CN103883339B - A kind of cable bolting method repeating Shi Hanzhang - Google Patents

A kind of cable bolting method repeating Shi Hanzhang Download PDF

Info

Publication number
CN103883339B
CN103883339B CN201410144433.4A CN201410144433A CN103883339B CN 103883339 B CN103883339 B CN 103883339B CN 201410144433 A CN201410144433 A CN 201410144433A CN 103883339 B CN103883339 B CN 103883339B
Authority
CN
China
Prior art keywords
anchor cable
anchor
sleeve pipe
anchored
shi hanzhang
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410144433.4A
Other languages
Chinese (zh)
Other versions
CN103883339A (en
Inventor
黄翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU WANHE COATING MACHINE Co.,Ltd.
Original Assignee
Quzhou Youde Industrial Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Quzhou Youde Industrial Design Co Ltd filed Critical Quzhou Youde Industrial Design Co Ltd
Priority to CN201410144433.4A priority Critical patent/CN103883339B/en
Priority to CN201610022872.7A priority patent/CN105649663B/en
Priority to CN201610022873.1A priority patent/CN105673054B/en
Priority to CN201610022874.6A priority patent/CN105507929B/en
Priority to CN201610022871.2A priority patent/CN105626109B/en
Publication of CN103883339A publication Critical patent/CN103883339A/en
Application granted granted Critical
Publication of CN103883339B publication Critical patent/CN103883339B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection

Abstract

The invention discloses a kind of cable bolting method repeating Shi Hanzhang, anchor cable comprises anchor cable body, anchored end anchor device, supporting plate, lockset, described anchor cable body is positioned at boring outer end and is provided with supporting plate and lockset successively, it is characterized in that: in anchor cable boring, outer end place is also provided with a T-shaped pressure pipe, supporting plate is pressed against on the wing plate of T-shaped pressure pipe, at anchor cable body, described anchored end anchor device is set by boring the inner, the anchor cable body of a distance, described anchored end anchor device top arranges a sleeve pipe, an annular space is formed between this sleeve pipe and anchor cable body, sleeve pipe is provided with flexible stop grouting plug near one end of described anchored end anchor device, after anchor cable installation, one end sealing that described T-shaped pressure pipe is positioned at boring is resisted against on described sleeve pipe, described anchored end anchor device can provide enough anchored force, repetition Shi Hanzhang is carried out to meet anchor cable.Mainly there is fabrication and installation anchor cable, first slip casting, secondary grouting, repetition Shi Hanzhang step.Cable bolting method of the present invention can have a repeated Shi Hanzhang of the anchored end of sufficient intensity at not disturbance total length slip casting consolidated structure.

Description

A kind of cable bolting method repeating Shi Hanzhang
Technical field
The present invention relates to mine surrounding rock supporting field, particularly a kind of mine laneway repeats the cable bolting method of Shi Hanzhang.
Background technology
Mine surrounding rock supporting is subterranean resource exploitation extremely important, the essential aspect lacked, field, coal mining Frequent Accidents in recent years, the accidents such as landslide, roof fall are continuous, to be that technical measures are not in place cause these accidents, effective technical measures or technical measures are not taked effectively not to perform, and pit mining surrounding rock supporting is enough, the accident that the country rocks such as landslide produce can be avoided.In prior art, reinforce adjoining rock Main Means is bolting and rope support, grouting support, combined support with bolt-net-cable, hydraulic support stand, column supporting, reserved coal pillar or ore pillar, gob side entry retaining etc., Anchor cable-rod supporting is the general supporting means of this area, so those skilled in the art are always continuous in improvement Anchor cable-rod supporting performance, improve supporting effect, arranging prestress anchorage cable bolt support is a major technique direction.
Current China mine enters deep mining, surrounding rock supporting is even more important in recovery process, but at enforcement anchor pole, during cable bolting, for increasing anchor pole, the supporting effect of anchor cable, often one end slip casting of anchor pole rope is fixed on country rock deep, then full-length prestress is applied, but often need first slip casting anchoring anchor cable boom end in prior art during Shi Hanzhang, then first Shi Hanzhang, and then implement total length slip casting, finally carry out outer end mounting plate Shi Hanzhang, like this can repeatedly disturbance surrounding rock supporting, and the injection slurry that solidified and anchor cable bar can be made to produce loosen, destroy slip casting slurry consolidated structure, bolt-grouting support effect structure is unsatisfactory.
Summary of the invention
For solving the technical problem that prior art exists, the object of the invention is to provide a kind ofly has the supporting method of the anchor cable of the repeated Shi Hanzhang of the anchored end of sufficient intensity at not disturbance total length slip casting consolidated structure.
For solving the problems of the technologies described above, the present invention adopts following technical scheme:
Repeat a cable bolting method for Shi Hanzhang, it comprises the steps:
1) fabrication and installation anchor cable: the anchor cable that can repeat Shi Hanzhang comprises anchor cable body, anchored end anchor device, supporting plate, lockset, described anchor cable body is positioned at boring outer end and is provided with supporting plate and lockset successively, in anchor cable boring, outer end place is also provided with a T-shaped pressure pipe, supporting plate is pressed against on the wing plate of T-shaped pressure pipe, at anchor cable body, described anchored end anchor device is set by boring the inner, the anchor cable body of a distance, described anchored end anchor device top arranges a sleeve pipe, an annular space is formed between this sleeve pipe and anchor cable body, sleeve pipe is provided with flexible stop grouting plug near one end of described anchored end anchor device, when anchor cable is finally in installation state, one end sealing that described T-shaped pressure pipe is positioned at boring is resisted against on described sleeve pipe,
2) anchor end of anchorage cable of slip casting anchoring first: in above-mentioned steps 1) after fabrication and installation are good, drive anchored end anchor device in running order, carry out slip casting anchoring by Grouting Pipe to anchor cable body bottom portion, described anchored end anchor device and grout cures one, for anchor cable improves enough anchored force;
3) secondary grouting: after wait anchored end slurries fully solidify, continue to carry out total length slip casting to the annular space between sleeve pipe and drill hole wall, carry out full length fastening;
4) Shi Hanzhang is repeated: after above-mentioned steps is implemented, repeatedly Shi Hanzhang can be repeated period in different supporting by lockset and draw-off gear in the outer end of anchor cable body, can not produce the injecting cement paste applied and destroy and disturbance, prevent supporting from loosening or lost efficacy, effectively safeguarding supporting and protection structure body.
Described anchored end anchor device in step 1) comprises the first fixed block, sliding shoe, the hook wing, the first support bar, first fixed block be fixed on described anchor cable body deeply hole in the inner, sliding shoe is slidably arranged on the anchor cable body body of rod between sleeve pipe and the first fixed block, and the first support bar and the first fixed block, the hook wing and movable block, the first support bar and the hook wing all carry out being articulated and connected in relative rotation.
Described anchored end anchor device in step 1) also comprises the second fixed block and the second support bar, second fixed block is close first fixed block place between the first fixed block and sliding shoe, second support bar one end is hingedly connected on the pin joint of the first support bar and the hook wing, and the other end is hingedly connected on the second fixed block.
Step 2) described in driving anchored end anchor device in running orderly to comprise: by applying jacking force to pressure pipe and/or making its lower end contact with sliding shoe by drawing anchor cable body, the hook wing and the first support bar is driven to open, the crotch of the hook wing is " U " shape to hell direction, when the hook wing is in running order against drill hole wall, slip casting is carried out to the anchored end of anchor cable body, after slurry solidifies, the hook wing and the first support bar will firmly be anchored at boring inner end, provide enough anchored force.
Step 2) described in driving anchored end anchor device in running orderly to comprise: by applying jacking force to pressure pipe and/or making its lower end contact with sliding shoe by drawing anchor cable body, the hook wing, the first support bar and the second support bar is driven to open, the crotch of the hook wing is " U " shape to hell direction, when the hook wing is in running order against drill hole wall, slip casting is carried out to the anchored end of anchor cable body, after slurry solidifies, the hook wing, the first support bar and the second support bar will firmly be anchored at boring inner end, provide enough anchored force.
Described flexible stop grouting plug is flexible sealing rubber, and described sleeve pipe is pvc pipe or aluminum pipe.
Described T-shaped pressure pipe and sleeve pipe abutment end are provided with flanging outside managing, and described flanging is provided with the annular groove docked with sleeve pipe, is provided with sealing ring in groove, and pressure pipe is connected with bobbin seal.
Also be provided with a sealing mat between shown T-shaped pressure pipe and boring country rock wall, make grouting serous fluid to ooze out outside boring in a large number, play plugging action.
The invention has the beneficial effects as follows: one does not carry out disturbance destruction to total length grouting and reinforcing body when being and anchor cable can being made to repeat Shi Hanzhang by sleeve pipe, enable like this solidified slurry fully and the country rock bodily form integrally, integrally bear pressure from surrounding rock; One is that anchor end of anchorage cable adopts the scalable hook wing, both in having facilitated anchor cable deeply to hole, simultaneously when carrying out resin or slip casting anchoring, tightly be anchored at foot of hole, for anchor cable repeatedly Shi Hanzhang enough anchored force are provided, and anchored end structure is simple, contribute to anchor cable installation deeply boring, simultaneously can abundant anchoring anchor cable.The enough strong anchored force that anchored end anchor device provides and anchor cable are implemented to repeat prestressing force and are complemented each other, and do not have enough anchored force, anchored end will be subject to heavy damage, be difficult to effectively form prestress anchorage cable.
Accompanying drawing explanation
Fig. 1: Shi Hanzhang anchor cable structure schematic diagram can be repeated.
Fig. 2: T-shaped pressure pipe structural representation.
Fig. 3: anchored end anchor device modified node method schematic diagram.
Detailed description of the invention
Embodiment 1: shown in Fig. 1-2, anchor cable of the present invention is a kind of prestressing anchor support method that can repeat to apply to need in not disturbance injecting cement paste situation, described anchor cable comprises: anchor cable body 1, anchored end anchor device, sleeve pipe 6, pressure pipe 7, supporting plate 8, lockset 9, stop grouting plug 10, described anchored end anchor device comprises the first fixed block 2, sliding shoe 3, the hook wing 5, first support bar 4, first fixed block 2 is fixed on the inner in the deep boring of anchor cable body 1, sliding shoe 3 is slidably arranged on anchor cable body 1 body of rod between sleeve pipe 6 and the first fixed block 2, sleeve pipe 6 is arranged on a distance, movable block 3 upper end, to have enough sliding extension distances when movable block 3 is in anchor cable is deeply holed, be convenient in anchor cable deeply holes.As shown in Figure 1, the first support bar 4 and the first fixed block 2, the hook wing 5 all carry out relatively turnable being articulated and connected with movable block 3, first support bar 4 and the hook wing 5.Sleeve pipe 6 is provided with stop grouting plug 10 near sliding shoe 3 one end, prevent the slurries when bored grouting from entering in sleeve pipe 6, pressure pipe 7 is pressed against sleeve pipe 6 upper end, by applying jacking force to pressure pipe 7 or making sleeve pipe 6 lower end contact with sliding shoe 3 by primary drawing anchor cable body 1, the hook wing 5 and the first support bar 4 is driven to open, the crotch of the hook wing 5 is " U " shape to hell direction, when the hook wing 5 is against drill hole wall, first slip casting is carried out to the anchored end of anchor cable body 1, after slurry solidifies, the hook wing 5 and the first support bar 4 will firmly be anchored at boring inner end, enough anchored force are provided.
After wait anchored end slurries enough solidify, continue to carry out total length slip casting to the annular space between sleeve pipe 6 and drill hole wall, by sleeve pipe 6, pressure pipe 7 and the tightly anchoring of boring country rock, due to the extension of pressure pipe 7 outside the oriented hole of drill end mouthpiece, according to needing at the extension of pressure pipe 7 and sealing mat 11 to be added between wing plate and wall, make grouting serous fluid to ooze out outside boring in a large number like this, play plugging action, obtain better slip casting effect.
After above-mentioned all slip casting terminates, repeatedly repeat Shi Hanzhang in the outer end of anchor cable body 1 by lockset 8 and draw-off gear, can not produce the injecting cement paste applied like this and destroy and disturbance, effectively safeguard supporting and protection structure body.
Stop grouting plug 10 adopts flexible sealing block, such as, adopt caulking gum, and such anchor cable is when repeating Shi Hanzhang, and stretcher strain amount is unlikely to stop grouting plug 10 to destroy, and it allows anchor cable body 1 to carry out longitudinal stretching.
Sleeve pipe 6 can adopt pvc pipe, aluminum pipe or other lightweight tubing; Pressure pipe 7 is teeprofiles, and pipe thickness is more bigger than sleeve pipe 6, and pressure pipe 7 can arrange flanging with sleeve pipe 6 contact jaw outside managing, and flanging is provided with the annular groove docked with sleeve pipe, is provided with sealing ring in groove, and pressure pipe is connected with bobbin seal.Sealing mat 11 is circular middle through holes with the diameter substantially equal with pressure pipe 7 external diameter.
Embodiment 2: shown in composition graphs 3, improve further the anchored end anchor device in embodiment 1, other parts are identical with embodiment 1.Described anchored end anchor device is except comprising the first fixed block 2, sliding shoe 3, the hook wing 5, first support bar 4, also comprise the second fixed block 13 and the second support bar 12, second support bar 12 one end is hingedly connected to the first support bar 4 with on the pin joint of the hook wing 5, and the other end is hingedly connected on the second fixed block 13.By adding the second support bar 12 and the second fixed block 13, making the hook wing 5 can have enough support forces makes the hook wing 5 against hole wall, meanwhile, when anchored end slip casting anchoring, the second support bar 12, second fixed block 13 also provides stronger with the anchored force combined together that is slurries.

