention
The invention provides a railway subgrade settlement observation scale protection column and a manufacturing and using method thereof, which solve the technical problem that the observation scale is easy to be blocked in the railway subgrade settlement monitoring process.
The invention solves the technical problems through the following technical scheme:
the utility model provides a railway subgrade settlement observation scale guard post, including guard post pouring die plate, the center department of guard post pouring die plate is fixed and is provided with the fixed pipe base, peg graft on the fixed pipe base and have the protection pipe hypomere pipe, the top of protection pipe hypomere pipe is fixed and is welded the protection pipe upper segment pipe that the diameter equals with fixed pipe base diameter, equally spaced radian is provided with three central point location cantilever on the lateral wall of protection pipe upper segment pipe, be provided with four central point location movable jackscrews on the guard post pouring die plate in the fixed pipe base outside, guard post pouring tube-shape outside template sets up in the outside of guard pipe hypomere pipe, the outside end top of central point location cantilever is connected on the medial surface of guard post pouring tube-shape outside template, the outside face top of central point location movable jackscrew and guard post pouring tube-shape outside template is in the same place; concrete is poured between the outer side wall of the lower section pipe of the protection pipe and the inner side wall of the casting cylindrical outer side template of the protection column, and between the outer side wall of the upper section pipe of the protection pipe and the inner side wall of the casting cylindrical outer side template of the protection column.
The height of the fixing tube base is 20 cm, the height of the protective column pouring cylindrical outer side template is 60 cm, and the distance between the top end surface of the upper tube of the protective tube and the protective column pouring bottom template is 80 cm.
A manufacturing and using method of a railway subgrade settlement observation scale protection column comprises the following steps:
the method comprises the steps that a fixed pipe base is fixedly arranged at the center of a protective column pouring bottom formwork, a protective pipe lower section pipe is inserted into the fixed pipe base, a protective pipe upper section pipe with the diameter equal to that of the fixed pipe base is fixedly welded at the top end of the protective pipe lower section pipe, three center point positioning cantilevers are arranged on the outer side wall of the protective pipe upper section pipe at equal intervals in radian, four center point positioning movable jackscrews are arranged on the protective column pouring bottom formwork outside the fixed pipe base, a protective column pouring cylindrical outer side formwork is arranged on the outer side of the protective pipe lower section pipe, the outer side end of the center point positioning cantilever is propped against the inner side surface of the protective column pouring cylindrical outer side formwork, and the center point positioning movable jackscrews are propped against the outer side surface of the protective column pouring cylindrical outer side formwork; concrete is poured between the outer side wall of the lower section pipe of the protection pipe and the inner side wall of the casting cylindrical outer side template of the protection column, and between the outer side wall of the upper section pipe of the protection pipe and the inner side wall of the casting cylindrical outer side template of the protection column;
secondly, when the strength of the poured concrete in the casting cylindrical outer side template of the protective column meets the requirement, loosening four center points to position movable jackscrews, dismantling the casting cylindrical outer side template of the protective column, arranging lifting holes at the top end of the upper section of the protective tube, lifting the manufactured protective column away from a manufacturing table through a lifting appliance, storing the protective column in a concentrated manner, and manufacturing the next protective column on the working table according to the steps;
thirdly, after a construction site settlement observation scale bottom plate is buried, placing a manufactured first railway roadbed settlement observation scale protection column on the observation scale bottom plate, connecting a first section of observation scale to the central position of a lower section pipe of a protection pipe and an upper section pipe of the protection pipe, filling a first layer of roadbed filler to a height of 30 cm, hoisting a second railway roadbed settlement observation scale protection column to the position right above the first railway roadbed settlement observation scale protection column, slowly dropping the second railway roadbed settlement observation scale protection column, sleeving a hole formed in the inner side wall of the lower section pipe of the protection pipe on the lower bottom surface of the second railway roadbed settlement observation scale protection column on the top pipe section of the upper section pipe of the protection pipe of the first railway roadbed settlement observation scale protection column, thus completing vertical butt joint of the two protection columns, connecting the second section of observation scale with the first section of observation scale, ensuring that the second section of observation scale is arranged at the central position of a middle hole of the second railway roadbed settlement observation scale protection column, and continuing to fill the second layer of roadbed filler; and circulating until the roadbed is filled.
