CN203891047U - Equipment equipped with steel platform for foundation construction of land bridge - Google Patents

Equipment equipped with steel platform for foundation construction of land bridge Download PDF

Info

Publication number
CN203891047U
CN203891047U CN201420178471.7U CN201420178471U CN203891047U CN 203891047 U CN203891047 U CN 203891047U CN 201420178471 U CN201420178471 U CN 201420178471U CN 203891047 U CN203891047 U CN 203891047U
Authority
CN
China
Prior art keywords
steel
steel platform
construction
steel casing
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420178471.7U
Other languages
Chinese (zh)
Inventor
吴明威
郭埝平
华勇
白文虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN201420178471.7U priority Critical patent/CN203891047U/en
Application granted granted Critical
Publication of CN203891047U publication Critical patent/CN203891047U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to equipment equipped with a steel platform for the foundation construction of a land bridge, and belongs to the technical field of bridge construction measures. The equipment comprises a plurality of steel protection cylinders fixed on a precipice of a mountain. Each steel protection cylinder is provided with a lower main beam which is provided with a bailey beam. Each bailey beam is provided with a distribution beam which is provided with a steel platform panel. A construction operating platform is provided through a structural mode of the steel platform.

Description

Set up steel platform and carry out land bridge foundation construction equipment
Technical field
The utility model belongs to bridge construction measure technical field, is specifically related to a kind of steel platform of setting up and carries out land bridge foundation construction equipment.
Background technology
First land bridge needs construction plant to fill out and dig processing before foundation construction, adopts direct excavation, Blasting Excavation, directly backfill more, builds the technique formation construction operation platforms such as retaining wall backfill by laying bricks or stones.In Bridges in Mountainous Areas construction, impact due to orographic condition, geological condition, when pile foundation exposes that earth's surface radical is many, stake top expose highly large, the massif gradient is large, excavation at need, adopt excavation, backfill and build retaining wall technique basis of formation construction operation platform inapplicable.
Utility model content
The purpose of this utility model is exactly the defect for prior art, provides a kind of steel platform of setting up to carry out land bridge foundation construction equipment.When land bridge pile foundation exposes that earth's surface radical is many, stake top expose highly large, the massif gradient is large, excavation difficulty is difficult for adopting digging up and filling in, build retaining wall method carries out construction plant and process this kind of construction technology of appropriate to the occasion employing and carry out foundation construction.
The technical solution adopted in the utility model is: it comprises the some sections steel casings that are fixed on massif precipice, described steel casing is provided with lower floor's girder, described lower floor girder is provided with Bailey beam, and described Bailey beam is provided with distribution beam, and described distribution beam is provided with steel platform panel.
Further preferred structure, described some sections steel casings upper end flushes.
Further preferred structure, is provided with bracket diagonal brace between described steel casing side and lower floor's girder.
The utlity model has the advantages such as technical difficulty is low, security risk is low, processing cost is low, the processing time is short, the difficulty running into from technology, safety, the many-sided work progress solving of economic dispatch.Make the construction plant processing that engineering quantity is large originally, cost is high, technical difficulty is high, security risk is large become simple, easy to operate, the controllable construction of technique, not only guaranteed reliability of structure, also shortened greatly the construction plant processing time, avoided a large amount of embankment operation to the interference of job site water environment and pollution, environmental protection effect is obvious simultaneously.The form of structure of steel platform can be used as again the measure of bridge main body structure construction when construction operation platform is provided, practical, economic effect is obvious.Steel casing method for embedding has effectively solved the problem that is connected and fixed of steel casing and ground, and personnel, equipment, material input amount are little, and economic effect is obvious.
Accompanying drawing explanation
Fig. 1 is the utility model steel platform panel top view;
Fig. 2 be in Fig. 1 A-A to structural representation;
Fig. 3 be in Fig. 1 B-B to structural representation;
Fig. 4 builds mixed earth cushion cap schematic diagram.
In figure, 1-steel casing; 2-bracket diagonal brace; 3-lower floor girder; 4-Bailey beam; 5-distribution beam; 6-steel platform panel; 7-massif above-ground route; 8-steel platform construction district; 9-cushion cap; 10-mixed earth post.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail, is convenient to be well understood to the utility model, but they do not form and limit the utility model.
As shown in Fig. 1-Fig. 4, the utility model comprises the some sections steel casings 1 that are fixed on massif precipice, and described steel casing 1 is provided with lower floor's girder 3, and described lower floor girder 3 is provided with Bei Lei 4 beams, described Bailey beam 4 is provided with distribution beam 5, and described distribution beam 5 is provided with steel platform panel 6.Described some sections steel casings 1 upper end flushes.Between described steel casing 1 side and lower floor's girder 3, be provided with bracket diagonal brace 2.
Construction method of the present utility model: (1), will steel casing be transported to job site after some sections processing in 1 minute; (2), on massif precipice, pile foundation is carried out to setting-out, take stake position is greater than some holes of steel casing diameter as center of circle digging diameter, then lift first sections steel casing, first sections steel casing is embedded in behind a hole, between steel casing outside and stake hole, concreting is fixed first section of steel casing; (3), lift all the other sections steel casings, be embedded in each Kong Zhongzhi upper end and first sections steel casing with high, after having buried underground, between steel casing outside and a hole, concreting is fixed all the other sections steel casings; (4), lower floor's girder 3 is installed on steel casing 1, in steel casing 1 side, bracket diagonal brace 2 is being installed; (5), Bailey beam 4 is installed on lower floor's girder 3; (6), distribution beam 5 is installed in Bailey beam 4, distribution beam 5 comprises transverse distribution beam 5.1 and longitudinal distribution beam 5.2; (7), in distribution beam 5, lay steel platform panel 6 and form steel platform construction district 8; (8), toward building pile foundation concrete in steel casing 1, form mixed earth post 10, steel casing 1 is as the main force structure that exposes pile foundation formwork and formwork supports steel platform panel 6; (9), on steel platform panel 6, build cushion cap 9 concrete, steel platform panel 6 is as cushion cap 9 bed dies, steel casing 1 and pile foundation are as the main force structure that supports cushion cap 9 overhanging portions and steel platform panel 6.
First the utility model is that rock stratum is extremely stablized in the stake hole (steel casing diameter is greater than design stake footpath 20cm) that excavation is greater than steel casing diameter 1m, steel casing has just been embedded in above stable rock stratum like this, then between steel casing outside and stake hole, builds the fixedly concrete of use steel casing is fixed.After steel casing fixedly completes, continue to carry out borehole construction operation in steel casing, between stake hole, press a design stake footpath borehole.After having set up, steel platform construction district starts to carry out pile foundation, bearing platform construction.
The utility model steel platform construction district adopts steel casing as basis, and bracket diagonal brace is installed on steel casing, lays Bailey beam and distribution beam, then in distribution beam, lay steel platform panel on bracket diagonal brace; During pile foundation construction, steel casing is as the main force structure that exposes pile foundation formwork and formwork supports steel platform panel; During bearing platform construction, steel platform panel is as cushion cap bed die, and steel casing and pile foundation are as the main force structure that supports cushion cap overhanging portion and steel platform panel.
The content that this manual is not described in detail belongs to the known prior art of professional and technical personnel in the field.

Claims (3)

1. set up steel platform and carry out land bridge foundation construction equipment for one kind, it is characterized in that: it comprises the some sections steel casings that are fixed on massif precipice, described steel casing is provided with lower floor's girder, described lower floor girder is provided with Bailey beam, described Bailey beam is provided with distribution beam, and described distribution beam is provided with steel platform panel.
2. the steel platform of setting up according to claim 1 carries out land bridge foundation construction equipment, it is characterized in that: described some sections steel casings upper end flushes.
3. the steel platform of setting up according to claim 1 carries out land bridge foundation construction equipment, it is characterized in that: between described steel casing side and lower floor's girder, be provided with bracket diagonal brace.
CN201420178471.7U 2014-04-14 2014-04-14 Equipment equipped with steel platform for foundation construction of land bridge Expired - Fee Related CN203891047U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420178471.7U CN203891047U (en) 2014-04-14 2014-04-14 Equipment equipped with steel platform for foundation construction of land bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420178471.7U CN203891047U (en) 2014-04-14 2014-04-14 Equipment equipped with steel platform for foundation construction of land bridge

Publications (1)

Publication Number Publication Date
CN203891047U true CN203891047U (en) 2014-10-22

Family

ID=51717468

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420178471.7U Expired - Fee Related CN203891047U (en) 2014-04-14 2014-04-14 Equipment equipped with steel platform for foundation construction of land bridge

Country Status (1)

Country Link
CN (1) CN203891047U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103938640A (en) * 2014-04-14 2014-07-23 中交第二航务工程局有限公司 Technology and device for erecting steel platform for land bridge foundation construction
CN104631332A (en) * 2015-01-16 2015-05-20 中国电建集团成都勘测设计研究院有限公司 Prestressed concrete T-shaped beam on-site prefabricating erection construction method
CN114737493A (en) * 2022-05-23 2022-07-12 上海公路桥梁(集团)有限公司 Land construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103938640A (en) * 2014-04-14 2014-07-23 中交第二航务工程局有限公司 Technology and device for erecting steel platform for land bridge foundation construction
CN103938640B (en) * 2014-04-14 2016-02-17 中交第二航务工程局有限公司 Set up steel platform and carry out land bridge foundation construction technique
CN104631332A (en) * 2015-01-16 2015-05-20 中国电建集团成都勘测设计研究院有限公司 Prestressed concrete T-shaped beam on-site prefabricating erection construction method
CN104631332B (en) * 2015-01-16 2016-08-24 中国电建集团成都勘测设计研究院有限公司 PC T beam precast erection construction method
CN114737493A (en) * 2022-05-23 2022-07-12 上海公路桥梁(集团)有限公司 Land construction method

Similar Documents

Publication Publication Date Title
CN106907159B (en) Shallow-buried underground excavation subway station separated open type structure and construction method thereof
CN101614125B (en) Construction method of V-level surrounding rock tunnel
CN104612162B (en) A kind of Deep Foundation Pit of Metro Stations excavation construction method
CN102562075B (en) Large cross-section weak surrounding rock tunnel three-step and six-part short-distance construction method
CN102505695B (en) Construction method for deep foundation pit of three-dimensional garage
CN104389610B (en) A kind of ultrashort step construction method of traversing operation freeway tunnel
CN102146672B (en) Method for constructing pile foundation in karst area
CN102226399A (en) Soft rock four-line large-span tunnel three-bench cable-bracing excavation construction method
CN102606162A (en) Quick construction method for weak surrounding rock shallowly-buried easily-collapsed area of tunnel
CN102678134A (en) Collapse and sink intrusion limit construction method for treating wind accumulated sand loess tunnel through stride shed pipe
CN107965325B (en) A kind of small interval shallow tunnel just branch arch replacement construction method
CN108457656A (en) A kind of unearthed method for tunnel construction
CN106968690A (en) The method for tunnel construction for soil property of caving in
CN103628885A (en) Tunnel exit cover-excavation construction method of Ultra-shadow buried tunnel
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN102505704A (en) Large open caisson construction method in soft geological shaft
CN112502777A (en) Method for treating tunnel inrush roof fall and door closing
CN103321244A (en) Construction method for additionally arranged basement in existing building on sand foundation
CN104632227B (en) Subway station excavation technology of single-layer beam arch structure
CN203334300U (en) Root pile supporting structure
CN110778328A (en) Construction method of entrance section of loess tunnel crossing landslide mass
CN109706945A (en) Come down fracture belt tunnel construction method
CN110735436A (en) cutting rock slope reinforced structure
CN104863613B (en) Rocky stratum tunneling underground structure flash joist anchor draws just branch structure and construction method
CN109610473A (en) A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141022

Termination date: 20210414