CN203049577U - Complete recovery type non-grouting anchor grasping anchor cable timbering structure - Google Patents
Complete recovery type non-grouting anchor grasping anchor cable timbering structure Download PDFInfo
- Publication number
- CN203049577U CN203049577U CN 201320018281 CN201320018281U CN203049577U CN 203049577 U CN203049577 U CN 203049577U CN 201320018281 CN201320018281 CN 201320018281 CN 201320018281 U CN201320018281 U CN 201320018281U CN 203049577 U CN203049577 U CN 203049577U
- Authority
- CN
- China
- Prior art keywords
- anchor
- connecting rod
- girder
- grabbed
- casing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model relates to a complete recovery type non-grouting anchor grasping anchor cable timbering structure. The complete recovery type non-grouting anchor grasping anchor cable timbering structure comprises a plate girder, wherein the plate girder is composed of a girder and a ribbed plate, screw holes are placed by the girder at intervals, are placed at the two ends of the ribbed plate, and are connected with a girder screw; and a screw rod connecting hole formed at the end portion of the girder is connected with the anchor. The complete recovery type non-grouting anchor grasping anchor cable timbering structure is characterized in that the complete recovery type non-grouting anchor grasping anchor cable is composed of a timbering support, a connecting rod, a fluke plate, opening stretching wires, recovery bracing wires, steel stranded wires, a pile casing, and an anchor head, wherein a pile casing sleeve is located at the front end of the timbering support, stretching wires are connected with the two ends of the pile casing, the opening stretching wires are connected with a retaining ring of the connecting rod, the recovery stretching lines are connected with a recovery retaining ring of the timbering support, and opposite angles penetrate through the retaining ring of the connecting rod. By adopting the structure, the complete recovery type non-grouting anchor grasping anchor cable timbering structure basically solves the problems of the timbering structure of recovery of anchor cables of foundation trench side slopes and the like, achieves the purposes of leaving no traces and no pollution, has great significance to development and utilization of urban underground space, and avoids occurrence of the problems of ' red line' construction in developed countries.
Description
Technical field
The utility model relates to the non-grouting anchor of a kind of complete reclaiming type and grabs the cable bolting structure, is applicable to foundation ditch and all kinds of ground, open-pit slope and chamber.
Background technology
Deep foundation pit supporting structure pattern at present commonly used has cement-soil gravity supporting and protection structure, soil nailed wall retaining structure, pile-anchor retaining structure, stake support supporting and protection structure and five kinds of supporting and protection structure patterns of diaphragm wall, may only adopt single supporting and protection structure pattern in the engineering, also may adopt two or more supporting and protection structure pattern comprehensively to reduce cost.Also there is corresponding shortcoming in various supporting and protection structure in its advantage of performance.
Cement-soil gravity barricade compressive strength height, but tension and anti-side rigidity are less, the displacement of barricade top is bigger, to surrounding buildings thing, road, and piping facility security presence potential threat; It is subjected to degree of depth restriction bigger, is not suitable for the darker pattern foundation pit supporting structure of the supporting degree of depth.
Soil-nail wall support arranges soil nailing needs the bigger underground space, and soil nailing belongs to flexible support, is easy to generate moderate finite deformation, when foundation pit deformation is had strict demand, should not adopt the plate brad supporting structure, simultaneously soil nature be had relatively high expectations, be not suitable for being used in weak soil and the loosening sand stratum.
The shared working space of pile-anchor retaining is bigger, and setting up of anchor pole requires the place that spacious surrounding enviroment and the good underground space are arranged; Stable soil layer or rock stratum need be arranged so that anchoring body to be set; Use the pile-anchor retaining structure when the too poor or soil pressure of geological conditions is too big, the curved destruction or the destruction of toppling that be subjected to of supporting and protection structure taken place easily.
The dismounting that the inner support of stake support supporting forms necessary strength and inner support all need occupy certain duration, the inner support of arranging in the foundation ditch has reduced working space, increased the difficulty of excavation, muck haulage and underground structure construction, be unfavorable for raising labour efficiency and saving the duration, along with the increase of cutting depth, this adverse effect is more obvious; When the foundation ditch planar dimension is big, not only to increase the length of inner support, the sectional dimension of inner support also increases thereupon, and economy is relatively poor.
Diaphragm wall cost height, construction technical requirement height, spoir and waste mud need to handle, and except increasing engineering cost, as deal with improperly, also can cause new environment pollution.In addition, the construction of continuous concrete wall duration is generally longer.
Emerging enlarged footing anchor cable and recoverable anchor cable have stronger advantage in recent years.The enlarged footing anchor cable can reduce than the anchoring section length of common anchor cable, and anchor cable construction reduces the influence of surrounding building, and safety improves.The place of some original unconditional construction anchor cable also becomes feasible.The quantity in anchor cable hole reduces, to the globality of underground diaphragm wall with prevent from being leaked with benefit.The uplift resistance of enlarged footing anchor cable can improve more than 2~3 times than common anchor cable, and therefore, the radical of anchor cable and whole project can reduce more than 50%, consider the influence of the some other factor in the actual engineering, and engineering quantity and total cost can reduce about 30%.The enlarged footing anchor cable can overcome the shortcoming of common anchor cable effectively, and single uplift resistance is big, and displacement is little, reliability height, good economy performance; Recoverable anchor cable place compliance is strong, when being used for the temporary work reinforcing, after finishing, its function of use can realize the recovery of anchor cable body easily, thereby can not cause engineering to close on the pollution of the underground space and the obstacle of subsequent development, in the urban construction afterwards wide application prospect will be arranged.
But all exist the job practices complexity in the existing deep foundation pit support technology, the construction costs costliness, the recoverable anchor cable also can not be realized reclaiming fully, etc. problem.In application number was 200410027469.0 Chinese patent, the recyclable anchor cable of the civil engineering that the inventor proposes had been realized the partially recycled of anchor cable, but still left a part of cement paste and metal material in the soil body; In application number was 200620130273.9 Chinese patent, the recoverable prestress anchorage cable that the inventor proposes can be realized the recovery of anchor cable, but still leaves cement paste in the soil body, and recovering means need be by the hoist engine main equipment; In application number was 200910116447 Chinese patent, earth-layer internally strutting umbelliform earth anchor head and strutting tool thereof that the inventor proposes need not grouting, but can not reclaim, and can cause the soil body plastic failure when load is excessive simultaneously, and anchored force is subjected to certain restriction.More than three kinds of inventions in existing literature, there is no and promote the use of.
The utility model content
It is a kind of simple in structure, easy to use that one of the purpose of this utility model is to provide, and the non-grouting anchor of reclaiming type is grabbed anchor cable fully, is used for supporting foundation pit, all kinds of ground, open-pit slope and chamber etc.
Two of the purpose of this utility model is to provide a kind of supporting plate-girder of recyclable utilization, is used for supporting foundation pit, all kinds of ground, open-pit slope and chamber etc.
Last purpose of the present utility model is achieved in that and comprises plate-girder, and this plate-girder is made up of girder and floor, and girder is by the pitch arrangement screw, and screw is arranged at the floor two ends, joins with the girder screw rod; The girder end is provided with the screw rod connecting hole and is connected with form anchor (81), it is characterized in that: the non-grouting anchor of this complete reclaiming type grab anchor cable by supporting frame, connecting rod, anchor fluke plate, open backguy, reclaim backguy, steel strand, casing, anchor head form, wherein casing is enclosed within the front end of supporting frame, the casing two ends are connected with backguy respectively, open on the clasp that backguy is connected connecting rod, reclaim backguy and be connected on the recovery clasp of supporting frame, the diagonal angle passes the clasp of connecting rod.
Described supporting frame is made up of skeleton bar, annulus, end bar, support bar, end platform, round platform, fixed bar, tension member, casing clasp, recovery clasp.Wherein the skeleton bridge is located on the annulus, be provided with the end bar in the end of skeleton bar, be welded with support bar between end bar and the end platform, the diagonal angle is furnished with the casing clasp on the bar of end, the annulus adjacent with the end bar is provided with round platform, be connected with fixed bar between round platform and the annulus, be welded with tension member at the opposite side of this annulus, the end of tension member is provided with the steel strand connecting hole.
The described end tablecloth has the perforation of connecting rod major part, and round platform is furnished with connecting rod microcephaly perforation, and the tension member end is furnished with the steel strand connecting hole.
Described connecting rod is made up of connecting rod major part, connecting rod microcephaly and disk, and connecting rod microcephaly end is provided with and reclaims the backguy clasp; The connecting rod major part of connecting rod and connecting rod microcephaly penetrate the connecting rod major part perforation of supporting frame end platform and the connecting rod microcephaly perforation of round platform respectively.
Described steel strand are connected on the steel strand connecting hole of tension member, and the other end is connected on the crab-bolt, and the grappling cap penetrates in the form anchor, and join with the crab-bolt screw thread.
Described anchor fluke plate adopts roller bearing with being connected of supporting frame, the casing clasp that contacts with the casing backguy adopts truckle, one of them adopts truckle to reclaim clasp, and contacting between casing and the supporting frame can be adopted roller bearing or truckle, all is to reduce resistance with the top sheave purpose.
The further improvement project of the present invention is: the antirust, anti-corrosive layer can be set, to increase the application life of anchor cable.
The present invention also further improvement project be: movable connecting rod is not set, only adopt casing that the anchor fluke plate is opened, anchor is grabbed plate and is relied on the stressed locking condition that is of extruding mutually, though not recyclable like this, but can be used for the permanent improvement of side slope, can save a part of steel.
Another object of the present invention is achieved in that screw rod connects between girder and the form anchor, adopts screw rod to connect between floor and the girder, is provided with suspension ring in the termination of girder.
The present invention adopts said structure, substantially solved the recovery problem of supporting and protection structure stream lines such as excavation slope, can accomplish to leave no trace, pollution-free, development and use to urban underground space are significant, avoided " red line " construction problem in the developed country.Because of rational in infrastructure, easy to process, processing ease is reliable, and construction and recovery speed are all very fast, and development potentiality is huge.Compared with the prior art, have following clear superiority:
(1) rational in infrastructure, simple to operate easy, construction and recovery speed are all very fast, need not large-sized power plant.
(2) flexible and convenient to use, can be processed into the anchor cable of corresponding stressed size according to different soil pressures.
(3) need not be in the milk, pore-forming gets final product stretch-draw, need not the cement strength time, and all supporting and protection structure all can reclaim fully, thoroughly accomplishes pollution-free.
(4) support cost is cheap, and the member of recovery can reuse again.
(5) supporting process does not influence the construction of other operations, can greatly shorten construction speed.
Description of drawings
Fig. 1 is the partial perspective view of anchor cable structure.
Fig. 2 is the structural representation of connecting rod.
Fig. 3 is the structural representation that anchor is grabbed plate.
Fig. 4 is the overall structure schematic diagram.
Fig. 5 is the partial front elevation view of anchor cable structure.
Fig. 6 is the structural representation of anchor head.
Among the figure,--1, connecting rod--2, the anchor fluke plate--3, open backguy--4, reclaim backguy--5, steel strand--6, casing--7, anchor head--8, skeleton bar-11, annulus-12, end bar-13, support bar-14, end platform-15, round platform-16, fixed bar-17, tension member-18, casing clasp-19, connecting rod major part-21, connecting rod microcephaly-22, disk-23, reclaim backguy clasp-24, connecting rod major part perforation-111, connecting rod microcephaly perforation-112, steel strand connecting hole-113, form anchor-81, grappling cap-82, crab-bolt-83 to the supporting frame.
The specific embodiment
Below in conjunction with accompanying drawing the present invention is done to describe further: but use of the present invention is not constituted any restriction.
Casing (7) is enclosed within the front end of supporting frame (1), casing (7) two ends are connected with backguy respectively, opening backguy (4) is connected on the clasp of connecting rod (2), reclaiming backguy (5) is connected on the recovery clasp of supporting frame (1), the diagonal angle passes the clasp of connecting rod, can spur casing and locate to the casing clasp (19) of end bar (13), casing bottom clasp can be return the original place under the effect of backguy.Reclaim backguy (5) when promoting connecting rod (2), pulling steel strand (6), anchor are grabbed plate (3) can rotate and promote disk (23) slip on the connecting rod (2) backward.