According to the invention, through the vertical socket connection mode of the protective column, the observation scale in the hole is prevented from being damaged by construction, the vertical state is kept all the time, the extrusion clamping stagnation phenomenon is avoided in the whole observation connection process, the measurement accuracy is high, the measurement data is real and reliable, and the high-quality operation of the subsequent construction is ensured. The protective column is simple to manufacture, convenient to store and install, low in manufacturing cost and particularly suitable for being used in on-site settlement observation of railway roadbed.
Drawings
FIG. 1 is a schematic view of the structure of a railway subgrade settlement observation scale guard post of the present invention;
fig. 2 is a schematic view of the structure of the present invention in a top view.
Detailed Description
The invention is described in detail below with reference to the attached drawing figures:
the utility model provides a railway subgrade settlement observation scale guard post, including guard post pouring die plate 1, the center department of guard post pouring die plate 1 is fixed and is provided with fixed pipe base 2, peg graft on fixed pipe base 2 and have guard pipe hypomere pipe 3, the top fixedly welding of guard pipe hypomere pipe 3 has the diameter equal with fixed pipe base 2 guard pipe upper segment pipe 4, equally interval radian is provided with three central point location cantilever 5 on the lateral wall of guard pipe upper segment pipe 4, be provided with four central point location movable jackscrews 6 on guard post pouring die plate 1 in the outside of fixed pipe base 2, guard post pouring tube-shape outside template 7 sets up in the outside of guard pipe hypomere pipe 3, the outside end top of central point location cantilever 5 is connected on the medial surface of guard post pouring tube-shape outside template 7, central point location movable jackscrew 6 is in the same place with the lateral surface top of guard post pouring tube-shape outside template 7; concrete 8 is poured between the outer side wall of the protective pipe lower section pipe 3 and the inner side wall of the protective column pouring cylindrical outer side template 7, and between the outer side wall of the protective pipe upper section pipe 4 and the inner side wall of the protective column pouring cylindrical outer side template 7.
The height of the fixed pipe base 2 is 20 cm, the height of the protective column pouring cylindrical outer side template 7 is 60 cm, and the distance between the top end face of the protective pipe upper section pipe 4 and the protective column pouring bottom template 1 is 80 cm.
A manufacturing and using method of a railway subgrade settlement observation scale protection column comprises the following steps:
the method comprises the steps that a fixed pipe base 2 is fixedly arranged at the center of a protective column pouring bottom formwork 1, a protective pipe lower section pipe 3 is inserted into the fixed pipe base 2, a protective pipe upper section pipe 4 with the diameter equal to that of the fixed pipe base 2 is fixedly welded at the top end of the protective pipe lower section pipe 3, three center point positioning cantilevers 5 are arranged on the outer side wall of the protective pipe upper section pipe 4 at equal intervals in radian, four center point positioning movable jackscrews 6 are arranged on the protective column pouring bottom formwork 1 at the outer side of the fixed pipe base 2, a protective column pouring cylindrical outer side formwork 7 is arranged at the outer side of the protective pipe lower section pipe 3, the outer side ends of the center point positioning cantilevers 5 are propped against the inner side surface of the protective column pouring cylindrical outer side formwork 7, and the center point positioning movable jackscrews 6 are propped against the outer side surface of the protective column pouring cylindrical outer side formwork 7; concrete 8 is poured between the outer side wall of the lower section pipe 3 of the protection pipe and the inner side wall of the casting cylindrical outer side template 7 of the protection column, and between the outer side wall of the upper section pipe 4 of the protection pipe and the inner side wall of the casting cylindrical outer side template 7 of the protection column;
