CN202936710U - Steel chisel for road paving construction layout - Google Patents

Steel chisel for road paving construction layout Download PDF

Info

Publication number
CN202936710U
CN202936710U CN 201220653670 CN201220653670U CN202936710U CN 202936710 U CN202936710 U CN 202936710U CN 201220653670 CN201220653670 CN 201220653670 CN 201220653670 U CN201220653670 U CN 201220653670U CN 202936710 U CN202936710 U CN 202936710U
Authority
CN
China
Prior art keywords
steel
drill rod
nut
steel pipe
chisel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220653670
Other languages
Chinese (zh)
Inventor
韩贵杰
李军
顾宪彬
文福
李天堂
张剑
赵中元
曲华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heilongjiang Provincial Longjian Road & Bridge 4th Engineering Ltd Co
Original Assignee
Heilongjiang Provincial Longjian Road & Bridge 4th Engineering Ltd Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heilongjiang Provincial Longjian Road & Bridge 4th Engineering Ltd Co filed Critical Heilongjiang Provincial Longjian Road & Bridge 4th Engineering Ltd Co
Priority to CN 201220653670 priority Critical patent/CN202936710U/en
Application granted granted Critical
Publication of CN202936710U publication Critical patent/CN202936710U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a steel chisel for road paving construction layout. At present, the steel chisels for suspending datum lines of pavers in the road construction are various, and almost temporarily manufactured and have a lot of defects that the height adjustment is convenient, the working efficiency of workers is reduced, and paving quality is affected by elevation change during a tightening process of the datum line due to the insufficient fastening force of a main rod or a transverse rod. The steel chisel comprises a steel chisel main rod (1) with a pointed bottom, wherein the steel chisel main rod passes through a circular steel tube (3) of a steel chisel transverse rod (2); a nut (4) is welded on the circular steel tube; a fastening screw hole (5) is formed in the circular steel tube corresponding to the nut; a fastening screw (6) is arranged on the nut; the circular steel tube is connected with flat steel (7); and a datum line slot (9) and a datum line wiring clamp slot (9) are formed in the two sides of the flat steel respectively. The steel chisel disclosed by the utility model is used for suspending the datum line for paving construction layout of the paver in the road construction.

Description

The highway construction lofting drill rod that paves
Technical field:
The utility model relates to a kind of highway construction lofting drill rod that paves.
Background technology:
At present, be used for to hang the pave drill rod of reference line of paver in construction of the highway, of a great variety, unified standard, be not all interim making basically, has many shortcomings.For example: highly regulate inconvenience, reduced workman's efficient.Another shortcoming is that the fastening force of mobile jib or cross bar is inadequate, causes elevation to change when the reference line tensioning, affects spreading quality.Also having a shortcoming is should not keep in repair when being damaged.
Summary of the invention:
The purpose of this utility model is to provide a kind of highway construction lofting drill rod that paves, and makes the construction lofting that paves convenient, accurate.
Above-mentioned purpose realizes by following technical scheme:
A kind of highway construction lofting drill rod that paves, its composition comprises: the bottom is pointed drill rod mobile jib, described drill rod mobile jib passes the round steel pipe of drill rod cross bar, be welded with nut on described round steel pipe, has top wire hole on described round steel pipe corresponding to described nut, on described nut, jackscrew is installed, described round steel pipe is connected with band steel, and the both sides of described band steel have respectively benchmark wire casing, reference line wiring draw-in groove.
The described highway construction lofting drill rod that paves, the internal diameter of described nut equates with the diameter of described top wire hole.
The described highway construction lofting drill rod that paves, described round steel pipe and described band steel are integrated.
Beneficial effect:
1. the utility model is easy to adjust, as long as unclamp the random adjusting that jackscrew just can be accomplished up and down, angle, can shorten the setting-out time, increases efficient; Increase simultaneously the fastening force of cross bar, can offset the tensile force of reference line, made the measured cross bar of survey can not change elevation when the reference line tensioning, increased accuracy rate; In the suburb or the field, the design of this product has taken into full account the link of processing and fabricating due to the construction of the highway great majority, and this production is simple, and only needing a prevailing minicomputer to add the workshop just can processing and fabricating, convenient, flexible; Also have the arbitrary parts damages of this product can accomplish to change at any time.
2. the utility model is avoided in construction of the highway paver paving process, cause thickness and the vertical error of construction because of the supporter error that hangs reference line, the drill rod mobile jib of bottom through forging, harder, the center to center distance with the benchmark wire casing that has top wire hole on round steel pipe is fixed, make calculating more accurate, improve construction quality.Drill rod mobile jib and round steel pipe two parts fit clearance are reasonable, increase the degree of accuracy.
Description of drawings:
Accompanying drawing 1 is structural representation of the present utility model.
Accompanying drawing 2 is structural representations of drill rod cross bar in accompanying drawing 1.
Accompanying drawing 3 is structural representations of round steel pipe and band steel in accompanying drawing 1.
Structural representation.
The specific embodiment:
Embodiment 1:
A kind of highway construction lofting drill rod that paves, its composition comprises: the bottom is pointed drill rod mobile jib 1, described drill rod mobile jib passes the round steel pipe 3 of drill rod cross bar 2, be welded with nut 4 on described round steel pipe, has top wire hole 5 on described round steel pipe corresponding to described nut, jackscrew 6 is installed on described nut, and described round steel pipe is connected with band steel 7, and the both sides of described band steel have respectively benchmark wire casing 8, reference line wiring draw-in groove 9.
The drill rod mobile jib adopts GB Φ 18 round steel, and the bottom is harder through forging, and the round steel pipe that size is determined can be accomplished convenient height and the angle of regulating, and is that the construction that paves is convenient, accurate, improves construction quality.
Round steel pipe adopts the steel pipe of GB Φ 20 * 25 * 2.5mm, and band steel adopts 55 * 50 GB band steels.Reference line groove center and pipe center to center distance are 20mm; Reference line wiring draw-in groove is reference line wiring draw-in groove; Top wire hole uses the M10 nut-welding on the tube wall of round steel pipe; Jackscrew adopts the M10 screw rod.
Drill rod mobile jib bottom is forged hard; Round steel pipe center and reference line groove center are apart from determining; Mobile jib coordinates rationally with cross bar.
Embodiment 2:
The above-mentioned highway construction lofting drill rod that paves, the internal diameter of described nut equates with the diameter of described top wire hole.
Embodiment 3:
The above-mentioned highway construction lofting drill rod that paves, described round steel pipe and described band steel are integrated.

