CN103498574A CN201310477069.9A CN201310477069A CN103498574A CN 103498574 A CN103498574 A CN 103498574A CN 201310477069 A CN201310477069 A CN 201310477069A CN 103498574 A CN103498574 A CN 103498574A
Authority
CN
China
Prior art keywords
boring
panel
reinforcing bar
stem
masonry panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310477069.9A
Other languages
Chinese (zh)
Other versions
CN103498574B (en
Inventor
董有
甄进平
谢建明
王建红
吴保光
郑方昊遐
李薇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Zhong Ma Construction Engineering Co., Ltd.
Original Assignee
BEIJING AEIDO INTERNATIONAL ENGINEERING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING AEIDO INTERNATIONAL ENGINEERING TECHNOLOGY Co Ltd filed Critical BEIJING AEIDO INTERNATIONAL ENGINEERING TECHNOLOGY Co Ltd
Priority to CN201310477069.9A priority Critical patent/CN103498574B/en
Publication of CN103498574A publication Critical patent/CN103498574A/en
Application granted granted Critical
Publication of CN103498574B publication Critical patent/CN103498574B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a method for conducting anti-seismic reinforcement through later-arranged core columns in a masonry panel, and belongs to the technical field of anti-seismic reinforcement. The method comprises the steps of vertically drilling holes in a panel, arranging reinforcing steel bars in the holes in a penetrated mode, and enabling the holes to be filled with thick liquid to form the core columns. The method is the technology that drilling devices are erected on the outer side of an existing building, at the position where the core columns are planned to be built, long-distance horizontal drilling is carried out in a panel, the reinforcing steel bars are arranged in the holes in a penetrated mode, then the holes are filled with polymer mortar to form core column limiting rod pieces similar to construction columns, and therefore ductility of the panel of the existing building is reinforced. When earthquakes occur, and crack developing of the panel is limited, and integrity of the panel is strengthened. Damage of the anti-seismic force to upper structures is reduced. According to the method, the anti-seismic property of a masonry body can be greatly improved without entering a room, construction is simple, and the construction cost is low. The method is wide in application scope and suitable for solid brick walls, solid hollow blocks, cavity brick walls and boulder strip masonry walls.

Description

Increase the stem stem Shockproof reinforcing method after in masonry panel
Technical field
The present invention relates to a kind of being used in the existing building masonry panel and put after reinforcing bar slip casting forms by vertical boring the stem stem constraining member enhancing wall ductility technology that increases the like configurations post, increase the stem stem Shockproof reinforcing method after being called for short in masonry panel, belong to the seismic hardening technical field.
Background technology
At present, the existing house of China, the seismic hardening of agriculture residence start to start, before the eighties in last century, a large amount of masonry structure buildings of existing house and the agriculture residence before 2000 are without ring beam and construction column, have a strong impact on the required ductile performance of its masonry panel antidetonation, there is following problem in additional constructional column: difficulty of construction is large, the concrete material loading is difficult, shuttering supporting is difficult, and effectively the strengthening construction output capacity is low---and the pillar structure expense is well below the external scaffolding expense, and building peripheral operation construction is dangerous large; Existing balcony exterior window need be torn down and reconstructed; Large on impacts such as existing building exterior tubing, guardrail, air-conditionings; Affect the outer facade effect of original building; Constructional column is difficult to vertical until top; Additional constructional column can't be enhanced for inboard wall ductility, for wider, long building, improves whole ductility DeGrain.
Summary of the invention
In order to address the above problem, increase the stem stem Shockproof reinforcing method after the present invention proposes in a kind of masonry panel.It is without destroying appearance and interior decoration, and all external procedure forms new antidetonation rod member, strengthens the existing building wall ductility, can significantly improve and solve the anti-seismic performance of existing building.
Technical scheme of the present invention is as follows:
Increase the stem stem Shockproof reinforcing method after in a kind of masonry panel, comprise the former masonry panel of existing building, increase stem stem be provided with vertical body of wall in former masonry panel after, increase the polymer mortar that stem stem comprises perfusion in the reinforcing bar that wears in the elongated vertical boring that is arranged on the vertical middle position of former masonry panel, boring or steel strand and boring after described body of wall, adopt following steps to be reinforced:
Step 1: according to after construction drawing design body of wall, increasing aperture and the hole spacing of stem stem, and select rig, carry out reconnaissance trip, the unwrapping wire location, set up scaffold, and the erection construction platform sets up rig boring on the existing building roof; Boring should vertically penetrate former masonry panel, floor and the basis of existing building until the soil of foundation bottom;
Step 2: hole complete hole is cleaned out and penetrated reinforcing bar or steel strand;
Step 3: by reinforcing bar or steel strand, frame in boring is vertical placed in the middle;
Step 4: end closure in boring adopts grouting equipment and adopts High-Pressure Grouting Method injection of polymer mortar in boring;
Step 5: the construction content is carried out an acceptance inspection.
Further, described bore diameter is 40mm-150mm.
Further, described elongated vertical boring is positioned at former masonry panel width middle position.
Further, described reinforcing bar or steel strand are positioned at boring cross section center.
Further, described reinforcing bar adopts overlap joint or is welded to connect form.
Further, described reinforcing bar adopts the HRB335 reinforcing bar.
Beneficial effect:
The present invention sets up rig and is intending increasing the stem stem position by the vertical boring of long distance in body of wall on the existing building roof, then wear reinforcing bar or steel strand in hole, then in hole, the stem stem constraining member of polymer injection mortar formation like configurations post strengthens existing building wall ductility technology.To retrain wall body slit during earthquake and carry out, strengthen the body of wall globality.Reduce the destruction that seismic forces causes superstructure.
The present invention strengthens existing building wall ductility technology, will retrain wall body slit during earthquake and carry out, and strengthens the body of wall globality, reduces the destruction that seismic forces causes superstructure.The present invention does not register one's residence and realizes soon to the larger raising of Seismic Behavior of Masonry and speed of application, and construction is simple, and cost is low.Range of application of the present invention is applicable to solid brick wall, porous brick wall, hollow block wall, empty bucket brick wall, rectangular slab of stone masonry wall, rubble masonry.The invention process has higher economic benefit and social benefit.
The accompanying drawing explanation
Fig. 1 increases stem stem plane of arrangement figure after in masonry panel;
The A-A sectional view that Fig. 2 is Fig. 1;
Fig. 3 is Fig. 1's place's enlarged drawing;
Fig. 4 is Fig. 1's
Figure 20131047706991000021
place's enlarged drawing;
Fig. 5 is Fig. 1's
Figure 3
place's enlarged drawing;
Fig. 6 is Fig. 1's
Figure 4
place's enlarged drawing;
Fig. 7 is Fig. 1's
Figure 5
place's enlarged drawing.
In figure, 1, increase stem stem after body of wall; 2, polymer mortar; 3, reinforcing bar or steel strand; 4, former masonry panel; 5, floor; 6, basis; 7, soil.
The specific embodiment
Increase the stem stem Shockproof reinforcing method after in a kind of masonry panel, comprise former masonry panel 4, increase stem stem 1 be provided with vertical body of wall in former masonry panel 4 after, increase stem stem 1 after described body of wall and comprise the elongated vertical boring that is arranged on former masonry panel 4 vertical middle positions, the polymer mortar 2 of perfusion in the reinforcing bar worn in boring or steel strand 3 and boring, wherein, set up rig on the existing building roof by vertically holing in the interior long distance of former masonry panel 4, then wear reinforcing bar or steel strand 3 in hole, then the constraining member that increases stem stem 1 in hole after 2 formation of polymer injection mortar strengthens existing masonry panel 4 ductility technology.Vertical boring adopts special equipment, and bore position is placed in the middle on masonry panel 4 widths, and the boring size need be determined according to design, between 40mm to 150mm.Wear reinforcing bar or steel strand 3 in hole, if use reinforcing bar to adopt the multiple reinforcing bar connected modes such as colligation overlap joint or welding, length is identical with the hole longitudinal length, and reinforcing bar or steel strand 3 are positioned at boring cross section center.Polymer injection mortar 2 in hole, polymer mortar 2 adopts high-pressure injection pumps to inject, and needs fullly in the hole in, and polymer mortar 2 intensity are chosen according to design, increase stem stem 1 constraining member after finally formation and have strengthened masonry panel 4 ductility.
The former masonry panel of existing building 4 internal drilling positions are roughly selected referring to Fig. 1.
Design bore position, aperture and on-the-spot boring are noted destroying original structure precast floor slab 5, referring to Fig. 2.
The reinforcing step is as follows:
Step 1: select rig according to the aperture and the hole spacing that increase stem stem 1 after construction drawing design body of wall, carry out reconnaissance trip, the unwrapping wire location, set up scaffold, and the erection construction platform sets up rig boring on the existing building roof; Boring should vertically penetrate the former masonry panel 4, floor 5 of existing building and basis 6 until the soil 7 of foundation bottom, after increase stem stem 1 Wei, aperture, hole and hole spacing all should determine according to the Practical Project situation.
Step 2: hole and complete hole is cleaned out and penetrated reinforcing bar or steel strand 3, the model of reinforcing bar or steel strand 3, as used reinforcing bar, the reinforcing bar model is preferably HRB335.
Step 3: reinforcing bar or 3 of steel strand is vertical placed in the middle.
Step 4: upper end closure adopts grouting equipment polymer injection mortar 2 in hole, the applying high voltage slip casting method.
Step 5: the construction content is carried out an acceptance inspection.
Be more than an exemplary embodiment of the present invention, specific embodiment of the invention is not limited to this.

Claims (6)

1. after in a masonry panel, increase the stem stem Shockproof reinforcing method, comprise the former masonry panel of existing building (4), increase stem stem (1) be provided with vertical body of wall in former masonry panel (4) after, increase the polymer mortar (2) that stem stem (1) comprises perfusion in the reinforcing bar that wears in the elongated vertical boring that is arranged on the vertical middle position of former masonry panel (4), boring or steel strand (3) and boring after described body of wall, it is characterized in that: adopt following steps to be reinforced:
Step 1: according to after construction drawing design body of wall, increasing aperture and the hole spacing of stem stem (1), and select rig, carry out reconnaissance trip, the unwrapping wire location, set up scaffold, and the erection construction platform sets up rig boring on the existing building roof; Boring should vertically penetrate former masonry panel (4), floor (5) and the basis (6) of existing building until the soil of foundation bottom (7):
Step 2: hole complete hole is cleaned out and penetrated reinforcing bar or steel strand (3);
Step 3: by reinforcing bar or steel strand (3), frame in boring is vertical placed in the middle;
Step 4: end closure in boring adopts grouting equipment and adopts High-Pressure Grouting Method injection of polymer mortar (2) in boring;
Step 5: the construction content is carried out an acceptance inspection.
2. require 1 described method according to power, it is characterized in that: described bore diameter is 40mm-150mm.
3. require 2 described methods according to power, it is characterized in that: described elongated vertical boring is positioned at former masonry panel (4) width middle position.
4. require 3 described methods according to power, it is characterized in that: described reinforcing bar or steel strand (3) are positioned at boring cross section center.
5. require 4 described methods according to power, it is characterized in that: described reinforcing bar adopts overlap joint or is welded to connect form.
6. require 5 described methods according to power, it is characterized in that: described reinforcing bar adopts the HRB335 reinforcing bar.
CN201310477069.9A 2013-10-12 2013-10-12 After in masonry panel, increase stem stem Shockproof reinforcing method Expired - Fee Related CN103498574B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310477069.9A CN103498574B (en) 2013-10-12 2013-10-12 After in masonry panel, increase stem stem Shockproof reinforcing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310477069.9A CN103498574B (en) 2013-10-12 2013-10-12 After in masonry panel, increase stem stem Shockproof reinforcing method

