CN106869000A - A kind of device and setting out method for roadbed setting-out - Google Patents

A kind of device and setting out method for roadbed setting-out Download PDF

Info

Publication number
CN106869000A
CN106869000A CN201710233187.3A CN201710233187A CN106869000A CN 106869000 A CN106869000 A CN 106869000A CN 201710233187 A CN201710233187 A CN 201710233187A CN 106869000 A CN106869000 A CN 106869000A
Authority
CN
China
Prior art keywords
roadbed
column
pedestal
unit piece
setting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710233187.3A
Other languages
Chinese (zh)
Inventor
罗柳
郑万林
崔成华
刘进
王雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN201710233187.3A priority Critical patent/CN106869000A/en
Publication of CN106869000A publication Critical patent/CN106869000A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/01Devices or auxiliary means for setting-out or checking the configuration of new surfacing, e.g. templates, screed or reference line supports; Applications of apparatus for measuring, indicating, or recording the surface configuration of existing surfacing, e.g. profilographs

Abstract

The present invention relates to highway engineering construction technical field, in particular to a kind of device and setting out method for roadbed setting-out.Including for burying the pedestal being fixed on processed good roadbed ground and the column being fixed on pedestal;Described column is that multiple unit pieces join end to end the vertical column structure that combination formed, and column lower end is vertically fixed on pedestal;The beacon information for indicating soil layer backfill construction is set on described unit piece.Simple structure of the present invention is effective, practical, solves the problems, such as complicated setting-out in subgrade construction, it is adaptable to most of road foundation stemming operation.Manpower is also liberated while improve Subgrade Construction Quality, with promotional value very high.