secondly, after the strength of the poured concrete 8 in the protective column pouring cylindrical outer side template 7 meets the requirement, loosening four center point positioning movable jackscrews 6, dismantling the protective column pouring cylindrical outer side template 7, arranging lifting holes at the top end of the upper section pipe 4 of the protective pipe, lifting the manufactured protective column away from a manufacturing table through a lifting appliance, storing the protective column in a concentrated manner, and manufacturing the next protective column on the working table according to the steps;
thirdly, after a construction site settlement observation scale bottom plate is buried, placing a manufactured first railway roadbed settlement observation scale protection column on the observation scale bottom plate, connecting a first section of observation scale to the central position of a protection pipe lower section pipe 3 and a protection pipe upper section pipe 4, filling a first layer of roadbed filler to a height of 30 cm, hoisting a second railway roadbed settlement observation scale protection column to the position right above the first railway roadbed settlement observation scale protection column, slowly dropping the second railway roadbed settlement observation scale protection column, sleeving a hole formed in the inner side wall of the protection pipe lower section pipe 3 on the lower bottom surface of the second railway roadbed settlement observation scale protection column on the top pipe section of the protection pipe upper section pipe 4 of the first railway roadbed settlement observation scale protection column, thus completing the vertical butt joint of the two protection columns, connecting the second section of observation scale with the first section of observation scale, ensuring that the second section of observation scale is arranged at the central position of a middle hole of the second railway roadbed settlement observation scale protection column, and filling the second section of observation scale protection column is continuously filled; and circulating until the roadbed is filled.
Claims (3)
1. The railway subgrade settlement observation scale protection column comprises a protection column pouring bottom template (1), a fixed pipe base (2) is fixedly arranged at the center of the protection column pouring bottom template (1), and is characterized in that a protection pipe lower section pipe (3) is inserted on the fixed pipe base (2), a protection pipe upper section pipe (4) with the same diameter as the fixed pipe base (2) is fixedly welded at the top end of the protection pipe lower section pipe (3), three center point positioning cantilevers (5) are arranged on the outer side wall of the protection pipe upper section pipe (4) at equal intervals in radian, four center point positioning movable jackscrews (6) are arranged on the protection column pouring bottom template (1) outside the fixed pipe base (2), a protection column pouring cylindrical outer side template (7) is arranged outside the protection pipe lower section pipe (3), the outer side ends of the center point positioning cantilevers (5) are propped against the inner side surface of the protection column pouring cylindrical outer side template (7), and the center point positioning movable jackscrews (6) are propped against the outer side surface of the protection column pouring cylindrical outer side template (7); concrete (8) is poured between the outer side wall of the protective pipe lower section pipe (3) and the inner side wall of the protective column pouring cylindrical outer side template (7) and between the outer side wall of the protective pipe upper section pipe (4) and the inner side wall of the protective column pouring cylindrical outer side template (7).
2. A railway subgrade settlement observation scale protective column according to claim 1, characterized in that the height of the fixed pipe base (2) is 20 cm, the height of the protective column casting cylindrical outside template (7) is 60 cm, and the distance between the top end surface of the protective pipe upper pipe (4) and the protective column casting bottom template (1) is 80 cm.