Claims (3)

1. repeat a cable bolting method for Shi Hanzhang, it comprises the steps:
1) fabrication and installation anchor cable: the anchor cable that can repeat Shi Hanzhang comprises anchor cable body (1), anchored end anchor device, supporting plate (8), lockset (9), described anchor cable body (1) is positioned at boring outer end and sets gradually described supporting plate and lockset, in anchor cable boring, outer end place is also provided with a T-shaped pressure pipe (7), supporting plate is pressed against on the wing plate of T-shaped pressure pipe, be positioned at boring the inner at anchor cable body and described anchored end anchor device is set, the anchor cable body of a distance, described anchored end anchor device top arranges a sleeve pipe (6), an annular space is formed between this sleeve pipe and anchor cable body, sleeve pipe is provided with flexible stop grouting plug (10) near one end of described anchored end anchor device, when anchor cable is finally in installation state, one end sealing that described T-shaped pressure pipe is positioned at boring is resisted against on described sleeve pipe,
2) anchor end of anchorage cable described in slip casting anchoring first: in above-mentioned steps 1) after fabrication and installation are good, drive anchored end anchor device in running order, by Grouting Pipe, slip casting anchoring is carried out to anchor cable body bottom portion, described anchored end anchor device and grout cures are integrated, for anchor cable provides enough anchored force;
3) secondary grouting: after wait anchored end slurries fully solidify, continue to carry out total length slip casting to the annular space between sleeve pipe (6) and drill hole wall, carry out full length fastening;
4) Shi Hanzhang is repeated: after above-mentioned steps is implemented, repeatedly Shi Hanzhang can be repeated period in different supporting by lockset (9) and draw-off gear in the outer end of anchor cable body (1), it can not produce the injecting cement paste applied and destroy and disturbance, prevent supporting from loosening or lost efficacy, effectively safeguarding supporting and protection structure body.
2. the cable bolting method repeating Shi Hanzhang as claimed in claim 1, it is characterized in that: described flexible stop grouting plug is flexible sealing rubber, described sleeve pipe is pvc pipe or aluminum pipe.
3. one kind is repeated the cable bolting method of Shi Hanzhang as claimed in claim 1, it is characterized in that: described T-shaped pressure pipe and sleeve pipe abutment end are provided with flanging outside managing, described flanging is provided with the annular groove docked with sleeve pipe, is provided with sealing ring in groove, and T-shaped pressure pipe is connected with bobbin seal.
CN201410144433.4A 2014-04-11 2014-04-11 A kind of cable bolting method repeating Shi Hanzhang Active CN103883339B (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
CN201410144433.4A CN103883339B (en) 2014-04-11 2014-04-11 A kind of cable bolting method repeating Shi Hanzhang
CN201610022872.7A CN105649663B (en) 2014-04-11 2014-04-11 One kind, which has, to be repeated to apply prestressed cable bolting method
CN201610022873.1A CN105673054B (en) 2014-04-11 2014-04-11 A kind of repetition applies the method for protecting support of prestressed anchor cable
CN201610022874.6A CN105507929B (en) 2014-04-11 2014-04-11 A kind of method that repetition applies prestressed cable bolting
CN201610022871.2A CN105626109B (en) 2014-04-11 2014-04-11 It is a kind of that there is the method for repeating to apply prestressed cable bolting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410144433.4A CN103883339B (en) 2014-04-11 2014-04-11 A kind of cable bolting method repeating Shi Hanzhang

Related Child Applications (4)

Application Number Title Priority Date Filing Date
CN201610022871.2A Division CN105626109B (en) 2014-04-11 2014-04-11 It is a kind of that there is the method for repeating to apply prestressed cable bolting
CN201610022873.1A Division CN105673054B (en) 2014-04-11 2014-04-11 A kind of repetition applies the method for protecting support of prestressed anchor cable
CN201610022872.7A Division CN105649663B (en) 2014-04-11 2014-04-11 One kind, which has, to be repeated to apply prestressed cable bolting method
CN201610022874.6A Division CN105507929B (en) 2014-04-11 2014-04-11 A kind of method that repetition applies prestressed cable bolting

Publications (2)

Publication Number Publication Date
CN103883339A CN103883339A (en) 2014-06-25
CN103883339B true CN103883339B (en) 2016-03-23

Family

ID=50952433

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201610022874.6A Active CN105507929B (en) 2014-04-11 2014-04-11 A kind of method that repetition applies prestressed cable bolting
CN201410144433.4A Active CN103883339B (en) 2014-04-11 2014-04-11 A kind of cable bolting method repeating Shi Hanzhang
CN201610022871.2A Active CN105626109B (en) 2014-04-11 2014-04-11 It is a kind of that there is the method for repeating to apply prestressed cable bolting

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201610022874.6A Active CN105507929B (en) 2014-04-11 2014-04-11 A kind of method that repetition applies prestressed cable bolting

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201610022871.2A Active CN105626109B (en) 2014-04-11 2014-04-11 It is a kind of that there is the method for repeating to apply prestressed cable bolting

Country Status (1)

Country Link
CN (3) CN105507929B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638625B (en) * 2016-11-02 2018-08-17 中国十七冶集团有限公司 After a kind of failure of prestressd anchor cable can tensioning again construction method
CN108756973B (en) * 2018-08-08 2023-09-08 中国矿业大学(北京) Split full-length anchoring flexible grouting anchor rod and grouting anchoring method
CN109235455A (en) * 2018-10-31 2019-01-18 中国三冶集团有限公司 A kind of double anchors expansion self-locking devices of soil anchor

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003042501A1 (en) * 2001-11-15 2003-05-22 Grinaker-Lta Limited Rock bolt
CN1487149A (en) * 2003-08-12 2004-04-07 葛修润 High-grade prestressed bolt cable of compact rope for geotechnical engineering
CN1884716A (en) * 2006-06-05 2006-12-27 吴德兴 Prestress anchor device
CN101503962A (en) * 2009-03-06 2009-08-12 山东科技大学 Novel anchor rod with cap anchorage and total length radial anchorage
KR100919277B1 (en) * 2008-11-11 2009-09-30 박시우 Fixing means using the nail anchor and method thereof
CN201539270U (en) * 2009-08-20 2010-08-04 陕西省公路勘察设计院 Novel prestressed supporting device
CN101871353A (en) * 2010-06-22 2010-10-27 宋彦波 Method for soft rock roadway grouting and full-length prestress baseboard anchor cable comprehensive support
CN102022129A (en) * 2010-10-15 2011-04-20 山西潞安环保能源开发股份有限公司五阳煤矿 Anchorage length limit device for grouting anchor cable
CN202596756U (en) * 2012-01-01 2012-12-12 谢理想 Shell-expanding high-strength grouting bolt

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TR199700018A2 (en) * 1996-01-31 1997-08-21 Hoffmann La Roche Process for the production of alpha, beta-unsaturated organic carboxylic acids.
CN2451634Y (en) * 2000-08-09 2001-10-03 合肥工业大学 Expansion anchor
CN1162589C (en) * 2002-12-12 2004-08-18 上海交通大学 Ship anchor type anchor head of ground anchor in grouting stretch model
CN103382847B (en) * 2013-07-26 2015-08-19 中国矿业大学 A kind of prestressing force bores anchor note anchor cable and supporting method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003042501A1 (en) * 2001-11-15 2003-05-22 Grinaker-Lta Limited Rock bolt
CN1487149A (en) * 2003-08-12 2004-04-07 葛修润 High-grade prestressed bolt cable of compact rope for geotechnical engineering
CN1884716A (en) * 2006-06-05 2006-12-27 吴德兴 Prestress anchor device
KR100919277B1 (en) * 2008-11-11 2009-09-30 박시우 Fixing means using the nail anchor and method thereof
CN101503962A (en) * 2009-03-06 2009-08-12 山东科技大学 Novel anchor rod with cap anchorage and total length radial anchorage
CN201539270U (en) * 2009-08-20 2010-08-04 陕西省公路勘察设计院 Novel prestressed supporting device
CN101871353A (en) * 2010-06-22 2010-10-27 宋彦波 Method for soft rock roadway grouting and full-length prestress baseboard anchor cable comprehensive support
CN102022129A (en) * 2010-10-15 2011-04-20 山西潞安环保能源开发股份有限公司五阳煤矿 Anchorage length limit device for grouting anchor cable
CN202596756U (en) * 2012-01-01 2012-12-12 谢理想 Shell-expanding high-strength grouting bolt

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
预应力锚索支护体系在地铁明挖深基坑施工中的应用;侯永寿;《民营科技》;20140131;第190、198页 *

Also Published As

Publication number Publication date
CN105626109B (en) 2017-09-15
CN105626109A (en) 2016-06-01
CN105507929A (en) 2016-04-20
CN105507929B (en) 2017-09-01
CN103883339A (en) 2014-06-25

Similar Documents

Publication Publication Date Title
CN103088819B (en) Construction prestressed cable method
CN203080518U (en) Self-drilling type recoverable anchor wire
CN102418536A (en) Large-aperture pretension base plate hollow grouting device
CN101851925A (en) Deep mixing pile-micro pre-stressed steel pipe concrete pile-vertical anchor rod composite foundation pit support method
CN109441512B (en) Reinforced concrete through anchor cable and construction method thereof
CN103758549B (en) Anchor prestressing force full-length anchorage support method after a kind of first filling based on ointment material
CN103883339B (en) A kind of cable bolting method repeating Shi Hanzhang
CN103590845B (en) A kind of Impact-resistant interval grouting cable anchor and using method thereof
CN103572701A (en) Buckling anchor system combined rock anchor
CN103161484B (en) A kind of lotion fixed length anchoring support method
CN205858371U (en) A kind of colliery big cross section digging laneway combined support structure
CN203867598U (en) Anchor cable capable of applying prestress repeatedly
CN203584447U (en) Anti-impact interval grouting anchor cable
CN206581960U (en) The solid anchoring integral hydraulic expansion anchor pole of mining slip casting
CN103147777B (en) Pumping paste prestress full bolting anchor rod/cable supporting method
CN104264671A (en) Recyclable anchor rod
CN102776881B (en) Recyclable post-tensioned prestressing anchor cable pile and construction method thereof
CN205171547U (en) Recoverable miniature stock wall
CN104532860B (en) Recoverable soil nail
CN203049577U (en) Complete recovery type non-grouting anchor grasping anchor cable timbering structure
CN103883341B (en) One can repeat to apply prestressed anchor cable
CN102748048A (en) Hole wall grouting anchor cable
CN105649663B (en) One kind, which has, to be repeated to apply prestressed cable bolting method
CN202989919U (en) Pressure-bearing water-sand-layer anchor rod mounting structure
CN105673054B (en) A kind of repetition applies the method for protecting support of prestressed anchor cable

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Huang Xiang

Inventor before: Shi Xinyong

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201229

Address after: 224005 building 1-2 (7), 266 Xinye Road, Yancheng City, Jiangsu Province

Patentee after: JIANGSU WANHE COATING MACHINE Co.,Ltd.

Address before: No. 159, Daijia village, Xinxin street, Kecheng District, Quzhou green industry cluster district, Quzhou City, Zhejiang Province

Patentee before: QUZHOU YOUDE INDUSTRIAL DESIGN Co.,Ltd.

TR01 Transfer of patent right