CN101851925A - Deep mixing pile-micro pre-stressed steel pipe concrete pile-vertical anchor rod composite foundation pit support method - Google Patents

Deep mixing pile-micro pre-stressed steel pipe concrete pile-vertical anchor rod composite foundation pit support method Download PDF

Info

Publication number
CN101851925A
CN101851925A CN 201010195079 CN201010195079A CN101851925A CN 101851925 A CN101851925 A CN 101851925A CN 201010195079 CN201010195079 CN 201010195079 CN 201010195079 A CN201010195079 A CN 201010195079A CN 101851925 A CN101851925 A CN 101851925A
Authority
CN
China
Prior art keywords
steel pipe
pile
deep
stressed steel
pipe concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010195079
Other languages
Chinese (zh)
Inventor
姚小波
刘国清
江永建
柳文涛
万加勤
胡兴坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC
Original Assignee
Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC filed Critical Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC
Priority to CN 201010195079 priority Critical patent/CN101851925A/en
Publication of CN101851925A publication Critical patent/CN101851925A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention provides a deep mixing pile-micro pre-stressed steel pipe concrete pile-vertical anchor rod composite foundation pit support method. The method comprises the following steps: (1) constructing the deep mixing pile; (2) grouting at an anchoring end; and (3) forming the micro pre-stressed steel pipe concrete pile. The method has the advantages that as the deep mixing pile is equipped with the micro pre-stressed steel pipe pile and an anchor rod or an anchor rope, the bending and shearing bearing capacity thereof is improved; the antidumping and anti-slip capability of the wall body of the mixing pile is improved under the condition of not exceeding a land red line; and meanwhile the combined support method has the advantages of short construction period, low noise, no pollution and no soil squeezing and is very beneficial to environmental protection during the construction process, thus being a novel combined support member and a method which are worth to be popularized and applied.

Description

Deep-mixed pile+micro pre-stressed steel pipe concrete stake+vertical anchor rod composite foundation pit support method
Technical field
The present invention relates to technical field of buildings, a kind of specifically deep-mixed pile+micro pre-stressed steel pipe concrete stake+vertical anchor rod composite foundation pit support method.
Background technology
The safety of foundation ditch is directly connected to the safety of life and property, how to guarantee the safety of foundation ditch under the condition of economical rationality, and crucial problem depends on the reliability of support system.And the conventional deep-mixed pile gravity barricade that uses, it is all relatively poor that its bending resistance, shearing resistance, overturning or slip resistance analysis and antiskid move ability, is easy to produce under the soil pressure effect destroy, and influences the safety of foundation ditch and surrounding building, therefore, is necessary prior art is improved.
Summary of the invention
The objective of the invention is to develop and a kind ofly can effectively improve the bending resistance of deep-mixed pile gravity barricade, shearing resistance, overturning or slip resistance analysis and antiskid and move ability, and easy construction, deep-mixed pile+micro pre-stressed steel pipe concrete stake+vertical anchor rod composite foundation pit support method that cost is low.
Deep-mixed pile of the present invention+micro pre-stressed steel pipe concrete stake+vertical anchor rod composite foundation pit support method, its step is as follows:
1, construction deep-mixed pile;
2, Deep Mixing Piles Construction was finished in 12 hours, with engineering driller pore-forming in agitation pile, anchor pole or anchor cable was inserted the anchored end soil layer, carried out anchored end slip casting;
3, treat slurries solidify after with steel pipe socket at the bottom of passing the agitation pile endoporus on anchor pole or the anchor cable and inserting deep-mixed pile, build the concrete cover plate and solidify the post tensioning anchor pole or anchor cable applies prestressing force and locks with ground tackle, cement injection or pea gravel concreten in steel pipe form the micro pre-stressed steel pipe concrete stake again.
Described anchored end external diameter, outer diameter of steel pipes are identical with agitation pile endoporus external diameter.
Steel pipe can be round steel pipe or square steel pipe in the described deep-mixed pile.
Described anchor pole is a Ribbed Bar, and described anchor cable is a steel hinge line.
The advantage of deep-mixed pile of the present invention+micro pre-stressed steel pipe concrete stake+vertical anchor rod composite foundation pit support method is: because micro pre-stressed steel pipe stake and anchor pole or anchor cable are set in deep-mixed pile, improved its bending resistance, shear-carrying capacity, the overturning or slip resistance analysis and the antiskid that improve the agitation pile body of wall simultaneously under the situation that does not exceed the land used red line move ability.This combination supporting worker method duration in work progress is short, noise is little, pollution-free, soil compaction not, and is very favourable to environmental protection, is a kind of novel combination supporting member and method that is worthy of promotion and application therefore.
Description of drawings
Fig. 1 is the engineering effort figure of deep-mixed pile+micro pre-stressed steel pipe concrete stake+vertical anchor rod composite foundation pit support method.
Fig. 2 is that the engineering of deep-mixed pile+micro pre-stressed steel pipe concrete stake+vertical anchor rod composite foundation pit support method is overlooked design sketch.
The specific embodiment
Embodiment one
According to Fig. 1, shown in Figure 2, a kind of deep-mixed pile+micro pre-stressed steel pipe concrete stake+vertical anchor rod composite foundation pit support method, its step is as follows:
1, construction deep-mixed pile;
2, Deep Mixing Piles Construction was finished in 12 hours, with engineering driller pore-forming in agitation pile, Ribbed Bar was inserted the anchored end soil layer, carried out anchored end slip casting;
3, treat slurries solidify after with round steel pipe be enclosed within pass the agitation pile endoporus on the Ribbed Bar and insert deep-mixed pile at the bottom of, build the concrete cover plate and solidify the post tensioning Ribbed Bar and apply prestressing force and lock with ground tackle, cement injection in round steel pipe forms the micro pre-stressed steel pipe concrete stake again.
Described anchored end external diameter, outer diameter of steel pipes are identical with agitation pile endoporus external diameter.
Embodiment two
According to Fig. 1, shown in Figure 2, a kind of deep-mixed pile+micro pre-stressed steel pipe concrete stake+vertical anchor rod composite foundation pit support method, its step is as follows:
1, construction deep-mixed pile;
2, Deep Mixing Piles Construction was finished in 12 hours, with engineering driller pore-forming in agitation pile, steel hinge line was inserted the anchored end soil layer, carried out anchored end slip casting;
3, treat slurries solidify after with square steel pipe be enclosed within pass the agitation pile endoporus on the steel hinge line and insert deep-mixed pile at the bottom of, build the concrete cover plate and solidify the post tensioning steel hinge line and apply prestressing force and lock with ground tackle, in square steel pipe, annotate pea gravel concreten again, form the micro pre-stressed steel pipe concrete stake.
Described anchored end external diameter, outer diameter of steel pipes are identical with agitation pile endoporus external diameter.
The invention is not restricted to above embodiment, can realize a plurality of different embodiment as required.

Claims (2)

1. deep-mixed pile+micro pre-stressed steel pipe concrete stake+vertical anchor rod composite foundation pit support method, it is characterized in that: its step is as follows:
(1) construction deep-mixed pile;
(2) Deep Mixing Piles Construction was finished in 12 hours, with engineering driller pore-forming in agitation pile, anchor pole or anchor cable was inserted the anchored end soil layer, carried out anchored end slip casting;
(3) treat slurries solidify after with steel pipe socket at the bottom of passing the agitation pile endoporus on anchor pole or the anchor cable and inserting deep-mixed pile, build the concrete cover plate and solidify the post tensioning anchor pole or anchor cable applies prestressing force and locks with ground tackle, cement injection or pea gravel concreten in steel pipe form the micro pre-stressed steel pipe concrete stake again.
2. deep-mixed pile according to claim 1+micro pre-stressed steel pipe concrete stake+vertical anchor rod composite foundation pit support method is characterized in that: described anchored end external diameter, outer diameter of steel pipes are identical with agitation pile endoporus external diameter.
CN 201010195079 2010-06-03 2010-06-03 Deep mixing pile-micro pre-stressed steel pipe concrete pile-vertical anchor rod composite foundation pit support method Pending CN101851925A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010195079 CN101851925A (en) 2010-06-03 2010-06-03 Deep mixing pile-micro pre-stressed steel pipe concrete pile-vertical anchor rod composite foundation pit support method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010195079 CN101851925A (en) 2010-06-03 2010-06-03 Deep mixing pile-micro pre-stressed steel pipe concrete pile-vertical anchor rod composite foundation pit support method

Publications (1)

Publication Number Publication Date
CN101851925A true CN101851925A (en) 2010-10-06

Family

ID=42803595

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010195079 Pending CN101851925A (en) 2010-06-03 2010-06-03 Deep mixing pile-micro pre-stressed steel pipe concrete pile-vertical anchor rod composite foundation pit support method

Country Status (1)

Country Link
CN (1) CN101851925A (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561363A (en) * 2012-02-08 2012-07-11 上海强劲地基工程股份有限公司 Prestressed gravity type cement parapet wall and construction method thereof
CN102839659A (en) * 2012-09-25 2012-12-26 吴良斌 Construction method for leading anchor pipe and minitype steel pipe pile
CN103352477A (en) * 2013-07-12 2013-10-16 青岛理工大学 Vertical prestressed anchor rod gravity type composite retaining wall and design and construction method thereof
CN103526773A (en) * 2013-10-22 2014-01-22 青岛理工大学 Cantilever type vertical anchor rod composite retaining wall and design and construction method thereof
CN104452771A (en) * 2014-11-06 2015-03-25 左克伟 Counterfort type row pile supporting method for foundation pit
CN104563111A (en) * 2014-12-01 2015-04-29 浙江省岩土基础公司 Construction method for rock embedding of inclined pile
CN104711991A (en) * 2013-12-12 2015-06-17 中国核工业第五建设有限公司 Foundation near foundation pit slope and reinforcement method thereof
CN104727322A (en) * 2015-03-20 2015-06-24 济南轨道交通集团有限公司 Recoverable device for fixing anchor rod with steel pipe pile and construction method
CN106337418A (en) * 2015-07-10 2017-01-18 华北冶建工程建设有限公司 Supporting structure and supporting method of deep foundation pit in narrow area
CN106759322A (en) * 2017-01-12 2017-05-31 兰州理工大学 Rib Reinforced reinforced anchor bolt lockset and application method
CN106759266A (en) * 2017-01-09 2017-05-31 王立明 Combination reinforcement diaphragm wall and its construction method
CN106968245A (en) * 2017-05-18 2017-07-21 重庆科技学院 The uplift pile of prestress anchorage cable manually digging hole and its construction method
CN107338792A (en) * 2017-06-16 2017-11-10 中建市政工程有限公司 Prestressed cement mixing pile and construction method thereof
CN109853598A (en) * 2019-03-29 2019-06-07 西安工业大学 A kind of mini pile rigid connection structure and construction method for having both landslide-proofing and producing road
CN109930609A (en) * 2019-04-09 2019-06-25 大连交通大学 A kind of campshed composite supporting construction and its construction method for upper-soft lower-hard ground
CN110130360A (en) * 2019-05-10 2019-08-16 中国建筑西南勘察设计研究院有限公司 A kind of post-tensioned prestressing supporting construction and its construction method
CN114108694A (en) * 2021-11-11 2022-03-01 中冶集团武汉勘察研究院有限公司 Micro-disturbance anti-floating underground cylindrical structure and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56125528A (en) * 1980-03-06 1981-10-01 Nittoku Kensetsu Kk Construction of in-situ driven pile
JPH06330524A (en) * 1993-05-20 1994-11-29 Taisei Corp Construction method of cast-place pile used for anchor
CN101619574A (en) * 2009-07-28 2010-01-06 朱奎 Prestress pulling resistant anchor pile and constructing method thereof
CN101629422A (en) * 2009-08-06 2010-01-20 朱奎 Construction method for supporting foundation ditch of reinforced cement earth wall

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56125528A (en) * 1980-03-06 1981-10-01 Nittoku Kensetsu Kk Construction of in-situ driven pile
JPH06330524A (en) * 1993-05-20 1994-11-29 Taisei Corp Construction method of cast-place pile used for anchor
CN101619574A (en) * 2009-07-28 2010-01-06 朱奎 Prestress pulling resistant anchor pile and constructing method thereof
CN101629422A (en) * 2009-08-06 2010-01-20 朱奎 Construction method for supporting foundation ditch of reinforced cement earth wall

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561363A (en) * 2012-02-08 2012-07-11 上海强劲地基工程股份有限公司 Prestressed gravity type cement parapet wall and construction method thereof
CN102839659A (en) * 2012-09-25 2012-12-26 吴良斌 Construction method for leading anchor pipe and minitype steel pipe pile
CN102839659B (en) * 2012-09-25 2015-11-18 吴良斌 The construction method of a kind of advanced anchor tube and miniature steel pipe pile
CN103352477A (en) * 2013-07-12 2013-10-16 青岛理工大学 Vertical prestressed anchor rod gravity type composite retaining wall and design and construction method thereof
CN103526773A (en) * 2013-10-22 2014-01-22 青岛理工大学 Cantilever type vertical anchor rod composite retaining wall and design and construction method thereof
CN104711991A (en) * 2013-12-12 2015-06-17 中国核工业第五建设有限公司 Foundation near foundation pit slope and reinforcement method thereof
CN104452771A (en) * 2014-11-06 2015-03-25 左克伟 Counterfort type row pile supporting method for foundation pit
CN104563111A (en) * 2014-12-01 2015-04-29 浙江省岩土基础公司 Construction method for rock embedding of inclined pile
CN104563111B (en) * 2014-12-01 2016-06-22 浙江省岩土基础公司 A kind of construction method of taper pile anchor rock
CN104727322A (en) * 2015-03-20 2015-06-24 济南轨道交通集团有限公司 Recoverable device for fixing anchor rod with steel pipe pile and construction method
CN106337418A (en) * 2015-07-10 2017-01-18 华北冶建工程建设有限公司 Supporting structure and supporting method of deep foundation pit in narrow area
CN106759266A (en) * 2017-01-09 2017-05-31 王立明 Combination reinforcement diaphragm wall and its construction method
CN106759266B (en) * 2017-01-09 2019-11-05 王立明 Combine reinforcement diaphragm wall and its construction method
CN106759322A (en) * 2017-01-12 2017-05-31 兰州理工大学 Rib Reinforced reinforced anchor bolt lockset and application method
CN106968245A (en) * 2017-05-18 2017-07-21 重庆科技学院 The uplift pile of prestress anchorage cable manually digging hole and its construction method
CN107338792A (en) * 2017-06-16 2017-11-10 中建市政工程有限公司 Prestressed cement mixing pile and construction method thereof
CN109853598A (en) * 2019-03-29 2019-06-07 西安工业大学 A kind of mini pile rigid connection structure and construction method for having both landslide-proofing and producing road
CN109930609A (en) * 2019-04-09 2019-06-25 大连交通大学 A kind of campshed composite supporting construction and its construction method for upper-soft lower-hard ground
CN110130360A (en) * 2019-05-10 2019-08-16 中国建筑西南勘察设计研究院有限公司 A kind of post-tensioned prestressing supporting construction and its construction method
CN114108694A (en) * 2021-11-11 2022-03-01 中冶集团武汉勘察研究院有限公司 Micro-disturbance anti-floating underground cylindrical structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN101851925A (en) Deep mixing pile-micro pre-stressed steel pipe concrete pile-vertical anchor rod composite foundation pit support method
CN202559345U (en) Bottom-expanded pre-stress anti-floating anchor rod
CN203741868U (en) Reinforced concrete retaining wall structure with combined anchor wire
CN101775814B (en) Anti-slip cement soil pile soil blocking structure and construction method thereof
CN103437354A (en) Water drainage anchor rod and construction method
CN201730091U (en) Cast-in-situ pile
CN102535458A (en) Reinforced cement-soil anchor bolt and construction method thereof
CN101694098B (en) Recyclable prestressed tendon for soft oil support and construction method thereof
CN113123373A (en) Pressure-bearing uplift pile with rear-inserted unbonded steel strand U-shaped pipe and construction method thereof
CN110616740A (en) Structure for expanding subway section in subway mine method construction interval and construction method thereof
CN210395412U (en) Prestressed anchor pile uplift foundation suitable for overhead transmission line in mountain area
CN108005097A (en) High gradient slope top of the slope construction/build thing anchor raft foundation construction and construction method
CN107034894A (en) Post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile and preparation method thereof and construction method
CN202187340U (en) Socketed pile with concrete-filled steel tube core column
CN203049577U (en) Complete recovery type non-grouting anchor grasping anchor cable timbering structure
CN103883339B (en) A kind of cable bolting method repeating Shi Hanzhang
CN209211459U (en) Skirt piles are gone along with sb. to guard him in a kind of buried subway station PBA
CN203440818U (en) Drainage anchor rod
CN203867598U (en) Anchor cable capable of applying prestress repeatedly
CN203846399U (en) Combined type rock anchor with buckling anchor system
CN214784243U (en) Back-inserted unbonded steel strand U-shaped pipe pressure-bearing uplift pile
CN101818495A (en) Construction method for retaining and protecting foundation excavation and supporting structure thereof
CN213867907U (en) Prefabricated expanded packing key type digging foundation for power transmission line
CN203049578U (en) Large-diameter soil nail
CN112343074A (en) Spliced prefabricated root key type digging foundation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20101006