Claims (3)

1. highway construction lofting drill rod that paves, its composition comprises: the bottom is pointed drill rod mobile jib, it is characterized in that: described drill rod mobile jib passes the round steel pipe of drill rod cross bar, be welded with nut on described round steel pipe, has top wire hole on described round steel pipe corresponding to described nut, on described nut, jackscrew is installed, described round steel pipe is connected with band steel, and the both sides of described band steel have respectively benchmark wire casing, reference line wiring draw-in groove.
2. the highway according to claim 1 construction lofting drill rod that paves, it is characterized in that: the internal diameter of described nut equates with the diameter of described top wire hole.
3. the highway according to claim 1 and 2 construction lofting drill rod that paves, it is characterized in that: described round steel pipe and described band steel are integrated.
CN 201220653670 2012-12-03 2012-12-03 Steel chisel for road paving construction layout Expired - Fee Related CN202936710U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220653670 CN202936710U (en) 2012-12-03 2012-12-03 Steel chisel for road paving construction layout

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220653670 CN202936710U (en) 2012-12-03 2012-12-03 Steel chisel for road paving construction layout

Publications (1)

Publication Number Publication Date
CN202936710U true CN202936710U (en) 2013-05-15

Family

ID=48320956

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220653670 Expired - Fee Related CN202936710U (en) 2012-12-03 2012-12-03 Steel chisel for road paving construction layout

Country Status (1)

Country Link
CN (1) CN202936710U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869000A (en) * 2017-04-11 2017-06-20 中交第二航务工程局有限公司 A kind of device and setting out method for roadbed setting-out
CN107217578A (en) * 2017-08-10 2017-09-29 贵州路桥集团有限公司 Control the benchmark line apparatus of road surface elevation and coordinate

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869000A (en) * 2017-04-11 2017-06-20 中交第二航务工程局有限公司 A kind of device and setting out method for roadbed setting-out
CN107217578A (en) * 2017-08-10 2017-09-29 贵州路桥集团有限公司 Control the benchmark line apparatus of road surface elevation and coordinate

Similar Documents

Publication Publication Date Title
CN206458918U (en) A kind of adjustable subway suspension and support
CN202936710U (en) Steel chisel for road paving construction layout
CN204974846U (en) Tie up instrument of bending of U type band steel bracket for cable
CN202899001U (en) Universal template for highway semi-rigid base construction
CN205254621U (en) Parallel jaw for lathe of high stability
CN201661013U (en) Binding-free self-positioning steel bar spacer block
CN205110448U (en) Modified I -steel straightener
CN204429923U (en) A kind of front fork bend pipe bending machine
CN205088703U (en) Seat thick liquid parallels leveling device
CN204239392U (en) A kind of mounting blocks
CN204023362U (en) A kind of paver paves leveling unit
CN208717686U (en) Pavement tile work calibrating installation
CN205079723U (en) Roller is chain rocking arm for squareness measurement
CN203426986U (en) Multifunctional electric installation work bench
CN203160266U (en) Steel structure anchor bolt pre-embedded control plate
CN204338966U (en) A kind of Fast Circle pipe bit hole clamping mechanism
CN105458681A (en) Rapid screw beating tool
CN204570439U (en) Seton device
CN204183278U (en) Clamping tooling
CN205254506U (en) Quick screw frock of beating
CN204825631U (en) Overpass expansion joint steel beam mounting levelling device
CN204183260U (en) A kind of clamping tooling
CN203903853U (en) Upper chord adjustment type positioning supporting device for cargo boom of tower crane
CN202853525U (en) Auxiliary positioning angle square for square cabinet
CN203047773U (en) Structural steel fixing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130515

Termination date: 20181203