Description

A kind of device and setting out method for roadbed setting-out
Technical field
The present invention relates to highway engineering construction technical field, in particular to a kind of device for roadbed setting-out and setting-out side Method.
Background technology
In highway engineering construction, roadbed uses back-filling in layers construction technology, and this is accomplished by each layer and all measures Setting-out.The dynamic then tens layers of general subgrade hierarchy number, workload is big, repetitive rate is high and easy error, that is, influence construction speed to make again Into the waste of manpower.
The content of the invention
Deficiency present invention aim to solve above-mentioned background technology, there is provided a kind of device for roadbed setting-out and Setting out method.
The technical scheme is that:A kind of device for roadbed setting-out, it is characterised in that:Including for embedded fixation Pedestal and the column being fixed on pedestal on processed good roadbed ground;Described column is multiple unit piece head and the tail phases The vertical column structure that even combination is formed, column lower end is vertically fixed on pedestal;Set on described unit piece and referred to Show the beacon information of soil layer backfill construction.
Further described unit piece is the column structure that length is 10~50cm, and the upper end of unit piece is provided with along it Raised Cylindrical joint axially upwards, the lower end of unit piece offers the interface of corresponding joints, and adjacent cells part passes through joint card Close in interface and connect as one.
Further described pedestal is the cube concrete prefabricated element being embedded on processed good roadbed ground; Steel pipe is embedded with described pedestal;Described steel pipe lower end is embedded in pedestal, and upper end is vertically stretched out on pedestal End face;Can be fastened on steel pipe by lower end interface positioned at the unit piece of column bottom and be fixedly connected with pedestal.
Pile No. is provided with the further unit piece positioned at the top of column;Described pile No. is to be welded on column topmost Rosette on unit piece.
Further described column is embedded in roadbed after the completion of roadbed backfill;Described pile No. has been backfilled in roadbed It is exposed to outside roadbed after.
A kind of roadbed setting out method, it is characterised in that:Roadbed substrate to preparing backfill carries out roller compaction construction, will be prefabricated Pedestal be embedded in the substrate of compacting, the unit piece that will have been marked according to engineered fill situation is combined into column, passes through Be fixed on column on pedestal by the steel pipe being embedded on pedestal, and pile No. is welded in the upper end of column, then according to the mark on column Show that information carries out roadbed backfill.
Further comprise the following steps:
1), the density needed according to construction is segmented to roadbed, and the thickness gauge according to backfill calculates every section of roadbed to be made The embedded absolute altitude of strut length, integrated mode and pedestal;
2), roadbed substrate is carried out to roll compacting, base is buried in the roadbed substrate of compacting according to the embedded absolute altitude for calculating Seat;
3), the unit piece that will fill beacon information according to the strut length and integrated mode that calculate is assembled and set up Post, the interface of column bottom unit piece is fastened on steel pipe, and pile No. is welded on the unit piece at the top of column;
4), backfilled according to the markup information on column, until being backfilled to design height.
The method of embedded pedestal is on roadbed in further described step 2:At every section of both sides sideline of roadbed Bury two pedestals positioned opposite.
The method of mark is on unit piece in further described step 3:Unit piece is assembled into column, Ran Houyi According to result of calculation by back fill course thickness value and compaction's numerical marker on the column unit part of correspondence soil layer height.
Advantages of the present invention has:
1st, disposable setting-out in place, saves cumbersome setting-out operation, easy and effective;
2nd, concrete foundation add steel-pipe pile position, firm stable, in addition, setting-out stake be located at roadbed both sides edge positions, be difficult Destruction, it is high-visible during construction, very clear;
3rd, setting-out stake is made up of the unit piece of same scale, can be according to the different flexible combinations of backfill height, strong applicability.
Simple structure of the present invention is effective, practical, solves the problems, such as complicated setting-out in subgrade construction, it is adaptable to big portion Shunting road subgrade backfill engineering.Manpower is also liberated while improve Subgrade Construction Quality, with promotional value very high.
Brief description of the drawings
Fig. 1:Structural representation of the invention;
Fig. 2:The structural representation of unit piece of the invention;
Fig. 3:The structural representation of pedestal of the invention;
Wherein:1-pedestal;2-unit piece;3-steel pipe;4-joint;5-interface;6-pile No..
Specific embodiment
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Such as Fig. 1~3, a kind of device for roadbed setting-out, the device of putting sheep out to pasture of the present embodiment includes pedestal 1 and column, base Seat 1 is embedded with steel pipe 3, pedestal to be embedded in the cube concrete prefabricated element on processed good roadbed ground, pedestal 1 1 and steel pipe 3 be standard component, by precast plant's pre-production, the pedestal 1 of the present embodiment is embedded at roadbed sideline, Bu Huiying Roadbed backfill construction is rung, the space of subgrade construction will not be occupied, be also not easy to be blocked, it is very clear.
Pedestal 1 is set by roadbed sideline both sides, can mutually be corresponded to, it is ensured that the definition and accuracy of construction.Base Column is fixed with seat 1, the column of the present embodiment is that multiple unit pieces 2 join end to end the vertical column structure that combination formed, and is stood Post lower end is vertically fixed on pedestal 1, and the beacon information for indicating soil layer backfill construction is set on unit piece 2.
As shown in Fig. 2 unit piece 2 is length be 10~50cm column structure, the upper end of unit piece 2 is provided with along its axle To the Cylindrical joint 4 for raising up, the lower end of unit piece 2 offers the interface 5 of corresponding joints 4, and adjacent cells part 2 passes through joint 4 are engaged in interface 5 and connect as one.
As shown in figure 3, being embedded with steel pipe 3 in pedestal 1, the lower end of steel pipe 3 is embedded in pedestal 1, and upper end is vertically stretched For the upper surface of pedestal 1, can be fastened on steel pipe 3 by lower end interface 5 positioned at the unit piece 2 of column bottom and be fixed with pedestal 1 Connection.
Pile No. 6 is provided with unit piece 2 at the top of column, pile No. 6 is to be welded on column the top unit piece 2 Rosette.Pile No. 6 is used to indicate road information.When generally backfilling, column is embedded in roadbed, and pile No. 6 is exposed to roadbed table Face.
The roadbed setting out method of the present embodiment is comprised the following steps:
1st, the density needed according to construction is segmented to roadbed, and the thickness gauge according to backfill calculates every section of roadbed and uses Strut length, integrated mode and pedestal 1 embedded absolute altitude,
2nd, roadbed substrate is carried out rolling compacting, roadbed substrate is compacted with road roller, it is to avoid subgrade settlement, pedestal 1 be seated in the substrate of compacting can more accurately instruct backfill construct, according to calculate embedded absolute altitude compacting roadbed base Pedestal 1 is buried on bottom,
3rd, the unit piece 2 that will fill beacon information according to the strut length and integrated mode that calculate assembles establishment Post, during practical application, the design conditions backfilled according to roadbed assemble column, and the length of unit piece 2 of the present embodiment is 10~20cm, Different height are adapted to by the assembling of multi-segmental, the column assembling of the present embodiment is simple, by by connecing on a upper unit piece 2 Mouth 5 is fastened in the joint 4 on next unit part 2, the interface 5 of column bottom unit piece 2 is fastened on steel pipe 3, in column Pile No. 6 is welded on the unit piece 2 at top, the beacon information on the unit piece 2 of the present embodiment includes back fill course thickness and compacting Degree, it is each corresponding with corresponding soil layer numerical value,
4th, backfilled according to the markup information on column, until being backfilled to design height.
General principle of the invention, principal character and advantages of the present invention has been shown and described above.The technology of the industry Personnel it should be appreciated that the present invention is not limited to the above embodiments, simply explanation described in above-described embodiment and specification this The principle of invention, various changes and modifications of the present invention are possible without departing from the spirit and scope of the present invention, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appending claims and its Equivalent is defined.