3. A manufacturing and using method of a railway subgrade settlement observation scale protection column comprises the following steps:
the method comprises the steps that a fixed pipe base (2) is fixedly arranged at the center of a protective column pouring base template (1), a protective pipe lower section pipe (3) is inserted into the fixed pipe base (2), a protective pipe upper section pipe (4) with the same diameter as the fixed pipe base (2) is fixedly welded at the top end of the protective pipe lower section pipe (3), three center point positioning cantilevers (5) are arranged on the outer side wall of the protective pipe upper section pipe (4) at equal intervals in radian, four center point positioning movable jackscrews (6) are arranged on the protective column pouring base template (1) at the outer side of the fixed pipe base (2), a protective column pouring cylindrical outer side template (7) is arranged at the outer side of the protective pipe lower section pipe (3), the outer side ends of the center point positioning cantilevers (5) are propped against the inner side surface of the protective column pouring cylindrical outer side template (7), and the center point positioning movable jackscrews (6) are propped against the outer side surface of the protective column pouring cylindrical outer side template (7); concrete (8) is poured between the outer side wall of the lower section pipe (3) of the protection pipe and the inner side wall of the casting cylindrical outer side template (7) of the protection column, and between the outer side wall of the upper section pipe (4) of the protection pipe and the inner side wall of the casting cylindrical outer side template (7) of the protection column;
secondly, when the strength of the poured concrete (8) in the casting cylindrical outer side template (7) of the protective column meets the requirement, loosening four center point positioning movable jackscrews (6), dismantling the casting cylindrical outer side template (7) of the protective column, arranging lifting holes at the top end of the upper section pipe (4) of the protective pipe, lifting the manufactured protective column away from a manufacturing table through a lifting appliance, storing the protective column in a concentrated manner, and manufacturing the next protective column on the workbench according to the steps;
thirdly, after a construction site settlement observation scale bottom plate is buried, placing a manufactured first railway roadbed settlement observation scale protection column on the observation scale bottom plate, connecting the first section of observation scale to the central position of a protection pipe lower section pipe (3) and a protection pipe upper section pipe (4), filling a roadbed first layer of filler to a height of 30 cm, hoisting a second railway roadbed settlement observation scale protection column to the position right above the first railway roadbed settlement observation scale protection column, slowly dropping the second railway roadbed settlement observation scale protection column, sleeving a hole formed in the inner side wall of the protection pipe lower section pipe (3) on the lower bottom surface of the second railway roadbed settlement observation scale protection column on the top end pipe section of the protection pipe upper section pipe (4) of the first railway roadbed settlement observation column, connecting the second section of observation scale with the first section of observation scale, and ensuring that the second section of observation scale is arranged at the central position of a settlement observation column of the second railway roadbed, and continuing filling the second section of filler layer of the second railway roadbed; and circulating until the roadbed is filled.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710401673.1A CN107178075B (en) | 2017-05-31 | 2017-05-31 | Railway subgrade settlement observation scale protection column and manufacturing and using method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710401673.1A CN107178075B (en) | 2017-05-31 | 2017-05-31 | Railway subgrade settlement observation scale protection column and manufacturing and using method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107178075A CN107178075A (en) | 2017-09-19 |
CN107178075B true CN107178075B (en) | 2023-05-26 |
Family
ID=59835115
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710401673.1A Active CN107178075B (en) | 2017-05-31 | 2017-05-31 | Railway subgrade settlement observation scale protection column and manufacturing and using method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107178075B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113756138A (en) * | 2021-10-08 | 2021-12-07 | 重庆交通职业学院 | Anti-settling subway rail |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU808586A1 (en) * | 1978-12-18 | 1981-02-28 | Белорусский Технологический Институтим.C.M.Кирова | Device for measuring sagging of embankment base |
