CN109297461A - A kind of monitoring device and application method of the sedimentation of collapsible loess high-filled embankment - Google Patents

A kind of monitoring device and application method of the sedimentation of collapsible loess high-filled embankment Download PDF

Info

Publication number
CN109297461A
CN109297461A CN201811078261.XA CN201811078261A CN109297461A CN 109297461 A CN109297461 A CN 109297461A CN 201811078261 A CN201811078261 A CN 201811078261A CN 109297461 A CN109297461 A CN 109297461A
Authority
CN
China
Prior art keywords
settlement observation
sedimentation
plate
elevation
observation bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811078261.XA
Other languages
Chinese (zh)
Inventor
徐志军
程远浩
张冉冉
刘军
原方
刘婷婷
韩星
郭兆翔
刘海林
杜乾
庞照昆
姜学佳
张健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan University of Technology
Original Assignee
Henan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan University of Technology filed Critical Henan University of Technology
Priority to CN201811078261.XA priority Critical patent/CN109297461A/en
Publication of CN109297461A publication Critical patent/CN109297461A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C5/00Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels

Abstract

The invention discloses the monitoring devices and application method of a kind of collapsible loess high-filled embankment sedimentation in civil engineering in relation to subgrade engineering field, including settlement observation bar, sedimentation plate, PVC casing, displacement monitoring stake.It settles plate to use with a thickness of 1cm, section is the square steel plate of 50 × 50cm, and settlement observation bar is made of extensible steel pipe, and is welded into an entirety, housing pvc pipe with sedimentation plate.One settlement observation point is set every 50m in high filling section position of center line, displacement monitoring stake is arranged in settlement observation point two sides and corresponds to outside plain stage of slope, banket and gutter;Plate will be settled to be placed in the heatable adobe sleeping platform that monitoring place has been dug;PVC casing is vertically packed into settlement observation bar;Settlement observation bar elevation is observed with the level continuous a few days, determines initial elevation;The coordinate of each displacement monitoring stake is monitored using total station;Periodic measurement goes out the elevation for settling the settlement observation bar on plate in the construction process, and the elevation changing value on settlement observation bar top is settling amount.