Claims (9)

1. a kind of device for roadbed setting-out, it is characterised in that:Including being fixed on processed good roadbed ground for embedded On pedestal (1) and the column that is fixed on pedestal (1);Described column is formed for multiple unit pieces (2) join end to end to combine Vertical column structure, column lower end is vertically fixed on pedestal (1);Set on described unit piece (2) and indicate soil The beacon information of layer backfill construction.
2. a kind of device for roadbed setting-out as claimed in claim 1, it is characterised in that:Described unit piece (2) is long The column structure for 10~50cm is spent, the upper end of unit piece (2) is provided with along its Cylindrical joint (4) raised axially upwards, single The lower end of element (2) offers the interface (5) of corresponding joints (4), and adjacent cells part (2) is engaged to interface (5) by joint (4) Inside connect as one.
3. a kind of device for roadbed setting-out as claimed in claim 2, it is characterised in that:Described pedestal (1) is embedded Cube concrete prefabricated element on processed good roadbed ground;Steel pipe (3) is embedded with described pedestal (1);Institute Steel pipe (3) lower end stated is embedded in pedestal (1), and upper end vertically stretches out in pedestal (1) upper surface;Positioned at column bottom Unit piece (2) can be fastened on steel pipe (3) by lower end interface (5) and be fixedly connected with pedestal (1).
4. a kind of device for roadbed setting-out as claimed in claim 3, it is characterised in that:Unit piece at the top of column (2) pile No. (6) is provided with;Described pile No. (6) is the rosette being welded on column the top unit piece (2).
5. a kind of device for roadbed setting-out as claimed in claim 4, it is characterised in that:Described column is backfilled in roadbed After the completion of be embedded in roadbed;Described pile No. (6) is exposed to outside roadbed after the completion of roadbed backfill.
6. a kind of roadbed setting out method as claimed in claim 5, it is characterised in that:Roadbed substrate to preparing backfill is ground Pressure construction, prefabricated pedestal (1) is embedded in the substrate of compacting, according to the unit that engineered fill situation will have been marked Part (2) is combined into column, column is fixed on pedestal (1) by the steel pipe (3) being embedded on pedestal (1), in the upper of column End welding pile No. (6), then carries out roadbed backfill according to the beacon information on column.
7. a kind of roadbed setting out method as claimed in claim 6, it is characterised in that:Comprise the following steps:
1), the density needed according to construction is segmented to roadbed, and the thickness gauge according to backfill calculates what every section of roadbed was used The embedded absolute altitude of strut length, integrated mode and pedestal (1);
2), roadbed substrate is carried out to roll compacting, pedestal is buried in the roadbed substrate of compacting according to the embedded absolute altitude for calculating (1);
3), the unit piece (2) that will fill beacon information according to the strut length and integrated mode that calculate is assembled into column, The interface (5) of column bottom unit piece (2) is fastened on steel pipe (3), pile No. is welded on the unit piece (2) at the top of column (6);
4), backfilled according to the markup information on column, until being backfilled to design height.
8. a kind of roadbed setting out method as claimed in claim 7, it is characterised in that:Buried on roadbed in described step 2 The method of pedestal (1) is:Two pedestals (1) positioned opposite are buried at every section of both sides sideline of roadbed.
9. a kind of roadbed setting out method as claimed in claim 7, it is characterised in that:In unit piece subscript in described step 3 The method of note is:Unit piece (2) is assembled into column, then according to result of calculation by back fill course thickness value and compaction Numerical marker is on the column unit part (2) of correspondence soil layer height.
CN201710233187.3A 2017-04-11 2017-04-11 A kind of device and setting out method for roadbed setting-out Pending CN106869000A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710233187.3A CN106869000A (en) 2017-04-11 2017-04-11 A kind of device and setting out method for roadbed setting-out