CN2624180Y (en) * | 2003-04-28 | 2004-07-07 | 长安大学 | Multifunctional settlement plate for highway roadbed settlement observation device |
CN103174123A (en) * | 2013-03-25 | 2013-06-26 | 长沙理工大学 | Soft foundation settlement observation method based on reverse excavation settlement plates |
CN203132533U (en) * | 2013-03-29 | 2013-08-14 | 中铁十二局集团有限公司 | Roadbed settlement deformation observation device |
CN204555955U (en) * | 2015-04-16 | 2015-08-12 | 上海申元岩土工程有限公司 | A kind of magnet ring type deep soil settlement survey device |
CN205605223U (en) * | 2016-02-01 | 2016-09-28 | 中铁建大桥工程局集团第三工程有限公司 | Prefabricated tube coupling fluid pressure type combination steel form |
CN205642355U (en) * | 2016-05-25 | 2016-10-12 | 张泽伟 | Festival segmentation settlement plate |
CN207079562U (en) * | 2017-05-31 | 2018-03-09 | 中铁二十一局集团第六工程有限公司 | Railroad bed settlement observes scale protection post |
-
2017
- 2017-05-31 CN CN201710401673.1A patent/CN107178075B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU808586A1 (en) * | 1978-12-18 | 1981-02-28 | Белорусский Технологический Институтим.C.M.Кирова | Device for measuring sagging of embankment base |
CN2624180Y (en) * | 2003-04-28 | 2004-07-07 | 长安大学 | Multifunctional settlement plate for highway roadbed settlement observation device |
CN103174123A (en) * | 2013-03-25 | 2013-06-26 | 长沙理工大学 | Soft foundation settlement observation method based on reverse excavation settlement plates |
CN203132533U (en) * | 2013-03-29 | 2013-08-14 | 中铁十二局集团有限公司 | Roadbed settlement deformation observation device |
CN204555955U (en) * | 2015-04-16 | 2015-08-12 | 上海申元岩土工程有限公司 | A kind of magnet ring type deep soil settlement survey device |
CN205605223U (en) * | 2016-02-01 | 2016-09-28 | 中铁建大桥工程局集团第三工程有限公司 | Prefabricated tube coupling fluid pressure type combination steel form |
CN205642355U (en) * | 2016-05-25 | 2016-10-12 | 张泽伟 | Festival segmentation settlement plate |
CN207079562U (en) * | 2017-05-31 | 2018-03-09 | 中铁二十一局集团第六工程有限公司 | Railroad bed settlement observes scale protection post |
Non-Patent Citations (1)
Title |
---|
韩伟 ; .风化岩路基填料沉降观测试验研究.西安建筑科技大学学报(自然科学版).2011,(第02期),第32-36页. * |
Also Published As
Publication number | Publication date |
---|---|
CN107178075A (en) | 2017-09-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111851565B (en) | Steel structure stand column alignment structure with cup-mouth type foundation and construction method thereof | |
CN102493471B (en) | Suspending installation construction process method of structural foot margin anchor bolt | |
CN208533586U (en) | A kind of five layers of inverse method one-column one-pile one thousandth vertical adjustment precision plumbing device in underground | |
CN204920963U (en) | Rectangle push pipe stopping structure | |
CN107178075B (en) | Railway subgrade settlement observation scale protection column and manufacturing and using method thereof | |
CN103256918A (en) | Special ruler for measuring vault settlement of tunnel | |
CN101838986B (en) | Disassembling tool type lattice column and construction method thereof | |
CN208183758U (en) | The stake holes lattice column positioning and plumbing system of dry method pore-forming | |
CN210507148U (en) | Positioning and adjusting device for main tower cable guide pipe of cable-stayed bridge | |
CN210194603U (en) | Empty pile steel pipe column positioning device | |
CN103147402B (en) | For bracing or strutting arrangement and the height regulation method of continuous box girder bridge construction | |
CN112458905A (en) | Splicing adjustment method for prefabricated capping beam and prefabricated stand column | |
CN208201869U (en) | A kind of steady stake platform | |
CN207079562U (en) | Railroad bed settlement observes scale protection post | |
CN108179749B (en) | Lattice column positioner and positioning method thereof | |
CN215857713U (en) | Long auger drilling fills steel reinforcement cage control auxiliary device | |
CN213859930U (en) | Positioning disc for bearing platform steel bars | |
CN211872669U (en) | Uneven jacking system of current bridge superstructure | |
CN210827478U (en) | Deep foundation pit underground structure reverse construction method steel pipe column positioning device | |
CN209323390U (en) | Absolute altitude iron box beam catenary mast and the bracing wire pre-cast bolt positioning device that casts anchor | |
CN103276725B (en) | Construction structure and construction method of anchor pile for large-tonnage test pile | |
CN112663958A (en) | Levelness monitoring device and method for floor slab pouring bottom formwork | |
CN215801087U (en) | Bridge jacking early warning stop device | |
CN212836781U (en) | Hoisting column for reverse construction of steel pipe column and primary-secondary column hoisting system | |
CN219386291U (en) | Casting pile protection structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |