CN207176700U - A kind of solid matter perfusion inner support of pile foundation ditch permanent support structure under complex environment - Google Patents

A kind of solid matter perfusion inner support of pile foundation ditch permanent support structure under complex environment Download PDF

Info

Publication number
CN207176700U
CN207176700U CN201721153954.1U CN201721153954U CN207176700U CN 207176700 U CN207176700 U CN 207176700U CN 201721153954 U CN201721153954 U CN 201721153954U CN 207176700 U CN207176700 U CN 207176700U
Authority
CN
China
Prior art keywords
pile
foundation ditch
foundation
inner support
solid matter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721153954.1U
Other languages
Chinese (zh)
Inventor
刘俊雄
龚立新
吴加武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Co Ltd Of Navigation Planning Designing Institute Of Guangdong Province
Original Assignee
Co Ltd Of Navigation Planning Designing Institute Of Guangdong Province
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Co Ltd Of Navigation Planning Designing Institute Of Guangdong Province filed Critical Co Ltd Of Navigation Planning Designing Institute Of Guangdong Province
Priority to CN201721153954.1U priority Critical patent/CN207176700U/en
Application granted granted Critical
Publication of CN207176700U publication Critical patent/CN207176700U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model is the solid matter perfusion inner support of pile foundation ditch permanent support structure under a kind of complex environment,Including the first high-pressure rotary jet grouting pile,Bored concrete pile,Second high-pressure rotary jet grouting pile,Concrete linked network,Guan Liang,Inner support,Blotter,Reinforced concrete floor,Foundation soil body,First high-pressure rotary jet grouting pile is vertical at form compound foundation in the foundation soil body at foundation ditch bottom,Blotter is laid on composite foundation,It is reinforced concrete floor on blotter,Bored concrete pile uses reinforced concrete structure,It is vertical in foundation soil body,Side on the outside of foundation ditch between bored concrete pile is connected by the second high-pressure rotary jet grouting pile,Opposite side on the inside of foundation ditch between bored concrete pile is connected integral using concrete linked network,Connected at the top of bored concrete pile by Guan Liang integral,Foundation ditch both sides Guan Liang is connected with inner support,The reinforcing bar of inner support is extend into Guan Liang,Together with the bar connecting of Guan Liang,Casting concrete turns into an entirety again.The utility model can improve foundation bearing capacity, low engineering cost, and consolidation effect is good.

Description

A kind of solid matter perfusion inner support of pile foundation ditch permanent support structure under complex environment
Technical field
The utility model belongs to marine traffic engineering pattern foundation pit supporting structure field, is irrigated more particularly to the solid matter under a kind of complex environment Inner support of pile foundation ditch permanent support structure.
Background technology
With the development of urban construction, the underground space is developed in each big city, such as underground parking, underground Civil air defense constructions and installations, subterranean commercial area, subway, the underground such as river and seabed tunnel excessively are built(Structure)The construction for building thing is vigorously developed, so as to Generate the various base pit engineering of large amount of complex.And develop and build these underground spaces and facility, especially in soft clay area, The requirement more and more higher of base pit engineering, produced problem is also more and more therewith, many new theoretical study methods or construction warp Test etc. and to be occurred, and tend to be ripe.
Because Geotechnical Engineering, the complexity of foundation ditch surrounding enviroment and its engineering properties have uncertainty, existing branch Protection structure design theory still has many weak points, causes many problems in the engineering practice of foundation ditch be present.Wherein include:Enclose Protection structure safety problem;Soil mechanics intensity, deformation and stable problem;Soil and supporting construction INTERACTION PROBLEMS;And environment rock The problems such as geotechnological journey.And existing foundation pit supporting project is mostly provisional support engineering, supporting is ageing shorter, and works as base Resistance to overturning is had a great influence when cheating support engineering as permanent retaining engineering.
The content of the invention
The purpose of this utility model is to provide the solid matter perfusion inner support of pile foundation ditch permanent support under a kind of complex environment Structure.The utility model ensures the resistance to overturning of structure and ground during use, can be suitably used for the poor Soft Soil Area of soil property Domain, the deformation of the soil body can be controlled after the completion of processing well, can improve foundation bearing capacity, low engineering cost, consolidation effect is good.
The utility model is achieved by following technical solution:Solid matter bored concrete pile under complex environment of the present utility model Inner support foundation ditch permanent support structure, include the first high-pressure rotary jet grouting pile, bored concrete pile, the second high-pressure rotary jet grouting pile, concrete linked network, Guan Liang, inner support, blotter, reinforced concrete floor, foundation soil body, the first high-pressure rotary jet grouting pile are vertical at the ground at foundation ditch bottom Form compound foundation in the base soil body, blotter is laid on composite foundation, be reinforced concrete floor on blotter, bored concrete pile Using reinforced concrete structure, it is vertical in foundation soil body, the side on the outside of foundation ditch between bored concrete pile is revolved by the second high pressure Spray stake to connect, the opposite side on the inside of foundation ditch between bored concrete pile is integral using the connection of concrete linked network, passes through hat at the top of bored concrete pile Beam connection is integral, and foundation ditch both sides Guan Liang is connected with inner support, and inner support and Guan Liang are reinforced concrete structure, inner support Reinforcing bar is extend into Guan Liang, and together with the bar connecting of Guan Liang, then casting concrete turns into an entirety.
Solid matter perfusion inner support of pile foundation ditch permanent support structure of the present utility model includes single deposited reinforced concrete pile, Bored concrete pile is vertical in ground, and stake top is linked together by Guan Liang, and Guan Liang is connected to become one by reinforced concrete support Individual entirety, reinforced using high-pressure rotary jet grouting pile under base plate of foundation pit.Existing solid matter perfusion inner support of pile foundation ditch permanent support structure is applied to Sand, clay and the poor Soft Soil Layer of soil property, can effectively control the deformation of the soil body, ensure structure and the resistance to overturning of ground, Ensure peripheral path, the deformation stability of pipeline.Improve hole subsoil body ground by high-pressure rotary jet grouting pile basement process and hold in foundation ditch bottom Carry power, the effective uplift of soil for controlling bottom of foundation ditch.In addition, the utility model to stake footpath, stake spacing and foundation ditch insert depth, Size and spacing of inner support etc. are defined, and ensure the internal force and soil deformation stability of pile body.The utility model is one The solid matter bored concrete pile inner supporting structure of the good foundation ditch permanent support being used under complex environment of kind low cost, consolidation effect.
Brief description of the drawings
Fig. 1 is that bottom of foundation ditch stake bit plane of the present utility model arranges schematic diagram;
Fig. 2 is the A-A profiles in Fig. 1;
Fig. 3 is the B-B profiles in Fig. 1;
Fig. 4 is inner support horizontal layout schematic diagram in top of the present utility model.
Embodiment
Solid matter perfusion inner support of pile foundation ditch permanent support structure under complex environment of the present utility model, such as the institute of Fig. 1,2,3 Show, include the first high-pressure rotary jet grouting pile 1, bored concrete pile 2, the second high-pressure rotary jet grouting pile 3, concrete linked network 4, Guan Liang 5, inner support 6, broken Stone bed course 11, reinforced concrete floor 12, foundation soil body 13, the first high-pressure rotary jet grouting pile 1 are vertical at the foundation soil body at foundation ditch bottom Form compound foundation in 13, blotter 11 is laid on composite foundation, be reinforced concrete floor 12 on blotter 11, is irrigated Stake 2 uses reinforced concrete structure, is vertical in foundation soil body 13, the side on the outside of foundation ditch between bored concrete pile 2 passes through second High-pressure rotary jet grouting pile 3 connects, and the opposite side on the inside of foundation ditch between bored concrete pile 2 connects integral, bored concrete pile 2 using concrete linked network 4 Top connected by Guan Liang 5 integral, foundation ditch both sides Guan Liang 5 is connected with inner support 6, and inner support 6 is that reinforcing bar mixes with Guan Liang 5 Xtah Crude Clay structure, the reinforcing bar of inner support 6 is extend into Guan Liang 5, and together with the bar connecting of Guan Liang 5, then casting concrete turns into One entirety.Connected on the outside of foundation ditch between bored concrete pile 2 using high-pressure rotary jet grouting pile 3, as water-stop curtain.
Above-mentioned high-pressure rotary jet grouting pile 1 be in order to reinforce foundation ditch bottom foundation soil body 13, play improve foundation ditch bottom foundation bearing capacity and The effect of control settlement.Bored concrete pile 2 is support pile, plays a part of controlling the horizontal distortion of foundation soil body 13.Irrigated on the outside of foundation ditch Connected between stake 2 by the second high-pressure rotary jet grouting pile 3, it is therefore an objective to prevent the effect inside the direction of groundwater flow foundation ditch outside foundation ditch;Base Connected between the bored concrete pile 2 of hole inner side using concrete linked network 4 integral, it is therefore an objective to after excavation of foundation pit, between prevention bored concrete pile 2 The effect that the soil body comes off.
In the present embodiment, above-mentioned foundation ditch both sides Guan Liang 5 is provided with guard rail 7.
In the present embodiment, the part that above-mentioned first high-pressure rotary jet grouting pile 1 enters foundation ditch bottom foundation soil body 13 is no less than 3m.High pressure The purpose of rotary churning pile 1 is the soft soil reinforced in bottom of foundation ditch foundation soil body, therefore enters the length of heatable adobe sleeping platform bottom foundation soil body For the thickness of ground soft soil.
The thickness for the blotter 11 laid on above-mentioned composite foundation is no less than 100mm, in the present embodiment, on composite foundation The thickness of the blotter 11 of laying is 100mm.
The thickness of above-mentioned reinforced concrete floor 12 is 300mm ~ 500mm.In the present embodiment, reinforced concrete floor 12 Thickness is 300mm.
In the present embodiment, the part that above-mentioned bored concrete pile 2 enters bottom of foundation ditch is no less than 7m.According to the property of foundation soil body with The cutting depth of foundation ditch carries out calculating analysis, it is determined that meeting desired minimum embedded length, while meets to be not less than foundation depth 0.3 times.
Integral thickness is connected using concrete linked network 4 between bored concrete pile 2 on the inside of above-mentioned foundation ditch and is no less than 50mm, this reality Apply in example, use concrete linked network 4 to connect integral thickness as 50mm between bored concrete pile 2 on the inside of foundation ditch.
In the present embodiment, the above-mentioned outside of bored concrete pile 2 is road 8, and road 8 is layed in the surface of foundation soil body 13.
In the present embodiment, above-mentioned foundation soil body 13 is embedded with drainage pipeline 9.Above-mentioned foundation soil body 13 is embedded with high-tension cable Pipeline 10.
Referring to Fig. 3, the high-pressure rotary jet grouting pile 1 is made up of water, cement and the soil body, and stake footpath is 0.6m, and stake spacing is 0.45m, Using gridiron structure.Bored concrete pile 2 is Single row pillars diameter 1.0m, and stake spacing is 1.2m.3 a diameter of 0.6m of high-pressure rotary jet grouting pile, stake Spacing is 1.2m.
Fig. 4 is that the solid matter under complex environment of the present utility model is irrigated in the top of inner support of pile foundation ditch permanent support structure Supporting plane arranges schematic diagram.Guan Liang 5 uses Reinforced Concrete Materials, width 1.5m, is highly 1.0m.Inner support 6 uses Reinforced Concrete Materials, length 4m, width 0.6m, it is highly 0.8m, spacing 4.0m ~ 6.0m.
Although embodiment of the present utility model is described above in association with accompanying drawing, the utility model does not limit to In above-mentioned specific embodiments and applications field, above-mentioned specific embodiment is only schematical, directiveness, without It is restricted.One of ordinary skill in the art is under the enlightenment of this specification and is not departing from the utility model claims In the case of the scope protected, the form of many kinds can also be made, these belong to the row of the utility model protection.

Claims (10)

1. the solid matter perfusion inner support of pile foundation ditch permanent support structure under a kind of complex environment, it is characterised in that it is high to include first Pressure rotary-spraying stake(1), bored concrete pile(2), the second high-pressure rotary jet grouting pile(3), concrete linked network(4), Guan Liang(5), inner support(6), rubble Bed course(11), reinforced concrete floor(12), foundation soil body(13), the first high-pressure rotary jet grouting pile(1)It is vertical at the ground at foundation ditch bottom The base soil body(13)Middle form compound foundation, blotter is laid on composite foundation(11), blotter(11)Upper is reinforced concrete Native bottom plate(12), bored concrete pile(2)Using reinforced concrete structure, foundation soil body is vertical at(13)In, bored concrete pile on the outside of foundation ditch (2)Between side connected by the second high-pressure rotary jet grouting pile 3, bored concrete pile on the inside of foundation ditch(2)Between opposite side use concrete Linked network(4)Connect integral, bored concrete pile(2)Top passes through Guan Liang(5)Connect integral, foundation ditch both sides Guan Liang(5)With inner support (6)Connection, inner support(6)With Guan Liang(5)It is reinforced concrete structure, inner support(6)Reinforcing bar extend into Guan Liang(5)In, With Guan Liang(5)Bar connecting together, then casting concrete turns into an entirety.
2. the solid matter perfusion inner support of pile foundation ditch permanent support structure under complex environment according to claim 1, its feature It is above-mentioned foundation ditch both sides Guan Liang(5)It is provided with guard rail(7).
3. the solid matter perfusion inner support of pile foundation ditch permanent support structure under complex environment according to claim 1, its feature It is above-mentioned first high-pressure rotary jet grouting pile(1)Into foundation ditch bottom foundation soil body(13)Part be no less than 3m.
4. the solid matter perfusion inner support of pile foundation ditch permanent support structure under complex environment according to claim 1, its feature It is the blotter laid on above-mentioned composite foundation(11)Thickness be not less than 100mm.
5. the solid matter perfusion inner support of pile foundation ditch permanent support structure under complex environment according to claim 1, its feature It is above-mentioned reinforced concrete floor(12)Thickness be 300mm ~ 500mm.
6. the solid matter perfusion inner support of pile foundation ditch permanent support structure under complex environment according to claim 1, its feature It is above-mentioned bored concrete pile(2)7m is no less than into the part of bottom of foundation ditch.
7. the solid matter perfusion inner support of pile foundation ditch permanent support structure under complex environment according to claim 1, its feature It is bored concrete pile on the inside of above-mentioned foundation ditch(2)Between use concrete linked network(4)Connect integral thickness and be no less than 50mm.
8. the solid matter perfusion inner support of pile foundation ditch permanent support knot under the complex environment according to any one of claim 1 to 7 Structure, it is characterised in that above-mentioned bored concrete pile(2)Outside is road(8), road(8)It is layed in foundation soil body(13)Surface.
9. the solid matter perfusion inner support of pile foundation ditch permanent support structure under complex environment according to claim 8, its feature It is above-mentioned foundation soil body(13)It is embedded with drainage pipeline(9).
10. the solid matter perfusion inner support of pile foundation ditch permanent support structure under complex environment according to claim 9, its feature It is above-mentioned foundation soil body(13)It is embedded with high-tension cable pipeline(10).
CN201721153954.1U 2017-09-11 2017-09-11 A kind of solid matter perfusion inner support of pile foundation ditch permanent support structure under complex environment Expired - Fee Related CN207176700U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721153954.1U CN207176700U (en) 2017-09-11 2017-09-11 A kind of solid matter perfusion inner support of pile foundation ditch permanent support structure under complex environment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721153954.1U CN207176700U (en) 2017-09-11 2017-09-11 A kind of solid matter perfusion inner support of pile foundation ditch permanent support structure under complex environment

Publications (1)

Publication Number Publication Date
CN207176700U true CN207176700U (en) 2018-04-03

Family

ID=61743570

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721153954.1U Expired - Fee Related CN207176700U (en) 2017-09-11 2017-09-11 A kind of solid matter perfusion inner support of pile foundation ditch permanent support structure under complex environment

Country Status (1)

Country Link
CN (1) CN207176700U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109487793A (en) * 2017-09-11 2019-03-19 广东省航运规划设计院有限公司 Inner support of pile foundation pit permanent support structure is perfused in a kind of solid matter under complex environment
CN110306560A (en) * 2019-06-28 2019-10-08 中铁第四勘察设计院集团有限公司 Supporting construction and foundation ditch construction method
CN110306558A (en) * 2019-06-06 2019-10-08 中铁第四勘察设计院集团有限公司 Foundation pit supporting method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109487793A (en) * 2017-09-11 2019-03-19 广东省航运规划设计院有限公司 Inner support of pile foundation pit permanent support structure is perfused in a kind of solid matter under complex environment
CN110306558A (en) * 2019-06-06 2019-10-08 中铁第四勘察设计院集团有限公司 Foundation pit supporting method
CN110306560A (en) * 2019-06-28 2019-10-08 中铁第四勘察设计院集团有限公司 Supporting construction and foundation ditch construction method

Similar Documents

Publication Publication Date Title
CN107503257B (en) One kind being close to mountain high-filled subgrade stabilization and Deformation control structure and construction method
CN106498953A (en) Cut slope composite supporting construction and its construction method
CN105464134B (en) Multi-layer underground space is along inverse combining construction method and supporting construction under existing facility
CN100580190C (en) Building foundation pit supporting construction
CN106801417A (en) Tunnel Passing structures steel pipe isolation pile stratum consolidation system and its construction method
CN105464686A (en) Multistory underground space screen frame type tunneling construction method under existing facilities and support structure
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN101634143A (en) Method for treating spiral oil-extruding filling pile composite foundation in stratum containing soft clay
CN103911996B (en) Close on existing building steel sheet pile and pull out construction method
CN103696416B (en) A kind of method for processing foundation
CN207176700U (en) A kind of solid matter perfusion inner support of pile foundation ditch permanent support structure under complex environment
CN107740434A (en) It is a kind of to be used for sandy gravel, the construction method of dolomite crushed zone dam foundation ditch water protecting curtain
CN111365005A (en) Reinforcing structure and method for shield tunnel lower-penetrating elevated bridge foundation
CN109487793A (en) Inner support of pile foundation pit permanent support structure is perfused in a kind of solid matter under complex environment
CN107489106A (en) A kind of rocky bed subaqueous bearing platform construction method
CN204174636U (en) In-situ deposited prefabricated combined retaining wall structure
CN109610505A (en) A kind of tunnel upper foundation pit construction method
CN205382942U (en) Multilayer underground space curtain posture subsurface excavated construction's supporting construction under existing facility
CN205874851U (en) Ballastless track roadbed structure is made up with stake raft with section to flexible stake
CN206245321U (en) Cut slope composite supporting construction
CN103866788B (en) A kind of method of pillar abutment scarp slope barricadeization transformation
CN203475486U (en) Basement producing no water buoyancy
CN102425179A (en) Reinforced soil infiltration ditch structure supported by miniature steel pipe cast-in-place pile
CN206298896U (en) A kind of Tunnel Passing structures steel pipe isolation pile stratum consolidation system
CN208266895U (en) Cofferdam is built in returning for seabed tunnel point storehouse construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180403