Description

A kind of monitoring device and application method of the sedimentation of collapsible loess high-filled embankment
Technical field
The present invention relates to the monitoring devices and application method of a kind of sedimentation of collapsible loess high-filled embankment, especially for just In the monitoring that the collapsible loess highway high-filled embankment of construction settles.
Background technique
With the continuous development of central and west regions economy, to meet people in trip and substance, the needs of the exchange of information, Development in terms of road traffic increasingly seems important, the Collapsible Loess District especially in Midwest.Although China is at this Aspect has had many decades to obtain construction experiences, but due to the complexity, inhomogeneities, uncertain factor of collapsible loess itself Compare more, is difficult to accurately react the actual conditions of local ground with geological exploration data in addition, so high-filled embankment destroys The problem of still occur often.It is mainly manifested in subgrade settlement, road surface depression, a variety of quality diseases such as bumping at bridge-head, direct shadow Ring social benefit brought by the personal safety and highway construction to people.And face the gully of Midwest Collapsible Loess District What fluctuating, the superiority that high-filled embankment has the structures such as bridge cannot replace again, therefore reinforcement settled high-filled embankment Monitoring, improving its stability has important engineering significance.
The settlement monitoring of high-filled embankment can make complexity in all multiple-projects, inhomogeneities, probabilistic factor by Gradually make clear.Recessive problem present in embankment can be timely found in the construction process, effectively avoided highway and built At the generation of rear quality disease, the expense of Renovation after highway is open to traffic is reduced.In addition to this, moreover it is possible to preferably ensure passing The safety of vehicle and pedestrian.Therefore, the settlement monitoring that high-filled embankment is carried out in highway construction process is necessary.
Summary of the invention
In order to overcome the shortcomings of the prior art to the processing of collapsible loess subgrade uneven subsidence, the present invention provides one The monitoring device and application method of kind collapsible loess high-filled embankment sedimentation.Pass through Collapsible Loess District in highway communication line When the mountain valley area of hypsography injustice, often there is the variability of a large amount of prospective design and complexity, embankment fill material to grind The many factors such as the limitation of construction are pressed, this will cause roadbed subsidence larger, so as to cause road surface depression and fracture.Solution of the present invention The relevant issues determined in dynamic construction process in relation to engineering construction safety and subgrade stability.
The technical solution adopted by the present invention to solve the technical problems is: a kind of collapsible loess high-filled embankment sedimentation Monitoring device and application method, including settlement observation bar, sedimentation plate, PVC casing, cuff, displacement monitoring stake.Plate is settled using thick Degree is 1cm, and section is the square steel plate of 50cm × 50cm, and settlement observation bar is made of extensible steel pipe, observation bar and observation bar Between connected with cuff, housing pvc pipe, and by settlement observation bar be welded on sedimentation plate on.Displacement monitoring stake uses a length of 0.8m, Section is the C15 concrete square pile of 0.2m × 0.2m.Sedimentation plate should avoid the pipeline locations such as communication, water channel, settle plate and displacement The arrangement of monitoring stake can be appropriately adjusted according to actual landform and condition of construction.
One settlement observation point is set every 50m in high filling section position of center line, displacement monitoring stake is arranged in sedimentation Observation point two sides correspond to outside plain stage of slope, banket and gutter;Sedimentation plate is placed on the heatable adobe sleeping platform bottom dug monitoring point, with level Ruler corrects plate face level, then backfill leveling compacting;PVC casing is vertically packed into settlement observation bar, end is located on native face;With The level continuous a few days observes settlement observation bar elevation, determines initial elevation;The seat of each displacement monitoring stake is monitored using total station Mark, it is ensured that the accuracy of settlement observation bar position;Periodic measurement goes out to settle the elevation of settlement observation bar on plate in the construction process, The elevation changing value on settlement observation bar top is settling amount.
The invention has the advantages that a kind of monitoring device and application method of the sedimentation of collapsible loess high-filled embankment, When highway communication line passes through the Collapsible Loess District especially mountain valley area of hypsography injustice, to collapsibility in construction The differential settlement of loess makes effective monitoring, so that problem can be found in time, to guarantee the progress of normal construction And safety, and after being open to traffic road quality, traffic safety problem caused by effectively avoiding because of collapsible loess differential settlement, And its brought loss.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is observation point section arrangement schematic diagram of the present invention;
Fig. 2 is observation point plan view of the present invention;
Fig. 3 is present invention sedimentation plate structure schematic diagram;
1. settlement observation bar in figure, 2. cuffs, 3. sedimentation plates, 4. displacement monitoring stakes, 5. gutters, 6. reinforce welding bar,
7. pipe cap.
Specific embodiment
[embodiment]
The technical solution adopted by the present invention to solve the technical problems is: a kind of monitoring of collapsible loess high-filled embankment sedimentation Device and application method, including settlement observation bar (1), sedimentation plate (3), cuff (2), displacement monitoring stake (4).Referring to Fig. 3, sedimentation For plate (3) using with a thickness of 1cm, section is the square steel plate of 50cm × 50cm, and settlement observation bar (1) is made of extensible steel pipe, It observes between bar and observation bar and being connected with cuff (2), and be welded into an entirety, housing pvc pipe with sedimentation plate (3).Displacement prison Pile (4) uses a length of 0.8m, and section is the C15 concrete square pile of 0.2 × 0.2m.Sedimentation plate (3) should avoid communication, water channel etc. Pipeline location, the arrangement for settling plate (3) and displacement monitoring stake (4) can be appropriately adjusted according to actual landform and condition of construction.
Referring to Figures 1 and 2, one settlement observation point, displacement monitoring are set every 50m in high filling section position of center line Stake (4) is arranged in settlement observation point two sides and corresponds to plain stage of slope, banket and gutter (5) outside;Sedimentation plate (3) is placed on monitoring point The heatable adobe sleeping platform bottom dug, it is horizontal with horizontal ruler correction plate face, then backfill leveling compacting;PVC casing is vertically packed into sedimentation to see Measuring staff (1), end are located on native face;Settlement observation bar (1) elevation is observed with the level continuous a few days, determines initial elevation;It adopts The coordinate of each displacement monitoring stake (4) is monitored with total station, it is ensured that the accuracy of settlement observation bar (1) position;In the construction process Periodic measurement goes out the elevation for settling the settlement observation bar (1) on plate (3), and the elevation changing value on settlement observation bar (1) top is Settling amount.
With the increase of the depth of fill, settlement observation bar (1) can not disconnecting it is high, when adapter tube, observes the pipe of adapter tube front and back simultaneously Crest level is referred to as " under rise ", and " above rising ", settlement observation generally uses levelling method, i.e. roadbed It fills and the settlement observation precision of precompressed phase is not less than national fourth-order leveling measurement request, strict implement country water is answered in observation work Locating tab assembly specification makes observation condition identical as far as possible, accomplishes five settled principles.
It, can be according to geologic information and empirically determined Slab culvert, in Slab culvert in monitoring implementation process It can quickly banket in range, strictly should control speed of banketing according to monitoring materials when the depth of fill oversteps the extreme limit the depth of fill Rate.Each high roadbed measuring frequency section is no less than 3, and same measuring frequency section observation point is laid on same root axis, construction period Observation in every 3 days is primary, and in the time of path link Chinese herbaceous peony after construction, observation in every 14 days is primary, road be open to traffic a year and a half when Interior each moon observation is primary.

Claims (2)

1. a kind of monitoring device of collapsible loess high-filled embankment sedimentation, including settlement observation bar (1), sedimentation plate (3), cuff (2), displacement monitoring stake (4).
2. a kind of monitoring method of collapsible loess high-filled embankment sedimentation, which is characterized in that in high filling section center line position It sets and one settlement observation point is set every 50m, displacement monitoring stake (4) is arranged in settlement observation point two sides and corresponds to plain stage of slope, shield Ramp and gutter (5) are outside;Sedimentation plate (3) is placed on the heatable adobe sleeping platform bottom dug monitoring point, it is horizontal with horizontal ruler correction plate face, then return Leveling of banketing is compacted;PVC casing is vertically packed into settlement observation bar (1), end is located on native face;It is seen with the level continuous a few days Settlement observation bar (1) elevation is surveyed, determines initial elevation;The coordinate of each displacement monitoring stake (4) is monitored using total station, it is ensured that sedimentation Observe the accuracy of bar (1) position;Periodic measurement goes out the elevation for settling the settlement observation bar (1) on plate (3) in the construction process, The elevation changing value on settlement observation bar (1) top is settling amount.
CN201811078261.XA 2018-09-17 2018-09-17 A kind of monitoring device and application method of the sedimentation of collapsible loess high-filled embankment Pending CN109297461A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811078261.XA CN109297461A (en) 2018-09-17 2018-09-17 A kind of monitoring device and application method of the sedimentation of collapsible loess high-filled embankment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811078261.XA CN109297461A (en) 2018-09-17 2018-09-17 A kind of monitoring device and application method of the sedimentation of collapsible loess high-filled embankment

Publications (1)

Publication Number Publication Date
CN109297461A true CN109297461A (en) 2019-02-01

Family

ID=65163219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811078261.XA Pending CN109297461A (en) 2018-09-17 2018-09-17 A kind of monitoring device and application method of the sedimentation of collapsible loess high-filled embankment

Country Status (1)

Country Link
CN (1) CN109297461A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110016906A (en) * 2019-04-29 2019-07-16 中交上海航道勘察设计研究院有限公司 A kind of sedimentation plate fixing means of the barged-in fill sedimentation of observation on the water
CN110670568A (en) * 2019-09-09 2020-01-10 中国二十冶集团有限公司 Method for observing vertical deformation of roadbed filling in soft foundation area and settlement plate

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202329617U (en) * 2011-11-15 2012-07-11 成都市市政工程(集团)有限责任公司 Physical settlement gauge for measuring gap value between rigid pavement and subgrade
CN203132533U (en) * 2013-03-29 2013-08-14 中铁十二局集团有限公司 Roadbed settlement deformation observation device
CN103994753A (en) * 2014-06-13 2014-08-20 太原理工大学 Layered settlement device and layered settlement measuring method for loess filler high fill embankment
CN204479060U (en) * 2015-01-07 2015-07-15 天津二十冶建设有限公司 A kind of subgrade stability recording geometry
US20150197895A1 (en) * 2012-07-17 2015-07-16 Council Of Scientific & Industrial Research Stepwise repeated destabilization and stabilization of highly collapsible soil mass by 'soil nailing technique' used for construction of railway/road underpass

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202329617U (en) * 2011-11-15 2012-07-11 成都市市政工程(集团)有限责任公司 Physical settlement gauge for measuring gap value between rigid pavement and subgrade
US20150197895A1 (en) * 2012-07-17 2015-07-16 Council Of Scientific & Industrial Research Stepwise repeated destabilization and stabilization of highly collapsible soil mass by 'soil nailing technique' used for construction of railway/road underpass
CN203132533U (en) * 2013-03-29 2013-08-14 中铁十二局集团有限公司 Roadbed settlement deformation observation device
CN103994753A (en) * 2014-06-13 2014-08-20 太原理工大学 Layered settlement device and layered settlement measuring method for loess filler high fill embankment
CN204479060U (en) * 2015-01-07 2015-07-15 天津二十冶建设有限公司 A kind of subgrade stability recording geometry

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王国爱: "通榜公路高填方路基的沉降观测与分析", 《甘肃科技纵横》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110016906A (en) * 2019-04-29 2019-07-16 中交上海航道勘察设计研究院有限公司 A kind of sedimentation plate fixing means of the barged-in fill sedimentation of observation on the water
CN110670568A (en) * 2019-09-09 2020-01-10 中国二十冶集团有限公司 Method for observing vertical deformation of roadbed filling in soft foundation area and settlement plate

Similar Documents

Publication Publication Date Title
Abu-Hejleh et al. Monitored displacements of unique geosynthetic-reinforced soil bridge abutments
Boulanger et al. Pile foundations in liquefied and laterally spreading ground during earthquakes: centrifuge experiments & analyses
Abu-Hejleh et al. Performance of geosynthetic-reinforced walls supporting bridge and approaching roadway structures
CN109914173B (en) Foam light soil pouring table back structure in expressway reconstruction and extension project and construction method thereof
CN102747662A (en) Construction method for sand-filling subgrade
CN107119520A (en) The soft base combined type of coastal tidal, which is changed, fills out structure and Treatment Methods
CN108412016A (en) Underground tube body assures construction method
CN109297461A (en) A kind of monitoring device and application method of the sedimentation of collapsible loess high-filled embankment
CN108252176A (en) A kind of pavement engineering construction method equipped with inspection shaft
CN112554167A (en) Novel poured large-particle-size aggregate UHPC soft soil road foundation pile
CN109056804B (en) Comprehensive pipe rack foundation pit supporting structure and implementation method thereof
CN206800092U (en) The soft base combined type of coastal tidal, which is changed, fills out structure and Roadbed by offshore soft clay
CN210151776U (en) Structure of balance weight type retaining wall
CN108981657A (en) The monitoring and analysis method of peat soil soft soil roadbed settlement
Rahman et al. Settlement of bridge approaches on soft soil area in Batu Pahat, Johor
CN208009281U (en) The structure of existing bridges and culverts is reinforced using corrugated steel pipe
Negussey et al. Geofoam fill performance monitoring
CN110878566A (en) Model test device for vacuum-stacking combined pre-pressing plastic drainage plate foundation
CN113914227B (en) Construction method for viaduct curved section steel box girder supporting system on existing bridge
Yang et al. High fill embankment of collapsible loess settlement observation and research
Ma et al. Embankment filling loads on an assembled concrete culvert beneath high embankment
Jin-Wei et al. Deformation monitoring and numerical simulation of retaining structure in subway station deep foundation pit
Hogan et al. Construction and Monitoring of Alabama’s First Geosynthetic Reinforced Soil-Integrated Bridge System
CN217556594U (en) Backfill and restore pavement structure after excavation of white-to-black pavement
CN107989059B (en) Construction method of foundation cushion structure of cast-in-place beam support

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190201

WD01 Invention patent application deemed withdrawn after publication