Publications (2)

Publication Number Publication Date
CN103498574A true CN103498574A (en) 2014-01-08
CN103498574B CN103498574B (en) 2016-05-04

Family

ID=49863824

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310477069.9A Expired - Fee Related CN103498574B (en) 2013-10-12 2013-10-12 After in masonry panel, increase stem stem Shockproof reinforcing method

Country Status (1)

Country Link
CN (1) CN103498574B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612397A (en) * 2015-01-19 2015-05-13 昆明理工大学 Rammed earth wall vertical hole opener
CN104912347A (en) * 2015-06-09 2015-09-16 洛阳理工学院 Ancient building post root bezel setting repairing structure
CN108374565A (en) * 2018-02-01 2018-08-07 三峡大学 One kind being used for building structure local stiffening device
CN116290893A (en) * 2023-03-20 2023-06-23 宁波永大建设集团有限公司 Anti-seismic reinforcement method for masonry structure house

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4452028A (en) * 1980-09-19 1984-06-05 Willard S. Norton Structure and method for reinforcing a wall
US4563852A (en) * 1984-12-21 1986-01-14 Irving Achtenberg Method of reinforcing concrete block foundation walls
JPH11324341A (en) * 1998-05-18 1999-11-26 Shimizu Corp Reinforcement structure of masonry building and aseismatic modification method therefor
JP2011006947A (en) * 2009-06-26 2011-01-13 Takenaka Komuten Co Ltd Reinforcing structure of masonry construction wall, masonry construction wall, masonry structure, and method of reinforcing masonry construction wall

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4452028A (en) * 1980-09-19 1984-06-05 Willard S. Norton Structure and method for reinforcing a wall
US4563852A (en) * 1984-12-21 1986-01-14 Irving Achtenberg Method of reinforcing concrete block foundation walls
JPH11324341A (en) * 1998-05-18 1999-11-26 Shimizu Corp Reinforcement structure of masonry building and aseismatic modification method therefor
JP2011006947A (en) * 2009-06-26 2011-01-13 Takenaka Komuten Co Ltd Reinforcing structure of masonry construction wall, masonry construction wall, masonry structure, and method of reinforcing masonry construction wall

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
吴会阁等: "《设芯柱的蒸压加气混凝土砌体承重墙抗震性能试验》", 《北京工业大学学报》 *
路冬莲: "《钢筋工》", 31 January 2004, 中国铁道出版社 *
黄兴棣等: "《《建筑结构加固工程施工质量验收规范》实施指南》", 31 July 2011, 中国建筑工业出版社 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612397A (en) * 2015-01-19 2015-05-13 昆明理工大学 Rammed earth wall vertical hole opener
CN104612397B (en) * 2015-01-19 2017-01-18 昆明理工大学 Rammed earth wall vertical hole opener
CN104912347A (en) * 2015-06-09 2015-09-16 洛阳理工学院 Ancient building post root bezel setting repairing structure
CN108374565A (en) * 2018-02-01 2018-08-07 三峡大学 One kind being used for building structure local stiffening device
CN116290893A (en) * 2023-03-20 2023-06-23 宁波永大建设集团有限公司 Anti-seismic reinforcement method for masonry structure house
CN116290893B (en) * 2023-03-20 2023-08-29 宁波永大建设集团有限公司 Anti-seismic reinforcement method for masonry structure house

Also Published As

Publication number Publication date
CN103498574B (en) 2016-05-04

Similar Documents

Publication Publication Date Title
CN109024651B (en) Steel pipe concrete mixed pile foundation and construction method
CN104499568A (en) Square steel pipe fabricated column-prefabricated superposed beam integrally-fabricated frame and construction method
CN103510540B (en) Mortar flag stone retaining wall reinforcement construction method and structure thereof
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN103352582B (en) The method of inner prestressed reinforcement bolt anchorage Concrete Hollow Block Masonry Structures
CN103758362B (en) After existing masonry building, increase the Shockproof reinforcing method of collar tie beam, constructional column and reinforcing pull rod
CN102094525B (en) Method for constructing reinforced concrete lintel
CN103498574A (en) Method for conducting anti-seismic reinforcement through later-arranged core columns in masonry panel
CN104018490A (en) Z-shaped rectangular-section anti-skidding pile and construction method thereof
CN105714678B (en) A kind of combined type gravity anchorage
CN206467667U (en) Suspended net shotcrete building enclosure between a kind of stake of use expansion type fixation reinforced mesh
CN103498567A (en) Method for conducting anti-seismic reinforcement through later-arranged dark ring beams in masonry panel and reinforcement structure thereof
CN205152983U (en) Stratum pre -reinforcing of underground space construction handles structure
CN105386779B (en) The counterfort method of large underground structure is built in shallow embedding rock stratum
CN102220764B (en) Construction method of deep foundation pit bracing system
CN203613568U (en) Anti-floating cement soil pile and anti-floating anchor rod combined anti-floating system
CN104775544A (en) Energy dissipation type coupled anti-seismic wall with reinforcing bars, grouting holes, building blocks and combined coupling beam and manufacturing method
CN105178355B (en) The stratum pre-reinforcement processing method of underground space construction
CN105201525B (en) A kind of recoverable preventing and treating pucking method
CN203603519U (en) Anti-seismic reinforcing structure with core column arranged later in brickwork wall
CN203394092U (en) Concrete hollow block masonry structure reinforced by adopting internal prestressing force
CN103758361B (en) The seismic hardening construction method of short-limb wall and reinforcing pull rod is increased after existing building
CN206337566U (en) Foundation ditch vertical prestressing anchor pole supporting construction
CN104018496A (en) Round-section slide-resistant pile with pile body provided with horizontal haunched beam and construction method of round-section slide-resistant pile
CN101565931B (en) Cast in-situ piling pile reinforcement bridge pier structure and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Du Lihong

Inventor before: Dong You

Inventor before: Zhen Jinping

Inventor before: Xie Jianming

Inventor before: Wang Jianhong

Inventor before: Wu Baoguang

Inventor before: Dong Youzhen Jinping, Xie Jian Ming Jian Hong Ya Wu Baoguang Zheng Fanghao Li Wei

Inventor before: Li Wei

CB03 Change of inventor or designer information
TR01 Transfer of patent right

Effective date of registration: 20171113

Address after: 102600, room 2, building 2212, center 3, 2 Xinghua street, Daxing District, Beijing

Patentee after: Beijing Yong Bo Science and Technology Ltd.

Address before: 100043, Beijing, Shijingshan District, 166 Fu Shi Road, 2 floor, Chak Yang Building

Patentee before: Beijing Aeido International Engineering Technology Co., Ltd.

TR01 Transfer of patent right
CB03 Change of inventor or designer information

Inventor after: Lin Qincheng

Inventor after: Huang Hailong

Inventor before: Du Lihong

TR01 Transfer of patent right

Effective date of registration: 20171206

Address after: No. 103, 816 North Road, Lianjiang County, Fuzhou, Fujian province (5 floor of the traffic bureau building)

Patentee after: Fujian Zhong Ma Construction Engineering Co., Ltd.

Address before: 102600, room 2, building 2212, center 3, 2 Xinghua street, Daxing District, Beijing

Patentee before: Beijing Yong Bo Science and Technology Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160504

Termination date: 20201012