CN107119520A - The soft base combined type of coastal tidal, which is changed, fills out structure and Treatment Methods - Google Patents

The soft base combined type of coastal tidal, which is changed, fills out structure and Treatment Methods Download PDF

Info

Publication number
CN107119520A
CN107119520A CN201710366714.8A CN201710366714A CN107119520A CN 107119520 A CN107119520 A CN 107119520A CN 201710366714 A CN201710366714 A CN 201710366714A CN 107119520 A CN107119520 A CN 107119520A
Authority
CN
China
Prior art keywords
soft
sea sand
layer
changed
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710366714.8A
Other languages
Chinese (zh)
Inventor
米德才
刘先林
叶琼瑶
骆俊晖
李盛家
唐正辉
漆春
李敦仁
黄泽斌
李世明
陈川
温庆珍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Transportation Planning Survey And Design Institute Co Ltd
Original Assignee
Guangxi Transportation Planning Survey And Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Transportation Planning Survey And Design Institute Co Ltd filed Critical Guangxi Transportation Planning Survey And Design Institute Co Ltd
Priority to CN201710366714.8A priority Critical patent/CN107119520A/en
Publication of CN107119520A publication Critical patent/CN107119520A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

Changed the invention discloses the soft base combined type of coastal tidal and fill out structure and Treatment Methods, be related to Soft Ground field.A kind of soft base combined type of coastal tidal of present invention offer, which is changed, fills out structure, including sea sand bed course, blotter, geogrids layer, embankment filled soil layer and road surface structare layer, and set gradually from bottom to top, sea sand bed course and blotter are respectively positioned on below ground, and GSZ, embankment filled soil layer and road surface structare layer are located at more than ground.Changed present invention also offers a kind of soft base and fill out Treatment Methods, it changes applied to above-mentioned combined type and fills out structure.The soft base combined type of coastal tidal that the present invention is provided, which is changed, fills out structure and Treatment Methods and can make full use of abundant sea sand resources, reduce soft base and change and fill into this, the construction period is shortened, and can effectively ensure that soft base changes matrix amount, with good economic benefit and far-reaching social benefit.

Description

The soft base combined type of coastal tidal, which is changed, fills out structure and Treatment Methods
Technical field
The present invention relates to Soft Ground field, changed in particular to the soft base combined type of coastal tidal fill out structure and Treatment Methods.
Background technology
With the fast development of China's economy, the demand to highway construction expands rapidly, while the also matter to highway construction Amount problem proposes baptism.China is vast in territory, and many highways are built on coastal tidal phase soft soil foundation, along strand Area builds highway, and is frequently encountered saturation silt clay and loose fine sand layer, if punishment is improper, easily cause the construction time with The diseases such as the jump car of the roadbed longitudinal cracking of operation phase, roadbed sliding and bridges and culverts joint.Guangxi is coastal as the connection North Sea The important channel in area, Binhai Highway total length 314.2km, route is laid along northern indented coast line, and soft soil foundation section exceedes 200km, accounts for the 70% of route overall length.
Binhai Highway is normally at strand terrace region of no relief, and landform is flat, physical features is relatively low, there is following technical characterstic:Ground Lower water level long-term existence and water level is poor compared with high, Technical Characteristics of Mild Clay, periphery stone material is few, sea sand resources are abundant etc..By existing correlation Code requirement, soft base replacing method is generally the materials such as slabstone, rubble, cobble, gravel, but because coastal region is generally deficient of this Class material, if all outer exchange filler, there are problems that changing filler transfer distance it is remote and, all adopted if soft base changes to fill out With above-mentioned outsourcing material, only treatment of soft foundation will produce enormous expenditure.
The characteristics of weak soil regional for coastal tidal, answered when carrying out Soft Soil punishment emphasis consider weak soil composition, structure, Content in terms of underground water, replacing method type and source and embankment stability.Existing weak sub-grade treatment method can not be well The level of ground water long-term existence and water level that solve to build highway presence on coastal tidal mutually regional weak soil are higher, Soft Soil Engineering The problems such as matter is poor, periphery stone material is few.Coastal region sea sand resources very abundant, sea sand price is relatively cheap, if can make full use of The soft base of sea sand progress, which is changed, to be filled out, and will substantially reduce the weak sub-grade treatment expense in coastal tidal area.
The content of the invention
Changed it is an object of the invention to provide a kind of soft base combined type of coastal tidal and fill out structure, which improved in coastal tidal The level of ground water long-term existence of highway presence is built on phase weak soil and water level is higher, Soft Soil Engineering property is poor, periphery stone material is few Problem.Meanwhile, the abundant sea sand resources enriched using seashore are reduced soft base and changed and fill into this, are accelerated soft base and are changed and fill out speed, The construction period is shortened, and can effectively ensure that soft base changes matrix amount, with good economic benefit and far-reaching social benefit.
Change another object of the present invention is to providing a kind of soft base combined type of coastal tidal and fill out Treatment Methods, which improve The level of ground water long-term existence of highway presence is built on coastal tidal phase weak soil and water level is higher, Soft Soil Engineering property is poor, periphery The problem of stone material is few.Meanwhile, the abundant sea sand resources enriched using seashore are reduced soft base and changed and fill into this, are accelerated soft base and are changed Speed is filled out, the construction period is shortened, and can effectively ensure that soft base changes matrix amount, with good economic benefit and far-reaching society Can benefit.
The present invention provides a kind of technical scheme:
A kind of soft base combined type of coastal tidal, which is changed, fills out structure, it is adaptable to which coastal tidal area soft soil foundation, which is changed, fills out processing.Shore Seabeach, which applies soft base combined type, to be changed and fills out structure and include sea sand bed course, blotter, geogrids layer, embankment filled soil layer and pavement structure Layer, sea sand bed course, blotter, geogrids layer, embankment filled soil layer and the cross sectional shape of road surface structare layer are trapezoidal, and from Set gradually on down, sea sand bed course and blotter are respectively positioned on below ground, geogrids layer, embankment filled soil layer and road surface knot Structure layer is located at more than ground.
Further, the long side in above-mentioned sea sand bed course section is contacted with the short side in blotter section, blotter section It is long while with embankment filled soil layer it is long while contact, and blotter section length of long sides be more than embankment filled soil layer it is long while while It is long.
Further, above-mentioned blotter is located between sea sand bed course and embankment filled soil, and sea sand bed course is more than rubble pad The thickness of layer.
Further, above-mentioned GSZ is arranged between embankment filled soil layer and blotter, and the quantity of GSZ To be multiple, and multiple GSZs are layered on top of each other.
Further, above-mentioned GSZ laying direction is perpendicular to route direction of advance, cross-sectional direction laying Ying Lu Base outer rim anti-package 150cm~200cm, the connected mode of adjacent two width GSZ is overlap joint, and it overlaps length and is more than or waits In 15cm.
A kind of soft base combined type of coastal tidal, which is changed, fills out Treatment Methods, is changed applied to the soft base combined type of coastal tidal and fills out structure. The soft base combined type of coastal tidal, which is changed, fills out structure and highway subgrade and includes sea sand bed course, blotter, embankment filled soil layer and road surface knot Structure layer.Sea sand bed course, blotter, embankment filled soil layer and the cross sectional shape of road surface structare layer are trapezoidal, and from bottom to top according to Secondary to set, sea sand bed course and blotter are respectively positioned on below ground, and embankment filled soil layer and road surface structare layer are located at more than ground.Shore Seabeach, which applies soft base combined type, to be changed and fills out Treatment Methods and include preparation of construction step, surveying and locating step, weak soil thickness testing procedure, clear Except Soft Soil Layer step, base bearing capacity testing procedure, backfill sea sand step, backfill rubble step, Roadbed Soil step and road surface Structure paves step.Removing Soft Soil Layer step includes:Slope excavation removing is carried out to the Soft Soil Layer in selected strand section.Backfill Sea sand step includes:Hole filling sea sand is filled out to changing, and adopts steamroller, to obtain sea sand bed course.Backfill rubble step bag Include:Blotter is layed on sea sand bed course, and adopts steamroller, to obtain blotter.GSZ is laid Step:Lay and tense at the top of blotter, to obtain geogrids layer.Roadbed Soil step includes:On blotter Banketed, to obtain embankment filled soil layer.The pavement structure step that paves includes:Repairing for pavement structure is carried out on embankment filled soil layer Build, to obtain road surface structare layer.
Further, the step of above-mentioned Soft Soil Layer to selected strand section is purged is removed including the use of excavator Soft Soil Layer, and the slope in excavation, to ensure the stability of slope of soft soil foundation pit.Changed using small-sized machine and manual cleaning and fill out hole bottom The Soft Soil Layer in portion.
Further, the step of above-mentioned filling sea sand to soft soil foundation pit pushes the step of paving sea sand for multiple layerings, point Layer, which pushes the step of paving sea sand, to be included:Medium coarse sand is proceeded by with bull-dozer by one end of soft soil foundation pit to backfill;Backfill rubble Step also includes:Pushed in each layering after the step of paving sea sand terminate, to after layering pushes the step of paving sea sand The sea sand paving layer of formation carries out water filling, and makes the water surface higher than the aspect of sea sand paving layer, after sea sand paving layer reaches saturation, Sea sand paving layer is compacted.
Further, it is above-mentioned into the soft soil foundation pit with sea sand bed course fill rubble the step of for it is multiple layering pave it is broken The step of stone;Backfill rubble step also includes pressing the rubble paving layer formed after the step of layering paves rubble Real, the step of being compacted to the rubble paving layer formed after the step of layering paves rubble is carried out multiple using road roller Roll, and the wheelmark rolled every time overlapping 1/3.
