CN209211459U - Skirt piles are gone along with sb. to guard him in a kind of buried subway station PBA - Google Patents
Skirt piles are gone along with sb. to guard him in a kind of buried subway station PBA Download PDFInfo
- Publication number
- CN209211459U CN209211459U CN201920826054.1U CN201920826054U CN209211459U CN 209211459 U CN209211459 U CN 209211459U CN 201920826054 U CN201920826054 U CN 201920826054U CN 209211459 U CN209211459 U CN 209211459U
- Authority
- CN
- China
- Prior art keywords
- steel
- cushion block
- guard
- waist rail
- lacing wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229920003190 poly( p-benzamide) Polymers 0.000 title claims abstract description 20
- 229920001485 poly(butyl acrylate) polymer Polymers 0.000 title claims abstract description 20
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 87
- 239000010959 steel Substances 0.000 claims abstract description 87
- 210000001624 Hip Anatomy 0.000 claims abstract description 28
- 230000003014 reinforcing Effects 0.000 claims description 5
- 238000010276 construction Methods 0.000 abstract description 17
- 239000011435 rock Substances 0.000 abstract description 4
- 238000009412 basement excavation Methods 0.000 description 7
- 239000004567 concrete Substances 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 210000000481 Breast Anatomy 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 1
- 238000004873 anchoring Methods 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 239000011513 prestressed concrete Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000005641 tunneling Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Abstract
The utility model discloses a kind of buried subway stations PBA to go along with sb. to guard him skirt piles, it includes fender post stake main body, oblique cutting has steel cushion block in the fender post stake main body, and I-steel waist rail is inserted in the steel cushion block, and the end outside the steel cushion block and upwarped is placed on the I-steel waist rail and is pressed with steel plate;Lacing wire is inserted into the I-steel waist rail and steel cushion block, and the lacing wire is identical as the extending direction of the I-steel waist rail and steel cushion block, and one end of the lacing wire is pierced by from the steel plate and is connected afterwards with anchorage.Go along with sb. to guard him skirt piles in the buried subway station PBA provided by the utility model, after its fender post stake main body is put into the hole that construction is completed, steel cushion block, I-steel waist rail, lacing wire are inserted into stake main body, it is connect by lacing wire with rock mass, apply prestressing force by anchorage again, to improve the bonding strength of fender post, construction efficiency is improved for subsequent construction, has saved the construction time.
Description
Technical field
The utility model relates to a kind of construction pile foundations, and in particular to skirt piles are gone along with sb. to guard him in a kind of buried subway station PBA.
Background technique
The principle of cavern-pile method (" PBA ", i.e. stake Pile, beam Beam, arch Arc) is exactly by traditional ground frame structure construction
Method and subsurface excavation method are organically combined, i.e., when not having construction foundation pit building enclosure condition on the ground, change into underground and shift to an earlier date
It is applied in the good pilot tunnel of tunneling and goes along with sb. to guard him skirt piles, center pillar, bottom beam and top beam, crown, collectively form stake, beam, arch brace frame system,
The external loads for bearing work progress successively excavate downwards the soil body then under the protection of crown and skirt piles, internal junction of constructing
Structure ultimately forms the permanent carrying system being composed of outer layer skirt piles and crown preliminary bracing and two lining cutting of internal layer.
Existing PBA (i.e. Underground Subway Station cavern-pile method) skirt piles construction method are as follows: the setting-out of stake position is first carried out, according to setting-out position
It sets and carries out first segment earth excavation, first segment excavation height can be determined according to stake diameter and geological condition, according to design drawing size
After the completion of earth excavation, the binding of retaining wall reinforcing bar is carried out, then carries out formwork erection, and pour breast wall concrete;First segment retaining wall coagulation
After soil pours, installed artificial digging pile vertical hoisting system (generally using electric block, hoist engine or winch) at hole hole, the
Two section earth excavations are until stake bottom earth excavation is completed the artificial digging pile waste that earth excavation is formed by vertical hoisting system
Transport, and the binding of retaining wall reinforcing bar and applying of pouring of breast wall concrete are carried out according to design requirement according to the progress of earth excavation
Work is until stake bottom;Pore-forming examination is finally carried out, pile body steel reinforcement cage is bound after acceptance(check) and pours pile body concrete.
By above-mentioned construction method skirt piles obtained, structural strength is poor, to influence whether subsequent construction.
Utility model content
The purpose of this utility model is to provide one kind be suitable for the buried subway station PBA, structural strength it is high go along with sb. to guard him side
Stake.
To achieve the goals above, the utility model provides the following technical solutions:
A kind of buried subway station PBA go along with sb. to guard him skirt piles comprising fender post stake main body, oblique cutting has in the fender post stake main body
Steel cushion block, the central axis of the steel cushion block and the central axis of the fender post stake main body are cross-shaped;The steel cushion block interpolation
There is I-steel waist rail, the I-steel waist rail is identical as the extending direction of the steel cushion block, is placed on the I-steel waist rail described
Steel cushion block is outer and the end that upwarps is pressed with steel plate;Lacing wire is inserted into the I-steel waist rail and steel cushion block, the lacing wire and institute
It is identical with the extending direction of steel cushion block to state I-steel waist rail, and one end of the lacing wire from the steel plate be pierced by after with anchorage phase
Connection.
Preferably, the steel cushion block is cylindrical.
Preferably, the outer diameter of the cylindric steel cushion block is less than the outer diameter of the fender post stake main body.
Preferably, the lacing wire is steel strand wires or reinforcing bar.
Preferably, the steel plate with a thickness of 20mm.
Preferably, the anchorage is any one of strand tapered anchorage, supporting type anchorage, cone plug type anchorage.
Skirt piles are gone along with sb. to guard him in the buried subway station PBA provided by the utility model, and fender post stake main body, which is put into, has constructed
At hole in after, in stake main body be inserted into steel cushion block, I-steel waist rail, lacing wire, connect by lacing wire with rock mass, then by anchorage
Apply prestressing force, to improve the bonding strength of fender post, construction efficiency is improved for subsequent construction, when having saved construction
Between.
Detailed description of the invention
In order to illustrate the technical solutions in the embodiments of the present application or in the prior art more clearly, below will be to institute in embodiment
Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only to record in the utility model
Some embodiments be also possible to obtain other drawings based on these drawings for those of ordinary skill in the art.
Fig. 1 is the main view that skirt piles are gone along with sb. to guard him in the buried subway station PBA provided by the embodiment of the utility model;
Fig. 2 is the cross-sectional view that skirt piles are gone along with sb. to guard him in the buried subway station PBA provided by the embodiment of the utility model.
Description of symbols:
1, fender post stake main body;2, steel cushion block;3, I-steel waist rail;4, steel plate;5, lacing wire;6, anchorage.
Specific embodiment
In order to make those skilled in the art more fully understand the technical solution of the utility model, below in conjunction with attached drawing pair
The utility model is further detailed.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or the terminal device that include a series of elements not only include those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or end
The intrinsic element of end equipment.In the absence of more restrictions, being limited by sentence " including ... " or " including ... "
Element, it is not excluded that there is also other elements in process, method, article or the terminal device for including the element.This
Outside, herein, " being greater than ", " being less than ", " being more than " etc. are interpreted as not including this number;" more than ", " following ", " within " etc. understand
Being includes this number.
As depicted in figs. 1 and 2, skirt piles are gone along with sb. to guard him in a kind of buried subway station PBA comprising fender post stake main body 1, this is gone along with sb. to guard him
Oblique cutting has steel cushion block 2 in stake stake main body 1, it is preferable that the steel cushion block 2 is cylindrical.In addition, the cylindric steel cushion block 2
Outer diameter is less than the outer diameter of the fender post stake main body 1.The center of the central axis of the steel cushion block 2 and the fender post stake main body 1
Axis is cross-shaped.It is inserted with I-steel waist rail 3 in the steel cushion block 2, the extension side of the I-steel waist rail 3 and the steel cushion block 2
To identical.Steel tank on the I-steel waist rail 3 extends along the extending direction of the steel cushion block 2.It is set on the I-steel waist rail 3
In the steel cushion block 2, end that is outer and upwarping is pressed with steel plate 4.
Lacing wire 5 is inserted into the I-steel waist rail 3 and steel cushion block 2, the lacing wire 5 and the I-steel waist rail 3 and steel
The extending direction of cushion block 2 is identical, and one end of the lacing wire 5 is pierced by from the steel plate 4 and is connected afterwards with anchorage 6.(anchorage is
Refer to permanent anchor used in prestressed concrete, to keep the pulling force of presstressed reinforcing steel and passing it in concrete
The anchoring tool in portion, also referred to as prestressed anchor.)
After first fender post stake main body 1 is put into the hole that construction is completed, steel cushion block 2, I-steel are inserted into stake main body
Then waist rail 3 is inserted into lacing wire 5 along the steel tank of I-steel waist rail 3, steel strand wires or reinforcing bar can be selected in lacing wire 5;Then, in I-shaped
The thickness of the end cover upper steel plate 4 that steel waist rail 3 upwarps, the steel plate 4 is preferably 20mm;It is worn from the steel plate 4 end of lacing wire 5
It is connected after out with anchorage 6, is connect by lacing wire 5 with rock mass, then apply prestressing force by anchorage 6, folder can be selected in the anchorage 6
Any one of chip anchorage, supporting type anchorage, cone plug type anchorage.It can weld between steel plate 4 and I-steel waist rail 3.
Skirt piles are gone along with sb. to guard him in the buried subway station PBA provided by the present embodiment, and fender post stake main body 1 is put into construction and is completed
Hole in after, in stake main body 1 be inserted into steel cushion block 2, I-steel waist rail 4, lacing wire 5, connect by lacing wire 5 with rock mass, then by
Anchorage 6 applies prestressing force, to improve the bonding strength of fender post, improves construction efficiency for subsequent construction, has saved and applied
Between working hour.
It is above that certain exemplary embodiments of the utility model are only described by way of explanation, undoubtedly, for
Those skilled in the art can be with a variety of different without departing from the spirit and scope of the utility model
Mode is modified described embodiment.Therefore, above-mentioned attached drawing and description are regarded as illustrative in nature, and should not be construed as
Limitation to the utility model claims protection scope.
Claims (6)
1. skirt piles, including fender post stake main body are gone along with sb. to guard him in a kind of buried subway station PBA, which is characterized in that the fender post stake main body
Upper oblique cutting has steel cushion block, and the central axis of the steel cushion block and the central axis of the fender post stake main body are cross-shaped;The steel
I-steel waist rail is inserted in cushion block, the I-steel waist rail is identical as the extending direction of the steel cushion block, on the I-steel waist rail
It is placed in the end outside the steel cushion block and upwarped and is pressed with steel plate;Lacing wire is inserted into the I-steel waist rail and steel cushion block, described
After lacing wire is identical as the extending direction of the I-steel waist rail and steel cushion block, and one end of the lacing wire is pierced by from the steel plate
It is connected with anchorage.
2. skirt piles are gone along with sb. to guard him in the buried subway station PBA according to claim 1, which is characterized in that the steel cushion block is in cylinder
Shape.
3. skirt piles are gone along with sb. to guard him in the buried subway station PBA according to claim 2, which is characterized in that the cylindric steel cushion block
Outer diameter be less than the fender post stake main body outer diameter.
4. skirt piles are gone along with sb. to guard him in the buried subway station PBA according to claim 1, which is characterized in that the lacing wire is steel strand wires
Or reinforcing bar.
5. skirt piles are gone along with sb. to guard him in the buried subway station PBA according to claim 1, which is characterized in that the steel plate with a thickness of
20mm。
6. skirt piles are gone along with sb. to guard him in the buried subway station PBA according to claim 1, which is characterized in that the anchorage is clip type
Any one of anchorage, supporting type anchorage, cone plug type anchorage.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920826054.1U CN209211459U (en) | 2019-06-03 | 2019-06-03 | Skirt piles are gone along with sb. to guard him in a kind of buried subway station PBA |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920826054.1U CN209211459U (en) | 2019-06-03 | 2019-06-03 | Skirt piles are gone along with sb. to guard him in a kind of buried subway station PBA |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209211459U true CN209211459U (en) | 2019-08-06 |
Family
ID=67468158
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920826054.1U Active CN209211459U (en) | 2019-06-03 | 2019-06-03 | Skirt piles are gone along with sb. to guard him in a kind of buried subway station PBA |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209211459U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110566223A (en) * | 2019-09-16 | 2019-12-13 | 北京市市政四建设工程有限责任公司 | deep-buried PBA subway station section design method |
-
2019
- 2019-06-03 CN CN201920826054.1U patent/CN209211459U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110566223A (en) * | 2019-09-16 | 2019-12-13 | 北京市市政四建设工程有限责任公司 | deep-buried PBA subway station section design method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103452147B (en) | Self-balancing anchor counterweight broken pile forced-landing tilt correcting method | |
CN105239586B (en) | Method for supporting foundation pit by adopting support structure | |
CN106498950B (en) | Anchor head is placed in the implementation method of the Pile-Anchor Supporting for Deep Excavation system of pile body | |
CN106522242B (en) | For soft stratum close to underground structure foundation pit supporting system construction method | |
CN106759376B (en) | For closing on the construction method of the Anchored Sheet Pile Wall for Excavation system of existing underground structure | |
CN103031839A (en) | Construction method of hand-dug piles | |
CN206408630U (en) | Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system of pile body | |
CN103590408A (en) | Novel double-row pile beam vertical anchor supporting system and construction method thereof | |
CN109930609A (en) | A kind of campshed composite supporting construction and its construction method for upper-soft lower-hard ground | |
CN111254966A (en) | Mountain abutment and pier column foundation structure and construction method thereof | |
CN109972519A (en) | The construction method of precast hollow pier mounting structure | |
CN113529756A (en) | Slope emergency support device and method | |
CN103321234B (en) | Constructing method of load-bearing structure built on high slope or geological complex area | |
CN106988303A (en) | A kind of pile foundation and its construction method | |
CN209211459U (en) | Skirt piles are gone along with sb. to guard him in a kind of buried subway station PBA | |
CN102330436A (en) | Composite retaining structure and composite retaining method for half geotechnical layer ultradeep round spiral flow tank | |
CN104863613B (en) | Rocky stratum tunneling underground structure flash joist anchor draws just branch structure and construction method | |
CN204199296U (en) | Based on the foundation pit supporting construction of old outer wall of basement structure | |
CN216041225U (en) | Slope emergency support device | |
CN203891047U (en) | Equipment equipped with steel platform for foundation construction of land bridge | |
CN109898521A (en) | A kind of anchored pile supporting and construction method for foundation pit external corner | |
CN108149691A (en) | Face the method for excavation of deep foundation pit of inner city under complicated geological | |
CN108914945A (en) | A kind of deep basal pit pile for prestressed pipe, prestress anchorage cable combined supporting construction method | |
CN108385715A (en) | A kind of assembled stake arch combination retaining wall and its construction method | |
CN214460568U (en) | Bridge steel pipe support foundation on bedding rock face |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |