CN206298896U - A kind of Tunnel Passing structures steel pipe isolation pile stratum consolidation system - Google Patents

A kind of Tunnel Passing structures steel pipe isolation pile stratum consolidation system Download PDF

Info

Publication number
CN206298896U
CN206298896U CN201621327472.9U CN201621327472U CN206298896U CN 206298896 U CN206298896 U CN 206298896U CN 201621327472 U CN201621327472 U CN 201621327472U CN 206298896 U CN206298896 U CN 206298896U
Authority
CN
China
Prior art keywords
steel pipe
isolation pile
pipe isolation
structures
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621327472.9U
Other languages
Chinese (zh)
Inventor
戴志仁
王立新
王俊
康华
李润轩
王天明
杨沛敏
马晓波
李储军
贾少春
曹伟
王博
雷永生
韩建
翁木生
倪飞
段亚刚
高志宏
毛念华
张海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Survey and Design Institute Group Ltd
Original Assignee
China Railway First Survey and Design Institute Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Survey and Design Institute Group Ltd filed Critical China Railway First Survey and Design Institute Group Ltd
Priority to CN201621327472.9U priority Critical patent/CN206298896U/en
Application granted granted Critical
Publication of CN206298896U publication Critical patent/CN206298896U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model is related to a kind of Tunnel Passing structures steel pipe isolation pile stratum consolidation system.Influenceed by surrounding enviroment, during Tunnel Passing structures, may be limited with surrounding enviroment by site condition, the isolation pile of conventional cast-in-situ bored pile pattern without implementation condition, such as when net level length is not enough between tunnel and structures, or when wearing structures under tunnel.The utility model is in existing buildings(Basement)Set steel pipe isolation pile in a row between Under-cross tunnel, the tunnel arch following certain distance in bottom is goed deep into its bottom, and steel pipe isolation pile is oblique or vertically squeezes into, and top is linked to be entirety by stake top Guan Liang;Between steel pipe isolation pile and structures basement, then set mini-valve tube in a row, the following certain distance of structures basement is goed deep into its bottom, is tracked slip casting.The utility model has that floor space is small, construction is flexibly and the characteristics of adapt to all kinds of environmental requirements, can meet it is various in the case of the requirement of structures consolidation process.

Description

A kind of Tunnel Passing structures steel pipe isolation pile stratum consolidation system
Technical field
The utility model belongs to Tunnel Engineering technical field, and in particular to a kind of Tunnel Passing structures steel pipe isolation pile ground Layer reinforcement system.
Background technology
For the railway traffic engineering of current cities in China, with the continuous encryption of subway gauze, follow-up subway line When road is built, influenceed by built subway line and surrounding enviroment, in line alignment and paving mode, spatial relationship and structural type The requirement of the aspects such as formula and construction method and engineering measure is stricter.When Tunnel Passing existing buildings, by space away from From the influence with underground utilities, the isolation pile of conventional cast-in-situ bored pile pattern may be without implementation condition.
The content of the invention
The purpose of this utility model is to provide a kind of Tunnel Passing structures steel pipe isolation pile stratum consolidation system, in complexity Acted on the tracking grouting of mini-valve tube by the isolation effect of steel-pipe pile under environment, during being capable of achieving Tunnel Passing structures, structure Thing foundation bearing capacity is built to be substantially unaffected.
The technical scheme that the utility model is used for:
A kind of Tunnel Passing structures steel pipe isolation pile stratum consolidation system, it is characterised in that:
Set steel pipe isolation pile in a row between existing buildings basement and Under-cross tunnel, steel pipe isolation pile is oblique or vertical Directly squeeze into, steel pipe isolation pile top is linked to be entirety by stake top Guan Liang.
Mini-valve tube is set in a row between steel pipe isolation pile and structures basement.
Steel pipe isolation pile is formed by the framework of steel reinforcement in steel pipe and steel pipe by concrete perfusion, and framework of steel reinforcement includes joint bar With the stirrup of annular configuration.
Stake top Guan Liang is stretched at steel pipe isolation pile top, and steel pipe isolation pile stake top position is provided with the U-shaped reinforcing bar of outward opening, Steel pipe is firmly welded with U-shaped reinforcing bar;
Perpendicular Guan Liang reinforcing bar is welded with U-shaped reinforcing bar.
At least 2m below tunnel arch bottom is goed deep into steel pipe isolation pile bottom, stake top Guan Liang top surface and ground at the top of steel pipe isolation pile Table is concordant;
Steel pipe isolation pile and horizontal plane angle >=30 °;
The longitudinal pitch of steel pipe isolation pile is not less than 0.5m.
At least 3m below structures basement bottom board is goed deep into mini-valve tube bottom, and top is concordant with earth's surface;
Mini-valve tube and horizontal plane angle >=30 °;
The longitudinal pitch of mini-valve tube is not less than 0.5m.
The utility model has advantages below:
The utility model sets steel-pipe pile, mini-valve tube in earth's surface, and steel reinforcement cage, pressure injection microdilatancy water are inserted into steel-pipe pile Mud, pour Guan Liang in stake top, form steel pipe isolation pile reinforcement system, the steel being related to, cement mortar and steel-pipe pile set institute Plant equipment etc. is conventional material(Equipment), its corresponding size is general type, is easy to processing and manufacturing;And steel-pipe pile, Mini-valve tube length can be adjusted according to tunnel with structures buried depth, steel-pipe pile, mini-valve tube horizontal layout can be according to buried pipe The relative position relation of line distribution situation, tunnel and structures is adjusted, and steel-pipe pile rigidity can be according to the micro- swollen of internal filling Swollen concrete grade, steel reinforcement cage and steel pipe stiffness by itself information summary determine, steel-pipe pile, the quantity of mini-valve tube, setting angle can According to being adjusted the need for being reinforced structures.By the blanketing effect of steel pipe isolation pile, the tracking grouting effect of mini-valve tube, The safety of surrounding enviroment during can ensure that Tunnel Passing structures, reaches that can to meet surrounding enviroment harsh small with floor space, The requirement of stratum consolidation can be reached again, and during conventional cast-in-situ bored pile can be avoided to implement, noise is big, it is big to take up an area, while being also possible to Need to carry out underground utilities to move the adverse effect for changing.With economic benefit and social benefit higher, in urban track traffic, iron Have wide practical use in the engineerings such as road, highway.
Brief description of the drawings
Fig. 1 is that steel pipe isolation pile reinforces schematic diagram.
Fig. 2 is joint bar drawing in steel pipe isolation pile.
Fig. 3 is the short muscle welding schematic diagram of steel pipe top.
In figure, 1- existing buildings, 2- structures basements, 3- tunnels, 4- steel pipe isolation piles, 5- mini-valve tubes, 6- stake tops Guan Liang, 7- Guan Liang reinforcing bars, 8-U steel bars, 9- joint bars, 10- stirrups.
Specific embodiment
The utility model is described in detail with reference to specific embodiment.
The Tunnel Passing structures steel pipe isolation pile stratum consolidation system that the utility model is related to, in existing buildings 1 Structures basement 2 and under set steel pipe isolation pile 4 in a row between the tunnel 3 worn, steel pipe isolation pile 4 is oblique or vertically squeezes into, The top of steel pipe isolation pile 4 is linked to be entirety by horizontal stake top Guan Liang 6.Steel pipe isolation pile 4 has certain level with existing buildings 1 Distance, with ensure reinforcement measure implement during existing buildings 1 safety.Set between steel pipe isolation pile 4 and structures basement 2 Put the mini-valve tube 5 being arranged in rows.
Existing buildings 1 may include various type of foundations, structural shape, and structures basement 2 is general by being examined within 3 layers Consider;Tunnel 3 can be similar round or shape of a hoof Tunneling by mining method, circular shield tunnel, or rectangle open trench tunnel.
Steel pipe isolation pile 4 is formed by the framework of steel reinforcement in steel pipe and steel pipe by concrete perfusion, and framework of steel reinforcement includes inserting The stirrup 10 of muscle 9 and annular configuration.Stretch into the certain distance of stake top Guan Liang 6, the stake top of steel pipe isolation pile 4 in the top of steel pipe isolation pile 4 Position is provided with the U-shaped reinforcing bar 8 of outward opening, and steel pipe is welded to connect with U-shaped reinforcing bar 8;It is welded with U-shaped reinforcing bar 8 perpendicular Guan Liang reinforcing bar 7.The following certain distance in the bottom of tunnel 3 is goed deep into the bottom of steel pipe isolation pile 4(Not less than 2m), to ensure isolation effect Really, 4 top Guan Liang of steel pipe isolation pile, 6 top surfaces are concordant with ground;Steel pipe isolation pile 4 and horizontal plane angle >=30 °;Steel pipe isolation pile 4 longitudinal pitch is not less than 0.5m.
The following certain distance of base plate of structures basement 2 is goed deep into the bottom of mini-valve tube 5(Not less than 3m), top is put down with ground Together;Mini-valve tube 5 and horizontal plane angle >=30 °;The longitudinal pitch of mini-valve tube 5 is not less than 0.5m.
The construction method of above-mentioned Tunnel Passing structures steel pipe isolation pile stratum consolidation system, comprises the following steps:
Step one:Setting-out is measured between existing buildings 1 and Under-cross tunnel 3, according to design coordinate, steel pipe is marked Isolation pile 4 is with mini-valve tube 5 in earth's surface respective coordinates point position;
Step 2:Mounting and positioning device, according to design angle, using roof-bolter or other rig pore-formings, drilling diameter is omited More than the diameter of steel pipe isolation pile 3, to ensure pore-forming effect, need strictly to control rig using pipe-following drilling technique, in pore forming process Angle, it is ensured that crept into along design direction high accuracy;
Step 3:In pore forming process, steel pipe is put into according to depth of pore forming in time, every section of length of steel pipe is considered by 3~5m, Coupling is firmly connected using screw thread;After pore-forming terminates, by the space between steel pipe isolation pile 3 and pore-forming hole wall, using cement Mortar backfill is closely knit;
Step 4:Before treating that steel pipe is placed into specified location on request, the joint bar 9 in steel pipe and stirrup 10 are welded on request Overall framework of steel reinforcement is connected into, then framework of steel reinforcement is put into steel pipe, slightly expanded concrete is finally irrigated on request, formation has The steel pipe isolation pile 4 of certain bending rigidity;
Step 5:After steel pipe isolation pile 4 is all implemented in place, stake top is excavated, U-shaped reinforcing bar 8 is welded at stake top position, Subsequent colligation Guan Liang reinforcing bar 6, and U-shaped reinforcing bar 8 is welded on request with Guan Liang reinforcing bar 6, subsequent casting concrete, form Guan Liang 6;
Step 6:Roof-bolter or other rig pore-formings, drilling diameter are used to be slightly larger than again according to the setting-out coordinate of mini-valve tube 5 Mini-valve tube diameter, needs strictly to control rig angle in pore forming process, it is ensured that crept into along design direction high accuracy;
Step 7:After mini-valve tube pore-forming terminates, pre-buried mini-valve tube 5 on request, the bottom of mini-valve tube 5 is deeply constructed by protection 3m below the base plate of thing basement 2;
Step 8:During Tunnel Passing structures, according to monitoring situation, the tracking grouting of mini-valve tube 5 is carried out in time, by tunnel The stratum settlement that excavation causes effectively is made up in the influence of the bottom of structures 1 by sleeve valve barrel grouting.
Steel pipe isolation pile with the structures safeguard measure that mini-valve tube is combined have flexible and changeable, strong adaptability, safety can By the features such as.Steel-pipe pile plan-position can be adjusted as needed with angle is set, and this is essential characteristic of the present utility model, Steel reinforcement cage and slightly expanded concrete that stake top Guan Liang, steel-pipe pile are inserted into are to ensure that the basic measures of its overall isolation effect, then Plus the tracking grouting effect of mini-valve tube, it can be ensured that the Environmental security during Tunnel Passing structures.
Content of the present utility model is not limited to cited by embodiment, and those of ordinary skill in the art are new by reading this practicality Type specification and any equivalent conversion taken technical solutions of the utility model, are claim institute of the present utility model Cover.

Claims (6)

1. a kind of Tunnel Passing structures steel pipe isolation pile stratum consolidation system, it is characterised in that:
In existing buildings(1)Basement and Under-cross tunnel(3)Between set steel pipe isolation pile in a row(4), steel pipe isolation pile(4) It is oblique or vertically squeeze into, steel pipe isolation pile(4)Top passes through stake top Guan Liang(6)It is linked to be entirety.
2. a kind of Tunnel Passing structures steel pipe isolation pile stratum consolidation system according to claim 1, it is characterised in that:
Steel pipe isolation pile(4)With structures basement(2)Between set mini-valve tube in a row(5).
3. a kind of Tunnel Passing structures steel pipe isolation pile stratum consolidation system according to claim 1, it is characterised in that:
Steel pipe isolation pile(4)Formed by concrete perfusion by the framework of steel reinforcement in steel pipe and steel pipe, framework of steel reinforcement includes joint bar (9)With the stirrup of annular configuration(10).
4. a kind of Tunnel Passing structures steel pipe isolation pile stratum consolidation system according to claim 1, it is characterised in that:
Steel pipe isolation pile(4)Stretch into stake top Guan Liang in top(6), steel pipe isolation pile(4)Stake top position is provided with the U-shaped of outward opening Reinforcing bar(8), steel pipe and U-shaped reinforcing bar(8)Firmly welding;
U-shaped reinforcing bar(8)On be welded with perpendicular Guan Liang reinforcing bar(7).
5. a kind of Tunnel Passing structures steel pipe isolation pile stratum consolidation system according to claim 1, it is characterised in that:
Steel pipe isolation pile(4)Tunnel is goed deep into bottom(3)At least 2m, steel pipe isolation pile below arch bottom(4)The stake top Guan Liang at top(6) Top surface is concordant with earth's surface;
Steel pipe isolation pile(4)With horizontal plane angle >=30 °;
Steel pipe isolation pile(4)Longitudinal pitch be not less than 0.5m.
6. a kind of Tunnel Passing structures steel pipe isolation pile stratum consolidation system according to claim 2, it is characterised in that:
Mini-valve tube(5)Structures basement is goed deep into bottom(2)At least 3m below base plate, top is concordant with earth's surface;
Mini-valve tube(5)With horizontal plane angle >=30 °;
Mini-valve tube(5)Longitudinal pitch be not less than 0.5m.
CN201621327472.9U 2016-12-06 2016-12-06 A kind of Tunnel Passing structures steel pipe isolation pile stratum consolidation system Active CN206298896U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621327472.9U CN206298896U (en) 2016-12-06 2016-12-06 A kind of Tunnel Passing structures steel pipe isolation pile stratum consolidation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621327472.9U CN206298896U (en) 2016-12-06 2016-12-06 A kind of Tunnel Passing structures steel pipe isolation pile stratum consolidation system

Publications (1)

Publication Number Publication Date
CN206298896U true CN206298896U (en) 2017-07-04

Family

ID=59212637

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621327472.9U Active CN206298896U (en) 2016-12-06 2016-12-06 A kind of Tunnel Passing structures steel pipe isolation pile stratum consolidation system

Country Status (1)

Country Link
CN (1) CN206298896U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108979659A (en) * 2018-07-04 2018-12-11 中铁第勘察设计院集团有限公司 The ruggedized construction and method of structures are worn under weak soil rich water large cross-section tunnel group
CN110219666A (en) * 2019-06-10 2019-09-10 中交隧道工程局有限公司 Method for tunnel construction and loess tunnel

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108979659A (en) * 2018-07-04 2018-12-11 中铁第勘察设计院集团有限公司 The ruggedized construction and method of structures are worn under weak soil rich water large cross-section tunnel group
CN110219666A (en) * 2019-06-10 2019-09-10 中交隧道工程局有限公司 Method for tunnel construction and loess tunnel

Similar Documents

Publication Publication Date Title
CN106801417B (en) Tunnel Passing structures steel pipe isolation pile stratum consolidation system and its construction method
CN106499413B (en) A kind of Shallow-buried section tunnel stratum consolidation construction method
CN104846829B (en) Shield-reserved penetration composite type foundation pit support wall and construction method thereof
CN108035335A (en) A kind of construction freezing method well shaft type underground parking garage method
CN205742213U (en) Foundation pit supporting construction
CN106958256A (en) A kind of placement layer by layer, the open caisson construction technique repeatedly sunk
CN103883328B (en) The dark construction method of half lid half of high steep V-type coombe biased segment is worn under separate tunnel
CN106759473A (en) The constructing structure and its construction method of underground pipe gallery and road
CN106013171B (en) A kind of semi-rigid supporting construction semi-flexible and method of deep-foundation side wall
CN204199335U (en) A kind of pressure release well reducing PHC tube pile construction soil compaction effect
CN105464074B (en) A kind of artificial digging pile high polymer grouting safeguard structure and its construction method
CN108843333A (en) Collapsible Loess District tunneling double-arched tunnel passes through the construction method of existing railway
CN111101540B (en) Construction method for passing existing electric power tunnel on open cut tunnel
CN106812150A (en) A kind of mountain area steep slope region Road Bridge Pile Foundation construction method
CN105673025A (en) Underground engineering loess tunnel ground surface settlement control construction process
CN110042842A (en) A kind of open cut construction method of deep foundation ditch for wearing river
CN110004991A (en) Underground structure anti-floating system and construction method based on raised type tangs plate
CN201538975U (en) Seepage-proofing joint of underground continuous wall
CN104532853A (en) Deep foundation pit supporting method and system characterized by steel reinforced cement-soil piles, bolts easy to detach and automatic monitoring and early warning
CN115539048A (en) Construction method for shallow-buried bias tunnel portal
CN111365005A (en) Reinforcing structure and method for shield tunnel lower-penetrating elevated bridge foundation
CN206298896U (en) A kind of Tunnel Passing structures steel pipe isolation pile stratum consolidation system
CN207176700U (en) A kind of solid matter perfusion inner support of pile foundation ditch permanent support structure under complex environment
CN109610473A (en) A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration
CN113431097A (en) Protection structure of shallow foundation building next to deep foundation pit engineering and construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant