CN205664836U - Civil engineering construction laying -out guide pile - Google Patents
Civil engineering construction laying -out guide pile Download PDFInfo
- Publication number
- CN205664836U CN205664836U CN201620560749.6U CN201620560749U CN205664836U CN 205664836 U CN205664836 U CN 205664836U CN 201620560749 U CN201620560749 U CN 201620560749U CN 205664836 U CN205664836 U CN 205664836U
- Authority
- CN
- China
- Prior art keywords
- pile body
- civil engineering
- pile
- construction
- stake
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses a civil engineering construction laying -out guide pile, including the regulating plate and have stake end and the pile body of pile head, pile head and pile body structure as an organic whole, the surface is equipped with the scale, be equipped with a draw -in groove on the pile body, and inlay on the draw -in groove to be equipped with and mark the tablet, it has the space that is used for placing the card to mark between tablet and the pile body, the regulating plate passes through the knob to be installed on the pile body perpendicularly, and the regulating plate can reciprocate or control rotatoryly by relative pile body, regulating plate one end is equipped with the through wires hole that is used for fixed axis, the face of the other end for being used for placing the scale. The utility model discloses convenient to use is simple, and the repeated measurement number that just can significantly reduce, improvement efficiency of construction reduce personnel intensity of labour, improve the precision.
Description
Technical field
This utility model relates to engineering construction technology field, is specifically related to a kind of Construction of Civil Engineering setting-out
Stake.
Background technology
In work progress, after engineering survey, current mapping worker is all the coordinate being determined works scope by measurement
Control point, positions simple pile body wedging coordinate points such as reinforcing bar or timber wedge, and coordinate information needs personnel's hand-kept,
Next time enters the concrete coordinate that place needs to find all coordinates just can tell coordinate setting point.Height at work progress king-pile
Degree is it may happen that change, but can not with the naked eye differentiate, before construction next time have to repetition measurement, if it occur that height change, just
Must be newly set control point.Specific construction needs with level gauge etc. with the use of, carry out elevation control.During measure axis
Waiting, need to connect with rope yarn between pile body, usual pile body does not has rope yarn bearing, is susceptible to slide, and output error causes
Do over again.
Utility model content
The purpose of this utility model is to provide a kind of civil engineering setting-out stake, in order to solve of the prior art lacking
Fall into, have a good application prospect.
For achieving the above object, the following technical scheme of this utility model offer:
A kind of Construction of Civil Engineering setting-out stake, including adjustable plate and the pile body with an end and pile crown, described stake
Head and pile body are structure as a whole, and surface is provided with scale;Described pile body is provided with a draw-in groove, and is embedded with nameplate on draw-in groove, institute
State the space having between nameplate and pile body for placing card;Described adjustable plate is vertically mounted on pile body by knob,
And adjustable plate can move up and down or left rotation and right rotation by pile body relatively;Described adjustable plate one end is provided with the threading for fixed axis
Hole, the other end is the plate face for placing scale.
As further program of the utility model: the employing wood materials of described stake end, and its diameter is straight more than pile body
Footpath.
As further program of the utility model: described pile crown and pile body use rustless steel to make.
As further program of the utility model: described pile body surface scribbles yellow and aluminium paint.
As further program of the utility model: the height of described pile body is 30-70cm, a diameter of 2.5cm.
As further program of the utility model: described nameplate uses transparent plastic to make.
Compared with prior art, the beneficial effects of the utility model are:
This utility model can control the exposed height of pile body, greatly reduces repeated measure number of times;It is placed on nameplate
And card between pile body, can help the relevant informations such as the project personnel position identifying rapidly coordinate control point, carry in the future
High efficiency of construction, reduces personnel labor intensity;This utility model can with the measuring instrument such as level gauge with the use of, measuring mark
Height carries out, in setting-out, to substantially increase precision.By the height of knob regulation adjustable plate, thus keep the absolute altitude of axis,
Decrease repetition measurement rate.This utility model is simple and easy to use, and can repeat practicality, reduces cost.
