CN103498574B - After in masonry panel, increase stem stem Shockproof reinforcing method - Google Patents

After in masonry panel, increase stem stem Shockproof reinforcing method Download PDF

Info

Publication number
CN103498574B
CN103498574B CN201310477069.9A CN201310477069A CN103498574B CN 103498574 B CN103498574 B CN 103498574B CN 201310477069 A CN201310477069 A CN 201310477069A CN 103498574 B CN103498574 B CN 103498574B
Authority
CN
China
Prior art keywords
stem
boring
wall
reinforcing bar
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310477069.9A
Other languages
Chinese (zh)
Other versions
CN103498574A (en
Inventor
董有
甄进平
谢建明
王建红
吴保光
郑方昊遐
李薇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Zhong Ma Construction Engineering Co., Ltd.
Original Assignee
BEIJING AEIDO INTERNATIONAL ENGINEERING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING AEIDO INTERNATIONAL ENGINEERING TECHNOLOGY Co Ltd filed Critical BEIJING AEIDO INTERNATIONAL ENGINEERING TECHNOLOGY Co Ltd
Priority to CN201310477069.9A priority Critical patent/CN103498574B/en
Publication of CN103498574A publication Critical patent/CN103498574A/en
Application granted granted Critical
Publication of CN103498574B publication Critical patent/CN103498574B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

After the present invention relates in a kind of masonry panel, increase stem stem Shockproof reinforcing method, comprise in body of wall and vertically in boring, hole, wear slip casting formation stem stem in reinforcing bar, hole, belong to seismic hardening technical field. It is characterized in that: set up rig on existing building roof and proposing constructional column position by super dark vertical boring in body of wall, then in hole, wear reinforcing bar, then in hole, the stem stem constraining member of polymer injection mortar formation like configurations post strengthens existing building wall ductility technology. When earthquake, will retrain wall body slit and carry out, strengthen body of wall globality. Reduce the destruction that seismic force causes superstructure. The present invention do not register one's residence realize the larger raising of Seismic Behavior of Masonry and, construction is simple, cost is low, has wide range of applications, and is applicable to solid brick wall, solid building-block, empty bucket brick wall, rectangular slab of stone masonry wall.

Description

After in masonry panel, increase stem stem Shockproof reinforcing method
Technical field
The present invention relates to one is used in and in existing building masonry panel, puts reinforcing bar slip casting by vertical boring and form rear increasing like configurations postStem stem constraining member strengthen wall ductility technology, increase stem stem Shockproof reinforcing method after being called for short in masonry panel, belong to seismic hardeningTechnical field.
Background technology
At present, Chinese existing house, the seismic hardening of agriculture residence start to start, existing house and 2000 before the eighties in last centuryThe a large amount of masonry structures of agriculture residence are in the past built without ring beam and construction column, have a strong impact on the required ductile performance of its masonry panel antidetonation, outerAdd constructional column and have following problem: difficulty of construction is large, concrete material loading difficulty, shuttering supporting difficulty, effectively strengthening construction outputRate is low---and pillar structure expense is well below external scaffolding expense, and building peripheral operation construction is dangerous large; Existing balcony exterior windowNeed tear down and reconstruct; Large on impacts such as existing building exterior tubing, guardrail, air-conditionings; Affect the outer facade effect of original building; Constructional column is difficult toVertical until top; Additional constructional column cannot be enhanced for inner side wall ductility, improves entirety for wider, long buildingDuctility DeGrain.
Summary of the invention
In order to address the above problem, the present invention proposes the rear stem stem Shockproof reinforcing method that increases in a kind of masonry panel. It is without destructionAppearance and interior decoration, all external procedure forms new antidetonation rod member, strengthens existing building wall ductility, can significantly improveWith the anti-seismic performance that solves existing building.
Technical scheme of the present invention is as follows:
After in a kind of masonry panel, increase stem stem Shockproof reinforcing method, comprise the former masonry panel of existing building, in former masonry panel, establishAfter being equipped with vertical body of wall, increase stem stem, after described body of wall, increase stem stem and comprise that being arranged on the elongated of the vertical middle position of former masonry panel erectsTo the polymer mortar of perfusion in the reinforcing bar that wears in boring, boring or steel strand wires and boring, adopt following steps to reinforce:
Step 1: according to increasing aperture and the hole spacing of stem stem after construction drawing design body of wall, and select rig, showField is made an on-the-spot survey, and unwrapping wire location, sets up scaffold, and erection construction platform sets up rig boring on existing building roof; BoreHole should vertically penetrate former masonry panel, floor and the basis of existing building until the soil of foundation bottom;
Step 2: hole complete hole is cleaned out and penetrated reinforcing bar or steel strand wires;
Step 3: frame in boring is vertical placed in the middle by reinforcing bar or steel strand wires;
Step 4: end closure in boring, adopts grouting equipment and adopt High-Pressure Grouting Method injection of polymer mortar in boring;
Step 5: construction content is carried out an acceptance inspection.
Further, described bore diameter is 40mm-150mm.
Further, described elongated vertical boring is positioned at former masonry panel width middle position.
Further, described reinforcing bar or steel strand wires are positioned at boring cross section center.
Further, described reinforcing bar adopts overlap joint or is welded to connect form.
Further, described reinforcing bar adopts HRB335 reinforcing bar.
Beneficial effect:
The present invention sets up rig and is intending increasing stem stem position by the vertical boring of long distance in body of wall, so on existing building roofIn metapore, wear reinforcing bar or steel strand wires, then in hole, the stem stem constraining member of polymer injection mortar formation like configurations post strengthens existingConstruction wall ductility technology. When earthquake, will retrain wall body slit and carry out, strengthen body of wall globality. Reduce seismic force to superstructureThe destruction of causing.
The present invention strengthens existing building wall ductility technology, will retrain wall body slit and carry out when earthquake, strengthens body of wall globality, subtractsThe destruction that few seismic force causes superstructure. The present invention does not register one's residence and realizes the larger raising of Seismic Behavior of Masonry and speed of applicationHurry up, construction is simple, and cost is low. Range of application of the present invention is applicable to solid brick wall, porous brick wall, hollow block wall, empty bucket brickWall, rectangular slab of stone masonry wall, rubble wall. The invention process has higher economic benefit and social benefit.
Brief description of the drawings
Fig. 1 is the rear stem stem plane of arrangement figure that increases in masonry panel;
Fig. 2 is the A-A cutaway view of Fig. 1;
Fig. 3 is Fig. 1'sPlace's enlarged drawing;
Fig. 4 is Fig. 1'sPlace's enlarged drawing;
Fig. 5 is Fig. 1'sPlace's enlarged drawing;
Fig. 6 is Fig. 1'sPlace's enlarged drawing;
Fig. 7 is Fig. 1'sPlace's enlarged drawing.
In figure, 1, increase stem stem after body of wall; 2, polymer mortar; 3, reinforcing bar or steel strand wires; 4. former masonry panel; 5, floor;6, basis; 7, soil.
Detailed description of the invention
After in a kind of masonry panel, increase stem stem Shockproof reinforcing method, comprise former masonry panel 4, in former masonry panel 4, be provided withAfter vertical body of wall, increase stem stem 1, after described body of wall, increase stem stem 1 and comprise and be arranged on the elongated of former masonry panel 4 vertical middle positionsIn the reinforcing bar wearing in vertical boring, boring or steel strand wires 3 and boring, the polymer mortar 2 of perfusion, wherein, builds existingBuild roof and set up rig by the vertical boring of the interior long distance of former masonry panel 4, then in hole, wear reinforcing bar or steel strand wires 3,Then in hole, polymer injection mortar 2 forms the rear constraining member that increases stem stem 1 and strengthens former masonry panel 4 ductility technology. Vertical boringHole adopts special equipment, and bore position is placed in the middle on former masonry panel 4 widths, and boring size need be definite according to design,Between 40mm to 150mm. In hole, wear reinforcing bar or steel strand wires 3, if use reinforcing bar to adopt the multiple steel such as colligation overlap joint or weldingMuscle connected mode, length is identical with hole longitudinal length, reinforcing bar or steel strand wires 3 are positioned at boring cross section center. Note polymerization in holeThing mortar 2, polymer mortar 2 adopt high-pressure injection pump inject, need in the hole in full, polymer mortar 2 intensity according to design selectGet, rear increasing stem stem 1 constraining member finally forming has strengthened former masonry panel 4 ductility.
The former masonry panel of existing building 4 internal drilling positions are roughly selected referring to Fig. 1.
Design bore position, aperture and on-the-spot boring are noted destroying original structure precast floor slab 5, referring to Fig. 2.
Reinforcing step is as follows:
Step 1: select rig according to the aperture and the hole spacing that increase stem stem 1 after construction drawing design body of wall, carry out sceneMake an on-the-spot survey, unwrapping wire location, sets up scaffold, and erection construction platform sets up rig boring on existing building roof; BoringShould vertically penetrate the former masonry panel 4, floor 5 of existing building and basis 6 until the soil 7 of foundation bottom, rear increasing stem stem 1Position, hole, aperture and hole spacing all should according to Practical Project situation determine.
Step 2: hole and complete hole is cleaned out and penetrated reinforcing bar or steel strand wires 3, the model of reinforcing bar or steel strand wires 3, as usedReinforcing bar, reinforcing bar model is preferably HRB335.
Step 3: by vertical placed in the middle to reinforcing bar or 3 of steel strand wires.
Step 4: upper end closure, adopts grouting equipment polymer injection mortar 2 in hole, applying high voltage slip casting method.
Step 5: construction content is carried out an acceptance inspection.
Be more than an exemplary embodiment of the present invention, specific embodiment of the invention is not limited to this.