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710233187.3A CN106869000A (en) 2017-04-11 2017-04-11 A kind of device and setting out method for roadbed setting-out

Publications (1)

Publication Number Publication Date
CN106869000A true CN106869000A (en) 2017-06-20

Family

ID=59162212

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710233187.3A Pending CN106869000A (en) 2017-04-11 2017-04-11 A kind of device and setting out method for roadbed setting-out

Country Status (1)

Country Link
CN (1) CN106869000A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024129A (en) * 2018-08-21 2018-12-18 华东建工集团有限公司 The compacted construction method of high-fill roadbed
DE102022127551A1 (en) 2021-10-20 2023-04-20 Caterpillar Paving Products Inc. ROTATING EDGE MILLING MACHINE FOR COLD MILLING

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE795439A (en) * 1973-02-14 1973-05-29 Frings Hans TUBULAR STAKEHOLDER
FR2579255A1 (en) * 1985-03-21 1986-09-26 Caf Grains Cie MODULAR CALIPER OF CALIBRATION
WO1996017132A1 (en) * 1994-11-29 1996-06-06 Marcel Frangi Device for marking levelling height
JPH1137758A (en) * 1997-07-16 1999-02-12 Sekisui House Ltd Setting-out implement for earth floor level
CN201508179U (en) * 2009-08-27 2010-06-16 徐建华 Stakes measuring lofting spotting annun-ciator
CN202936710U (en) * 2012-12-03 2013-05-15 黑龙江省龙建路桥第四工程有限公司 Steel chisel for road paving construction layout
CN103174123A (en) * 2013-03-25 2013-06-26 长沙理工大学 Soft foundation settlement observation method based on reverse excavation settlement plates
CN203132533U (en) * 2013-03-29 2013-08-14 中铁十二局集团有限公司 Roadbed settlement deformation observation device
CN204255343U (en) * 2014-12-17 2015-04-08 李小珍 A kind of settlement observer of Simple And Practical
CN204301739U (en) * 2014-12-01 2015-04-29 浙江人文园林有限公司 Waters setting-out stake
CN204329957U (en) * 2014-11-27 2015-05-13 广州市盾建地下工程有限公司 Transect layout device
CN205049147U (en) * 2015-10-30 2016-02-24 张旭东 Measuring device is used in road and bridge construction
CN205642355U (en) * 2016-05-25 2016-10-12 张泽伟 Festival segmentation settlement plate
CN205664836U (en) * 2016-06-03 2016-10-26 皖西学院 Civil engineering construction laying -out guide pile
CN106382923A (en) * 2016-08-22 2017-02-08 紫金矿业集团股份有限公司 A layout pile used for mine roads and a layout method thereof
CN206721633U (en) * 2017-04-11 2017-12-08 中交第二航务工程局有限公司 A kind of device for roadbed setting-out
CN208121604U (en) * 2018-03-06 2018-11-20 中国建筑第八工程局有限公司 A kind of Sign Board of civil construction adjustable-angle

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE795439A (en) * 1973-02-14 1973-05-29 Frings Hans TUBULAR STAKEHOLDER
FR2579255A1 (en) * 1985-03-21 1986-09-26 Caf Grains Cie MODULAR CALIPER OF CALIBRATION
WO1996017132A1 (en) * 1994-11-29 1996-06-06 Marcel Frangi Device for marking levelling height
JPH1137758A (en) * 1997-07-16 1999-02-12 Sekisui House Ltd Setting-out implement for earth floor level
CN201508179U (en) * 2009-08-27 2010-06-16 徐建华 Stakes measuring lofting spotting annun-ciator
CN202936710U (en) * 2012-12-03 2013-05-15 黑龙江省龙建路桥第四工程有限公司 Steel chisel for road paving construction layout
CN103174123A (en) * 2013-03-25 2013-06-26 长沙理工大学 Soft foundation settlement observation method based on reverse excavation settlement plates
CN203132533U (en) * 2013-03-29 2013-08-14 中铁十二局集团有限公司 Roadbed settlement deformation observation device
CN204329957U (en) * 2014-11-27 2015-05-13 广州市盾建地下工程有限公司 Transect layout device
CN204301739U (en) * 2014-12-01 2015-04-29 浙江人文园林有限公司 Waters setting-out stake
CN204255343U (en) * 2014-12-17 2015-04-08 李小珍 A kind of settlement observer of Simple And Practical
CN205049147U (en) * 2015-10-30 2016-02-24 张旭东 Measuring device is used in road and bridge construction
CN205642355U (en) * 2016-05-25 2016-10-12 张泽伟 Festival segmentation settlement plate
CN205664836U (en) * 2016-06-03 2016-10-26 皖西学院 Civil engineering construction laying -out guide pile
CN106382923A (en) * 2016-08-22 2017-02-08 紫金矿业集团股份有限公司 A layout pile used for mine roads and a layout method thereof
CN206721633U (en) * 2017-04-11 2017-12-08 中交第二航务工程局有限公司 A kind of device for roadbed setting-out
CN208121604U (en) * 2018-03-06 2018-11-20 中国建筑第八工程局有限公司 A kind of Sign Board of civil construction adjustable-angle

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024129A (en) * 2018-08-21 2018-12-18 华东建工集团有限公司 The compacted construction method of high-fill roadbed
DE102022127551A1 (en) 2021-10-20 2023-04-20 Caterpillar Paving Products Inc. ROTATING EDGE MILLING MACHINE FOR COLD MILLING

Similar Documents

Publication Publication Date Title
CN105887587B (en) A kind of low circuit switch area of putting of medium-and low-speed maglev is with non-switch area transition section structure
CN100497841C (en) Supporting leg type underground continuous wall construction method
CN101173495B (en) Thick collapsible loess subgrade groundwork structure
CN201148621Y (en) Miniature anti-slide pile composite structure
CN208219326U (en) A kind of high-speed railway Karst Subgrade construction having warning function
CN105951616B (en) Major diameter assembling type steel corrugated culvert cavity construction method
CN105696427A (en) Construction method for reinforcing newly-built railway karst foundation and roadbed structure thereof
CN103334357A (en) Viaduct road embankment structure with lower pile foundation bearing platform extending in roadbed, and construction method
CN107842046A (en) A kind of strengthening of foundation error-correction structure and the method for strengthening of foundation correction
CN106869000A (en) A kind of device and setting out method for roadbed setting-out
CN205116204U (en) Roadbed structure of crowded native bored concrete pile stake board of two -way spiral
CN203908552U (en) Surface subsidence leveling measuring and monitoring device
CN106835879A (en) Highway is laterally without support type peg board formula without earth roadbed and its construction method
CN201125355Y (en) Deep collapsible loess road bed foundation structure
CN203334154U (en) Embankment structure for preventing bearing platform of pile foundation from stretching in roadbed under viaduct
CN206721633U (en) A kind of device for roadbed setting-out
CN207525567U (en) A kind of pile plate composite structure suitable for Steep Slope Embankment
CN104297447B (en) The physical simulating method that a kind of surface subsidence influences on subway tunnel
CN105926391A (en) Method for widening shoulder of existing railway subgrade
CN107964843A (en) A kind of high-speed railway Karst Subgrade construction and its restorative procedure for having warning function
CN102031757B (en) Method for constructing bottom plate guide layer of jacked-in frame bridge
CN106283948B (en) Medium-and low-speed maglev traffic engineering two-wire embankment location pile foundation joist type support rail girder construction
CN205576638U (en) Consolidate roadbed structure who handles newly -built railway karst foundation
CN209324377U (en) Ledge method tunneling subway station arch springing ruggedized construction
CN207934007U (en) A kind of surface subsidence monitoring point constructing structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170620

RJ01 Rejection of invention patent application after publication