Accompanying drawing explanation
Fig. 1 is the front view of Construction of Civil Engineering setting-out stake.
Fig. 2 is the top view of Construction of Civil Engineering setting-out stake.
Fig. 3 is the structural representation of Construction of Civil Engineering setting-out stake scale.
Fig. 4 be Construction of Civil Engineering setting-out stake be embodied as schematic diagram.
In figure: 1-stake end, 2-knob, 3-pile body, 4-pile crown, 5-nameplate, 6-adjustable plate, 7-scale, 8-through wires hole, 9-
Scale.
Detailed description of the invention
For making the purpose of this utility model, technical scheme and advantage clearer, implement below in conjunction with this utility model
Accompanying drawing in example, is clearly and completely described the technical scheme in this utility model embodiment, it is clear that described reality
Executing example is a part of example of this utility model rather than whole examples.
Referring to Fig. 1-4, a kind of Construction of Civil Engineering setting-out stake, including adjustable plate 6 and have an end 1 and pile crown
The pile body 3 of 4, the employing wood materials of described stake end 1, and its diameter are more than pile body 3 diameter;Described pile crown 4 and pile body 3 are integrated
Structure, uses rustless steel to make, and surface is provided with scale 7.In this utility model, described pile body 3 surface scribbles yellow and silver color oil
Paint, convenient construction personnel carry out distant surveillance;The height of described pile body 3 is 30-70cm, a diameter of 2.5cm.Described pile body 3
It is provided with a draw-in groove, and on draw-in groove, is embedded with nameplate 5, there is between described nameplate 5 and pile body 3 sky for placing card
Between, and nameplate 5 uses transparent plastic to make;Described adjustable plate 6 is vertically mounted on pile body 3 by knob 2, and adjustable plate 6
Can move up and down or left rotation and right rotation by pile body 3 relatively;Described adjustable plate 6 one end is provided with the through wires hole 8 for fixed axis, another
End is the plate face for placing scale 9, and plate mask has certain roughness.
When using this utility model to position, first with hammer Driven Piles end 1, pile crown 4 and part pile body 3 are hammered into shape into earth
In;Then by observing scale 7, the exposed height of pile body 3 can be controlled, greatly reduce repeated measure number of times;Again by pile body 3
Anchor point coordinate, the information solicitation such as relative bearing is on card, and card is placed on can be placed on nameplate 5 and pile body
Between 3, project personnel can be helped in the future to identify rapidly the relevant information such as position of coordinate control point, improve efficiency of construction,
Reduce personnel labor intensity;Axis carries out setting-out when, first the scale 9 of measuring instrument is placed on the plate face of adjustable plate 6
On, measure elevation control, then by through wires hole 8, axis is fixed, through wires hole 8 is consistent with the altitude mixture control of scale 9 lower end,
This utility model can with the measuring instrument such as level gauge with the use of, carry out in setting-out measuring absolute altitude, can substantially increase
Precision.Before construction next time, observe scale 7, comparison data, observe whether pile body 3 occurs height change, if it occur that change, can
To be regulated the height of adjustable plate 6 by knob 2, thus keep the absolute altitude of axis, decrease repetition measurement rate.
Above the better embodiment of this patent is explained in detail, but this patent is not limited to above-mentioned embodiment party
Formula, in the ken that one skilled in the relevant art is possessed, it is also possible on the premise of without departing from this patent objective
Make a variety of changes.
Claims (5)
1. a Construction of Civil Engineering setting-out stake, it is characterised in that include adjustable plate and there is the stake of an end and pile crown
Body, described pile crown and pile body be structure as a whole, and surface is provided with scale;Described pile body is provided with a draw-in groove, and is embedded with on draw-in groove
Nameplate, has the space for placing card between described nameplate and pile body;Described adjustable plate passes through knob right angle setting
On pile body, and adjustable plate can move up and down or left rotation and right rotation by pile body relatively;Described adjustable plate one end is provided with for fixing axle
The through wires hole of line, the other end is the plate face for placing scale.
Construction of Civil Engineering setting-out stake the most according to claim 1, it is characterised in that the employing of described stake end is wooden
Material, and its diameter is more than pile body diameter.
Construction of Civil Engineering setting-out stake the most according to claim 1 and 2, it is characterised in that described pile crown and pile body
Employing rustless steel is made.
Construction of Civil Engineering setting-out stake the most according to claim 3, it is characterised in that described pile body surface scribbles Huang
Normal complexion aluminium paint.
5. according to the Construction of Civil Engineering setting-out stake described in claim 1 or 2 or 4, it is characterised in that the height of described pile body
Degree is 30-70cm, a diameter of 2.5cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620560749.6U CN205664836U (en) | 2016-06-03 | 2016-06-03 | Civil engineering construction laying -out guide pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620560749.6U CN205664836U (en) | 2016-06-03 | 2016-06-03 | Civil engineering construction laying -out guide pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205664836U true CN205664836U (en) | 2016-10-26 |
Family
ID=57155119
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620560749.6U Expired - Fee Related CN205664836U (en) | 2016-06-03 | 2016-06-03 | Civil engineering construction laying -out guide pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205664836U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106869000A (en) * | 2017-04-11 | 2017-06-20 | 中交第二航务工程局有限公司 | A kind of device and setting out method for roadbed setting-out |
CN114017587A (en) * | 2021-10-13 | 2022-02-08 | 嘉兴贝睿材料科技有限公司 | Inclined anti-drop self-hanging support equipment |
-
2016
- 2016-06-03 CN CN201620560749.6U patent/CN205664836U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106869000A (en) * | 2017-04-11 | 2017-06-20 | 中交第二航务工程局有限公司 | A kind of device and setting out method for roadbed setting-out |
CN114017587A (en) * | 2021-10-13 | 2022-02-08 | 嘉兴贝睿材料科技有限公司 | Inclined anti-drop self-hanging support equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104631459B (en) | Pile body perpendicularity and the high control method of stake top mark in static press piling construction | |
CN101349563A (en) | Method of laying out line for building construction measurement | |
CN205664836U (en) | Civil engineering construction laying -out guide pile | |
CN105180912A (en) | Concrete template verticality detector | |
CN209603513U (en) | A kind of cast-in-place concrete board thickness control device | |
CN204855304U (en) | Self -compaction concrete slump divergence testing arrangement | |
CN104006798B (en) | Pier stud verticality measuring instrument | |
CN201508179U (en) | Stakes measuring lofting spotting annun-ciator | |
CN205879182U (en) | Lead wire positioner | |
CN207215095U (en) | A kind of mold plate verticality survey tool | |
CN204988274U (en) | Building laser grade rod | |
CN205012378U (en) | Basic borer is used in building construction | |
CN203891086U (en) | Measuring and reading tool set for monitoring the horizontal displacement of deep foundation pit with straight line reset method | |
CN203893846U (en) | Pier stud perpendicularity measuring instrument | |
CN204831200U (en) | Pavement width automatic measuring device | |
CN103572769A (en) | Inclination monitoring method for sinking process of open caisson | |
CN206037998U (en) | Slope slope measurement device | |
CN102636161B (en) | Method for laying off plane control points by using wire suspension method | |
CN207515782U (en) | A kind of floor surveying setting-out fast accurate positioning device | |
CN204650837U (en) | A kind of teaching, training transit stake | |
CN206706854U (en) | A kind of pile penetration detection means of steel-pipe pile hammer piling | |
CN206583451U (en) | A kind of construction multi-funtional ruler | |
CN206070515U (en) | Pile-driving machine levelling device | |
CN204826647U (en) | Wall post form setting position and perpendicularity detection ruler | |
CN207515788U (en) | Multifunction laser plummet instrument |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161026 Termination date: 20180603 |