Further, the soft base combined type of above-mentioned coastal tidal change fill out Treatment Methods also include GSZ lay step, with GSZ bed course is obtained, GSZ lays step between backfill rubble step and Roadbed Soil step;GSZ Laying step includes vertically being layed in GSZ into the top surface of blotter, two neighboring GSZ along laying direct of travel Mutually overlap.
Compared with prior art, the soft base combined type of coastal tidal that the present invention is provided changes the beneficial effect for filling out structure and Treatment Methods It is really:
Material required for sea sand bed course arises directly from locally abundant sea sand resources, can save a large amount of manpowers, thing Power and financial resources.By sea sand and rubble organic assembling, soft soil foundation change to fill out punishment, solve and run into during construction rolling Return water problems, improve the soft base combined type of coastal tidal and change the intensity for filling out structure, the weak soil combined type after processing, which is changed, fills out roadbed Settling amount is small.Meanwhile, the water stabilities of the treatment structures is good, price is relatively low, substantially reduces engineering cost.The shore that the present invention is provided Seabeach, which applies soft base combined type, to be changed and fills out structure and Treatment Methods solve the underground that highway presence is built on coastal tidal phase weak soil Water level long-term existence and the problem of water level is higher, Soft Soil Engineering property is poor, periphery stone material is few, can be abundant be enriched using seashore Sea sand resources, reduce soft base and change and fill into this, accelerate soft base and change to fill out speed, shorten the construction period;Increase on sea sand bed course Blotter, solves and rolls the problem of sea sand returns water under the conditions of phreatic high, and due to the pressure diffusion effect phase of rubble It is good for sea sand, improve soft base and change the structural strength for filling out part, can effectively ensure that soft base changes matrix amount, with good warp Benefit of helping and far-reaching social benefit.
Brief description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be attached to what is used required in embodiment Figure is briefly described.It should be appreciated that the following drawings illustrate only certain embodiments of the present invention, therefore it is not construed as pair The restriction of scope.For those of ordinary skill in the art, on the premise of not paying creative work, can also be according to this A little accompanying drawings obtain other related accompanying drawings.
Fig. 1 changes the structural representation for filling out structure for the soft base combined type of coastal tidal that the first embodiment of the present invention is provided;
Fig. 2 is the mplifying structure schematic diagram at II in Fig. 1;
The structural representation for the GSZ pad that Fig. 3 provides for the first embodiment of the present invention;
Fig. 4 changes the flow signal for filling out Treatment Methods for the soft base combined type of coastal tidal that the second embodiment of the present invention is provided Figure.
Icon:The soft base combined type of 100- coastal tidals, which is changed, fills out structure;110- sea sand bed courses;120- blotters;130- soil Work grid;The grids of 131- first;The grids of 132- second;133- bundled pieces;140- embankment filled soils layer;150- road surface structare layers;S1- Preparation of construction step;S2- surveying and locating steps;S3- bearing capacity under soft foundation testing procedures;S4- removes Soft Soil Layer step;S5- substrates Test of bearing capacity step;S6- backfills sea sand step;S7- backfills rubble step;S8- GSZs lay step;S9- roadbeds are filled out Native step;S10- pavement structures pave step.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described.Obviously, described embodiment is A part of embodiment of the present invention, rather than whole embodiments.The present invention implementation being generally described and illustrated herein in the accompanying drawings The component of example can be arranged and designed with a variety of configurations.
Therefore, the detailed description of embodiments of the invention below to providing in the accompanying drawings is not intended to limit claimed The scope of the present invention, but be merely representative of the present invention selected embodiment.Based on the embodiment in the present invention, this area is common The every other embodiment that technical staff is obtained under the premise of creative work is not made, belongs to the model that the present invention is protected Enclose.
It should be noted that:Similar label and letter represents similar terms in following accompanying drawing, therefore, once a certain Xiang Yi It is defined in individual accompanying drawing, then it further need not be defined and explained in subsequent accompanying drawing.
In the description of the invention, it is to be understood that term " on ", " interior ", the orientation of the instruction such as " outer " or position close It is that for based on orientation shown in the drawings or position relationship, or the orientation usually put when using of the invention product or position are closed System, or the orientation that usually understands of those skilled in the art or position relationship, are for only for ease of the description present invention and simplify Description, rather than indicate or imply that the equipment or element of meaning must have specific orientation, with specific azimuth configuration and behaviour Make, therefore be not considered as limiting the invention.
In addition, term " first ", " second " etc. are only used for distinguishing description, and it is not intended that indicating or implying relatively important Property.
Below in conjunction with the accompanying drawings, the embodiment to the present invention is described in detail.
First embodiment
Fig. 1 and Fig. 2 are referred to, a kind of soft base combined type of coastal tidal is present embodiments provided and changes and fill out structure 100, it improves Built on coastal tidal phase weak soil the level of ground water long-term existence of highway presence and water level is higher, Soft Soil Engineering property is poor, The few problem of periphery stone material, with good economic benefit and far-reaching social benefit.
The soft base combined type of coastal tidal that the present embodiment is provided, which is changed, fills out structure 100 suitable for the regional soft soil foundation of coastal tidal Change and fill out processing, soft soil foundation includes ground (figure is not marked).The characteristics of for coastal tidal phase weak soil, should weigh during weak soil punishment Point considers the content in terms of weak soil composition, structure, underground water, replacing method and embankment stability.
The soft base combined type of coastal tidal that the present embodiment is provided, which is changed, fills out structure 100 including sea sand bed course 110, blotter 120th, GSZ 130, embankment filled soil layer 140 and road surface structare layer 150, sea sand bed course 110, blotter 120, embankment filled soil The cross sectional shape of layer 140 and road surface structare layer 150 is trapezoidal, and is set gradually from bottom to top, sea sand bed course 110 and rubble pad Layer 120 is respectively positioned on below ground, and embankment filled soil layer 140 and road surface structare layer 150 are located at more than ground, and GSZ 130 is located at Between blotter 120 and embankment filled soil layer 140.
It is appreciated that sea sand bed course 110 be use sea sand push and pave formed by.It again it will be understood that Be, blotter 120 be also using to rubble carry out push pave by the way of formed by.
In the present embodiment, section of sea sand bed course 110, blotter 120, embankment filled soil layer 140 and road surface structare layer 150 Face shape is trapezoidal.It is appreciated that sea sand bed course 110, blotter 120, embankment filled soil layer 140 and road surface structare layer 150 Trapezoid cross section can be isosceles trapezoid or other any trapezoidal.
In the present embodiment, the long side in the section of sea sand bed course 110 is contacted with the short side in the section of blotter 120, rubble pad The long of 120 section of layer contacts in long with embankment filled soil layer 140, and the section of blotter 120 length of long sides more than embankment The length of long sides of fill stratum 140.
In the present embodiment, sea sand bed course 110 and blotter 120 are respectively positioned on below ground, embankment filled soil Ceng140He roads Face structure sheaf 150 is respectively positioned on the ground.The length of long sides in the section of blotter 120 is more than the length of long sides of embankment filled soil layer 140, can So that positioned at ground embankment filled soil layer 140 and road surface structare layer 150 under the support of sea sand bed course 110 and blotter 120 Structural soundness is more preferable, so that improving the soft base combined type of coastal tidal changes the stability for filling out structure 100.
The scope of the length of side on the long side in the section of sea sand bed course 110 can according to geological conditions select 60m~200m (including end Point value) in an excavation length.In the present embodiment, the length of side on the long side in the section of sea sand bed course 110 is 100m.Certainly, and This is not limited only to, in other embodiments of the invention, the length of side can also be other values, such as 90m etc..
In the present embodiment, the thickness of sea sand bed course 110 is more than the thickness of blotter 120.The pressure of blotter 120 Diffusivity is more stronger than the pressure diffusion ability of sea sand bed course 110, thus blotter 120 can make the soft base of coastal tidal answer Box-like change fills out more stablizing for structure 100.
In the present embodiment, the thickness of sea sand bed course 110 is 1.5m, and the thickness of blotter 120 is 0.5m.Certainly, and This is not limited only to, in other embodiments of the invention, sea sand bed course 110 can also be respectively others with blotter 120 Thickness, such as the thickness of sea sand bed course 110 are 2.0m, and the thickness of blotter 120 is 0.8m etc., sea sand bed course 110 and rubble The specific thickness of bed course 120 can be determined according to embankment raising, level of ground water height, stress spread calculating etc. are comprehensive.
In order that the soft base combined type of coastal tidal is changed and fills out structure 100 and possess more preferable anti-pressure ability, the pressure of sea sand bed course 110 Solidity is 85% to 95%, and the compactness of blotter 120 is more than 90%.In the present embodiment, the compactness of sea sand bed course 110 For 90%, the compactness of blotter 120 is 90%.Certainly, it is not limited to that, in other embodiments of the invention, sea The compactness of sand bedding course 110 and blotter 120 can also be other values, such as the compactness of sea sand bed course 110 is 89%, broken The compactness of stone bed course 120 is 91% etc..
Referring to Fig. 3, the quantity for the GSZ 130 that the present embodiment is provided is one layer, GSZ 130 is arranged at embankment Between fill stratum 140 and blotter 120.
It is appreciated that GSZ 130 can also be set to multilayer according to the stability requirement of specific roadbed.It is preferred that Ground, GSZ 130 is 1~3 layer.
The effect of GSZ 130 is to change to strengthen the soft base combined type of coastal tidal to fill out the steadiness of structure 100, by soil Work grid 130, which is arranged between embankment filled soil layer 140 and blotter 120, can change the soft base combined type of coastal tidal to fill out structure 100 more steadiness.
It is appreciated that GSZ 130 lays direction perpendicular to route direction of advance, cross-sectional direction laying should be in roadbed Outer rim anti-package 150cm~200cm, the connected mode of adjacent two width GSZ 130 is overlap joint, and it overlaps length and is more than or waits In 15cm.
In the present embodiment, GSZ 130 includes the first grid 131, the second grid 132 and bundled piece 133, the first lattice Grid 131 are set mutual vertically with the second grid 132, and are connected between two neighboring GSZ 130 using overlapping mode, bundle The effect for tying up part 133 is in order to the first grid 131 and the second grid 132 are mutually overlapped.In the present embodiment, bundle Part 133 is iron wire.Certainly, it is not limited to that, in other embodiments of the invention, bundled piece 133 can also be other knots Structure, such as bundled piece 133 are rope for being made up of nano level high polymer material etc..
The soft base combined type of coastal tidal that the present embodiment is provided, which is changed, fills out the beneficial effect of structure 100 and is:The institute of sea sand bed course 110 The material needed arises directly from locally abundant sea sand resources, and sea sand and rubble organic assembling are answered soft soil foundation Box-like change fills out punishment, solves rolling of being run into work progress and returns water problems, improves the soft base combined type of coastal tidal and changes and fills out The intensity of structure 100, the compound soft soil roadbed settlement amount after processing is small.The soft base combined type of coastal tidal that the present embodiment is provided is changed Fill out structure 100 solve built on coastal tidal phase weak soil highway presence level of ground water long-term existence and water level is higher, soft Native engineering properties is poor, periphery stone material is few, roll the problems such as returning water, the sea sand resources can be abundant enriched using seashore, reduces Soft base, which is changed, fills into this, accelerates soft base and changes and fill out speed, shortens the construction period.The water stability of the treatment structures is good, price compared with It is low, engineering cost is substantially reduced, with good economic benefit and far-reaching social benefit.
Second embodiment
Treatment Methods are filled out referring to Fig. 4, present embodiments providing a kind of soft base combined type of coastal tidal and changing, are which solved The level of ground water long-term existence of highway presence is built on coastal tidal phase weak soil and water level is higher, Soft Soil Engineering property is poor, periphery The few problem of stone material, the Treatment Methods on-site construction operations are convenient, it is easy to which soft base, which is changed, fills out quality control, and construction cost is smaller, construction Short time limit, with good economic benefit and far-reaching social benefit.
The present embodiment provide the soft base combined type of coastal tidal change fill out Treatment Methods including preparation of construction step S1, measurement put Sample step S2, bearing capacity under soft foundation testing procedure S3, removing Soft Soil Layer step S4, base bearing capacity testing procedure S5, backfill sea sand Step S6, backfill rubble step S7, GSZ laying step S8, Roadbed Soil step S9 and pavement structure pave step S10, Illustrate separately below.
Preparation of construction step S1
In the present embodiment, preparation of construction step S1 includes:Prepare more than the medium coarse sand that laying sea sand bed course 110 is used Particle diameter, clay content≤5%, infiltration coefficient >=6 × 10-2~6 × 10-3cm/s;It is hard to prepare the laying medium stone of blotter 120 Matter-compared with hard rock material, and clay content≤5%;Tensile strength, elongation, the node limit for preparing laying GSZ 130 are shelled Design requirement should be met from power;The filler liquid limit for preparing laying embankment filled soil layer 140 is less than 50%, and plasticity index is less than 26%, Roadbed carries ratio >=3;Design related request should be met by preparing the material of laying road surface structare layer 150.
In the present embodiment, the particulate component ratio of sea sand bed course 110 is that 0.5~2.0mm of particle diameter accounts for 46.3%, 0.25~ 0.5mm accounts for 38.9%, and 0.75~0.25mm accounts for 7.2%, and medium coarse sand content accounts for 85.2%, and clay content is 0.7%, and infiltration coefficient is 5×10-2cm/s.The material of blotter 120 is middle weathered granite, and rock matter is hard, and compression strength is more than 30Mpa, and clay content is 0.2%, crushed stone material can not be made using the crushing such as swelling rock, easy softening rock, strongly soluble rock or salinization rock. GSZ 130 is the two-way firm modeling weldbonding GSZs 130 of GDZ150, and longitudinal direction is 150kN/m per linear meter(lin.m.) ultimate tensile strength, is indulged Elongation is 2.5%, breadth 6m, node limit peeling force 60N under to nominal tensile strength.The filler of embankment filled soil layer 140 Mechanics index of physics is that the scope of liquid limit is 19.5%~40.3%, and the scope of plasticity index is 8.6%~22.4%, roadbed The scope for carrying ratio is 3.8~19.6.
Surveying and locating step S2
In the present embodiment, surveying and locating step S2 includes:The repetition measurement of bench mark is completed by fourth-order leveling requirement, is pressed The requirement of first-order traverse measurement completes the repetition measurement of connecting traverse and sets up bench mark, traverse point encrypted work.Check vertical and horizontal section Figure, releases highway land scope line, and in being released by mono- stake of 20m, skirt piles, carry out natural ground level, vertical section elevation, cross-section Face repetition measurement.
Bearing capacity under soft foundation testing procedure S3
In the present embodiment, bearing capacity under soft foundation testing procedure S3 includes:Top drainage is carried out, and uses standard light power Whether feeler inspection carries out bearing capacity under soft foundation test, accurate rationally with the soft ground excavation depth that this examines design offer.Roadbed is longitudinally surveyed Try spacing to control by 20m, by the point control of left, center, right 3 on subgrade cross section, MTD is as required for the different depths of fill The control of design foundation bearing capacity, design foundation bearing capacity scope is 120kPa~150kPa.
Remove Soft Soil Layer step S4
The section filled out is changed in needs, suitable construction paragraph delimited, determines that every section is changed the length for filling out region.To selected shore The Soft Soil Layer of sea route section is purged, to obtain soft soil foundation pit.
Preferably, to soft soil foundation pit slope, the cross sectional shape for making soft soil foundation pit is trapezoidal.
In the present embodiment, usage mining machine excavates the Soft Soil Layer for changing and filling out in depth.Generally go through that excavator obtains changes Fill out hole, hole bottom surface can remaining certain thickness Soft Soil Layer, the Soft Soil Layer is by small-sized machine or manual cleaning.
According to situations such as weather, construction ability, Soft Clay condition, delimit suitable construction paragraph, with every segment length 60~ 200m is advisable.
In the present embodiment, usage mining machine excavates the Soft Soil Layer for changing and filling out in depth, notices that crater wall slope is stable during excavation, Change and fill out the bottom surface in hole and avoid serious disturbance subjacent bed.Hole bottom is filled out when changing not usually, stepped form should be made, according to elder generation during backfill Shallow principle, which is changed, after depth fills out.Soft base foundation ditch should not expose for a long time, and sea sand bed course 110 and blotter 120 should get the raw materials ready in advance.
Base bearing capacity testing procedure S5
In the present embodiment, base bearing capacity testing procedure S5 includes:It is light using standard again after soft soil foundation excavation Whether type dynamic sounding carries out bearing capacity under soft foundation test, thorough to examine weak soil excavation, otherwise should carry out secondary excavation removing soft Soil.Base bearing capacity test spacing is still controlled by roadbed longitudinal direction 20m, by the point control of left, center, right 3, test on subgrade cross section Depth is controlled by design foundation bearing capacity scope for 120kPa~150kPa.
Backfill sea sand step S6
Sea sand is filled to soft soil foundation pit, to obtain sea sand bed course 110.
In the present embodiment, the step of filling sea sand to soft soil foundation pit pushes the step of paving sea sand for multiple layerings, point Layer, which pushes the step of paving sea sand, to be included:Medium coarse sand is proceeded by with bull-dozer by one end of soft soil foundation pit to backfill, and by small-sized Machinery and artificial progress assistance pave.
Pushed in each layering after the step of paving sea sand terminate, to being formed after layering pushes the step of paving sea sand Sea sand paving layer carry out water filling, and make the water surface be higher than sea sand paving layer aspect, after sea sand paving layer reaches saturation, to sea Sand paving layer is compacted.
When starting backfill medium coarse sand, foundation ditch reclaimed water should be drained.Medium coarse sand is proceeded by by one end to backfill, press with bull-dozer 30~40cm thickness layerings, which are pushed, to be paved, and indivedual dead angles are paved by artificial assistance.Pave and water filling is carried out after one layer, water surface requirement is just Layer of sand top surface is covered, under water-saturated state, the bull-dozer using deadweight more than 15t walks back and forth, passed through using bull-dozer deadweight Crawler belt layer of sand is rolled it is compacted, compacting route along route longitudinal direction, from trackside into road or by the suitable of relatively low one lateral higher side Sequence is rolled, twice necessary overlapping 1/3 seat in the plane between track route, to ensure not leak pressure.According to number of rolling and compactness in construction It is detected as key Quality Control.If foundation ditch underground water especially enriches, it can also be paved using thick-layer sea sand, sea sand thickness is by slightly above Groundwater level is controlled, and using conducting oneself with dignity, less crawler dozer paves from one end of foundation ditch toward the other end, is pushed away by crawler type Native machine, which moves back and forth, tentatively to be rolled, and is then reused vibrating roller press and is compacted, the vibration intensity rolled is ascending.
Backfill rubble step S7
Rubble is filled into the soft soil foundation pit with sea sand bed course 110, to obtain blotter 120.
The step of rubble is filled into the soft soil foundation pit with sea sand bed course 110 is layered the step of paving rubble to be multiple. In the present embodiment, backfill rubble step S7 also includes entering the rubble paving layer formed after the step of layering paves rubble Row compacting, the step of being compacted to the rubble paving layer formed after the step of layering paves rubble is carried out using road roller Repeatedly roll, and the wheelmark rolled every time overlapping 1/3.
Blotter 120 can be backfilled after the completion of backfill sea sand bed course 110, can not there be the top surface of sea sand bed course 110 before backfill Bright water, rubble uses graded broken stone, rubble pave it is consistent with the medium coarse sand method that paves, unlike, graded broken stone is using pressure road Machine is compacted, and compaction requirement is more than 90%.The thickness 1m of blotter 120, back-filling in layers, lift height and number of rolling pass through experiment Section is determined, is layered paving thickness≤25cm, is rolled more than 4 times using 30t vibrated rollers, roll and follow " it is high after first low, it is first quiet After move, it is first slow after it is fast " principle, while the wheelmark of every time answers overlapping 1/3, pressure must not be leaked, it is all road roller have press less than ground Side, is tamped with small rammer tool, untill compactness as defined in reaching.
GSZ laying step S8
The soft base combined type of coastal tidal, which is changed, fills out Treatment Methods also including GSZ laying step S8, to obtain GSZ 130 bed courses, GSZ 130 lays step between backfill rubble step S7 and Roadbed Soil step S9.
In the present embodiment, GSZ laying step S8 includes along laying direct of travel vertically spreading GSZ 130 Located at the top surface of blotter 120, two neighboring GSZ 130 is mutually overlapped.
Using artificial laying, surface should be smooth, and laying direction is paved with whole blotter perpendicular to route direction of advance 120 top surfaces, cross-sectional direction is routed at roadbed outer rim 30cm, the GSZ 130 of roadbed outer rim answer anti-package 150cm~ 200cm, the connecting mode of GSZ 130 is using overlap joint, iron wire colligation connection, and its overlapping length is no less than 15cm.For It must be tensioned before ensureing the muscle body effect of geosynthetics, earthing, banketing must be in strict accordance with a lateral opposite side one direction Tiling is promoted, and forbids vehicle directly to be travelled on GSZ 130.
Roadbed Soil step S9
Banketed on blotter 120, to obtain embankment filled soil layer 140.
Pavement structure paves step S10
The build of pavement structure is carried out on embankment filled soil layer 140, to obtain road surface structare layer 150.
The soft base combined type of coastal tidal that the present embodiment is provided changes the beneficial effect for filling out Treatment Methods:The institute of sea sand bed course 110 The sea sand needed arises directly from locally, can save manpower and financial resources.Sea sand is organically combined to enter soft soil foundation with rubble Row, which is changed, fills out punishment, so that improving the soft base combined type of coastal tidal changes the intensity for filling out structure 100, it is compound soft soil roadbed after processing Settling amount is small.The Treatment Methods construction technology is simple, few by restraining factors without special construction plant equipment, is easy to construction, and And construction speed is very fast.Meanwhile, the water stabilities of the treatment structures is good, price is relatively low, substantially reduces engineering cost.The present embodiment The soft base combined type of coastal tidal of offer, which is changed, fills out structure 100 and improves what on coastal tidal phase weak soil building highway was present Level of ground water long-term existence and water level is higher, Soft Soil Engineering property is poor, the few problem of periphery stone material, with good economic benefit with Far-reaching social benefit.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should be included in the scope of the protection.

Claims (10)

1. a kind of soft base combined type of coastal tidal, which is changed, fills out structure, it is adaptable to which coastal tidal area soft soil foundation, which is changed, fills out processing, and it is special Levy and be, including sea sand bed course, blotter, geogrids layer, embankment filled soil layer and road surface structare layer, the sea sand bed course, The blotter, the geogrids layer, the embankment filled soil layer and the road surface structare layer cross sectional shape be it is trapezoidal, And set gradually from bottom to top, the sea sand bed course and the blotter are respectively positioned on below ground, the geogrids layer, institute State embankment filled soil layer and the road surface structare layer is located at more than ground.
2. the soft base combined type of coastal tidal according to claim 1, which is changed, fills out structure, it is characterised in that the sea sand bed course is cut The long side in face is contacted with the short side in blotter section, the blotter section it is long while with the embankment filled soil layer it is long while Contact, and the length of long sides of the length of long sides more than embankment filled soil layer in the blotter section.
3. the soft base combined type of coastal tidal according to claim 1, which is changed, fills out structure, it is characterised in that the blotter position Between the sea sand bed course and the embankment filled soil, and the sea sand bed course is more than the thickness of the blotter.
4. the soft base combined type of coastal tidal according to claim 1, which is changed, fills out structure, it is characterised in that the GSZ is set It is placed between embankment filled soil layer and the blotter, and the quantity of the GSZ is multiple, and multiple soil Work grid is layered on top of each other.
5. the soft base combined type of coastal tidal according to claim 4, which is changed, fills out structure, it is characterised in that the geotechnological lattice of adjacent two width The connected mode of grid is overlap joint, and it overlaps length and is more than or equal to 15cm.
6. a kind of soft base combined type of coastal tidal, which is changed, fills out Treatment Methods, for the shore as described in any one in claim 1-5 The seabeach soft base combined type of painting, which is changed, fills out structure, it is characterised in that the soft base combined type of coastal tidal, which is changed, fills out Treatment Methods including applying Work preparation process, surveying and locating step, bearing capacity under soft foundation testing procedure, remove Soft Soil Layer step, base bearing capacity testing procedure, Backfill sea sand step, backfill rubble step, GSZ laying step, Roadbed Soil step and pavement structure pave step;
The preparation of construction step:Be ready for preparing the soft base combined type of the coastal tidal change fill out required for structure sea sand, Rubble, GSZ, Roadbed Soil and ground surface material etc., it is desirable to which each material parameter meets related specifications requirement;
The bearing capacity under soft foundation testing procedure:Standard light power is carried out to load-carrying capacity of soft soil foundation and touches test, examines and intends excavating Weak soil thickness it is whether consistent with design document, judge whether cutting depth accurate rationally;
The removing Soft Soil Layer step:Slope excavation removing is carried out to the Soft Soil Layer in selected strand section, to obtain Soft Soil Hole;
The base bearing capacity testing procedure:After soft soil foundation excavation, the bearing capacity of weak soil is tested again, it is clear to examine weak soil Except whether thorough, it otherwise should carry out secondary excavation and remove weak soil;
The backfill sea sand step:Sea sand is filled under water to the soft soil foundation pit, and adopts steamroller, to be expired The sea sand bed course of sufficient compacting requirement;
The backfill rubble step:Blotter is layed on sea sand bed course, and adopts steamroller, to be met The blotter of compacting requirement;
The GSZ lays step:GSZ is laid at the top of the blotter, to obtain the geogrids layer;
The Roadbed Soil step:Banketed in the geogrids layer, to obtain the embankment filled soil layer;
The pavement structure paves step:The build of pavement structure is carried out on embankment filled soil layer, to obtain the road surface Structure sheaf.
7. the soft base combined type of coastal tidal according to claim 6, which is changed, fills out Treatment Methods, it is characterised in that described pair is selected The Soft Soil Layer in strand section remove the Soft Soil Layer including the use of excavator the step of be purged, and in soft soil foundation pit Slope in excavation, to ensure the stability of slope of the soft soil foundation pit;Changed using small-sized machine and manual cleaning and fill out the soft of hole bottom Soil layer, it is to avoid serious disturbance bottom supporting course.
8. the soft base combined type of coastal tidal according to claim 6, which is changed, fills out Treatment Methods, it is characterised in that described to described The step of soft soil foundation pit fills sea sand pushes the step of paving sea sand for multiple layerings, and the layering pushes the step of paving sea sand Including:Medium coarse sand is proceeded by with bull-dozer by one end of the soft soil foundation pit to backfill;
The backfill rubble step also includes:Pushed in each layering after the step of paving sea sand terminate, to by described Layering pushes the sea sand paving layer formed after the step of paving sea sand and carries out water filling, and makes the water surface higher than the sea sand paving layer Aspect, after the sea sand paving layer reaches saturation, is compacted to the sea sand paving layer.
9. the soft base combined type of coastal tidal according to claim 6, which is changed, fills out Treatment Methods, it is characterised in that to described In the soft soil foundation pit of sea sand bed course the step of paving rubble is layered the step of filling rubble to be multiple;
The backfill rubble step also includes carrying out the rubble paving layer formed after the step of layering paves rubble Compacting, the step of described pair of rubble paving layer formed after the step of layering paves rubble is compacted is using pressure road Machine is repeatedly rolled, and the wheelmark rolled every time overlapping 1/3.
10. the soft base combined type of coastal tidal according to claim 6, which is changed, fills out Treatment Methods, it is characterised in that the strand The soft base combined type of beach, which is changed, fills out Treatment Methods also including GSZ laying step, described to obtain the GSZ bed course GSZ lays step between the backfill rubble step and the Roadbed Soil step;
The GSZ laying step includes GSZ being vertically layed in the blotter along laying direct of travel Top surface, the two neighboring GSZ is mutually overlapped.
CN201710366714.8A 2017-05-23 2017-05-23 The soft base combined type of coastal tidal, which is changed, fills out structure and Treatment Methods Pending CN107119520A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710366714.8A CN107119520A (en) 2017-05-23 2017-05-23 The soft base combined type of coastal tidal, which is changed, fills out structure and Treatment Methods

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710366714.8A CN107119520A (en) 2017-05-23 2017-05-23 The soft base combined type of coastal tidal, which is changed, fills out structure and Treatment Methods

Publications (1)

Publication Number Publication Date
CN107119520A true CN107119520A (en) 2017-09-01

Family

ID=59728700

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710366714.8A Pending CN107119520A (en) 2017-05-23 2017-05-23 The soft base combined type of coastal tidal, which is changed, fills out structure and Treatment Methods

Country Status (1)

Country Link
CN (1) CN107119520A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107805987A (en) * 2017-09-14 2018-03-16 中交第公路勘察设计研究院有限公司 The hassock layer Foam lightweight soil road structure and construction method in deep soft foundation section
CN108316078A (en) * 2018-03-26 2018-07-24 西南交通大学 Under wear both embankment structures of wired bridge and embankment method
CN109056441A (en) * 2018-09-04 2018-12-21 杭州昂创科技有限公司 The soft soil roadbed three-dimensional reinforced structure of convolution and construction method are knitted in stake-
CN109113045A (en) * 2018-10-13 2019-01-01 湖北安达泰建设工程有限公司 A kind of soft-soil foundation treatment method
CN109797616A (en) * 2019-03-01 2019-05-24 长沙理工大学 A kind of water quenching ferronickel slag, which changes, doses muscle cushion layer structure and its construction method
CN110158383A (en) * 2019-05-05 2019-08-23 浙江大东吴集团建设有限公司 Beach pavement construction method
CN110670432A (en) * 2019-09-09 2020-01-10 中国二十冶集团有限公司 Roadbed construction method for soft foundation area in rainy period
CN113802426A (en) * 2021-10-21 2021-12-17 华蓝设计(集团)有限公司 Method for treating recent road filling foundation by adopting rubble compaction reinforced cushion layer method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002038465A (en) * 2000-07-27 2002-02-06 Port & Airport Research Institute Excavation, solidification, and replacement method for foundation
CN103161109A (en) * 2011-12-13 2013-06-19 中国二十冶集团有限公司 Method for subgrade filling of peat soil subgrade by sea sand
CN206800092U (en) * 2017-05-23 2017-12-26 广西交通规划勘察设计研究院有限公司 The soft base combined type of coastal tidal, which is changed, fills out structure and Roadbed by offshore soft clay

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002038465A (en) * 2000-07-27 2002-02-06 Port & Airport Research Institute Excavation, solidification, and replacement method for foundation
CN103161109A (en) * 2011-12-13 2013-06-19 中国二十冶集团有限公司 Method for subgrade filling of peat soil subgrade by sea sand
CN206800092U (en) * 2017-05-23 2017-12-26 广西交通规划勘察设计研究院有限公司 The soft base combined type of coastal tidal, which is changed, fills out structure and Roadbed by offshore soft clay

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
刘伟: "沿海滩涂公路软基施工方法分析", 《福建交通科技》 *
周泽昶等: "广西滨海地区软土地基处理方法探讨", 《西部交通科技》 *
周铮等: "广西滨海公路滩涂软土地基复合式换填处治技术研究", 《中外公路》 *
张彩利等: "海砂回填路基沉降变形分析", 《公路》 *
蔡业茂: "海砂在软基处理中的应用", 《科技信息》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107805987A (en) * 2017-09-14 2018-03-16 中交第公路勘察设计研究院有限公司 The hassock layer Foam lightweight soil road structure and construction method in deep soft foundation section
CN108316078A (en) * 2018-03-26 2018-07-24 西南交通大学 Under wear both embankment structures of wired bridge and embankment method
CN109056441A (en) * 2018-09-04 2018-12-21 杭州昂创科技有限公司 The soft soil roadbed three-dimensional reinforced structure of convolution and construction method are knitted in stake-
CN109056441B (en) * 2018-09-04 2023-12-05 至永建设集团有限公司 Pile-weaving combined type soft soil roadbed three-dimensional reinforcement structure and construction method
CN109113045A (en) * 2018-10-13 2019-01-01 湖北安达泰建设工程有限公司 A kind of soft-soil foundation treatment method
CN109797616A (en) * 2019-03-01 2019-05-24 长沙理工大学 A kind of water quenching ferronickel slag, which changes, doses muscle cushion layer structure and its construction method
CN110158383A (en) * 2019-05-05 2019-08-23 浙江大东吴集团建设有限公司 Beach pavement construction method
CN110670432A (en) * 2019-09-09 2020-01-10 中国二十冶集团有限公司 Roadbed construction method for soft foundation area in rainy period
CN110670432B (en) * 2019-09-09 2021-07-27 中国二十冶集团有限公司 Roadbed construction method for soft foundation area in rainy period
CN113802426A (en) * 2021-10-21 2021-12-17 华蓝设计(集团)有限公司 Method for treating recent road filling foundation by adopting rubble compaction reinforced cushion layer method

Similar Documents

Publication Publication Date Title
CN107119520A (en) The soft base combined type of coastal tidal, which is changed, fills out structure and Treatment Methods
CN105862710B (en) A kind of drain bar and construction method for Tidal Flat Inning Area processing
CN103758113B (en) A kind of grid encloses the anti-liquefied foundation reinforcement means of hoop
CN109914173B (en) Foam light soil pouring table back structure in expressway reconstruction and extension project and construction method thereof
CN106930319A (en) A kind of high slope framed revetment and its construction method
CN109056439A (en) It is close to the multilayered structure and construction method of mountain high-fill roadbed
Zhao et al. Application of construction waste in the reinforcement of soft soil foundation in coastal cities
CN110080051B (en) Geotextile bag bridge type embankment structure and construction method thereof
CN110777588A (en) Pressure filling construction method for soil-stone mixed high-filling roadbed
CN113445396A (en) High-fill road foundation filling construction method for high liquid limit soil road section
CN109487640B (en) High-speed railway roadbed reinforcing structure in underdrain development area and construction method
CN209039896U (en) The soft soil roadbed three-dimensional reinforced structure of convolution is knitted in a kind of stake-
CN206800092U (en) The soft base combined type of coastal tidal, which is changed, fills out structure and Roadbed by offshore soft clay
CN106836034B (en) High-fill cover plate culvert flexible load shedding system and construction method
CN115288162B (en) Reinforcing method for soft soil foundation filling side slope
AU2021102288A4 (en) Composite Replacement Structure and Treatment for Soft Base of Coastal Mudflat
CN116377780A (en) Mountain highway high-fill roadbed filling construction method
CN115652717A (en) High-fill roadbed construction method
CN106978770A (en) A kind of cheuch phase weak soil combined type, which is changed, fills out structure and Treatment Methods
Sapkota Effect of Modified Moisture Barriers on Slopes Stabilized with Recycled Plastic Pins
CN109056441A (en) The soft soil roadbed three-dimensional reinforced structure of convolution and construction method are knitted in stake-
CN108316077A (en) One kind underlies shallow embedding cave dwelling roadbed treatment structures and method
CN109082961A (en) Road construction method with abrupt slope
CN113005839A (en) Treatment process of bad soil roadbed
CN209039893U (en) It is close to the multilayered structure of mountain high-fill roadbed

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170901

RJ01 Rejection of invention patent application after publication