CN204825631U - Overpass expansion joint steel beam mounting levelling device - Google Patents

Overpass expansion joint steel beam mounting levelling device Download PDF

Info

Publication number
CN204825631U
CN204825631U CN201520573160.5U CN201520573160U CN204825631U CN 204825631 U CN204825631 U CN 204825631U CN 201520573160 U CN201520573160 U CN 201520573160U CN 204825631 U CN204825631 U CN 204825631U
Authority
CN
China
Prior art keywords
support bar
levelling device
fastening bolt
shrinkage joint
viaduct
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520573160.5U
Other languages
Chinese (zh)
Inventor
马祖勇
马运德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Chang Yong Mechanical Engineering Co Ltd
Original Assignee
Qingdao Chang Yong Mechanical Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Chang Yong Mechanical Engineering Co Ltd filed Critical Qingdao Chang Yong Mechanical Engineering Co Ltd
Priority to CN201520573160.5U priority Critical patent/CN204825631U/en
Application granted granted Critical
Publication of CN204825631U publication Critical patent/CN204825631U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a road construction aided engineering equipment technical field especially relates to an overpass expansion joint steel beam mounting levelling device. Its overpass expansion joint steel beam mounting levelling device, including bracing piece, fastening bolt, the bracing piece is equipped with a plurality of, the bracing piece middle part is equipped with the through -hole, fastening bolt and bracing piece are corresponding one by one, be connected with the bracing piece through the through -hole, fastening bolt's head is vertical to be placed downwards. The utility model discloses can carry out expansion joint installation leveling fast, greatly optimize the installation method at expansion joint, shorten the engineering time, improve construction quality.

Description

Viaduct shrinkage joint steel girder erection levelling device
Technical field
The utility model relates to road construction ancillary works equipment technical field, particularly relates to a kind of viaduct shrinkage joint steel girder erection levelling device.
Background technology
In the installation at viaduct shrinkage joint, the quality of shrinkage joint installation quality, is directly connected to the smooth degree of road.How leveling is the heavy difficult point of shrinkage joint installation work, at present, lacks the aid that a kind of auxiliary telescopic seam installs leveling on the market.
Summary of the invention
The technical problems to be solved in the utility model how to overcome the deficiencies in the prior art, provides a kind of viaduct shrinkage joint steel girder erection levelling device.
The technical scheme that the utility model adopts for achieving the above object is: viaduct shrinkage joint steel girder erection levelling device, comprise support bar, fastening bolt, described support bar is provided with several, through hole is provided with in the middle part of described support bar, described fastening bolt and support bar are corresponding one by one, be connected with support bar by through hole, the head upright of described fastening bolt is placed downwards.
Further: the length of described fastening bolt is greater than thickness and the width of described support bar.
Further: described support bar is straight, smooth surface.
Further: described support bar two ends are provided with and support turning.
Further: described fastening bolt both sides are provided with back-pressure centering bolt.
Further: the utility model also comprises hydraulic pressure and heightens bar, described hydraulic pressure is heightened bar and is comprised flower basket bolt, crossbeam and jack, described crossbeam is fixed on the top of described jack, described flower basket bolt is arranged on the two ends of described crossbeam, and described hydraulic pressure heightens the side use that bar is placed on described support bar.
The utility model has the advantage of that can carry out shrinkage joint rapidly installs leveling, greatly optimizes the mounting method at shrinkage joint, shortens the engineering time, improve construction quality.
Accompanying drawing explanation
Fig. 1 the utility model mounting structure schematic diagram.
Fig. 2 the utility model side scheme of installation.
Fig. 3 the utility model overall structure schematic diagram.
Fig. 4 the utility model hydraulic pressure heightens bar structural representation.
Detailed description of the invention
Viaduct shrinkage joint steel girder erection levelling device, comprise support bar 1, fastening bolt 2, described support bar 1 is provided with several, through hole 11 is provided with in the middle part of described support bar 1, described fastening bolt 2 is corresponding one by one with support bar 1, be connected with support bar 1 by through hole 11, the head upright of described fastening bolt 2 is placed downwards.
The length of described fastening bolt 2 is greater than thickness and the width of described support bar 1.
Described support bar 1 is straight, smooth surface.
Described support bar 1 two ends are provided with and support turning 12.
Using method of the present utility model is, first fastening bolt 2 is loosened, distance between the head of fastening bolt 2 and support bar 1 is extended, because shrinkage joint 3 is " L " shape, and the shrinkage joint 3 of installing in bridge 4 is symmetrical installation, so, support bar 1 is disposed across on the road surface of bridge 4, by fastening bolt 2 head down from the side at shrinkage joint 3, penetrate in shrinkage joint 3, tighten the fastening bolt 2 on support bar 1, the upper surface at shrinkage joint 3 is made to be adjacent to the soffit of support bar 1, because support bar 1 is disposed across on the road surface of bridge 4, when the upper surface at shrinkage joint 3 is adjacent to the soffit of support bar 1, also be in same plane with the road surface of bridge 4 simultaneously.
Described fastening bolt 2 both sides are provided with back-pressure centering bolt 5, by the acting in opposition to shrinkage joint 3, carry out leveling process to shrinkage joint 3.
The utility model also comprises hydraulic pressure and heightens bar 6, described hydraulic pressure is heightened bar 6 and is comprised flower basket bolt 61, crossbeam 62 and jack 63, described crossbeam 62 is fixed on the top of described jack 63, described flower basket bolt 61 is arranged on the two ends of described crossbeam 62, during use, by flower basket bolt 61 being fixed on the ground of side, shrinkage joint 3, jack 63 is placed in top, shrinkage joint, jack 63 is adjusted, described hydraulic pressure heightens the side that bar 6 is placed on described support bar 1, coordinate support bar 1, calibrated altitude is adjusted to shrinkage joint 3.
Above-described embodiment, just in order to technical conceive of the present utility model and feature are described, its objective is and is one of ordinary skilled in the art can be understood content of the present utility model and implement according to this, can not limit protection domain of the present utility model with this.The change of every equivalence done by the essence of the utility model content or modification, all should be encompassed in protection domain of the present utility model.

Claims (6)

1. viaduct shrinkage joint steel girder erection levelling device, it is characterized in that: comprise support bar, fastening bolt, described support bar is provided with several, through hole is provided with in the middle part of described support bar, described fastening bolt and support bar are corresponding one by one, be connected with support bar by through hole, the head upright of described fastening bolt is placed downwards.
2. viaduct shrinkage joint according to claim 1 steel girder erection levelling device, is characterized in that: the length of described fastening bolt is greater than thickness and the width of described support bar.
3. viaduct shrinkage joint according to claim 1 steel girder erection levelling device, is characterized in that: described support bar is straight, smooth surface.
4. viaduct shrinkage joint according to claim 1 steel girder erection levelling device, is characterized in that: described support bar two ends are provided with and support turning.
5. viaduct shrinkage joint according to claim 1 steel girder erection levelling device, is characterized in that: described fastening bolt both sides are provided with back-pressure centering bolt.
6. viaduct shrinkage joint according to claim 1 steel girder erection levelling device, it is characterized in that: also comprise hydraulic pressure and heighten bar, described hydraulic pressure is heightened bar and is comprised flower basket bolt, crossbeam and jack, described crossbeam is fixed on the top of described jack, described flower basket bolt is arranged on the two ends of described crossbeam, and described hydraulic pressure heightens the side use that bar is placed on described support bar.
CN201520573160.5U 2015-07-31 2015-07-31 Overpass expansion joint steel beam mounting levelling device Expired - Fee Related CN204825631U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520573160.5U CN204825631U (en) 2015-07-31 2015-07-31 Overpass expansion joint steel beam mounting levelling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520573160.5U CN204825631U (en) 2015-07-31 2015-07-31 Overpass expansion joint steel beam mounting levelling device

Publications (1)

Publication Number Publication Date
CN204825631U true CN204825631U (en) 2015-12-02

Family

ID=54683247

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520573160.5U Expired - Fee Related CN204825631U (en) 2015-07-31 2015-07-31 Overpass expansion joint steel beam mounting levelling device

Country Status (1)

Country Link
CN (1) CN204825631U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105510020A (en) * 2016-01-20 2016-04-20 宁波大学 Variable-width bridge expansion joint test platform and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105510020A (en) * 2016-01-20 2016-04-20 宁波大学 Variable-width bridge expansion joint test platform and construction method thereof
CN105510020B (en) * 2016-01-20 2017-09-29 宁波大学 A kind of variable-width bridge expanssion joint test platform and its construction method

Similar Documents

Publication Publication Date Title
CN103195450A (en) Hydraulic tunnel inverted arch operation trolley and inverted arch construction method
CN105544396A (en) Steel arc distributive girder structure of rod type bracket for cast-in-place arch bridge and construction method
CN103233479B (en) Method for pouring concrete cup foundation
CN105040591A (en) Positioning device for waveform steel web and positioning method thereof
CN105370315A (en) Drainage construction technology for seasonally-frozen ground tunnel
CN204825631U (en) Overpass expansion joint steel beam mounting levelling device
CN202176343U (en) Self-propelled multifunctional template trolley combining device
CN103882808B (en) Ramp bridge and main line bridge join the construction method across erecting beam support system
CN104563525B (en) A kind of box steel arch beam Integral horizontal type group is to method
CN203514200U (en) Pin rod support for bridge capping beam construction
CN203213019U (en) Long cantilever bent cap cast-in-place construction support system
CN105442452B (en) A kind of device and method for assembled double width bridge girder steel
CN203684102U (en) Supporting system for precast beam formed by connecting span erection of ramp bridge and main line bridge
CN207244425U (en) Part earth anchored suspension bridge
CN201686938U (en) Pier used for bent cap construction
CN204919567U (en) Shoring of trench stand shock attenuation construction equipment
CN205349372U (en) For a short time, construct to fold friendship tunnel controllable gate shaped steel frame apart from shield only
CN203130107U (en) Hydraulic tunnel inverted arch operation trolley
CN206267039U (en) A kind of jack support platform of hollow slab girder jack-up construction
CN206646524U (en) A kind of support bar and support frame
CN204780611U (en) Positioner of wave form steel web
CN204402514U (en) A kind of roadway support structure
CN205313960U (en) Easy operation platform of shake, make level, quick travel is integrated
CN204781317U (en) Steel construction beam column sliding connection node
CN204919565U (en) Steel platform of use is demolishd in shoring of trench

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151202

Termination date: 20200731