Skeleton bar (11) is erected on the annulus (12), be provided with end bar (13) in the end of skeleton bar, be welded with support bar (14) between end bar (13) and the end platform (15), go up the diagonal angle at end bar (13) and be furnished with casing clasp (19), the annulus adjacent with end bar (13) is provided with round platform (16), be connected with fixed bar (17) between round platform (16) and the annulus, be welded with tension member (18) at the opposite side of this annulus, the end of tension member is provided with the steel strand connecting hole.
Connecting rod (2) is made up of connecting rod major part (21), connecting rod microcephaly (22) and disk (23), and connecting rod microcephaly (22) end is provided with and reclaims backguy clasp (24); The connecting rod major part (21) of connecting rod (2) and connecting rod microcephaly (22) penetrate the connecting rod major part perforation (111) of supporting frame (1) end platform (15) and the connecting rod microcephaly perforation (112) of round platform (16) respectively.
Anchor head (8) is made up of form anchor (81), grappling cap (82) and crab-bolt (83), can pass grappling cap (82) after crab-bolt (83) one ends and steel strand (6) join and screw thread joins, and grappling cap (82) can penetrate form anchor (81).
Steel strand (6) are connected on the steel strand connecting hole (113) of tension member (18), and the other end is connected on the crab-bolt (83), and grappling cap (82) penetrates in the form anchor (81), and join with crab-bolt (83) screw thread.Steel strand (6) and steel strand connecting hole (113) are with after crab-bolt (83) is connected, and backguy (4) is opened in pulling, when the disk (23) on the connecting rod (2) slides, can promote anchor grab plate (3) to around open.
Anchor is grabbed plate (3) and is adopted roller bearing with being connected of supporting frame (1); Anchor is grabbed casing clasp (19) the employing truckle that plate (3) contacts with the casing backguy.
Contacting between casing (7) and the supporting frame (1) can be adopted roller bearing or truckle.
During use, the anchor cable rig to desired depth, carries out reaming with hole drill then, reach preset aperture after, rig is proposed.Grab anchor cable with the non-grouting anchor of complete reclaiming type and put into the hole this moment, under the thrust of steel strand (6), enter predetermined hole depth, and make anchor fluke plate (3) enter fully to be vacant state in the reaming, backguy (4) is opened in pulling then, connecting rod glides, disk (23) slides outside the hole and pushes four anchor fluke plates (3) open and open, and this moment, the connecting rod major part was displaced downwardly to the anchor fluke head place of anchor fluke plate, and the anchor fluke head compresses locked mutually; Then drag steel strand (6) outwardly, anchor is grabbed plate (3) and is contacted all around with the reaming aperture, spur the backguy on casing (7) end then, casing moves arrival supporting frame (1) end bar (13) position in the hole, at this moment the crab-bolt (83) that will be connected with steel strand (6) outside the hole is passed form anchor (81), and form anchor (81) is enclosed within the place, aperture, and crab-bolt (83) is joined with grappling cap (82) screw thread, clamp crab-bolt (83) with ground tackle at last steel strand (6) are carried out stretch-draw, and screw grappling cap (82).
During recovery, unclamp grappling cap (82) earlier, take out form anchor (81), steel strand this moment (6) are in relaxed state, steel strand (6) are promoted in the hole, loosening anchor is grabbed plate (3), backguy (5) is reclaimed in pulling then, and connecting rod this moment (2) slides in reaming, and connecting rod major part (21) also moves in reaming, pulling steel strand (6), move to the anchor handgrip place of anchor fluke plate at this moment on the microcephaly of connecting rod, the release of anchor fluke hand can be rotated to pore size towards 180 degree, four anchors are grabbed plate (3) and are turn in the hole and hole parallelly, and at this moment dragging steel strand can all reclaim anchor cable.
Screw rod connects between girder and the form anchor, adopts screw rod to connect between floor and the girder.Termination at girder is provided with suspension ring, unclamp and form anchor between screw rod after, hang the supporting object.
Claims (8)
1. the non-grouting anchor of reclaiming type is grabbed the cable bolting structure fully, comprises plate-girder, and this plate-girder is made up of girder and floor, and girder is by the pitch arrangement screw, and screw is arranged at the floor two ends, joins with the girder screw rod; The girder end is provided with the screw rod connecting hole and is connected with form anchor (81), it is characterized in that: the non-grouting anchor of this complete reclaiming type grab anchor cable by supporting frame (1), connecting rod (2), anchor fluke plate (3), open backguy (4), reclaim backguy (5), steel strand (6), casing (7), anchor head (8) form, wherein casing (7) is enclosed within the front end of supporting frame (1), casing (7) two ends are connected with backguy respectively, opening backguy (4) is connected on the clasp of connecting rod (2), reclaim backguy (5) and be connected on the recovery clasp of supporting frame (1), the diagonal angle passes the clasp of connecting rod.
2. the non-grouting anchor of complete reclaiming type according to claim 1 is grabbed the cable bolting structure, it is characterized in that: wherein skeleton bar (11) is erected on the annulus (12), be provided with end bar (13) in the end of skeleton bar, be welded with support bar (14) between end bar (13) and the end platform (15), go up the diagonal angle at end bar (13) and be furnished with casing clasp (19), the annulus adjacent with end bar (13) is provided with round platform, be connected with fixed bar (17) between round platform and the annulus, opposite side at this annulus is welded with tension member (18), and the end of tension member is provided with the steel strand connecting hole.
3. the non-grouting anchor of complete reclaiming type according to claim 1 is grabbed the cable bolting structure, it is characterized in that: described connecting rod (2) is made up of connecting rod major part (21), connecting rod microcephaly (22) and disk (23), and connecting rod microcephaly (22) end is provided with and reclaims backguy clasp (24); The connecting rod major part (21) of connecting rod (2) and connecting rod microcephaly (22) penetrate the connecting rod major part perforation (111) of supporting frame (1) end platform (15) and the connecting rod microcephaly perforation (112) of round platform (16) respectively.
4. the non-grouting anchor of complete reclaiming type according to claim 1 is grabbed the cable bolting structure, it is characterized in that: described anchor head (8) is made up of form anchor (81), grappling cap (82) and crab-bolt (83), can pass grappling cap (82) after crab-bolt (83) one ends and steel strand (6) join and screw thread joins, grappling cap (82) can penetrate form anchor (81).
5. the non-grouting anchor of complete reclaiming type according to claim 1 is grabbed the cable bolting structure, it is characterized in that: described steel strand (6) are connected on the steel strand connecting hole (113) of tension member (18), the other end is connected on the crab-bolt (83), grappling cap (82) penetrates in the form anchor (81), and joins with crab-bolt (83) screw thread.
6. the non-grouting anchor of complete reclaiming type according to claim 1 is grabbed the cable bolting structure, it is characterized in that: described anchor is grabbed plate (3) and is adopted roller bearing with being connected of supporting frame (1); Anchor is grabbed casing clasp (19) the employing truckle that plate (3) contacts with the casing backguy.
7. the non-grouting anchor of complete reclaiming type according to claim 1 is grabbed the cable bolting structure, it is characterized in that: contacting between casing (7) and the supporting frame (1) adopted roller bearing.
8. the non-grouting anchor of complete reclaiming type according to claim 1 is grabbed the cable bolting structure, it is characterized in that: contacting between casing (7) and the supporting frame (1) adopted truckle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320018281 CN203049577U (en) | 2013-01-15 | 2013-01-15 | Complete recovery type non-grouting anchor grasping anchor cable timbering structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320018281 CN203049577U (en) | 2013-01-15 | 2013-01-15 | Complete recovery type non-grouting anchor grasping anchor cable timbering structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203049577U true CN203049577U (en) | 2013-07-10 |
Family
ID=48732548
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320018281 Expired - Fee Related CN203049577U (en) | 2013-01-15 | 2013-01-15 | Complete recovery type non-grouting anchor grasping anchor cable timbering structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203049577U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110608061A (en) * | 2019-08-14 | 2019-12-24 | 四川大学 | Prestressed grouting anchor rod and installation and recovery method thereof |
CN112681303A (en) * | 2020-12-15 | 2021-04-20 | 陕西建工第六建设集团有限公司 | High-water-pressure soil layer anchor cable support construction method |
CN113322948A (en) * | 2021-06-01 | 2021-08-31 | 广西大学 | Device capable of replacing and recovering steel wire rope anchor rod and recovery method |
CN113529707A (en) * | 2021-08-10 | 2021-10-22 | 哈尔滨工业大学 | Umbrella-shaped light anchor rod, slope supporting structure and construction method thereof |
-
2013
- 2013-01-15 CN CN 201320018281 patent/CN203049577U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110608061A (en) * | 2019-08-14 | 2019-12-24 | 四川大学 | Prestressed grouting anchor rod and installation and recovery method thereof |
CN110608061B (en) * | 2019-08-14 | 2024-04-05 | 四川大学 | Prestressed grouting anchor rod and installation and recovery method thereof |
CN112681303A (en) * | 2020-12-15 | 2021-04-20 | 陕西建工第六建设集团有限公司 | High-water-pressure soil layer anchor cable support construction method |
CN113322948A (en) * | 2021-06-01 | 2021-08-31 | 广西大学 | Device capable of replacing and recovering steel wire rope anchor rod and recovery method |
CN113529707A (en) * | 2021-08-10 | 2021-10-22 | 哈尔滨工业大学 | Umbrella-shaped light anchor rod, slope supporting structure and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101851925A (en) | Deep mixing pile-micro pre-stressed steel pipe concrete pile-vertical anchor rod composite foundation pit support method | |
CN104179178A (en) | Flexible umbrella supporting anchor bolt and method for supporting soil slope thereby | |
CN104213509B (en) | A kind of cable hoisting anchor cable formula anchorage construction method | |
CN203049577U (en) | Complete recovery type non-grouting anchor grasping anchor cable timbering structure | |
CN103306289A (en) | Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof | |
CN103572701A (en) | Buckling anchor system combined rock anchor | |
CN103498574B (en) | After in masonry panel, increase stem stem Shockproof reinforcing method | |
CN104947663B (en) | Special drive type umbrella-shaped anchor for rushing to deal with emergency as well as application method of anchor | |
CN108203984A (en) | A kind of Dangerous Rock Body bolting with wire mesh method | |
CN110616740A (en) | Structure for expanding subway section in subway mine method construction interval and construction method thereof | |
CN101694098B (en) | Recyclable prestressed tendon for soft oil support and construction method thereof | |
CN205171547U (en) | Recoverable miniature stock wall | |
CN103883339B (en) | A kind of cable bolting method repeating Shi Hanzhang | |
CN207959225U (en) | One kind is certainly into the pull-type steel sheet pile supporting construction of churning anchor | |
CN109537592A (en) | The anchor cable invaded within the scope of interlocking pile cuts off construction method | |
CN203867598U (en) | Anchor cable capable of applying prestress repeatedly | |
CN201671104U (en) | Combined tower type crane base | |
CN203583501U (en) | Deep-layer shear resistant device capable of preventing rock sliding | |
CN216238507U (en) | Dig quick pore-forming dado structure soon | |
CN202164599U (en) | Reinforcing pile enabling reinforcing rib body to be recycled | |
CN204982875U (en) | Special use of speedily carrying out rescue work is hit into formula umbellate form anchor | |
CN203716145U (en) | Orientation steel pipe locking prestress multiple anchor rope | |
CN102359107B (en) | Stiffening pile for reclaiming reinforcing body | |
CN205677538U (en) | A kind of anchor bit of Recyclable anchor rope | |
CN103883341B (en) | One can repeat to apply prestressed anchor cable |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130710 Termination date: 20150115 |
|
EXPY | Termination of patent right or utility model |