Claims (1)

1. after in masonry panel, increase a stem stem Shockproof reinforcing method, comprise the former masonry panel of existing building (4), at former masonry wallAfter being provided with vertical body of wall in body (4), increase stem stem (1), after described body of wall, increase stem stem (1) and comprise and be arranged on former masonry panel(4) in the reinforcing bar wearing in the elongated vertical boring of vertical middle position, boring or steel strand wires (3) and boring, perfusion is poly-Compound mortar (2), is characterized in that: adopt following steps to reinforce:
Step 1: according to increasing aperture and the hole spacing of stem stem (1) after construction drawing design body of wall, and select rig, enterRow reconnaissance trip, unwrapping wire location, sets up scaffold, and erection construction platform sets up rig boring on existing building roof;Boring should vertically penetrate former masonry panel (4), floor (5) and the basis (6) of existing building until the soil of foundation bottom(7);
Step 2: hole complete hole is cleaned out and penetrated reinforcing bar or steel strand wires (3);
Step 3: frame in boring is vertical placed in the middle by reinforcing bar or steel strand wires (3);
Step 4: end closure in boring, adopts grouting equipment and adopt High-Pressure Grouting Method injection of polymer mortar (2) in boring;
Step 5: construction content is carried out an acceptance inspection;
Wherein, described bore diameter is 40mm-150mm; Described elongated vertical boring is positioned at former masonry panel (4) width sideTo middle position; Described reinforcing bar or steel strand wires (3) are positioned at boring cross section center; Described reinforcing bar adopts overlap joint or is welded to connectForm; Described reinforcing bar adopts HRB335 reinforcing bar.
CN201310477069.9A 2013-10-12 2013-10-12 After in masonry panel, increase stem stem Shockproof reinforcing method Expired - Fee Related CN103498574B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310477069.9A CN103498574B (en) 2013-10-12 2013-10-12 After in masonry panel, increase stem stem Shockproof reinforcing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310477069.9A CN103498574B (en) 2013-10-12 2013-10-12 After in masonry panel, increase stem stem Shockproof reinforcing method

Publications (2)

Publication Number Publication Date
CN103498574A CN103498574A (en) 2014-01-08
CN103498574B true CN103498574B (en) 2016-05-04

Family

ID=49863824

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310477069.9A Expired - Fee Related CN103498574B (en) 2013-10-12 2013-10-12 After in masonry panel, increase stem stem Shockproof reinforcing method

Country Status (1)

Country Link
CN (1) CN103498574B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612397B (en) * 2015-01-19 2017-01-18 昆明理工大学 Rammed earth wall vertical hole opener
CN104912347B (en) * 2015-06-09 2016-10-19 洛阳理工学院 A kind of ancient building post root plates repairerment structure
CN108374565A (en) * 2018-02-01 2018-08-07 三峡大学 One kind being used for building structure local stiffening device
CN111075216A (en) * 2019-12-31 2020-04-28 中震(北京)工程检测股份有限公司 Combined reinforcing masonry structure with steel pull rods penetrating through longitudinal wall and floor and construction method of combined reinforcing masonry structure
CN111075217A (en) * 2019-12-31 2020-04-28 中震(北京)工程检测股份有限公司 Masonry structure reinforced by longitudinal drilling steel-penetrating pull rods and end plates and construction method thereof
CN116290893B (en) * 2023-03-20 2023-08-29 宁波永大建设集团有限公司 Anti-seismic reinforcement method for masonry structure house

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4452028A (en) * 1980-09-19 1984-06-05 Willard S. Norton Structure and method for reinforcing a wall
US4563852A (en) * 1984-12-21 1986-01-14 Irving Achtenberg Method of reinforcing concrete block foundation walls
JPH11324341A (en) * 1998-05-18 1999-11-26 Shimizu Corp Reinforcement structure of masonry building and aseismatic modification method therefor
JP2011006947A (en) * 2009-06-26 2011-01-13 Takenaka Komuten Co Ltd Reinforcing structure of masonry construction wall, masonry construction wall, masonry structure, and method of reinforcing masonry construction wall

Also Published As

Publication number Publication date
CN103498574A (en) 2014-01-08

Similar Documents

Publication Publication Date Title
CN103498574B (en) After in masonry panel, increase stem stem Shockproof reinforcing method
CN104389628B (en) Landslide location tunnel reinforcement device and reinforced construction method
CN110905530B (en) Stability control construction method for water-rich soft rock tunnel penetrating fault fracture zone
CN103758362B (en) After existing masonry building, increase the Shockproof reinforcing method of collar tie beam, constructional column and reinforcing pull rod
CN109024651B (en) Steel pipe concrete mixed pile foundation and construction method
CN103510540B (en) Mortar flag stone retaining wall reinforcement construction method and structure thereof
CN102518453A (en) Quick tunnel-entrance construction method for bias-pressure shallow-buried or single-pressure tilting arenaceous loess tunnels
CN105178979A (en) Supporting structure of tunnel in bias salt cavity environment and construction method of supporting structure
CN103510510A (en) Reinforced long spiral drilling concrete grouting pile and construction method thereof
CN103898916A (en) Mini-pile combined support structure and construction method thereof
CN106368219A (en) Supporting reinforcing structure of deep foundation pit and construction method
CN104018490A (en) Z-shaped rectangular-section anti-skidding pile and construction method thereof
CN103603379A (en) Anti-floating system combining anti-floating cement soil pile and anti-floating anchor rod and construction process of anti-floating system
CN101838957B (en) Integral type T-shaped outer cantilever roads and construction method thereof
CN204662494U (en) Highway retaining wall reinforced structure
CN103498567B (en) Dark collar tie beam Shockproof reinforcing method and ruggedized construction thereof is increased after in masonry panel
CN203613568U (en) Anti-floating cement soil pile and anti-floating anchor rod combined anti-floating system
CN203866852U (en) Anti-floating pile structure composited by deep spiral-spraying cement soil plate and anchor rod
CN203049577U (en) Complete recovery type non-grouting anchor grasping anchor cable timbering structure
CN103758361A (en) Earthquake resistant reinforcing construction method of subsequently added short limb walls and steel pulling rods in existing building
CN103741961A (en) Aseismic strengthening method for adding pin key and hidden beam for prefabricated round hole plate of existing building
CN203603519U (en) Anti-seismic reinforcing structure with core column arranged later in brickwork wall
CN104404891B (en) Stone arch bridge bridge arch slip casing by pressure reinforcement means
CN104018496A (en) Round-section slide-resistant pile with pile body provided with horizontal haunched beam and construction method of round-section slide-resistant pile
CN103572756A (en) Cast-in-place pile sleeve and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Du Lihong

Inventor before: Dong You

Inventor before: Zhen Jinping

Inventor before: Xie Jianming

Inventor before: Wang Jianhong

Inventor before: Wu Baoguang

Inventor before: Dong Youzhen Jinping, Xie Jian Ming Jian Hong Ya Wu Baoguang Zheng Fanghao Li Wei

Inventor before: Li Wei

TR01 Transfer of patent right

Effective date of registration: 20171113

Address after: 102600, room 2, building 2212, center 3, 2 Xinghua street, Daxing District, Beijing

Patentee after: Beijing Yong Bo Science and Technology Ltd.

Address before: 100043, Beijing, Shijingshan District, 166 Fu Shi Road, 2 floor, Chak Yang Building

Patentee before: Beijing Aeido International Engineering Technology Co., Ltd.

TR01 Transfer of patent right
CB03 Change of inventor or designer information

Inventor after: Lin Qincheng

Inventor after: Huang Hailong

Inventor before: Du Lihong

TR01 Transfer of patent right

Effective date of registration: 20171206

Address after: No. 103, 816 North Road, Lianjiang County, Fuzhou, Fujian province (5 floor of the traffic bureau building)

Patentee after: Fujian Zhong Ma Construction Engineering Co., Ltd.

Address before: 102600, room 2, building 2212, center 3, 2 Xinghua street, Daxing District, Beijing

Patentee before: Beijing Yong Bo Science and Technology Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160504

Termination date: 20201012