CN209211459U - Skirt piles are gone along with sb. to guard him in a kind of buried subway station PBA - Google Patents

Skirt piles are gone along with sb. to guard him in a kind of buried subway station PBA Download PDF

Info

Publication number
CN209211459U
CN209211459U CN201920826054.1U CN201920826054U CN209211459U CN 209211459 U CN209211459 U CN 209211459U CN 201920826054 U CN201920826054 U CN 201920826054U CN 209211459 U CN209211459 U CN 209211459U
Authority
CN
China
Prior art keywords
steel
cushion block
guard
waist rail
lacing wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920826054.1U
Other languages
Chinese (zh)
Inventor
彭明玉
史磊磊
王渭
刘航
戴建伟
姜兆丰
王海涛
刘子瑜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing No 4 Municipal Construction Engineering Co Ltd
Original Assignee
Beijing No 4 Municipal Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing No 4 Municipal Construction Engineering Co Ltd filed Critical Beijing No 4 Municipal Construction Engineering Co Ltd
Priority to CN201920826054.1U priority Critical patent/CN209211459U/en
Application granted granted Critical
Publication of CN209211459U publication Critical patent/CN209211459U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The utility model discloses a kind of buried subway stations PBA to go along with sb. to guard him skirt piles, it includes fender post stake main body, oblique cutting has steel cushion block in the fender post stake main body, and I-steel waist rail is inserted in the steel cushion block, and the end outside the steel cushion block and upwarped is placed on the I-steel waist rail and is pressed with steel plate;Lacing wire is inserted into the I-steel waist rail and steel cushion block, and the lacing wire is identical as the extending direction of the I-steel waist rail and steel cushion block, and one end of the lacing wire is pierced by from the steel plate and is connected afterwards with anchorage.Go along with sb. to guard him skirt piles in the buried subway station PBA provided by the utility model, after its fender post stake main body is put into the hole that construction is completed, steel cushion block, I-steel waist rail, lacing wire are inserted into stake main body, it is connect by lacing wire with rock mass, apply prestressing force by anchorage again, to improve the bonding strength of fender post, construction efficiency is improved for subsequent construction, has saved the construction time.

Description

Skirt piles are gone along with sb. to guard him in a kind of buried subway station PBA
Technical field
The utility model relates to a kind of construction pile foundations, and in particular to skirt piles are gone along with sb. to guard him in a kind of buried subway station PBA.
Background technique
The principle of cavern-pile method (" PBA ", i.e. stake Pile, beam Beam, arch Arc) is exactly by traditional ground frame structure construction Method and subsurface excavation method are organically combined, i.e., when not having construction foundation pit building enclosure condition on the ground, change into underground and shift to an earlier date It is applied in the good pilot tunnel of tunneling and goes along with sb. to guard him skirt piles, center pillar, bottom beam and top beam, crown, collectively form stake, beam, arch brace frame system, The external loads for bearing work progress successively excavate downwards the soil body then under the protection of crown and skirt piles, internal junction of constructing Structure ultimately forms the permanent carrying system being composed of outer layer skirt piles and crown preliminary bracing and two lining cutting of internal layer.
Existing PBA (i.e. Underground Subway Station cavern-pile method) skirt piles construction method are as follows: the setting-out of stake position is first carried out, according to setting-out position It sets and carries out first segment earth excavation, first segment excavation height can be determined according to stake diameter and geological condition, according to design drawing size After the completion of earth excavation, the binding of retaining wall reinforcing bar is carried out, then carries out formwork erection, and pour breast wall concrete;First segment retaining wall coagulation After soil pours, installed artificial digging pile vertical hoisting system (generally using electric block, hoist engine or winch) at hole hole, the Two section earth excavations are until stake bottom earth excavation is completed the artificial digging pile waste that earth excavation is formed by vertical hoisting system Transport, and the binding of retaining wall reinforcing bar and applying of pouring of breast wall concrete are carried out according to design requirement according to the progress of earth excavation Work is until stake bottom;Pore-forming examination is finally carried out, pile body steel reinforcement cage is bound after acceptance(check) and pours pile body concrete.
By above-mentioned construction method skirt piles obtained, structural strength is poor, to influence whether subsequent construction.
Utility model content
The purpose of this utility model is to provide one kind be suitable for the buried subway station PBA, structural strength it is high go along with sb. to guard him side Stake.
To achieve the goals above, the utility model provides the following technical solutions:
A kind of buried subway station PBA go along with sb. to guard him skirt piles comprising fender post stake main body, oblique cutting has in the fender post stake main body Steel cushion block, the central axis of the steel cushion block and the central axis of the fender post stake main body are cross-shaped;The steel cushion block interpolation There is I-steel waist rail, the I-steel waist rail is identical as the extending direction of the steel cushion block, is placed on the I-steel waist rail described Steel cushion block is outer and the end that upwarps is pressed with steel plate;Lacing wire is inserted into the I-steel waist rail and steel cushion block, the lacing wire and institute It is identical with the extending direction of steel cushion block to state I-steel waist rail, and one end of the lacing wire from the steel plate be pierced by after with anchorage phase Connection.
Preferably, the steel cushion block is cylindrical.
Preferably, the outer diameter of the cylindric steel cushion block is less than the outer diameter of the fender post stake main body.
Preferably, the lacing wire is steel strand wires or reinforcing bar.
Preferably, the steel plate with a thickness of 20mm.
Preferably, the anchorage is any one of strand tapered anchorage, supporting type anchorage, cone plug type anchorage.
Skirt piles are gone along with sb. to guard him in the buried subway station PBA provided by the utility model, and fender post stake main body, which is put into, has constructed At hole in after, in stake main body be inserted into steel cushion block, I-steel waist rail, lacing wire, connect by lacing wire with rock mass, then by anchorage Apply prestressing force, to improve the bonding strength of fender post, construction efficiency is improved for subsequent construction, when having saved construction Between.
Detailed description of the invention
In order to illustrate the technical solutions in the embodiments of the present application or in the prior art more clearly, below will be to institute in embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only to record in the utility model Some embodiments be also possible to obtain other drawings based on these drawings for those of ordinary skill in the art.
Fig. 1 is the main view that skirt piles are gone along with sb. to guard him in the buried subway station PBA provided by the embodiment of the utility model;
Fig. 2 is the cross-sectional view that skirt piles are gone along with sb. to guard him in the buried subway station PBA provided by the embodiment of the utility model.
Description of symbols:
1, fender post stake main body;2, steel cushion block;3, I-steel waist rail;4, steel plate;5, lacing wire;6, anchorage.
Specific embodiment
In order to make those skilled in the art more fully understand the technical solution of the utility model, below in conjunction with attached drawing pair The utility model is further detailed.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or the terminal device that include a series of elements not only include those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or end The intrinsic element of end equipment.In the absence of more restrictions, being limited by sentence " including ... " or " including ... " Element, it is not excluded that there is also other elements in process, method, article or the terminal device for including the element.This Outside, herein, " being greater than ", " being less than ", " being more than " etc. are interpreted as not including this number;" more than ", " following ", " within " etc. understand Being includes this number.
As depicted in figs. 1 and 2, skirt piles are gone along with sb. to guard him in a kind of buried subway station PBA comprising fender post stake main body 1, this is gone along with sb. to guard him Oblique cutting has steel cushion block 2 in stake stake main body 1, it is preferable that the steel cushion block 2 is cylindrical.In addition, the cylindric steel cushion block 2 Outer diameter is less than the outer diameter of the fender post stake main body 1.The center of the central axis of the steel cushion block 2 and the fender post stake main body 1 Axis is cross-shaped.It is inserted with I-steel waist rail 3 in the steel cushion block 2, the extension side of the I-steel waist rail 3 and the steel cushion block 2 To identical.Steel tank on the I-steel waist rail 3 extends along the extending direction of the steel cushion block 2.It is set on the I-steel waist rail 3 In the steel cushion block 2, end that is outer and upwarping is pressed with steel plate 4.
Lacing wire 5 is inserted into the I-steel waist rail 3 and steel cushion block 2, the lacing wire 5 and the I-steel waist rail 3 and steel The extending direction of cushion block 2 is identical, and one end of the lacing wire 5 is pierced by from the steel plate 4 and is connected afterwards with anchorage 6.(anchorage is Refer to permanent anchor used in prestressed concrete, to keep the pulling force of presstressed reinforcing steel and passing it in concrete The anchoring tool in portion, also referred to as prestressed anchor.)
After first fender post stake main body 1 is put into the hole that construction is completed, steel cushion block 2, I-steel are inserted into stake main body Then waist rail 3 is inserted into lacing wire 5 along the steel tank of I-steel waist rail 3, steel strand wires or reinforcing bar can be selected in lacing wire 5;Then, in I-shaped The thickness of the end cover upper steel plate 4 that steel waist rail 3 upwarps, the steel plate 4 is preferably 20mm;It is worn from the steel plate 4 end of lacing wire 5 It is connected after out with anchorage 6, is connect by lacing wire 5 with rock mass, then apply prestressing force by anchorage 6, folder can be selected in the anchorage 6 Any one of chip anchorage, supporting type anchorage, cone plug type anchorage.It can weld between steel plate 4 and I-steel waist rail 3.
Skirt piles are gone along with sb. to guard him in the buried subway station PBA provided by the present embodiment, and fender post stake main body 1 is put into construction and is completed Hole in after, in stake main body 1 be inserted into steel cushion block 2, I-steel waist rail 4, lacing wire 5, connect by lacing wire 5 with rock mass, then by Anchorage 6 applies prestressing force, to improve the bonding strength of fender post, improves construction efficiency for subsequent construction, has saved and applied Between working hour.
It is above that certain exemplary embodiments of the utility model are only described by way of explanation, undoubtedly, for Those skilled in the art can be with a variety of different without departing from the spirit and scope of the utility model Mode is modified described embodiment.Therefore, above-mentioned attached drawing and description are regarded as illustrative in nature, and should not be construed as Limitation to the utility model claims protection scope.

Claims (6)

1. skirt piles, including fender post stake main body are gone along with sb. to guard him in a kind of buried subway station PBA, which is characterized in that the fender post stake main body Upper oblique cutting has steel cushion block, and the central axis of the steel cushion block and the central axis of the fender post stake main body are cross-shaped;The steel I-steel waist rail is inserted in cushion block, the I-steel waist rail is identical as the extending direction of the steel cushion block, on the I-steel waist rail It is placed in the end outside the steel cushion block and upwarped and is pressed with steel plate;Lacing wire is inserted into the I-steel waist rail and steel cushion block, described After lacing wire is identical as the extending direction of the I-steel waist rail and steel cushion block, and one end of the lacing wire is pierced by from the steel plate It is connected with anchorage.
2. skirt piles are gone along with sb. to guard him in the buried subway station PBA according to claim 1, which is characterized in that the steel cushion block is in cylinder Shape.
3. skirt piles are gone along with sb. to guard him in the buried subway station PBA according to claim 2, which is characterized in that the cylindric steel cushion block Outer diameter be less than the fender post stake main body outer diameter.
4. skirt piles are gone along with sb. to guard him in the buried subway station PBA according to claim 1, which is characterized in that the lacing wire is steel strand wires Or reinforcing bar.
5. skirt piles are gone along with sb. to guard him in the buried subway station PBA according to claim 1, which is characterized in that the steel plate with a thickness of 20mm。
6. skirt piles are gone along with sb. to guard him in the buried subway station PBA according to claim 1, which is characterized in that the anchorage is clip type Any one of anchorage, supporting type anchorage, cone plug type anchorage.
CN201920826054.1U 2019-06-03 2019-06-03 Skirt piles are gone along with sb. to guard him in a kind of buried subway station PBA Active CN209211459U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920826054.1U CN209211459U (en) 2019-06-03 2019-06-03 Skirt piles are gone along with sb. to guard him in a kind of buried subway station PBA

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920826054.1U CN209211459U (en) 2019-06-03 2019-06-03 Skirt piles are gone along with sb. to guard him in a kind of buried subway station PBA

Publications (1)

Publication Number Publication Date
CN209211459U true CN209211459U (en) 2019-08-06

Family

ID=67468158

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920826054.1U Active CN209211459U (en) 2019-06-03 2019-06-03 Skirt piles are gone along with sb. to guard him in a kind of buried subway station PBA

Country Status (1)

Country Link
CN (1) CN209211459U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110566223A (en) * 2019-09-16 2019-12-13 北京市市政四建设工程有限责任公司 deep-buried PBA subway station section design method
CN111021374A (en) * 2019-12-14 2020-04-17 中冶天工集团有限公司 Prestressed anchor cable repairable tensioning anchor sealing structure and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110566223A (en) * 2019-09-16 2019-12-13 北京市市政四建设工程有限责任公司 deep-buried PBA subway station section design method
CN111021374A (en) * 2019-12-14 2020-04-17 中冶天工集团有限公司 Prestressed anchor cable repairable tensioning anchor sealing structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN103452147B (en) Self-balancing anchor counterweight broken pile forced-landing tilt correcting method
CN106522242B (en) For soft stratum close to underground structure foundation pit supporting system construction method
CN106498950B (en) Anchor head is placed in the implementation method of the Pile-Anchor Supporting for Deep Excavation system of pile body
CN106759376B (en) For closing on the construction method of the Anchored Sheet Pile Wall for Excavation system of existing underground structure
CN105239586B (en) Method for supporting foundation pit by adopting support structure
CN109930609A (en) A kind of campshed composite supporting construction and its construction method for upper-soft lower-hard ground
CN103031839A (en) Construction method of hand-dug piles
CN108385715A (en) A kind of assembled stake arch combination retaining wall and its construction method
CN209211459U (en) Skirt piles are gone along with sb. to guard him in a kind of buried subway station PBA
CN206408630U (en) Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system of pile body
CN103321234B (en) Constructing method of load-bearing structure built on high slope or geological complex area
CN109898521A (en) A kind of anchored pile supporting and construction method for foundation pit external corner
CN111254966A (en) Mountain abutment and pier column foundation structure and construction method thereof
CN106988303A (en) A kind of pile foundation and its construction method
CN108914945A (en) A kind of deep basal pit pile for prestressed pipe, prestress anchorage cable combined supporting construction method
CN102330436A (en) Composite retaining structure and composite retaining method for half geotechnical layer ultradeep round spiral flow tank
CN104863613B (en) Rocky stratum tunneling underground structure flash joist anchor draws just branch structure and construction method
CN113529756A (en) Slope emergency support device and method
CN204780975U (en) A four return circuit terminal steel pipe poles are drawn and are dug compound basis of anchor log for medium voltage electric distribution circuit
CN205576957U (en) Stake end pilework
CN105370306B (en) The massif tunnel excavation construction method of vertical pre-reinforcement processing
CN208328968U (en) A kind of upper stake suitable for large-scale cyclic load is casted anchor novel foundation
CN204199296U (en) Based on the foundation pit supporting construction of old outer wall of basement structure
CN203891047U (en) Equipment equipped with steel platform for foundation construction of land bridge
CN110512667A (en) It is a kind of to handle because water damage leads to the new method of pile foundation settlement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant